Sei sulla pagina 1di 2

1.

Specific Lifting Plan for Non-Routine  Simple  Complicated


Rig Name: Location: Lifting Area: PTW #:
2. Description of Lifting Operation:

3. Load Details
Weight of Load: Load Dimensions: Type of Load:  Solid  Liquid  Fragile
4. Method(s) Of Communication To Be Used
 Radio  Verbal  Hand Signals
5. Crane Specification and Positions:
Crane 1- Safe Operating Limit: Crane 2- Safe Operating Limit:
Qty Description WLL Weight Qty Description WLL Weight

Total Rigging Weight Total Rigging Weight


6. State Lifting Equipment & Accessories to be used and current color code

7. All Lifting Operations Require the Following to Be Considered but This List Is Not inclusive.
 Cultural, communication and language difficulties  Conflicting tasks in area
 Weight, size, shape and centre of gravity of load Environmental conditions including weather
 Availability of approved lifting points on load  Lighting in the pick-up and lay-down areas;
 Method of slinging/attaching/detaching the load  Proximity hazards, obstructions, path of load
 Overturning/load integrity/need for tag lines  Working under suspended loads
 Suitability and condition of lifting equipment to be used  Availability of adequate barriers
 Initial and final load positions and how it will get there  Experience, competence and training of personnel
 Ground and underground considerations  Number of personnel required for task
 Lifting over live equipment  Pre-Use Inspection of equipment by operator
 Number and duration of lift(s)  Visibility of the load
 Requirements during blind lift  Visibility of banks-man to crane operator
 Specific Risk Assessment
8. 10 Questions to be Considered for a Safe Lift:
1. Is every one aware of & do they fully understand the lifting & hoisting procedures applicable to lift.
2. Has every one attended toolbox talk?
3. Has a pre-inspection of lifting equipment being carried out & are lifting accessories being marked & tagged with:
 Safe working load
 A unique identification number
 A valid certification date
4. Are all safety devices working
5. Does everyone know the person in-charge of the lifting operation
6. Is everyone competent & aware of his tasks
7. Is there a current lift plan & JSA and does everybody understand the job & precautions
8. Does everyone know the environmental limits (maximum permissible wind speed) for the lift

OHS-PR-009-FM-02-05
9. Is the lift area controlled & is everyone clear if the load falls or swings
10. Are signaling methods & communication agreed & clear to all.

9. HSE and Operation instruction (step by Step tasks and its control measures)

 The lifting operation shall not proceed without ensuring the followings

1. Raise PTW
2. Provide step by step details of the lifting operation (TRIC/JSA to be prepared)
3. Identify responsible parties in TRIC such as Person In charge/Crane Operator / Rigger / Banks-man
4. All involved personnel signing in TRIC have been delegated to this task, have been fully briefed and understand
what is required to follow and adhere to this lift plan.
10. Approval & Endorsement
Person in Charge (PTW Holder): Site Manager (PTW Authorizer):
Name: Name:

Sign: Sign:
11. Amendments/Improvements (during or post lifting)

Action Name Title Date Sign


Amended by
Authorized by
12. Indicate a sketch showing Slinging arrangements for Cranes

OHS-PR-009-FM-02-05