Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
3 Electrical System
3.1 Electrical Equipment and Meter - - 30 - 1899 211
4 Other System
4.1 Other System - - 22 - - -
4.2 CPMS System Interface 108 - Monitoring
Grand Total BMS Points 357 166 704 162 8,926 999
1389 8818
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-22
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
( 1 set = 4 points )
Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 1 Wired Type
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-23
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 1 Wired Type
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-24
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-25
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
( 1 set = 4 points )
Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 2 Wired Type
( 1 set = 10 points )
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-26
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 3 Wired Type
and Condensated drain pan
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-27
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-28
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
Water Leakage Detector at PAU room Water Leakage Sensor Water Leakage Detector DI 1 Wired Type
Grand Total BMS points for AC system 357 166 565 162 6879 768
1250 7647
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-29
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
SANITARY INSTALLATION Date 03-09-2018
Water Tank & Fire Tank Low Level Alarm Dry Contact DI 2
High Level Alarm Dry Contact DI 2
Return Sludge Pump & Excess Hi-Level Alarm Water Level Switch DI 1
Return Sludge Pump (SWP3 - SWP4) Low-Level Alarm Water Level Switch DI 1
SWP-3 - SWP-4 ON/OFF Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\2. SN BMS points TS/AC/20-30
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
SANITARY INSTALLATION Date 03-09-2018
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\2. SN BMS points TS/AC/20-31
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-32
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-33
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018
3.3.2 Level 9
SDP.01 Voltage Measurement (A, B, C)
LC.XX1 - 5 Current Measurement (A, B, C)
MODBUS Protocal
Real Power (kW) Measurement Digital Meter communication bus 54 6
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement
For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-9-AHU Current Measurement (A, B, C)
MODBUS Protocal
AHU-XX-01 - 05 Real Power (kW) Measurement Digital Meter communication bus 63 7
(1 set=9 points)
CRAC-9-01 Power Factor Measurement
Apparent Power (kVA) Measurement
Level 10-16
For Office Area Voltage Measurement (A, B, C)
SDP.10 - 16 Current Measurement (A, B, C)
MODBUS Protocal
( LC.XX1 - 7 ) x 7 Real Power (kW) Measurement Digital Meter communication bus 504 56
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-34
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018
For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-(17-22)-AHU Current Measurement (A, B, C)
MODBUS Protocal
( AHU-XX-01 - 02 ) x 6 Real Power (kW) Measurement Digital Meter communication bus 162 18
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement
For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-23-AHU Current Measurement (A, B, C)
MODBUS Protocal
AHU-XX-01 - 02 Real Power (kW) Measurement Digital Meter communication bus 27 3
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement
For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-24-AHU Current Measurement (A, B, C)
MODBUS Protocal
AHU-XX-01 - 02 Real Power (kW) Measurement Digital Meter communication bus 27 3
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement
For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-25-AHU Current Measurement (A, B, C)
MODBUS Protocal
AHU-XX-01 - 02 Real Power (kW) Measurement Digital Meter communication bus 27 3
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-36
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018
4.8 Lighting Control (BOH & FOH) General Alarm Dry Contact DI 1
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\4. Other TS/AC/20-37
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
CHILLER PLANT MANAGEMENT SYSTEM (CPMS)
CPMS Point Summary
Type of CPMS
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Point
AI AO DI DO Software Point Interface (set)
5 CHILLER PLANT MANAGEMENT SYSTEM Interface with BMS System, Monitoring
5.1 Water Cooled Chiller
WCH-9-01 to 04 Chiller Start/Stop Unit Control Panel COMM
Chiller Status Unit Control Panel COMM
Chiller Water Flow Status Unit Control Panel COMM
Condenser Water Flow Status Unit Control Panel COMM
Evaporator Leaving Water Temp. Unit Control Panel COMM
Evaporator Entering Water Temp. Unit Control Panel COMM
Condenser Leaving Water Temp. Unit Control Panel COMM
Condenser Entering Water Temp. Unit Control Panel COMM
Evaporator Refrigerant Temp. Unit Control Panel COMM
Condenser Refrigerant Temp. Unit Control Panel COMM
Percent RLA Unit Control Panel COMM
Analog Alarm Unit Control Panel COMM
Digital Alarm Unit Control Panel COMM
Manual Reset Alarm Unit Control Panel COMM
Auto Reset Alarm Unit Control Panel COMM
Compressor Status Unit Control Panel COMM
Run Hour of Chiller Unit Control Panel COMM
Number of Start Chiller Unit Control Panel COMM
Chiller Water Setpoint Unit Control Panel COMM
Demand Limit Setpoint Unit Control Panel COMM
SPECIFICATION
SMOKE CONTROL PANEL (SCP)
Date 03-09-2018
SMOKE CONTROL POINT SCHEDULE
SCP Point Summary
Type of
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Control Point
AI AO DI DO Software Point Interface (set)
1.0 Fire Escaped Stair
1.1 Fire Escaped Stair ST-01
PF-B-01
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 4
DDCP installed in Pressurized Fan Room
PF-D-01
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 5
DDCP installed in Pressurized Fan Room
1.2 Fire Escaped Stair ST-02
PF-B-02
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 7
DDCP installed in Pressurized Fan Room
PF-LMR-01
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
SMOKE CONTROL PANEL (SCP)
Date 03-09-2018
SMOKE CONTROL POINT SCHEDULE
SCP Point Summary
Type of
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Control Point
AI AO DI DO Software Point Interface (set)
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 3
DDCP installed in Pressurized Fan Room
1.3 Fire Escaped Stair ST-03
PF-8-01
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 3
DDCP installed in Pressurized Fan Room
Sub Total Item 1 22 5 30 5
SPECIFICATION
SMOKE CONTROL PANEL (SCP)
Date 03-09-2018
SMOKE CONTROL POINT SCHEDULE
SCP Point Summary
Type of
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Control Point
AI AO DI DO Software Point Interface (set)
SEF-7M(H)-01-09 VSD Speed Control VSD Panel AO 11
ON/OFF Control Control Relay DO 11
ON/OFF Status VFC/Dry Contact DI 11
Trip Alarm VFC/Dry Contact DI 11
Selector Mode VFC/Dry Contact DI 11
Fire Alarm Signal VFC/Dry Contact DI 11
Smoke Detector Duct Smoke Detector DI 11
Air Flow Status Air Diff Pressre Switch DI 11
DDCP installed in Pressurized Fan Room
SEF-3-01-02 VSD Speed Control VSD Panel AO 2
ON/OFF Control Control Relay DO 2
ON/OFF Status VFC/Dry Contact DI 2
Trip Alarm VFC/Dry Contact DI 2
Selector Mode VFC/Dry Contact DI 2
Fire Alarm Signal VFC/Dry Contact DI 2
Smoke Detector Duct Smoke Detector DI 2
Air Flow Status Air Diff Pressre Switch DI 2
Smoke Damper Motorized Fire&Smoke Damper DI 2
Smoke Damper Motorized Fire&Smoke Damper DO 0 2
DDCP installed in Pressurized Fan Room
Sub Total Item 3 0 13 80 15
Note
Graphical Smoke Control Panel with accessories to meet UL/cUL 864 UUKL 10th Edition Smoke Control system