WHA BANGNA BUSINESS COMPLEX TECHNICAL

OFFICE ZONE SPECIFICATION


BMS INSTALLATION
Date 03-09-2018
BMS POINT SCHEDULE
BMS Point Summary
Type of
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
CPMS Point
AI AO DI DO Software Point Interface (set)
1 MVAC System
1.1 MVAC Equipment 357 166 565 162 6879 768

Sub Total Item 1 357 166 565 162 6879 768

2 Plumbing and Fire Protection System


2.1 Sanitary Equipment and Fire Protection System - - 86 - 40 20

Sub Total Item 2 - - 86 - 40 20

3 Electrical System
3.1 Electrical Equipment and Meter - - 30 - 1899 211

Sub Total Item 3 - - 30 - 1899 211

4 Other System
4.1 Other System - - 22 - - -
4.2 CPMS System Interface 108 - Monitoring

4.3 SCP System Dry Contract 1

Sub Total Item 4 - - 23 - 108 -

BMS Work Station Install at Control/Engineering room


Level 8

Grand Total BMS Points 357 166 704 162 8,926 999
1389 8818
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
1.0 MVAC SYSTEM
1.1 MVAC Equipment
1.1.1 Level Basement Floor
EF-B1-01-02 Program Start/Stop Control Relay DO 2
ON/OFF Status Air Differential Pressure Switch DI 2
Trip Alarm Trip Aram DI 2
Air Flow Status Air Differential Pressure Switch DI 2
Auto/Manual Status Dry Contact DI 2
Sub Total Level 1 Floor 0 0 8 2 0 0
DDCP installed in Fire Command room

1.1.2 Level 1 Floor


EF-1-02 Program Start/Stop Control Relay DO 1
ON/OFF Status Air Differential Pressure Switch DI 1
Trip Alarm Trip Aram DI 1
Air Flow Status Air Differential Pressure Switch DI 1
Auto/Manual Status Dry Contact DI 1

FCU-1-01-02 , 07 Program Start/Stop Control Relay DO 8


WCDU/WFC-1-01 - 05 ON/OFF Status Dry Contact DI 8
Trip Alarm Dry Contact DI 8
Valve Control Proportional Valve DO 8
Room Temperature Temperature Sensor AI 8

Sub Total Level 1 Floor 8 0 20 17 0 0


DDCP installed in Fire Command room

1.1.3 Level 2 Floor


FCU-2-01-14 Program Start/Stop Control Relay DO 14
ON/OFF Status Dry Contact DI 14
Trip Alarm Dry Contact DI 14
Valve Control Proportional Valve DO 14
Room Temperature Temperature Sensor AI 14

Sub Total Level 2 Floor 14 0 28 28 0 0


DDCP installed in Fire Command room

1.1.4 Level 3 Floor


EF-3-01 Program Start/Stop Control Relay DO 1
ON/OFF Status Air Differential Pressure Switch DI 1
Trip Alarm Trip Aram DI 1
Air Flow Status Air Differential Pressure Switch DI 1
Auto/Manual Status Dry Contact DI 1

AHU-3-01 (CAV Type) Program Start/Stop Control Relay DO 1

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-22
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
ON/OFF Status Dry Contact DI 1
Auto/Manual Status Dry Contact DI 1
Trip Alarm Dry Contact DI 1
Air Flow Status Air Differential Pressure Switch DI 1
Room Temperature sensor Temperature Sensor AI 1
Valve Control Proportional Control Valve AO 1
Filter Alarm Air Differential Pressure Switch DI 1
Smoke Detector Alarm
Duct Smoke Detector DI 1
Smoke Detector Failure

PAU-3-01 - 03 (CAV Type) Program Start/Stop Control Relay DO 3


ON/OFF Status Dry Contact DI 3
Auto/Manual Status Dry Contact DI 3
Trip Alarm Dry Contact DI 3
Air Flow Status Air Differential Pressure Switch DI 3
Supply Air Temp Temperature Sensor AI 3
Air Flow Rate Air Flow Senser AI 3
Valve Control Proportional Control Valve AO 3
Filter Alarm Air Differential Pressure Switch DI 3
Smoke Detector Alarm
Duct Smoke Detector DI 3
Smoke Detector Failure
UV Lamp UV Lamp Controler 12 3 BACnet MSTP Protocal

( 1 set = 4 points )
Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 1 Wired Type

Sub Total Level 3 Floor 7 4 29 5 12 3


DDCP installed in AHU room

1.1.5 Level 4 Floor


FCU-4-01-02 Program Start/Stop Control Relay DO 4
ON/OFF Status Dry Contact DI 4
Trip Alarm Dry Contact DI 4
Valve Control Proportional Valve DO 4
Room Temperature Temperature Sensor AI 4

WCDU/WAHU-4-01 - 02 Program Start/Stop Control Relay DO 2


ON/OFF Status Dry Contact DI 2
Auto/Manual Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2
Air Flow Status Air Differential Pressure Switch DI 2
Room Temperature sensor Temperature Sensor AI 2
Valve Control Proportional Control Valve AO 2
Filter Alarm Air Differential Pressure Switch DI 2
Smoke Detector Alarm
Duct Smoke Detector DI 2
Smoke Detector Failure

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-23
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)

Sub Total Level 4 Floor 6 2 20 10 0 0


DDCP installed in AHU room Level 3

1.1.6 Level 8 Floor


TEF-8(0)-01,02 Program Start/Stop Control Relay DO 2
ON/OFF Status Air Differential Pressure Switch DI 2
Trip Alarm Trip Aram DI 2
Air Flow Status Air Differential Pressure Switch DI 2
Auto/Manual Status Dry Contact DI 2

FCU-8-01-02 Program Start/Stop Control Relay DO 2


ON/OFF Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2
Valve Control Proportional Valve DO 2
Room Temperature Temperature Sensor AI 2

WCDU/WAHU-8-01 - 02 Program Start/Stop Control Relay DO 2


ON/OFF Status Dry Contact DI 2
Auto/Manual Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2
Air Flow Status Air Differential Pressure Switch DI 2
Room Temperature sensor Temperature Sensor AI 2
Valve Control Proportional Control Valve AO 2
Filter Alarm Air Differential Pressure Switch DI 2
Smoke Detector Alarm
Duct Smoke Detector DI 2
Smoke Detector Failure

PAU-8-01 - 02 (VAV Type) Program Start/Stop Control Relay DO 2


ON/OFF Status Dry Contact DI 2
Auto/Manual Status Dry Contact DI 2
VSD Speed Control VSD Panel AO 2
VSD Fault Dry Contact DI 2
Air Flow Status Air Differential Pressure Switch DI 2
Static Pressure Sensor Duct Static Pressure Transmiter AI 2
Supply Air Temp Temperature Sensor AI 2
Air Flow Rate Air Flow Senser AI 2
Valve Control Proportional Control Valve AO 2
Filter Alarm Air Differential Pressure Switch DI 2
Smoke Detector Alarm
Duct Smoke Detector DI 2
Smoke Detector Failure
Water Leakage Sensor Water Leakage Detector DI 2 Wired Type
UV Lamp UV Lamp Controler 8 2 BACnet MSTP Protocal

Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 1 Wired Type

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-24
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)

AHE-8-01 - 02 Program Start/Stop Control Relay DO 2


ON/OFF Status Air Differential Pressure Switch DI 2
Trip Alarm Trip Aram DI 2
Air Flow Status Air Differential Pressure Switch DI 2
Auto/Manual Status Dry Contact DI 2

Sub Total Level 8 Floor 10 6 47 12 8 2


DDCP installed in PAU room

1.1.7 Level 9 Floor


EF-9-07 - 10 Program Start/Stop Control Relay DO 6
KEF-9-01 ON/OFF Status Air Differential Pressure Switch DI 6
MAF-9-01 Trip Alarm Trip Aram DI 6
Air Flow Status Air Differential Pressure Switch DI 6
Auto/Manual Status Dry Contact DI 6

FCU-9-01-04 Program Start/Stop Control Relay DO 4


ON/OFF Status Dry Contact DI 4
Trip Alarm Dry Contact DI 4
Valve Control Proportional Valve DO 4
Room Temperature Temperature Sensor AI 4

AHU-9-01 - 05 (CAV Type) Program Start/Stop Control Relay DO 7


WCDU/WAHU-9-01 - 02 ON/OFF Status Dry Contact DI 7
Auto/Manual Status Dry Contact DI 7
Trip Alarm Dry Contact DI 7
Air Flow Status Air Differential Pressure Switch DI 7
Room Temperature sensor Temperature Sensor AI 7
Valve Control Proportional Control Valve AO 7
Filter Alarm Air Differential Pressure Switch DI 7
Smoke Detector Alarm
Duct Smoke Detector DI 7
Smoke Detector Failure

PAU-9-01 (CAV Type) Program Start/Stop Control Relay DO 1


ON/OFF Status Dry Contact DI 1
Auto/Manual Status Dry Contact DI 1
Trip Alarm Dry Contact DI 1
Air Flow Status Air Differential Pressure Switch DI 1
Supply Air Temp Temperature Sensor AI 1
Air Flow Rate Air Flow Senser AI 1
Valve Control Proportional Control Valve AO 1
Filter Alarm Air Differential Pressure Switch DI 1
Smoke Detector Alarm
Duct Smoke Detector DI 1

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-25
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
Duct Smoke Detector DI 1
Smoke Detector Failure
UV Lamp UV Lamp Controler 4 1 BACnet MSTP Protocal

( 1 set = 4 points )
Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 2 Wired Type

ACU-9-01 Program Start/Stop Control Relay DO 1


ON/OFF Status Air Differential Pressure Switch DI 1
Trip Alarm Trip Aram DI 1
Air Flow Status Air Differential Pressure Switch DI 1
Auto/Manual Status Dry Contact DI 1

PAC-9-01 - 02 Interface Interface 20 2 BACnet MSTP Protocal

( 1 set = 10 points )

Sub Total Level 9 13 8 86 23 24 3


DDCP installed in AHU room

1.1.8 Level 10-18 Floor


AHU-(10 - 18)-01 - 02 (VAV Type) Program Start/Stop Control Relay DO 18
ON/OFF Status Dry Contact DI 18
Air Flow Status Air Differential Pressure Switch DI 18
VSD Speed Control VSD Panel AO 18
VSD Fault Dry Contact DI 18
Auto/Manual Status Dry Contact DI 18
Supply Air Temp Temp Sensor AI 18
Return Air Temp Temp Sensor AI 18
CO2 CO2 Transmitter AI 18
Humidity Humidity Sensor AI 18
Fresh Air Damper Status Damper Actuator AI 18
Fresh Air Damper Control Damper Actuator AO 18
Filter Alarm Air Differential Pressure Switch DI 18
Valve Control Proportional Valve AO 18
Static Pressure Sensor Duct Static Pressure Transmiter AI 18
Smoke Detector Alarm
Duct Smoke Detector DI 18
Smoke Detector Failure

Variable Air Volume (VAV Box) Control On/Off


Level 10 @ 47 sets Motorized Damper
Level 11 - 14 @ 59 sets Room Temperature
Level 15 - 16 @ 47 sets Air Flow Rate BACnet MSTP Protocal
4131 459
Level 17 - 18 @ 41 sets Room Temperature setpoint Interface (1 set = 9 point)
Monitoring max flow setpoint
Monitoring min flow setpoint
Room temp setpoint High limit
Room temp setpoint Low limit

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-26
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 2 Wired Type

Sub Total Level 10 - 18 108 54 110 18 4131 459


DDCP installed in AHU room

1.1.9 Level 19 Floor


FCU-19-01-03 Program Start/Stop Control Relay DO 4
WCDU/WFC-19-01 ON/OFF Status Dry Contact DI 4
Trip Alarm Dry Contact DI 4
Valve Control Proportional Valve DO 2
Room Temperature Temperature Sensor AI 4

AHU-19-01 - 02 (VAV Type) Program Start/Stop Control Relay DO 18


ON/OFF Status Dry Contact DI 18
Air Flow Status Air Differential Pressure Switch DI 18
VSD Speed Control VSD Panel AO 18
VSD Fault Dry Contact DI 18
Auto/Manual Status Dry Contact DI 18
Supply Air Temp Temp Sensor AI 18
Return Air Temp Temp Sensor AI 18
CO2 CO2 Transmitter AI 18
Humidity Humidity Sensor AI 18
Fresh Air Damper Status Damper Actuator AI 18
Fresh Air Damper Control Damper Actuator AO 18
Filter Alarm Air Differential Pressure Switch DI 18
Valve Control Proportional Valve AO 18
Static Pressure Sensor Duct Static Pressure Transmiter AI 18
Smoke Detector Alarm
Duct Smoke Detector DI 18
Smoke Detector Failure

Variable Air Volume (VAV Box) Control On/Off


Motorized Damper
Room Temperature
Air Flow Rate BACnet MSTP Protocal
369 41
Room Temperature setpoint Interface (1 set = 9 point)
Monitoring max flow setpoint
Monitoring min flow setpoint
Room temp setpoint High limit
Room temp setpoint Low limit

Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 3 Wired Type
and Condensated drain pan

Sub Total Level 19 112 54 119 24 369 41


DDCP installed in AHU room

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-27
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)

1.1.10 Level 20-25 Floor


AHU-(20 - 25)-01 - 02 (VAV Type) Program Start/Stop Control Relay DO 12
ON/OFF Status Dry Contact DI 12
Air Flow Status Air Differential Pressure Switch DI 12
VSD Speed Control VSD Panel AO 12
VSD Fault Dry Contact DI 12
Auto/Manual Status Dry Contact DI 12
Supply Air Temp Temp Sensor AI 12
Return Air Temp Temp Sensor AI 12
CO2 CO2 Transmitter AI 12
Humidity Humidity Sensor AI 12
Fresh Air Damper Status Damper Actuator AI 12
Fresh Air Damper Control Damper Actuator AO 12
Filter Alarm Air Differential Pressure Switch DI 12
Valve Control Proportional Valve AO 12
Static Pressure Sensor Duct Static Pressure Transmiter AI 12
Smoke Detector Alarm
Duct Smoke Detector DI 12
Smoke Detector Failure

Variable Air Volume (VAV Box) Control On/Off


Level 20 - 22 @ 43 sets Motorized Damper
Level 23 @ 44 sets Room Temperature
Level 24 - 25 @ 43 sets Air Flow Rate BACnet MSTP Protocal
2331 259
Room Temperature setpoint Interface (1 set = 9 point)
Monitoring max flow setpoint
Monitoring min flow setpoint
Room temp setpoint High limit
Room temp setpoint Low limit
Water Leakage Detector at AHU room Water Leakage Sensor Water Leakage Detector DI 2 Wired Type

Sub Total Level 20 - 25 72 36 74 12 2331 259


DDCP installed in AHU room

1.1.11 Level Roof Deck Floor


TEF-RD-01 Program Start/Stop Control Relay DO 1
ON/OFF Status Air Differential Pressure Switch DI 1
Trip Alarm Trip Aram DI 1
Air Flow Status Air Differential Pressure Switch DI 1
Auto/Manual Status Dry Contact DI 1

PAU-RD-01 (VAV Type) Program Start/Stop Control Relay DO 1


ON/OFF Status Dry Contact DI 1
Auto/Manual Status Dry Contact DI 1
VSD Speed Control VSD Panel AO 1

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-28
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
VSD Fault Dry Contact DI 1
Air Flow Status Air Differential Pressure Switch DI 1
Static Pressure Sensor Duct Static Pressure Transmiter AI 1
Supply Air Temp Temperature Sensor AI 1
Air Flow Rate Air Flow Senser AI 1
Valve Control Proportional Control Valve AO 1
Filter Alarm Air Differential Pressure Switch DI 1
Smoke Detector Alarm
Duct Smoke Detector DI 1
Smoke Detector Failure
Water Leakage Sensor Water Leakage Detector DI 1 Wired Type
UV Lamp UV Lamp Controler 4 1 BACnet MSTP Protocal

Water Leakage Detector at PAU room Water Leakage Sensor Water Leakage Detector DI 1 Wired Type

AHE-RD-01 Program Start/Stop Control Relay DO 1


ON/OFF Status Air Differential Pressure Switch DI 1
Trip Alarm Trip Aram DI 1
Air Flow Status Air Differential Pressure Switch DI 1
Auto/Manual Status Dry Contact DI 1

Sub Total Level Roof Deck Floor 3 2 16 3 4 1


DDCP installed in PAU room

1.1.12 Level LMR Floor


FCU-LMR-01 - 03 Program Start/Stop Control Relay DO 4
WCDU/WFC-LMR-01 ON/OFF Status Dry Contact DI 4
Trip Alarm Dry Contact DI 4
Valve Control ON/OFF Valve DO 4
Temperature Sensor Room Temp Sensor AI 4

Sub Total Level LMR Floor 4 0 8 8 0 0


DDCP installed in AHU Room

Grand Total BMS points for AC system 357 166 565 162 6879 768
1250 7647

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\1. MVAC BMS points TS/AC/20-29
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
SANITARY INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
2.0 SANITARY SYSTEM
2.1 Basement Floor
Water Up Feed Pump (TP1-TP2) ON/OFF Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2

Fire Pump (EFP-1 - EFP-2) ON/OFF Status Dry Contact DI 2


Trip Alarm Dry Contact DI 2
Failure Alarm Dry Contact DI 2

Jocky Pump (JP-1 - JP-2) ON/OFF Status Dry Contact DI 2


Trip Alarm Dry Contact DI 2
Failure Alarm Dry Contact DI 2

Water Tank & Fire Tank Low Level Alarm Dry Contact DI 2
High Level Alarm Dry Contact DI 2

Drainage Pump ON/OFF Status Dry Contact DI 8


DP-1 - DP-8 Trip Alarm Dry Contact DI 8
Failure Alarm Dry Contact DI 8

Sewage Pump Hi-Level Alarm Water Level Switch DI 1


SWP-7 - SWP-8 Low-Level Alarm Water Level Switch DI 1
ON/OFF Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2

Sub Total Basement Floor 0 0 50 0 0 0


DDCP Installed in Pump room

2.2 Waste Water Treatment Plant (WWTP)


Equalization Pump (SWP1 - SWP2) Hi-Level Alarm Water Level Switch DI 1
SWP-1 - SWP-2 Low-Level Alarm Water Level Switch DI 1
ON/OFF Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2

Effluent Pump (SWP5 - SWP6) Hi-Level Alarm Water Level Switch DI 1


SWP-5 - SWP-6 Low-Level Alarm Water Level Switch DI 1
ON/OFF Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2

Return Sludge Pump & Excess Hi-Level Alarm Water Level Switch DI 1

Return Sludge Pump (SWP3 - SWP4) Low-Level Alarm Water Level Switch DI 1
SWP-3 - SWP-4 ON/OFF Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\2. SN BMS points TS/AC/20-30
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
SANITARY INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)

Submersible Areator (AR1 – AR3) ON/OFF Status Dry Contact DI 5


AR-1 – AR-5 Trip Alarm Dry Contact DI 5

Sub Total WWTP 0 0 28 0 0 0


DDCP installed in Cold water pump room

2.3 Level Roof Floor


Booster Pump Hi-Level Alarm Water Level Switch DI 2
BP1-BP2 Low-Level Alarm Water Level Switch DI 2
ON/OFF Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2

Sub Total Level Roof Floor 0 0 8 0 0 0


DDCP installed in Water Pump room

2.4 Irrigation system System Status 0 0 0 0 Not available

2.5 Water Feature system System Status 0 0 0 0 Not available

2.6 Water Meter Digital Meter Comunication Bus 40 20 MODBUS Protocol

Grand Total BMS points for SN system 0 0 86 0 40 20


86 60

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\2. SN BMS points TS/AC/20-31
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
3.0 ELECTRICAL SYSTEM
3.1 Level 1
HV Switchgear
HV (2 in, 1 out) ON/OFF status of all incoming feeders Dry Contact DI 2
ON/OFF status of all outgoing feeders Dry Contact DI 1
Voltage Measurement (A, B, C) Voltage Transducer communication bus 3 1 MOD BUS Protocal

Sub Total Level 1 0 0 3 0 3 1


(1 set = 3 points)
3.2 Electrical Equipment Level 9
Generator (GEN-01) General Alarm Dry Contact DI 1
Status Start/Stop of Generator Dry Contact DI 1
ON/OFF status of Main CB Dry Contact DI 1
Trip Alarm of Main CB Dry Contact DI 1
Fuel day tank low oil level alarm Dry Contact DI 1
Voltage Measurement (A, B, C)
Current Measurement (A, B, C)
Energy Consumption (kWh) Measurement Power Analyser communication bus 10 1 MODBUS Protocal
Real Power (kW) Measurement (1 set=10 points)
Power Factor Measurement
Apparent Power (kVA) Measurement
Transformers
TX.01-TX.04 Transformer Protection General Alarm Dry Contact DI 4
416/240V, 3 phase, 4 wire Transformer Trip Alarm Dry Contact DI 4
ON/OFF Status of Forced Air Fans Dry Contact DI 4

MDB AND EDB


MDB.01 ON/OFF Status of Main CB Dry Contact DI 1
Trip Alarm of Main CB Dry Contact DI 1
Voltage Measurement (A, B, C)
Current Measurement (A, B, C)
Energy Consumption (kWh) Measurement Power Analyser communication bus 10 1 MODBUS Protocal
Real Power (kW) Measurement (1 set=10 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Feeder Voltage Measurement (A, B, C)


F102 - F112 Current Measurement (A, B, C)
MODBUS Protocal
Real Power (kW) Measurement Digital Meter communication bus 99 11
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-32
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
MDB.02 ON/OFF Status of Main CB Dry Contact DI 1
Trip Alarm of Main CB Dry Contact DI 1
Voltage Measurement (A, B, C)
Current Measurement (A, B, C)
Energy Consumption (kWh) Measurement Power Analyser communication bus 10 1 MODBUS Protocal
Real Power (kW) Measurement (1 set=10 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Feeder Voltage Measurement (A, B, C)


F203 - F204 Current Measurement (A, B, C)
MODBUS Protocal
Real Power (kW) Measurement Digital Meter communication bus 18 2
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

MDB.03 ON/OFF Status of Main CB Dry Contact DI 1


Trip Alarm of Main CB Dry Contact DI 1
Voltage Measurement (A, B, C)
Current Measurement (A, B, C)
Energy Consumption (kWh) Measurement Power Analyser communication bus 10 1 MODBUS Protocal
Real Power (kW) Measurement (1 set=10 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Feeder Voltage Measurement (A, B, C)


F301 - F307 Current Measurement (A, B, C)
MODBUS Protocal
Real Power (kW) Measurement Digital Meter communication bus 63 7
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

MDB.04 ON/OFF Status of Main CB Dry Contact DI 1


Trip Alarm of Main CB Dry Contact DI 1
Voltage Measurement (A, B, C)
Current Measurement (A, B, C)
Energy Consumption (kWh) Measurement Power Analyser communication bus 10 1 MODBUS Protocal
Real Power (kW) Measurement (1 set=10 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Feeder Voltage Measurement (A, B, C)


F402, F404 Current Measurement (A, B, C)
MODBUS Protocal
Real Power (kW) Measurement Digital Meter communication bus 18 2
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-33
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)

EDB.01 ON/OFF Status of Main CB Dry Contact DI 1


Trip Alarm of Main CB Dry Contact DI 1
Voltage Measurement (A, B, C)
Current Measurement (A, B, C)
Energy Consumption (kWh) Measurement MODBUS Protocal
Power Analyser communication bus 10 1
Real Power (kW) Measurement (1 set=10 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Feeder Voltage Measurement (A, B, C)


EF101-EF125 Current Measurement (A, B, C)
MODBUS Protocal
Real Power (kW) Measurement Digital Meter communication bus 225 25
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Sub Total Level 9 0 0 27 0 483 53

3.3 Electrical Meter (Loop to Control room L9)


3.3.1 Level 1 Voltage Measurement (A, B, C)
SDP.01 Current Measurement (A, B, C)
MODBUS Protocal
LC.RT11, LC.RT21 - 23 Real Power (kW) Measurement Digital Meter communication bus 45 5
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

3.3.2 Level 9
SDP.01 Voltage Measurement (A, B, C)
LC.XX1 - 5 Current Measurement (A, B, C)
MODBUS Protocal
Real Power (kW) Measurement Digital Meter communication bus 54 6
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-9-AHU Current Measurement (A, B, C)
MODBUS Protocal
AHU-XX-01 - 05 Real Power (kW) Measurement Digital Meter communication bus 63 7
(1 set=9 points)
CRAC-9-01 Power Factor Measurement
Apparent Power (kVA) Measurement

Level 10-16
For Office Area Voltage Measurement (A, B, C)
SDP.10 - 16 Current Measurement (A, B, C)
MODBUS Protocal
( LC.XX1 - 7 ) x 7 Real Power (kW) Measurement Digital Meter communication bus 504 56
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-34
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-(10-16)-AHU Current Measurement (A, B, C)
MODBUS Protocal
( AHU-XX-01 - 02 ) x 7 Real Power (kW) Measurement Digital Meter communication bus 189 21
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Level 17-22 Voltage Measurement (A, B, C)


For Office Area Current Measurement (A, B, C)
MODBUS Protocal
SDP.17 - 22 Real Power (kW) Measurement Digital Meter communication bus 378 42
(1 set=9 points)
( LC.XX1 - 6 ) x 7 Power Factor Measurement
Apparent Power (kVA) Measurement

For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-(17-22)-AHU Current Measurement (A, B, C)
MODBUS Protocal
( AHU-XX-01 - 02 ) x 6 Real Power (kW) Measurement Digital Meter communication bus 162 18
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Level 23 Voltage Measurement (A, B, C)


For Office Area Current Measurement (A, B, C)
MODBUS Protocal
SDP.23 Real Power (kW) Measurement Digital Meter communication bus 54 6
(1 set=9 points)
LC.XX1 - 5 Power Factor Measurement
Apparent Power (kVA) Measurement

For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-23-AHU Current Measurement (A, B, C)
MODBUS Protocal
AHU-XX-01 - 02 Real Power (kW) Measurement Digital Meter communication bus 27 3
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Level 24 Voltage Measurement (A, B, C)


For Office Area Current Measurement (A, B, C)
MODBUS Protocal
SDP.24 Real Power (kW) Measurement Digital Meter communication bus 18 2
(1 set=9 points)
LC.XX1 Power Factor Measurement
Apparent Power (kVA) Measurement

For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-24-AHU Current Measurement (A, B, C)
MODBUS Protocal
AHU-XX-01 - 02 Real Power (kW) Measurement Digital Meter communication bus 27 3
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Level 25 Voltage Measurement (A, B, C)


For Office Area Current Measurement (A, B, C)
MODBUS Protocal
Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-35
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
MODBUS Protocal
SDP.25 Real Power (kW) Measurement Digital Meter communication bus 18 2
(1 set=9 points)
LC.XX1 Power Factor Measurement
Apparent Power (kVA) Measurement

For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-25-AHU Current Measurement (A, B, C)
MODBUS Protocal
AHU-XX-01 - 02 Real Power (kW) Measurement Digital Meter communication bus 27 3
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Level Roof Deck


For AHU Office Area & Common Area Voltage Measurement (A, B, C)
MCCA-D-PAU Current Measurement (A, B, C)
MODBUS Protocal
Real Power (kW) Measurement Digital Meter communication bus 9 1
(1 set=9 points)
Power Factor Measurement
Apparent Power (kVA) Measurement

Sub Total Electrical Meter 0 0 0 0 1413 157

Grand Total BMS points for EE system 0 0 30 0 1899 211


30 2110

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\3. EE BMS points TS/AC/20-36
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
ELECTRICAL INSTALLATION Date 03-09-2018

BMS POINT SCHEDULE

BMS Point Summary


Item Equipment Description Function Field Devices Type of BMS Point Hardware Point Software Point Remark
AI AO DI DO Software Point Interface (set)
4 Other System
4.1 Lift
L1-L4, H1-H4,FL,CP1-CP-2 General Alarm Dry Contact DI 13
ESCALATOR1-ESCALATOR2

4.2 Fire Alarm System General Alarm Dry Contact DI 1

4.3 CCTV System General Alarm Dry Contact DI 1

4.4 Public Address System General Alarm Dry Contact DI 1

4.5 Patrol Tour System General Alarm Dry Contact DI 1

4.6 Door Monitoring System General Alarm Dry Contact DI 1

4.7 Proximity Cord Access System General Alarm Dry Contact DI 1

4.8 Lighting Control (BOH & FOH) General Alarm Dry Contact DI 1

4.9 General Printer General Alarm Dry Contact DI 1

4.10 Alarm Printer General Alarm Dry Contact DI 1

Grand Total BMS points for Other system 22


22 0

Z:\TT( ธี )\TT to Admin\BMS Project\WHA\001spc-20 BMS Point Schedule 2018-09-03\4. Other TS/AC/20-37
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
CHILLER PLANT MANAGEMENT SYSTEM (CPMS)
CPMS Point Summary
Type of CPMS
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Point
AI AO DI DO Software Point Interface (set)
5 CHILLER PLANT MANAGEMENT SYSTEM Interface with BMS System, Monitoring
5.1 Water Cooled Chiller
WCH-9-01 to 04 Chiller Start/Stop Unit Control Panel COMM
Chiller Status Unit Control Panel COMM
Chiller Water Flow Status Unit Control Panel COMM
Condenser Water Flow Status Unit Control Panel COMM
Evaporator Leaving Water Temp. Unit Control Panel COMM
Evaporator Entering Water Temp. Unit Control Panel COMM
Condenser Leaving Water Temp. Unit Control Panel COMM
Condenser Entering Water Temp. Unit Control Panel COMM
Evaporator Refrigerant Temp. Unit Control Panel COMM
Condenser Refrigerant Temp. Unit Control Panel COMM
Percent RLA Unit Control Panel COMM
Analog Alarm Unit Control Panel COMM
Digital Alarm Unit Control Panel COMM
Manual Reset Alarm Unit Control Panel COMM
Auto Reset Alarm Unit Control Panel COMM
Compressor Status Unit Control Panel COMM
Run Hour of Chiller Unit Control Panel COMM
Number of Start Chiller Unit Control Panel COMM
Chiller Water Setpoint Unit Control Panel COMM
Demand Limit Setpoint Unit Control Panel COMM

5.2 Motorized Valve Control For Chiller


Chilled Water Return Control Open / Close Motorize Valve Control Relay DO 4
Open / Close Motorize Valve Status Dry Contact DI 4
Condenser Water Supply Control Open / Close Motorize Valve Control Relay DO 4
Open / Close Motorize Valve Status Dry Contact DI 4
Chiller Water Supply Water Flow Status Water Flow Switch DI 4

5.3 Chilled Water Pump


CHWP-9-01 to 04 Control Start / Stop Control Relay DO 4
On / OFF Status Dry Contact DI 4
Water Flow Status Water Flow Switch DI 4
Auto / Manual Status Dry Contact DI 4
VSD Speed Control VSD Panel AO 4
VSD Fault Dry Contact DI 4

5.4 Minimum Chiller Flow Control Valve


By Pass Chilled Water Pipe Water Flow Sensor Motorized Control Valve AO 1 2 WAY Control Poportional Type

5.5 Last AHU or FCU


Diff. Pressure Transmitter Diff. Pressure Transmitter AI 1

5.6 Condenser Water Pump


CWP-9-01 to 04 Control Start / Stop Control Relay DO 4
On / Off Status Dry Contact DI 4
Water Flow Status Water Flow Switch DI 4
Auto / Manual Status Dry Contact DI 4
VSD Speed Control VSD Panel AO 4
VSD Fault Dry Contact DI 4
Temperature Sensor Temp Sensor AI 4
WHA BANGNA BUSINESS COMPLEX TECHNICAL
SPECIFICATION
MVAC INSTALLATION Date 03-09-2018
CHILLER PLANT MANAGEMENT SYSTEM (CPMS)
CPMS Point Summary
Type of CPMS
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Point
AI AO DI DO Software Point Interface (set)
5.7 Cooling Tower
CT-9-01 to 04 Control Start / Stop Control Relay DO 4
On / Off Status Dry Contact DI 4
VSD Fault Dry Contact DI 4
VSD Speed Control VSD Panel AO 4
High Level Alarm Level Switch DI 4
Low Level Alarm Level Switch DI 4
Water Temperature Water Temp. Sensor AI 4

5.8 Motorized Valve Control For Cooling Tower


Condenser Water Supply Control Open / Close Control Relay DO 4
Open / Close Status Dry Contact DI 4
Condenser Water Return Control Open / Close Control Relay DO 4
Open / Close Status Dry Contact DI 4

5.9 Condenser Water Pipe Header


Condenser Water Supply Temp. Temp. Sensor AI 1
Condenser Water Return Temp. Temp. Sensor AI 1
Condenser Water Supply Flowrate. Water Flow Transmitter AI 1

5.10 Chilled Water Pipe Header


Main Pipe Header Chilled Water Supply Temp. Temp. Sensor AI 1
Chilled Water Return Temp. Temp. Sensor AI 1
Chilled Water Supply Flowrate. Water Flow Transmitter AI 1

5.11 Ambient Weather Condition


Outdoor Air Temp. Temp. Sensor AI 1
Outdoor Air Humidity. Hum. Sensor AI 1

5.12 Packaged Booster Pump


PBP-9-01 ( 2 sets Of End Suction Pump) On / Off Status Dry Contact DI 2
Trip Alarm Dry Contact DI 2
Auto / Manual Status Dry Contact DI 2

5.13 Refrigerant Gas Monitoring For Chiller Plant


Refrigerant Gas Monitoring System Gas Detector AI 4

5.14 Condenser Water Flow Alarm


Overflow Water Flowrate. Water Flow Transmitter AI 1

DDCP installed in Chiller Plant Room

CPMS Work Station Install at Control/Engineering room


Level 9
Grand Total CPMS Points 23 12 74 28 0 0
137 0
WHA BANGNA BUSINESS COMPLEX TECHNICAL

SPECIFICATION
SMOKE CONTROL PANEL (SCP)
Date 03-09-2018
SMOKE CONTROL POINT SCHEDULE
SCP Point Summary
Type of
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Control Point
AI AO DI DO Software Point Interface (set)
1.0 Fire Escaped Stair
1.1 Fire Escaped Stair ST-01
PF-B-01
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 4
DDCP installed in Pressurized Fan Room
PF-D-01
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 5
DDCP installed in Pressurized Fan Room
1.2 Fire Escaped Stair ST-02
PF-B-02
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 7
DDCP installed in Pressurized Fan Room
PF-LMR-01
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
WHA BANGNA BUSINESS COMPLEX TECHNICAL

SPECIFICATION
SMOKE CONTROL PANEL (SCP)
Date 03-09-2018
SMOKE CONTROL POINT SCHEDULE
SCP Point Summary
Type of
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Control Point
AI AO DI DO Software Point Interface (set)
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 3
DDCP installed in Pressurized Fan Room
1.3 Fire Escaped Stair ST-03
PF-8-01
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 3
DDCP installed in Pressurized Fan Room
Sub Total Item 1 22 5 30 5

2.0 Fire Man Lift Lobby


Fire Man Lift Lobby
PF-B-03
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 1
DDCP installed in Pressurized Fan Room
PF-D-02
VSD Speed Control VSD Panel AO 1
ON/OFF Control Control Relay DO 1
ON/OFF Status VFC/Dry Contact DI 1
Trip Alarm VFC/Dry Contact DI 1
Selector Mode VFC/Dry Contact DI 1
Fire Alarm Signal VFC/Dry Contact DI 1
Smoke Detector Duct Smoke Detector DI 1
Air Flow Status Air Diff Pressre Switch DI 1
Static Pressure Sensor Static Pressure Transmitter AI 1
DDCP installed in Pressurized Fan Room
Sub Total Item 2 2 2 12 2

3.0 Smoke Exhaust Fan


SEF-2(H)-01-02
WHA BANGNA BUSINESS COMPLEX TECHNICAL

SPECIFICATION
SMOKE CONTROL PANEL (SCP)
Date 03-09-2018
SMOKE CONTROL POINT SCHEDULE
SCP Point Summary
Type of
Item Equipment Description Function Field Devices Hardware Point Software Point Remark
Control Point
AI AO DI DO Software Point Interface (set)
SEF-7M(H)-01-09 VSD Speed Control VSD Panel AO 11
ON/OFF Control Control Relay DO 11
ON/OFF Status VFC/Dry Contact DI 11
Trip Alarm VFC/Dry Contact DI 11
Selector Mode VFC/Dry Contact DI 11
Fire Alarm Signal VFC/Dry Contact DI 11
Smoke Detector Duct Smoke Detector DI 11
Air Flow Status Air Diff Pressre Switch DI 11
DDCP installed in Pressurized Fan Room
SEF-3-01-02 VSD Speed Control VSD Panel AO 2
ON/OFF Control Control Relay DO 2
ON/OFF Status VFC/Dry Contact DI 2
Trip Alarm VFC/Dry Contact DI 2
Selector Mode VFC/Dry Contact DI 2
Fire Alarm Signal VFC/Dry Contact DI 2
Smoke Detector Duct Smoke Detector DI 2
Air Flow Status Air Diff Pressre Switch DI 2
Smoke Damper Motorized Fire&Smoke Damper DI 2
Smoke Damper Motorized Fire&Smoke Damper DO 0 2
DDCP installed in Pressurized Fan Room
Sub Total Item 3 0 13 80 15

SCP Install at Control/Engineering room

Grand Total SCP Points 24 20 122 22 0 0


188 0

Note
Graphical Smoke Control Panel with accessories to meet UL/cUL 864 UUKL 10th Edition Smoke Control system