1 Team Meeting
2 Installation of Mobile hand set e-mails (Mass 360)
3 Data Collection from Office PC to personal e-mails and personal laptop
4 Data Compilation at personal laptop
5 New Machine for Superfinishing RFQ prepration
6 Prepraed the Contro plan for Upgraded 6*11 Bearing superfinishing

7 Reviewed the PC for CTRB Heat Treatment process for Carburising operation.
Correction made as per the input reieved from Plant

8 New
time
Microne Machine (Centerless Grinder) PC Created, and reviewed for the cycle

9 Control Plan revise for UIC Cone/Cup MPI testting operation


10 Control Plan revise for UIC Cone/Cup UT testting operation
11 Control Plan revise for CTRB bearing for grinding operation as per plant inputs
12 PFMEA revision for CTRB Bearing for incoming inspection
13 Process Minutes verification for upgraded class E
14 PFMEA SME work, difference between 3rd to 4th revision prepared
15 PFMEA SME work, difference between 4th to 5th revision prepared

16 Learning PFMEA VDA 5th Edition

17 Processng conditions for CTRB 6x11 Rollerface grinding updated asper plant input
18 PFMEA SME work
19 Processing conditon for Roller Hardning & Tempering reviewed for HiTemp Furnace
20 LDB PFD for NH1044 & NU1096 reviewed and updated
21 Processing condition prepration for 6x11 cone superfinishing
22 Processing condition review for CTRB heat Treatment (GC Furnace)
23 Processing condition review for CTRB Heat Treatment for UBH Furnece
24 PFMEA updation for the CTRB Bearing
25 Carburising PC Review for CTRB Components

Complete PFMEA to reviewed for CRB’s (Re-establishment) as per 4th Rev. of


26 PFMEA std.

27 CTRB's Job Heat treatment Processing conditions to be review and revision

28 Master List updating for all Control Plans

29 Master List updating for all Processing Conditions

30 Master List updating for all PFD's


31 Abberesive Standard to be prepare for all jobs in Railway

32 Optimised Profile, Grinding processing conditions to be review as per Plant input


33 Grinding Technology

34 Control Plan updation for CRB cone bore grinding

35 JDO Study for Cone Bore Grinding processing conditions creations

36 JDO Study for Cup Bore Grinding processing conditions creations

37 JDO Study for Cup Track Grinding processing conditions creations

38 JDO Study for Cone Track Grinding processing conditions creations

39 JDO Study for Heat Treatment processing conditions creations


40 Study for the overall activities done in Process Eng. Deptt
41 Training on Abbresives by Norton guy
42 Training on Basic Metallurgy by TATA Steel capability development
43 Training on Industry 4.0 by TATA Steel capability development

44 Training on Advance Excel by TATA Steel capability development

45 Training on TQM by TATA Steel capability development


Training on Steel Heat Treatment & Metallurgy by TATA Steel capability
46 development

47 Process Efficiency Improvement , turtle diagram etc

48 Excel Based Mathemetical formulation for the Cone Bore Grinding PC


49 Excel Based Mathemetical formulation for the Cup Track Grinding PC
50 Digitalisation Inputs
m Home Tasks - Railway Bearing Design Group

Assigned Task COMPLETION


Date CATEGORY SCHEDULE COMPLETION CRITERIA Status

Daily basis Departmental Regular Regular


23.03.20 Departmental 23.03.20 Done
23.03.20 Departmental 23.03.20 Done
23.03.20 Departmental 23.03.20 Done
24.03.20 Plant Support 24.03.20 Done
24.03.20 Plant Support 24.03.20 Doc Revision Done

24.03.20 Plant Support 24.03.20 Doc Revision Done

25.03.20 Plant Support 25.03.20 Doc Revision Done


25.03.20 Plant Support 25.03.20 Doc Revision Done
25.03.20 Plant Support 25.03.20 Doc Revision Done
25.03.20 Plant Support 25.03.20 Doc Revision Done
25.03.20 Plant Support 25.03.20 Doc Revision Done
26.03.20 Plant Support 26.03.20 Doc Revision Done
26.03.20 SME 26.03.20 Done
27.03.20 SME 27.03.20 Done

28.03.20 SME TBD In Process

30.03.20 Plant Support 30.03.20 Doc Revision Done


30.03.20 SME 30.03.20 Done
30.03.20 Plant Support 30.03.20 Doc Revision Done
30.03.20 Plant Support 30.03.20 Doc Revision Done
31.03.20 Plant Support 31.03.20 Doc Revision Done
31.03.20 Plant Support 31.03.20 Doc Revision Done
01.04.20 Plant Support 01.04.20 Doc Revision Done
02.04.20 Plant Support 08.04.20 Doc Revision Done
03.04.20 Plant Support 03.04.20 Doc Revision Done

10.04.20
06.04.20 Plant Support 29.04.20 Doc Revision To Start

09.04.20
06.04.20 Plant Support 29.04.20 Doc Revision To Start

06.04.20 Departmental 08.04.20 Database maintain Done

06.04.20 Departmental 08.04.20 Database maintain Done


17.04.20

06.04.20 Departmental 08.04.20 Database maintain Done


06.04.20 Plant Support 07.04.20 database maintain Hold

06.04.20 Plant Support 06.04.20 Doc Revision Done


14.04.20
07.04.20 Learning 22.04.20 Learning Done

09.04.20 Plant Support 14.04.20 Doc Revision Done

20.04.20
11.04.20 Learning 24.04.20 Self Learning Done

20.04.20
11.04.20 Learning Self Learning In Process
30.04.20

11.04.20 Learning 20.04.20 Self Learning To Start


30.04.20
20.04.20
11.04.20 Learning 30.04.20 Self Learning To Start

11.04.20 Learning 20.04.20 Self Learning To Start


30.04.20
11.04.20 Learning 20.04.20 Self Learning Done
14.04.20 Learning 14.04.20 Training Done
15.04.20 Learning 15.04.20 Training Done
16.04.20 Learning 16.04.20 Training Done

20.04.20
17.04.20 Learning Training In Process
26.04.20

17.04.20 Learning 20.04.20 Training Done


17.04.20 Learning 20.04.20 Training Done

20.04.20 Departmental 22.04.20 Departmental Done

24.04.20 Departmental 01.05.20 Departmental To Start


24.04.20 Departmental 01.05.20 Departmental To Start
27.04.20 Departmental 27.04.20 Departmental Done
Week 1 Wee

3/23/2020 3/24/2020 3/25/2020 3/26/2020 3/27/2020 3/28/2020 3/30/2020

Regular Regular Regular Regular Regular Regular Regular


Conpleted - - - - - -
Conpleted - - - - - -
Conpleted - - - - - -
- Conpleted - - - - -
- Conpleted - - - - -

- Conpleted - - - - -

- - Conpleted - - - -
- - Conpleted - - - -
- - Conpleted - - - -
- - Conpleted - - - -
- - In Process In Process Conpleted - -
- - - In Process In Process Conpleted -
- - - Conpleted - - -
- - - - Conpleted - -

In Process In Process In Process


- - - - (2% Complete) (5% Complete) (5% Complete)

- - - - - - Done
- - - - - - In Process
- - - - - - Done
- - - - - - Done
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -

- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
Week 2 Week 3

3/31/2020 4/1/2020 4/2/2020 4/3/2020 4/6/2020 4/7/2020 4/8/2020

Regular Regular Regular Regular Regular Regular Regular


- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
In Process In Process In Process In Process In Process
- - (10% (12% (15% (20% (22%
Complete) Complete) Complete) Complete) Complete)

- - - - - - -
Done - - - - - -
- - - - - - -
- - - - - - -
In Process Done - - - - -
Done - - - - - -
- Done - - - - -
- - In Process In Process - In Process Done
- - - Done - - -

- - - - - - -

- - - - - - -

- - - - - - -

In Process
- - - - - - (10%
Complete)

- - - - - - Done
- - - - - Hold

- - - - In Process Done -
- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -
- - - - - - -
- - - - - - -
Week 3 Week 4

4/9/2020 4/10/2020 4/11/2020 4/13/2020 4/14/2020 4/15/2020 4/16/2020 4/17/2020

Regular Regular Regular Regular Regular Regular Regular Regular


- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
In Process In Process In Process
(25% (30% - (35% - - - -
Complete) Complete) Complete)

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -

Done - - - - - - -
In Process In Process In Process
(30% (75% - - (90% - - Done
Complete) Complete) Complete)

- - - - - - - -

- - - - - - - -
In Process
- - - - (15% Done
Complete)
Done - - - - - - -

In Process In Process
- - - (25% (45% - - -
Complete) Complete)

- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - Done - - - -
- - - - Done - - -
- - - - - Done - -
- - - - - - Done -

- - - - - - - -

- - - - - - - -
- - - - - - - Done

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
Week 5 Week 6

4/20/2020 4/21/2020 4/22/2020 4/23/2020 4/24/2020 4/25/2020 4/27/2020 4/28/2020

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
In Process In Process
(40% (45% - - - -
Complete) Complete)

- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
In Process
- - - - (15% - - -
Complete)
In Process
- - - - (10% - - -
Complete)
- - - - - - - -

- - - - - - - -

- - - - - - - -
- - - - - - - -

In Process In Process
- - (60% (80% Done - - -
Complete) Complete)

In Process
- - - - (40% - - -
Complete)

- - - - - - To Start -

- - - - - - - To Start

- - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
In Process In Process In Process In Process
(10% (50% (80% (90% - - Done -
Complete) Complete) Complete) Complete)
Done - - - - - -
- - - - - - - -

In Process In Process
(20% (80% Done - - - - -
Complete) Complete)
- - - - - - - -
- - - - - - - -
- - - - - - Done -
Week 6

4/29/2020 4/30/2020 5/1/2020

- - -
- - -
- - -
- - -
- - -

- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - -

- - -

- - -

- - -

- - -
- - -

- - -

- - -

- - -

- - -

To Start
- - -
- - -
- - -
- - -

- - -

- - -
- - -

- - -

- - -
- - -
- - -