Finishing work
1 Vol of bW 16.544
sand req 0.2 per cubic meter 3.3088
cemnt per m3 6 per cubic meter 48
cement in kg 794.112
cement in bags 16
Addition
Door D 2 1 0.2 2.1 2.08
window Wl 2 1.2 0.2 1.2 1.92
Rough coat 6 12 mm
vol plastering 2.03808
sand 1.25 2.5476
cement in bags 12.22848
Rough coat 3 8 mm
vol plastering 1.35872
sand 1.25 1.6984
cement in bags 16.30464
SAND
8
cement bags
45
Height 3 m
7.6
0.2 3 0.2
Remarks
R1
3mx5m
W
AAC
length x witdth x depth x no mm mm mm
600 200 300 D
600 200 100
Price of on AAC
20
AED
Kg
no of bags
m3
m3
m3
bags
7.6
4 0.2
0.2
R2
4mX5m
W 5
5.4
0.2
D
1.4
0.1 0.1
1.2
Calculations for No of Bricks
29 no of AAC
30 no of mud bricks
31
32 with wastage aac
33 mud
34
35 Amount
36
37
38
39
0
Volume Remarks
m3
-1.68
-0.504
-0.378
-1.728
-0.096
-0.028
-0.022
-0.336
-0.196
36.966
0.039711
0.002
930.88
18483
1023.96 20
20331.3
20479.2626728
9.8
7.6
R1
3.5x 3.5
D1 D1
D3
WC
2X1.7
Hall
5.1
D3
T
2X1.7
D2 D1
3.5 x 3.5
D1
0
0.1
R1
3.5 x 3.5
13.5
11.3
x 3.5
Drawing room
3.5 x 3.5
1
0.1