Calculations for No of Bricks &

Finishing work

S.No Description item Nos Length width depth Area Volume


m m m m2 m3
1 Total Area R1,R2 1 7.6 5.4 - 41.04
2 Room-1 R1 1 3 5 -15
3 Room-2 R2 1 4 5 -20
4 Total Wall area Wl 1 6.04
5 Total Volume of wall 3 18.12
6
7 Deduction
8 Door D 2 1 0.2 2.1 -0.84
9 window Wl 2 1.2 0.2 1.2 -0.576
10 door lintel lt 2 1.2 0.2 0.1 -0.048
11 window lintel lt 4 1.4 0.2 0.1 -0.112
12
13 NET VOL WALL 16.544
14
15 AAC BLOCK 0.61 0.21 0.31 0.039711
16
17 NO OF BRICKS 416.61001
18 10% wastage 41.661001

19 Total Bricks REQUIRED 459


20 AMOUNT 9180
Cement Mortar for B.W

1 Vol of bW 16.544
sand req 0.2 per cubic meter 3.3088
cemnt per m3 6 per cubic meter 48
cement in kg 794.112
cement in bags 16

Cement Mortar for Finshing work


Total Area R1,R2 1 7.6 5.4 3 78
Room-1 R1 1 3 5 3 48
Room-2 R2 1 4 5 3 54
Deduction
Door D 4 1 - 2.1 -8.4
window Wl 4 1.2 - 1.2 -5.76

Addition
Door D 2 1 0.2 2.1 2.08
window Wl 2 1.2 0.2 1.2 1.92

Net Area 169.84

Rough coat 6 12 mm
vol plastering 2.03808
sand 1.25 2.5476
cement in bags 12.22848

Rough coat 3 8 mm
vol plastering 1.35872
sand 1.25 1.6984
cement in bags 16.30464

SAND
8
cement bags
45
Height 3 m

7.6
0.2 3 0.2

Remarks
R1
3mx5m
W

AAC
length x witdth x depth x no mm mm mm
600 200 300 D
600 200 100

610 210 310 1.2


0.61 0.21 0.31 0.1 0.1
0.1

Price of on AAC

20

AED

Kg

no of bags
m3

m3

m3

bags
7.6
4 0.2

0.2

R2
4mX5m
W 5
5.4

0.2
D

1.4
0.1 0.1

1.2
Calculations for No of Bricks

S.No Description item Nos Length width depth Area


m m m m2
1 Total Area 1 7.6 11.3 - 85.88
2 Room-1 R1,R2,DR 3 3.5 3.5 -36.75
3 Kitchen &wC K&Wc 2 2 1.7 -6.8
4 open area varanda 1 3.5 3.7 -12.95
5 Hall hl 1 5.1 3.5 -17.85
6 Total Area of wall 11.53

7 bounry wall ext 1 9.8 13.5 132.3

int 1 9.6 13.3 -127.68


8 gate 1 3 0.1 -0.3
9 total boundry wall area 4.32
10
11 total vol of wall 3
12 boundry wall vol 1.7
13 Deductions
14 Doors D1 4 1 0.2 2.1
15 D2 1 1.2 0.2 2.1
16 D3 2 0.9 0.1 2.1
17 Windows w 6 1.2 0.2 1.2
18 Lintels D1 4 1.2 0.2 0.1
19 D2 1 1.4 0.2 0.1
20 D3 2 1.1 0.1 0.1
21 w 12 1.4 0.2 0.1
22 ventilators vr 2 0.7 0.2 0.7
23

24 NET VOLUME OF WALL


25
26 AAC BLOCK 0.61 0.21 0.31
27 Mud brick 0.2 0.1 0.1
28

29 no of AAC

30 no of mud bricks
31
32 with wastage aac

33 mud
34
35 Amount
36
37
38
39
0

Volume Remarks
m3

34.59 vol of plinth area wall


7.344 vol of boundry wall

-1.68
-0.504
-0.378
-1.728
-0.096
-0.028
-0.022
-0.336
-0.196

36.966
0.039711
0.002

930.88
18483
1023.96 20

20331.3
20479.2626728
9.8

7.6

R1

3.5x 3.5

D1 D1

D3
WC
2X1.7
Hall

5.1
D3
T
2X1.7
D2 D1

3.5 x 3.5
D1
0
0.1

R1

3.5 x 3.5

13.5
11.3
x 3.5

Drawing room

3.5 x 3.5
1

0.1

Potrebbero piacerti anche