Sei sulla pagina 1di 1

A B A B ORIENTACION

UIA
W PLANO DE UBICACIÓN

4.30
N.B.L.+5.20
-2.00
0.08
0.00
4.15
4.15
0.08
0.15 -1.08 0.08
4.30
4.15 0.08 N.P.T.+5.15 Po
rtó
Mal
la

Cu
IDIT
n
Má arto
B.A.P. PVC 101mm B.A.P. PVC 101mm 0.03 B.A.P. PVC 101mm B.A.P. PVC 101mm
Pa
Res
Pe iduo
ID quin de

1 1
Albasillo lig
roso s IT as
0.08 0.15 0.08 ñile s

1 1
ría

0.08 0.08 Po
zo Zo
R TUBO ADS 151MM R Se na d
gu e
rid
N

PEND. 2%

PEND. 2%
ad

PEND. 2%
1.55

1.63
1.50

2.15 2.15 N.P.T. +3.80


Estacionamiento 3
136 cajones
1.50

5.20
5.15
5.30 5.15 2.00

H
BODEGA 2.00 5.15
5.30 5.15 1.00 1.00 5.15 5.30
0.30
ESCALA
GRÁFICA
N.P.T.+0.15
X X´

TUBO ADS 151MM

PEND. 2%
CISTERNA PVC
LOSA
51 mm N.P.T.+4.90 2.00

PEND. 2% PEND. 2% 0 1m 5m 10m


CB

-0.30 2.15 2.15


1.50
1.65 PVC
51 mm
R N.P.T.+0.15
N.P.T. ±0.0 SIMBOLOGIA

S
2 0.08
0.00
0.08
2 2 0.08 0.08 2
TUBO ADS 151MM

0.15 0.30 4.00 0.30


PEND. 2%

0.08 4.15 0.08


0.08 4.15 0.08
4.30
B.A.N.

O
4.30

W´ CONEXIÓN MUNICIPAL

B A

C
A B A B

I
Pendiente 2%

CORTE X, X´
R

PLANTA ARQUITECTÓNICA

M
PLANTA ARQUITECTÓNICA

É
B.A.P.

DETALLE 1
DETALLE 3
D
DETALLE DE REGISTRO Pendiente 2%

Tapa DETALLE 4

A
DETALLE CESPOL DE BOTE ISOMÉTRICO
R

Nivel de Tapa

C
(NT) NOTAS Y ESPECIFICACIONES

60x40cm

A
Tabique rojo ·

·
Relleno de concreto simple Plantilla de concreto simple
·

S
Nivel de arrastre (NA)
COLADERA DE PISO DE UNA BOCA,
Muro de tabique rojo común Asentado
MARCA UREA, DE 180MM. MODELO
con mortero cem-arena 1:5
Acabado final en muros interiores:
pulido fino con cemento

N E 121

DETALLE 2
VIENE DESCARGA
F I PROFESOR

DIBUJANTES
ESTATUS DEL PROYECTO

PARA REVISIONES

A
DE LOTE PLANO

CORTE / ESPECIFICACIONES

AR PENDIENTE 2%
PROYECTO

NOMBRE DE LA MATERIA

P FLUJO DE DRENAJE FLUJO DE DRENAJE


INFORMACION

SAN-01/01

Potrebbero piacerti anche