Sei sulla pagina 1di 21

0 1 2 3 4 5 6 7 8 9

MAIN MOTOR DELTA CONTACTOR STAR CONTACTOR THERMISTOR STANDSTILL PHASE MONITOR
HEATER
MCCB

440VAC +24V

I>
/ =M02-L1

I>
/ =M02-L2

I>
/ =M02-L3

600A L1 L2 L3 U2

13
1 3 5 1 3 5 1 3 5

=M09-K1 =M09-K2 =M09-K3 14


=M09/1.2 =M06/1.6 =M09/1.4 PHASE MONITOR
2 4 6 2 4 6 2 4 6
=M09/1.3 =M09/1.3
=M09/1.4 =M06/1.7

I13.4
PHASE MONITOR

-M1/1 / =M06/6.7
-M1/2 / =M05/2.0
=M02-M1/9 /
X5 30 31 =M02-M1/10 /

X3 46 47

PE PE

PE
+P1

-M1
160KW

T1 T2 ACM1 ACM2

U1 V1 W1

+ x1
M
3~
- x2

W2 U2 V2

2
Date 11/17/2018 EPLAN CTY CỔ PHẦN GIANG NAM MAIN MOTOR CIRCUIT DIAGRAM = M02
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 1
Modification Date Name Original Replacement of Replaced by Page 1 / 21
0 1 2 3 4 5 6 7 8 9

FEED OIL PUMP MOTOR GEAR OIL PUMP MOTOR HYDRAULIC OIL
COOLER MOTOR
440V AC
2.9 / L1.11 L1.11 / 2.0
2.9 / L2.11 L2.11 / 2.0
2.9 / L3.11 L3.11 / 2.0

1 3 5 1 3 5

-K4 -K5
2 4 6 2 4 6

1 3 5 13 1 3 5 13 1 3 5 13
-Q10 -Q11 -Q12
=M06 =M06 =M06
14 14 14

I>> I>> I>> I>> I>> I>> I>> I>> I>>


2 4 6 2 4 6 2 4 6

PE PE PE PE

PE

X4 5 6 7 8PE 9 10 11 12PE 13 14 15 16PE

+P1

1 2
XM2 5.0 5.1 6.0 6.1 7.0 7.1 8PE

+P1
-M2
10.3KW T2 T1 T6 PE +P1 U1 V1 W1 PE
+A1.W U1 V1 W1 PE
+
M M M
-M3 -M4
3~ 0.21KW 3 1.75KW 3
-

T4 T3 T5

1 =M09/1
Date 11/17/2018 EPLAN CTY CỔ PHẦN GIANG NAM AUXILIARY DRIVES CIRCUIT DIAGRAM = M02
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 2
Modification Date Name Original Replacement of Replaced by Page 2 / 21
0 1 2 3 4 5 6 7 8 9

Contactor Contactor Contactor Contactor Contactor


MOTOR MAIN MOTOR STAR MOTOR DELTA FEED OIL PUMP HYDRAULIC COOLER

L~220V
/ 1.1 220V /

5 5 5 5 5
R1 R2 R3 R4 R5
9 9 9 9 9

10 10
K3 K2
=M02/1.4 2 =M02/1.3 2

A1 A1 A1 A1 A1
-K1 -K2 -K3 -K4 -K5
A2 A2 A2 A2 A2

N
/ 1.1 N/

10 2 /1.4 10 2 /1.3

=M02/2 =M06/1
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM OUTPUT RELAY = M09
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 1
Modification Date Name Original Replacement of Replaced by Page 3 / 21
0 1 2 3 4 5 6 7 8 9

MOTOR PROTECTION MOTOR PROTECTION MOTOR PROTECTION RESERVE HYDRAULIC PUMP MOTOR HYDRAULIC PUMP MOTOR CRANE MOTOR OFF CRANE MOTOR ON
GEAR OIL PUMP FEED OIL PUMP HYDRAULIC OIL PUMP Start DELTA

CB2
2.0 / +24V / 1.9
2.0 / 0V / 1.9

X5 17

003

-3.6 /

S4 3

13 13 13 43 43 22 13
=M02-Q11 =M02-Q10 =M02-Q12 =M09-K2 =M09-K3 -S11 -S12
=M02/2.4 14 =M02/2.1 14 =M02/2.7 14 =M02/1.3 44 =M02/1.4 44 21 14
=M09/1.3
=M09/1.4

S4 6 S4 7

X5 40 (10)

A1-E00 000 001 002 003 004 005 006 007

M L+ I0.0 I0.1 I0.2 I0.3 I0.4 I0.5 I0.6 I0.7

CPU S7-1200 DC/DC/DC


=M09/1 2
Date 11/17/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC INPUT = M06
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 1
Modification Date Name Original Replacement of Replaced by Page 4 / 21
0 1 2 3 4 5 6 7 8 9

FILTER PRESSURE GEAR OIL FLOW Pressure switch Pressure switch Pressure switch RESEVER
SLEWING GEAR LUFFING GEAR HOISTING GEAR SPEED LIMITATION

CB2
1.0 / +24V / 2.9
1.0 / 0V / 2.9

X5 19 20

+P1.V
X10 13 X9 15 10 11 12
-24P9 /

13 13 13
-S7 P -S9 P -S10 P
10 bar 14 10 bar 14 10 bar 14

X9 20
+P1.P
12 X9 21
-S5 P
5 bar 11

13 13
-S6 -S8 P
10 bar 14
14

X10 14 X9 39 22 23 24

X5 43 44 45 46 47

010 011 012 013 014 015

M L+ I1.0 I1.1 I1.2 I1.3 I1.4 I1.5

CPU S7-1200 DC/DC/DC


1 3
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC INPUT = M06
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 2
Modification Date Name Original Replacement of Replaced by Page 5 / 21
0 1 2 3 4 5 6 7 8 9

RESERVE RESERVE RESERVE RESERVE RESERVE CONTROL LEVEL-SLEWING CONTROL LEVEL-SLEWING CONTROL LEVEL-
TESTING OPERATION CODE-INPUT SWITCH CODE-INPUT SWITCH CODE-INPUT SWITCH FAULT RESET CLOCKWISE C. -CLOCKWISE LUFFING IN
N0 N1 N2

CB4
4.0 / +24V / 3.9
4.0 /0V / 3.9

+F1.P8

3.9 / -3.6 -3.6 / 3.6

13 13 13 13
-S19 13 -S2 -S3 -S20
14 -S1 14 14 14
14

4.5 3.3 2.3


-S21
/4.2

4.05 3.03 2.03

S4 8 9 10

X5 50 51 52

000 001 002 003 004 005 006 007

M L+ I8.0 I8.1 I8.2 I8.3 I8.4 I8.5 I8.6 I8.7

MODULE DI 1
2 4
Date 11/17/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC INPUT = M06
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 3
Modification Date Name Original Replacement of Replaced by Page 6 / 21
0 1 2 3 4 5 6 7 8 9

CONTROL LEVEL- CONTROL LEVEL-HOISTING CONTROL LEVEL-LOWERING SLACK ROPE LIMIT SWITCH LUFFING LIMIT SWITCH LUFFING LIMIT SWITCH LUFFING LIMIT SWITCH LUFFING
LUFFING OUT HOISTING GEAR GEAR LUFFING GEAR LUFFING GEAR LUFFING GEAR LUFFING
IN MAIN-END IN PRE-END IN 2.REDUCTION IN 1.REDUCTION

CB4
3.0 / +24V / 4.9
3.0 / 0V / 4.9

X5 22 X5 48 4 X5 49

+F1.P8

/ -3.6
S5 3
X18 1 2

/ -5.5 -7.8 /

+F1.P7 +P1
+W1
BN BD
12 22 32 42
+ -
1.5 3 5
-S21 -S22 -B29 -S16
/3.6 /5.2 11 21 31 41
BK

1.05 03 05

X18 3
S4 11 S5 7 8

X5 53 X5 54 55 56 X5 58 59 60 61

-FREI
5.5

000 001 002 003 004 005 006 007

M L+ I9.0 I9.1 I9.2 I9.3 I9.4 I9.5 I9.6 I9.7

MODULE DI 1
3 5
Date 11/17/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC INPUT = M06
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 4
Modification Date Name Original Replacement of Replaced by Page 7 / 21
0 1 2 3 4 5 6 7 8 9

LIMIT SWITCH LUFFING LIMIT SWITCH LUFFING LIMIT SWITCH LUFFING LIMIT SWITCH LUFFING LIMIT SWITCH HOISTING LIMIT SWITCH HOISTING LIMIT SWITCH HOISTING LIMIT SWITCH HOISTING
GEAR 1.LOAD CAPACITY GEAR 2.LOAD CAPACITY LUFFING GEAR LUFFING GEAR HOISTING GEAR HOISTING GEAR GEAR INTERMED GEAR INTERMED
25.4m OUT PRE-END OUT MAIN-END OUT MAIN-END OUT PRE-END STEP 1 MAIN-END STEP 1 PRE-END

CB4
6.0 / +24V / 5.9
6.0 /0V / 5.9

X5 49 X5 119

+W1 +W1
52 62 72 12 22 42
-S16 -S17
/4.6 51 61 71 /6.5 11 21 41

4.9
X5 62 63 64 65 -FREI X5 66 67 68 69

-FREI
6.2

000 001 002 003 004 005 006 007

M L+ I12.0 I12.1 I12.2 I12.3 I12.4 I12.5 I12.6 I12.7

MODULE DI 2
4 6
Date 11/17/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC INPUT = M06
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 5
Modification Date Name Original Replacement of Replaced by Page 8 / 21
0 1 2 3 4 5 6 7 8 9

LIMIT SWITCH HOISTING LIMIT SWITCH HOISTING LIMIT SWITCH HOISTING THERMISTOR PHASE MONITOR BUTTON EMERGENCY
GEAR INTERMED GEAR INTERMED GEAR LOWERING RELAY MAIN MOTOR
STEP 2 MAIN-END STEP 2 PRE-END MAIN-END
CB4
5.0 / +24V / 6.9
5.0 / 0V / 6.9

X5 119

+W1

32 =M05/2.2 =M02/1.9

-S17 =M05-I13.3 =M02-M1/1


/5.6 31

13 11
13 U2 EMERGENCY
U3 14 12
14

X5 70 71 72
5.9 / -FREI -FREI /

73

000 001 002 003 004 005

M L+ I13.0 I13.1 I13.2 I13.3 I13.4 I13.5

MODULE DI 2
5 7
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC INPUT = M06
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 6
Modification Date Name Original Replacement of Replaced by Page 9 / 21
0 1 2 3 4 5 6 7 8 9

10V DC SET VALUE SET VALUE SET VALUE


SLEWING GEAR LUFFING GEAR HOISTING GEAR

10V DC 10V DC

1 2 3 4 5 1 2 3 5
S6 S7

8.0 / +24V / 7.9

X5 15 26 78 79 80 16 25 81 82

POWER +10V DC
=M05/1.7 / =M05+10VDC
=M05/1.6 / =M05-0V(U4) / 7.1

13B 5C 13C

L+ M M AI1 M AI2 M AI3

MODULE ANALOG 1 VOLT

6 8
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC ANALOG INPUT = M06
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 7
Modification Date Name Original Replacement of Replaced by Page 10 / 21
0 1 2 3 4 5 6 7 8 9

SENSOR LUFFING SENSOR HOISTING SENSOR OIL


GEAR PRESSURE GEAR PRESSURE TEMPERATURE

P 0 - 600 BAR P 0 - 600 BAR V 0 - 600 BAR

0 - 20 mA 0 - 20 mA 0 - 20 mA

<= <= <=

BW GN WH YE BW WH YE GN

X9 25
38
13 1 28 26 14 ? 27 29

X5 74 14 75 76 77

7.0 / +24V / 8.8

/ 0V / 8.8

PE PE

PE PE 6B 14B 14C 12C 15

AI1 M AI2 M AI3 M 0V +24V

MODULE ANALOG 2 CURRENT


7 =M05/1
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC ANALOG INPUT = M06
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 8
Modification Date Name Original Replacement of Replaced by Page 11 / 21
0 1 2 3 4 5 6 7 8 9

SUPPLY VOLTAGE Power supply NGUỒN TAY TRANG Power Coil Contactor
24V DC PLC S7-1200
POWER PACK
/ =M02L1 / 1.9
/ =M02L2 / 1.9
/ =M02L3 /
/ PE

L1 L2 L3

CB1

AC AC AC
-U1
380/440VAC 3
24VDC 10A
- + 1.8 1.8

220VAC

CB2 CB3 CB4

U4
+24VDC

+10VDC
0V +10V

+10VDC
0V(U4)
=M06/7.0 /

=M06/7.0 /
=M06-A1 M L+ M L+ M L+

PLC S7-1200 OUTPUT PLC INPUT PLC


CPU 1215C DC/DC/DC

=M06/8 2
Date 11/17/2018 EPLAN CTY CỔ PHẦN GIANG NAM CONTROL VOLTAGE 24VDC CIRCUIT DIAGRAM = M05
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 1
Modification Date Name Original Replacement of Replaced by Page 12 / 21
0 1 2 3 4 5 6 7 8 9

THERMISTOR RELAY MAIN MOTOR WINDSCREEN WIPER Fan Horn


(250 Omh - 700 Omh)
24V DC
2.9 / =M0624P5 =M0624P5 / 2.0
/ =M0624P4

X5 23 24

24V DC

0V +F1.P7 +F1.P8
2.2 / =M0624N2 =M0624N2 / 2.0

S5 2 S4 2

/ =M02-M1/1

=M02/1.9 / =M02-M1/2 22 33 13
-S1 -S21H
21 34 14

PE PE
+24V -1.1

A1 T1 T2 11 A2 =M07/7.6

U3 -2.1 PE
11

12 14

X7 5 6 7 8 9 10 X8 4 5 6PE

12 14

I13.3
=M06/6.6

S12 1 2 3 4

53 53e 53a BK/WH 1 2 PE


-M1 -M2 + -H1
+F1
M M

31 BK

CONNECTIONS:
53 = gn (BK)
53e = BU (GY)
53a = BK (BK-GY)
31 = BN

1 =M07/1
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM GENERAL CONSUMERS CIRCUIT DIAGRAM = M05
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 2
Modification Date Name Original Replacement of Replaced by Page 13 / 21
0 1 2 3 4 5 6 7 8 9

RELAY RESERVE RELAY RESERVE INDICATION LIGHTS LIGHTS FAULT LIMIT POSITIONS Overload
FEED OIL PUMP HYDRAULIC COOLER READY FOR OPERATION
GEAR OIL PUMP (OIL COOLER)

MODULE DQ 1
M L+ Q24.0 Q24.1 Q24.2 Q24.3 Q24.4 Q24.5 Q24.6 Q24.7

0v +24 000 001 002 003 010 011 012 013

X5 83 84 85 86

A1 A1 A1 A1 A1 A1
R4 R5 R13 R14 R15 R16
A2 A2 A2 A2 A2 A2

X5 5

2.0 / 0V / 1.9
2.0 / +24V / 1.9
CB3

9 5 /7.5 9 5 /7.6 9 5 /7.7 9 5 /7.8

=M05/2 2
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC OUTPUT = M07
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 1
Modification Date Name Original Replacement of Replaced by Page 14 / 21
0 1 2 3 4 5 6 7 8 9

RELAY RELAY BRAKE RELAY RELAY RELAY


SLEWING GEAR RESERVE SLEWING GEAR LUFFING GEAR RESERVE Brake RESERVE HOISTING GEAR
RIGHT,LEFT LUFFING IN,OUT AUX. PUMP HOISTING,LOWERING
MAIN PUMP

MODULE DQ 1
M L+ Q25.0 Q25.1 Q25.2 Q25.3 Q25.4 Q25.5 Q25.6 Q25.7

0v +24 020 021 022 023 033 032 033 034

X5 87 88

X5 91 92 93

+P1.P

X9 30K 31K 32K

A1 A1 A1 A1 A1
R6 R10 R7 R11 R8
A2 A2 A2 A2 A2

X9 4 1
30A 31A 32A

X9 3

X5 8
1.0 /0V / 2.9
1.0 / +24V / 2.9
CB3

1 3
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC OUTPUT = M07
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 2
Modification Date Name Original Replacement of Replaced by Page 15 / 21
0 1 2 3 4 5 6 7 8 9

RELAY RESERVE RESERVE RESERVE RESERVE RESERVE RESERVE RESERVE


HOISTING GEAR SOLENOID VALVES SOLENOID VALVES SOLENOID VALVES SOLENOID VALVES
Brake TRIMOT OIL PRE GEAR LUFFING IN GEAR LUFFING OUT
Heating AUX. PUMP AUX. PUMP

MODULE DQ 2
M L+ Q28.0 Q28.1 Q28.2 Q28.3 Q28.4 Q28.5 Q28.6 Q28.7
0v +24v 280 281 282 283 284 285 286 287

X5 89 137 90
94 96
133 134 135

A1
R12
A2

/ 0v / 3.9
/ +24v / 3.9
CB3
9 5 /7.4

2 4
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC OUTPUT = M07
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 3
Modification Date Name Original Replacement of Replaced by Page 16 / 21
0 1 2 3 4 5 6 7 8 9

PULSE SLEWING PULSE LUFFING PULSE HOISTING PULSE TRIMOT

CB2
5.0 / +24V / 4.9
5.0 / 0V / 4.9

M L+
CPU S7-1200 DC/DC/DC
TRIMOT
SLEWING LUFFING HOISTING

Q0.0 Q0.1 Q0.2 Q0.3


4
1 2 3

10
12 12 12 R8
R6 R7 R8 2
4 8 4 8 4 8

006
0v +24 000 001 002 003 004 005

I1 I2 I3 I4 I5 I6 I7
0V +24V Right Left In Out Hoisting Lowering Trimot

INPUT BOARD AMPLIFICATION PULSE


3 5
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC OUTPUT = M07
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 4
Modification Date Name Original Replacement of Replaced by Page 17 / 21
0 1 2 3 4 5 6 7 8 9

SOLENOI VALVE SOLENOI VALVE SOLENOI VALVE SOLENOI VALVE SOLENOI VALVE SOLENOI VALVE SOLENOI VALVE
SLEWING GEAR SLEWING GEAR LUFFING GEAR LUFFING GEAR HOISTING GEAR HOISTING GEAR Trimot
RIGHT Left IN OUT HOISTING LOWERING

OUTPUT BOARD AMPLIFICATION PULSE


Right Left In Out Hoisting Lowering Trimot

M L+ Q1 Q2 Q3 Q4 Q5 Q6 Q7
3 4 5 6 7 8 9
1 2

X5 91 92 93 95 97 98 99

X9 1 2 3 4 5 6 7

x1 x1 x1 x1 x1 x1 x1
Y6 Y7 Y8.1 Y9.1 Y10 Y11 Y12
x2 x2 x2 x2 x2 x2 x2

X9 8 9 10

/ 5.9

-X5 8

4.0 / 0V / 5.9
4.0 / +24V / 6.9
CB2

4 6
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC OUTPUT = M07
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 5
Modification Date Name Original Replacement of Replaced by Page 18 / 21
0 1 2 3 4 5 6 7 8 9

MAIN RELAY MOTOR STAR RELAY MOTOR DELTA RELAY MOTOR

MODULE DQ 2
M L+ Q29.0 Q29.1 Q29.2

1 2 3 4 5

A1 A1 A1
R1 R2 R3
A2 A2 A2

7.0 / 0V / 5.9
7.0 / +24V / 7.9
CB3

5 7
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC OUTPUT = M07
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 6
Modification Date Name Original Replacement of Replaced by Page 19 / 21
0 1 2 3 4 5 6 7 8 9

INDICATION LIGHTS LIGHTS FAULT LIMIT POSITIONS Overload


SOLENOID VALVES SOLENOID VALVES SOLENOID VALVES READY FOR OPERATION
SLEWING BRAKE LUFFING BRAKE HOISTING BRAKE

CB3
6.0 / +24V / 6.9

9 9 9 9 9 9 9
R10 R11 R12 R13 R14 R15 R16
5 5 /3.2 5 /1.6 5 /1.7 5 /1.8 5 /1.9 5

+F1.P8 +F1.P7
S4 4 5 S5 4 5

x1 x1 x1 x1
=M07 =M07 =M07 =M07
/7.6 x2 /7.5 x2 /7.8 x2 /7.7 x2
-H4 -H5 -H6 -H7

S5 1
X5 87 88 89

S4 1

=M05-2.1 -3.7
=M05/2.7
6 4 2

Y2 Y3 Y4

5 3 1
X5 6 7
X10

X5 7

6.0 / 0V /
CB3

6 =M10+LAYOUT PANEL/1
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM PLC OUTPUT = M07
Ed ADMIN LOGICSTICS + P1.H
Appr KRUPP L26 IEC_tpl001 Page 7
Modification Date Name Original Replacement of Replaced by Page 20 / 21
0 1 2 3 4 5 6 7 8 9

STT NAME DEVICE

1 1 TRANSFOMER 220VAC/24VDC
2 3 4 5 6 7 8 9 2 CB1
3 CB2
4 CB3
5 U3 THERMISTOR
6 FUSE 24V 8A
7 CB4
10 11 12 13 14 15 16 17 18 19 20 21 22 23 8 R15
9 R16
10 R1
11 R2
12 R3
13 R4
24 25 26 27 28 29 30 31 32 14 R5
15 R6
16 R7
17 R8
18 R9
19 R10
20 R11
21 R12
33 34 35 36 37 38 39 40
22 R13
23 R14
24 CPU S7-1200
25 MODULE DI1
26 MODULE DI2
27 MODULE DI3
28 MODULE DI4
29 MODULE DQ1
30 MODULE DQ2
41 31 MODULE AI1
32 MODULE AI2
33 CB5
34 CB6
35 FUSE 380VAC 20A
X5
42 36 Q10
37 Q12
38 K4
39 K5
40 CB7
41 K1
42 K2
43 43 K3

=M07+P1.H/7
Date 11/28/2018 EPLAN CTY CỔ PHẦN GIANG NAM = M10
Ed ADMIN LOGICSTICS + LAYOUT PANEL
Appr KRUPP L26 IEC_tpl001 Page 1
Modification Date Name Original Replacement of Replaced by Page 21 / 21

Potrebbero piacerti anche