Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
A. Approved
(Submit final document in MDR/IOM
only)
P.O. No:
Manufacture may proceed
4000046273
B. Approved with comments
(Revise and resubmit document)
Manufacture may proceed once Model/Serial No.:
comments are incorporated SGT-300-1S
C. Rejected
(Resubmit)
Manufacture may not proceed
VDRL Prime Code:
I. For Information Only
C01
(Submit final document in MDR/IOM
only) Tag No.:
Name: Xavier Grostabussiat PGCA-EZ-8110A
PGCA-EZ-8110B
Signature: PGCA-EZ-8110C
Date: 19 Sep 2019
PEGAGA DEVELOPMENT
PROJECT
Comment Response Sheet
Company : MDC Oil & Gas (SK320) Ltd CRS for Doc.: 6074-C01-004, Rev A
Project Title : Provision Of Engineering, Procurement, Construction, Installation Doc. Title : P&ID, AIR DISTRIBUTION
And Commissioning (EPCIC) for the Pegaga Development
Project Doc. No. : 4000046273-PGCA-EA-C01-003 Rev: 5.2
PO No. : 4000046273
Commented Status
No. Page Comment Response Date Remarks
by O/C *
2 1 Note 2 - Siemens shall be supplying the filter and This is not the part of Siemens scopes. HH 02/04/19 C
isolation valve as part of the off-skid valves or
consumer.
3 1 WITHOUT TIE-INS SCHEDULE / PIPING CLASS , Please refer Siemens doc# 6074-C04-001. HH 02/04/19 C
CUSTOMER CAN'T CONFIRM FURTHER
4 1 Siemens to provide interface flange 2" 150# Stainless Interface provided is 1.5” RF. HH 02/04/19 C
Steel Flange for Purchaser piping.
REVISION A – 5.2
5 1 to state client P&ID number Please mark-up the references you wish to XG 05/14/19 C
use and we will include them.
6 1 Per SFSB P&ID 1-127, SFSB is providing 2" Piping can be 2” but connection to the skid XG 05/14/19 C
inst air line to GTG skid. Pls amend will need to match the connection shown on
Tie-In Schedule.
Unrestricted
Page 1 of 2
Comment Response Sheet
Commented Status
No. Page Comment Response Date Remarks
by O/C *
* O - Open, C - Closed
Unrestricted
Page 2 of 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
REFERENCED NOTES:
1. IT IS THE CUSTOMER'S RESPONSIBILITY TO PROVIDE PRESSURE
A RELIEF IN THE SUPPLY SYSTEM WHERE THERE IS THE POSSIBILITY A
THAT THIS PRESSURE COULD BE EXCEEDED.
3. PLUGGED.
B B
C C
INSTRUMENT AIR
LUBE OIL MODULE
56 3/8" OD x 0.065" INSTRUMENT AIR
C01-005 /1.F8
LIQUID FUEL MODULE
41
C01-002 /2.G2
D D
INSTRUMENT AIR
VENTILATION DAMPERS
48 3/8" OD x 0.065" XV688 S S
1" OD x 0.083" 3/4" OD x 0.065"
C01-009 / 1.G1
ATHc
INSTRUMENT AIR
GAS FUEL MODULE
63 3/8" OD x 0.065"
C01-001 /2.C13
F INSTRUMENT AIR F
AUXILIARY MODULE
INSTRUMENT AIR 67
AUXILIARY MODULE C01-031 /1.C2
30 1/2" OD x 0.065" 3/8" OD x 0.065"
C01-031 /1.E2
INSTRUMENT AIR
AUXILIARY MODULE
G 11 G
3/4" OD x 0.065"
C01-031 /1.B2
GAS TURBINE SKID EDGE
H H
S S
3/8" OD x 0.065"
J J
AWJc
NOTE 3
APPROVED
11-19-2018
11-19-2018
X GROS
H HWANG
Air Distribution
DIMENSIONS IN [ ] ARE INCHES
COPYRIGHTED AS AN UNPUBLISHED WORK. ALL RIGHTS RESERVED. THIS BREAK ALL SHARP CORNERS
WORK CONTAINS THE CONFIDENTIAL AND PROPRIETARY INFORMATION OF REMOVE ALL BURRS
SIZE DOCUMENT - NUMBER REV LANGUAGE SHEET
SIEMENS. NEITHER THIS DOCUMENT NOR ANY INFORMATION DISCLOSED
HEREIN SHALL BE REPRODUCED IN ANY FORM, USED, OR DISCLOSED TO THIRD ANGLE PROJECTION
10730 Telge Rd.
OTHERS FOR ANY PURPOSE INCLUDING MANUFACTURING WITHOUT THE
EXPRESS WRITTEN PERMISSION OF SIEMENS. Houston, Texas 77095 USA
(281) 856-4400
D 6074 - C01-004 A en 11
/
1 2 3 4 5 6 7 8 9 10 11 Protection class: 02 Restricted Copyright (C) Siemens Energy, Inc 2018 All Rights Reserved