Site Test Report For Differential Protection

Customer SEC-SOA Contract # 40631024/00


Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

RELAY DETAILS

RELAY ANSI NO. 87T RELAY FUNCTION TRANS. DIFF

RELAY MAKE SIEMENS NOMINAL CURRENT 1A

TYPE / STYLE 7UT612 AUX SUPPLY VOLTAGE 60-125VDC

S. NO.

1-VISUAL AND MECHANICAL INSPECTION:

O.K
CHECK NAME PLATE DATA ACCORDING TO THE DRAWING
O.K
CHECK FOR TRANSPORTATION DAMAGE AND CORRECT POSITION
O.K
VERIFY TIGHTNEES OF EXTERNAL WIRING

2-ELECTRICAL CHECKS:

O.K
ALL CONNECTIONS CHECK ACCORDING TO WIRING DIAGRAM

O.K
AUX.SUPPLY CHECKED FOR RATING AND POLARITY

O.K
CASING EARTHING CHECK

All 7 programmable LEDs – apply Test LEDs under Test mode (Hardware test). OK

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 1 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

3- TRANSFORMER DATA:

 RATIO: 132/13.8KV
 MVA: 67 MVA
 H.V SIDE VOLTAGE: 132KV
 L.V SIDE VOLTAGE: 13.8KV
 GROUP NO: DYN1
 FREQUNCEY: 60 HZ
 H.V SIDE C.T RATIO: 500/1
 H.V SIDE C.T RATIO: 3000/1
 IMPEDENCE VOLTAGE: 14%
 H.V CALCULATED FULL LOAD CURRENT: 293.0 A = 0.586 A (sec value)
 LV CALCULATED FULL LOAD CURRENT: 2803.0 A = 0.934 (sec value)
*** Full load current= Trans MVA/Root of 3* KV

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 2 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

4. INPUT OPTO-ISOLATORS CHECKS (With Relay Energized):

GO TO TEST MODE (HARDWARE TEST) FOR CHECKING STATUS OF INPUTS

OPTO TEST METHOD RESULT REMARKS


INPUT (Energize only one at a time by soft ware) Display 0
NO. to 1
OPTO 1 ENERGIZE BI 1 (High) OK Spare

OPTO 2 ENERGIZE BI 2 (High) OK Spare

OPTO 3 ENERGIZE BI 3 (High) OK Spare

5. OUTPUT RELAYS CHECKS (With Relay Energized):

RESULT
OUTPUT TEST METHOD Contact
RELAY
(Energize only one at a time by soft ware) Checked REMARKS
No.

CONTACT OPERATED F6-F7


RL1 OK Relay trip
(N/O)
CONTACT OPERATED F8-F9
RL2 OK Spare
(N/O)
CONTACT OPERATED F10-F11
RL3 OK Spare
(N/O)
CONTACT OPERATED F12-F13
RL4 OK Spare
(N/O)

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 3 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

6- PICK UP TEST IDIFF> :

CALCULATED
PH A PH B PH C
I D> KVG
TRIP P.U D.O
TRIP P.U D.O TRIP P.U D.O TRIP P.U D.O
0.1
CT INPUT 0.25 1.0 0.147 0.125 0.103 0.147 0.126 0.104 0.146 0.123 0.102 0.147 0.102
25
1 0.25
(HV Side) 0.5 1.0 0.293 0.249 0.205 0.293 0.250 0.207 0.292 0.248 0.205 0.293
0
0.207
0.49
1.0 1.0 0.586 0.498 0.410 0.586 0.502 0.413 0.586 0.497 0.410 0.586
8
0.411
0.34
0.25 1.73 0.41 0.35 0.287 0.403 0.342 0.285 0.403 0.344 0.286 0.401 0.285
CT INPUT 5
2 0.68
0.5 1.73 0.810 0.688 0.567 0.810 0.689 0.567 0.806 0.684 0.567 0.807
5
0.570
(LV Side)
1.37
1.0 1.73 1.620 1.377 1.134 1.621 1.374 1.138 1.619 1.381 0.139 1.613
7
1.134

Select any Phase in HVS and inject current until pickup led then go up until trip contact operate then go
down again tell the pickup led disappear for delta winding program the O/P contact for each phase you
test every time
 TRIP = IDIFF>* Kvg*In Trans /In CT
 TRIP h.v = IDIFF>*1.0* 293/(500/1)= 0.586*IDFF> A
 TRIP l.v = IDIFF>*1.73* 2803/(3000/1)= 1.62*IDFF> A
 P.U =85% TRIP VALUE
D.O =70% TRIP VALUE

7- TIMING TEST (adress1625):

MEASURED TIME @ 2 Is
SETTING TIME A B C
(S) H.V L.V H.V L.V H.V L.V
0.0 37.8ms 37.9ms 39.9ms 37.2ms 38.3ms 34.3ms

 RELAY INHERENT TIME = 35 ms


Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 4 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

8- PICK UP& TIMING FOR IDFF>> :

I DIFF>> Kvg CAL. Trip Trip value (A) TRIP TIME @ 2 Is (ms)
SETTING (A)
Ph A Ph B Ph C Ph A Ph B Ph C
CT INPUT 1
(HV WINDING) 1.5 In 1.0 0.879 0.879 0.876 0.878 27 27.4 28.4
CT INPUT 2
(LV WINDING) 1.5 In 1.73 2.43 2.418 2.418 2.425 27 27.4 27.6

Change the setting for I DIFF> to be 2 In then make pick up for I DIFF>> or make another contact for
I DIFF>> only

 Pick up = I diff>> * Kvg * In trans/ In CT


 Trip hv = IDIFF>*1.0* 293/(500/1)= 0.586 *IDFF>> A
 Trip l.v = IDIFF>*1.73* 2803/(3000/1)= 1.62*IDFF>> A
 P.U =85% TRIP VALUE
 D.O =70% TRIP Value
 RELAY INHERENT TIME = 25 ms

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 5 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

9- Slop (Bias) Test:

I: slope 1

Operating angle
Slope1 M I1 (source1) I2 (source2) Measured slope
(Either one source)
0.5 0.293 0.81 27.9 0.24
0.25 1 0.586 1.62 27 0.24
1.5 0.879 2.43 27.7 0.23


Slope calculation: Slope = [A2 + B2] 1/2     A = [M - M x cos θ]
                                         
                  2xM       B = M x sin θ      

 I1= Kvg *M* I nsec W1 = 0.586 M where M constant , Kvg = (1.0) Ph-N
 I2= Kvg *M* I nsec W2 = 1.62 M where M constant , Kvg = (1.73) Ph-N
 The calculated slope 1 should be with in +-10% of setting

Inject same phase (L1) to High side & low side by stable current in table with phase shift 180۫ and
increase the angle of HS till Trip then calculate the slop by this angle

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 6 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

II: slope 2 :

Operating angle
Slope2 M I1 (source1) I2 (source2) Measured slope
(Either one source)
1 0.586 1.62 59 0.49
0.50 1.5 0.879 2.43 58 0.48
2 1.172 3.24 51.1 0.34


Slope calculation: Slope = [A2 + B2] 1/2     A = [M - M x cos θ]
                                         
                  2xM       B = M x sin θ      

 I1= Kvg* M* In sec W1 = 0.586 M where M constant , Kvg = (1.0) Ph-N


 I2= Kvg* M* In sec W2 =1.62 M where M constant , Kvg = (1.73) Ph-N
 The calculated slope 2 should be with in +-10% of setting

*** To test slope 2 base point to shifted to origin.

Inject same phase(L1) to High side & low side by stable current in table with phase shift 180۫ and
increase the angle of HS till Trip then calculate the slop by this angle

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 7 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

10- HARMONICS CHECK:

I 2nd HARMONICS :

INJECTED HV LV
SETTING
CURRENT REMARKS
% TRIP BLOCK TRIP BLOCK
(A)
15 1 <16% >16% <16% >16% -

By Freja Remote mode (Edit curve)


Inject 1A Have fundamental + 10 % of 2nd Harmonic and increase the value of harmonic in curve till
Block

II 5TH HARMONICS :

INJECTED HV LV
SETTING
CURRENT REMARKS
% TRIP BLOCK TRIP BLOCK
(A)
30 0.4 <30% >30% <30% >30% -

By Freja Remote mode


Inject 0.4A Have fundamental + 10 % of 5nd Harmonic and increase the value of harmonic in curve till
Block (Injection current must not excised the( limit IDIFF max of n-th harm-Restrain) setting

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 8 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

11-Cross Blocking 2nd Harmonics adress1612:

Procedure:
1. Inject two different phase at same time at one side
2. Phase A>Id with fundamental harmonics
3. Phase B>Id with 2nd harmonics
4. 1 Cycle=60HZ=1/60 =0.01666 sec

Time set in Time set in Time measured


(Cycles) (s) (s)
0.0 - -
125 2.075 126.3
250 4.15
500 8.3
1000 16.6

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 9 of 10
Site Test Report For Differential Protection
Customer SEC-SOA Contract # 40631024/00
Extension of Muhayil
Project Job #
S/S 132/33 KV
Location MUHAYEL Equipment Tag 6T1

Table 6: Correction Factor for 87-Itrip(Wx)

Notes:
1. For this table, 0 is considered even.
2. Use this row if the I0Process setting for the tested winding is I0 – Elimination. The settings
are Address 1106 for Winding 1, Address 1126 for Winding 2, and Address 1146 for Winding 3.
3. Use this row if the I0Process setting for the tested winding is either without or I0 – CORRECTION. The settings
are Address 1106 for Winding 1, Address 1126 for Winding 2, and Address 1146 for Winding 3.In tests 1-3 current
is injected in one phase at any time; therefore, use the rows for 1-phase faults. The
other fault types are given if the user wishes to expand the tests.

Remarks
Test Inst. Used FREJA300

Name: Eng. Mohamed


Witnessed Name: Eng .ALI Al AMRI
Tested By Shokry
Date:
Date: 20/07/09 By
Signature:
Page 10 of 10