Sei sulla pagina 1di 3

AGENDA:

Attendees:

TEAM
-Coconut
-Egg
-Banana
-ASR - for graduation clearance
-Plastic Pyrolyzer - for graduation clearance
-Leptospira -
-UWB Radar
-BOMB
-Garbage Classifier
-Harvesting Wood (TEG)

1.ECQ Period
-Until May 15, 2020????
-Alternate Method.
- NCR epicenter

2. The New NORMAL - GCQ (lifting of ECQ)


-MOdified Quarantine until there is a vaccine.
-Limited Movement
-Might occurs until the end of this year.

3. FACULTY CONSULTATIONS (ADVISER)


-Consult Regularly?
-Manuscript Presentation
- Panels:
Armil, Jonrey, ROtation of Faculty
- Engr. Armil is open for consultations.

4. SIMULATIONS BASED OUTPUT


- Advisers and Panels are willing to adjust. Proper coordination with the
students. Initiations from Students.
- They need your revised manusript to be submitted to them. (pdf file) - SEND
ONLINE.

- Reductions of Testing and Validation.


- Reductions of Objectives
- Reductions of Methodology

5. ADJUSTMENTS OF THE ENTIRE SCOPE OF THE STUDY


- REVISED MANUSCRIPT - SEND TO ADVISERS FOR VALIDATION.

6. PANELS AND ADVISER TO REVIEW THE REVISED SCOPE OF


THE STUDY
- REVISED MANUSCRIPT to send online.
7. APPROVAL OF THE PANELS AND ADVISER

8. SCHEDULE OF FINAL DEFENSE


- POSSIBILITY FOR ONLINE SET - UP
- To be announced.

9. ISSUES AND CONCERNS:

- PROBABILITY FOR MASS PROMOTIONS: PENDING c/o NUSG

- INPUTS FROM DIFFERENT SCHOOLS: (IN RELATION TO


THESIS)

- As is in terms requirement. Need to comply by any means.

10. OTHERS (Q AND A)

- Protoype - initial mediums, to provide data.


- Already purchased the resources (Cost)

- If we will be focussing on SImulations Based. What will be the impact to


your group? Is it feasible?

- Coconut: Device needed. SPeech Processing/ Audio Processing/ Signal


Processing. (c/o Sir Armil) - Sir
Emmanuel Malaay.

- Egg: Data Sets, Reference. Simulations?


Standard Data sets.

- Banana: Machine Learning. Revised Manuscript. For Scope and testing.


Consult your adviser.

- Leptospira: data sample. Change of scope, Change of Methodology. Revised


your paper. Mam Maila suggested a revisions. Consult your adviser.
- UWB Radar: Revise manuscript, reduce the methodology.

- BOMB : Engr. Meimban suggests for Simulations Only. Based on meeting.


: Revisions of paper subject for checking for panels.
(Sir Armil)
: In the previous study, mathematical model already exist.
Check for further validations.

- Garbage Classifier: Data sets, Revised Manuscript, Reduced Scope, Reduced


Testing and Methodology.

- TEG: Engr. Meimban suggests for Simulations Only. Just revised your
manuscript.
: MATLAB license until June 30,2020.
: Reduction of Scope and Methodology.
: Try to consult Armil.

INITIAL DATE OF FINAL DEFENSE: JUNE 1-6, 2020.


(ONLINE)

FINAL DATE OF SUBMISSION: JUNE 20, 2020


DEADLINE OF ENCODING OF FINAL GRADES: JUNE 25, 2020

MEETING ADJOURN AT 5:30 PM

** Sir Jerric Consultation


- Schedule c/o Diane
** Sched a meeting w/ sir Herbert
- Update
- Suggestions/Advise

** Panel

Potrebbero piacerti anche