CLIENT

CLIENT CONSULTANT

PART01
PART03
NOTES :

DESCRIPTION Owner's signature


A Approved.
B Approved with minor comments.
C Approved with major comments.
D Rejected.

REV. DATE BY DESCRIPTION CHKD. APPD.

1 2 3 4 5 6 7 8 9 10 11

KEY PLAN
A A

STORAGE
SUMP-PIT
WC
PRAYER ROOM
STORAGE PRAYER ROOM MALE
09 FEMALE

B STAIRS
08
B
32A/380V
FOR SUBMERSIBLE
PUMPS
EMCC-B2-01

PASSENGER LIFT

07
-7.34m STORAGE
STORAGE
F.F.L 05
10 LIFT LOBBY
06
7.34m
Main contractor :

F.F.L

C C
PARKING
12

PART01 PART03
-7.48m

PART02 FREIGHT LIFT

B03 -7.48m
F.F.L PART04
-7.34m
F.F.L
F.F.L

D LOBBY
32A/380V
FOR SUBMERSIBLE
D
B02 PUMPS
M.V
CABLE Main consultant :
TRENCH
E UP E
FREIGHT LIFT
STORAGE
STAIRS
B 05 12 SUMP-PIT
B01 Mearaj City, Cairo Ring Road, Bldg No: 2075 To 2078
EMCC-B2-02 Tel: (202) 2520 4500 (10 lines) Fax: (202) 2520 4505
WWW.shakergroup.com

F F
ARCHITECURE & LANDSCAPE CONSULTANT:

-7.48m

F.F.L

PROJECT :

TELECOM EGYPT REGIONAL HUB


DATA CENTER
PART04
PART02

1 2 3 4 5 6 7 8 9 10 11

NO.: ABBR.: BUILDING NAME :

-- EC Regional Cloud Hub - RCH

DRAWING TITLE :
SECOND BASEMENT FLOOR PLAN
FEEDER ROUTING SYSTEM LAYOUT
OVERALL

DRAWN AHMED AWAD SCALE 1/100 DATE FEB.2020


CHECKED PETER APPROVED AMR SHAHEEN
--- REV.
COMPANY PROJECT DWG. TYPE DISCIPLINE DWG. SEQUENCE
0
SCG 19060 EC B2 00