REQUISITION
FOR
PUMP
CONTENT
1. General.........................................................................................................................................3
2. Equipment to Be Purchased......................................................................................................3
4. References Documents..............................................................................................................4
6. Conflict..........................................................................................................................................4
15. Attachments.................................................................................................................................8
SCATTERED DFE MPP PLANT
REV. 00
NET DEPENDABLE CAPACITY 108 – 132 MW
1. General
This requisition defines the requirements relating to Engineering, Supply, Fabrication / Manufacturing, Inspection
& Testing, Delivery, Supervision for Installation, Site Inspection and Testing, Pre-commissioning, Commissioning,
and Performance Testing of High Speed Diesel Fuel Pumps for Scattered Dual Fuel Mobile Power Plant.
2. Equipment to Be Purchased
The following main equipment shall be furnished in accordance with the requirements specified in this
Requisition and the related documents described in Reference List Documents (Attachment-#2). Equipment to
be purchased shall refer to Attachment-#1 (Scope of Work and Supply). The equipment will be supplied for :
In accordance with Design, Supply of Materials, Fabrication / Manufacturing, Shop Inspection and Test of
the Equipment Purchased, Delivery to Site, Custom Clearance, Installation/Erection, Site Inspection and
Testing, Pre-commissioning, Commissioning, and Performance Testing, Vendor’s Scope shall include, but not
be limited to: all mechanical systems, electrical, instruments, control and safety system, piping, auxiliaries system,
all associated system and other equipment/components necessary for safe operation and ease of operation and
maintenance of the system as specified in this requisition, data sheets, specifications and the detailed Vendor’s
The equipment of Vendor shall assume responsibility for the entire units. The Vendor shall be responsible for
required engineering and coordination of the entire unit to keep consistency and continuity of design of
components, proper installation/erection/assembly and proper site inspection and testing. This includes, but not
limited to coordination for composite drawings, expediting Vendors, coordination for inspection and testing of
sub-ordered equipment, expediting sub-contractor, coordination for installation, site inspection and testing, pre-
Vendor shall guarantee the safe and satisfy operation and performance of the equipment specified on data sheet
and related Document. Vendor shall also warrant all supplied equipment.
4. References Documents
The document as listed on Reference List Document (Attachment-#2) shall also form as part of requirements of
this Requisition. Other documents which are mentioned, but referred to any of the references documents, shall
also form as part of the requirements. Vendor shall notify the purchaser for references documents.
Equipment shall comply with the requirements of the following Codes and Standards and Regulations as listed on
Attachment-#2 – General Specification for Pump. The latest edition and addenda up to the date of the
6. Conflict
In the event of conflict amongst the Contract Documents, the matter in conflict shall be submitted immediately by
Vendor to ADHI KARYA for determination and such a determination by ADHI KARYA will be final.
Clarification Exception and/or Deviation from this Requisition and the documents referred there too, if any, shall
be clearly stated in the following forms and will be approved / commented by ADHI KARYA.
Unless “Clarification, Exception and Deviation List” is submitted with the quotation, Vendor’s proposal shall be
deemed in full compliance with this requisition and other referenced documents.
Any exception and or deviation after contract award proposed by Vendor shall not be accepted and consequently
Note : Beside the Exception & Clarification Forms which has already explained, ADHI KARYA will also provide
Project Requirement Forms, Vendor shall declare their compliance in those Forms.
Vendor shall supply all spare parts, which are needed during construction up to Taking Over Certificate.
SCATTERED DFE MPP PLANT
REV. 00
NET DEPENDABLE CAPACITY 108 – 132 MW
Recommended spare parts shall mean all parts necessary for twelve (12) months operation or up to
A separate list of manufacturer’s recommended for twelve (12) months operation spare parts
(including prices, drawings, serial number, delivery time and other necessary information) shall be
For all material supply by Vendor the spare part shall be available for 20 years.
Vendor shall supply any special tools, standard tools and test equipment required adjusting, dismantling,
testing or maintaining any equipment of the plant. Tools & test equipment recommended by Vendor.
lubricants, chemical injection, etc. during erection, testing, commissioning up to plant acceptance.
The Vendor shall provide, without any additional cost, whatever consumables material are required over &
above those shown on in the list during the execution of the project.
9.2 Training
Vendor shall provide training for the OWNER’s personnel in the operation and maintenance of Pump.
10.1 QA Manual
The Vendor shall establish and operate the quality assurance system, which fully meets and at least
equivalent to the requirement as appropriate to the contracted Scope of Work and Supply.
SCATTERED DFE MPP PLANT
REV. 00
NET DEPENDABLE CAPACITY 108 – 132 MW
Vendor shall submit a detailed Quality Control Plan particularly developed from the Supplier’s Quality
Assurance System, including relevant inspection to the work require fulfilling the contracted
requirement.
ADHI KARYA or its designated representative has right to verify in any time that Vendor’s Quality
10.2 QA Audit
ADHI KARYA has right to audit Vendor or Vendor’s shop when it would be needed without any additional
Vendor shall submit the detail the Vendor’s Standard ITP or Quality Plan for ADHI KARYA and OWNER
approval.
Other than specified witness and spot witness, ADHI KARYA reserves the right to observe each inspection and
test.
In order to minimize the assembly field and erection work, all packaged units, if possible, shall be fully
Vendor shall package all equipment and furnished materials in such a manner to ensure protection
against damage and deterioration during shipment and storage which includes local transportation, air
and ocean freight, and site storage. Procedure and details shall be submitted to the OWNER for review
All surfaces of equipment both interior and exterior, subject to corrosion during sea transportation and
All exposed surfaces shall also be protected from splashed seawater and sea breeze during sea
Suitable support shall be provided for the parts which might damage during shipment and inland
transportation.
Packing and protective measures shall be clearly identified by painting or stenciling and shall be
Shipping weight and volume for each package/crate shall be informed to Purchaser.
Vendor shall propose Quotation with breakdown price for all equipment or item Scope of Work and
Supply.
During the proposal, Vendor shall provide information data but not limited as listed below:
1. Equipment List
3. Loading Data
5. Breakdown Price
Vendor shall be conform performance guarantee and performance test for this project
SCATTERED DFE MPP PLANT
REV. 00
NET DEPENDABLE CAPACITY 108 – 132 MW
Typical battery limit Vendor and ADHI KARYA as per picture below.