Lahmeyer
LahmeyerInternational
International2013
2013
Topic
• Company Information • Quality Management System
• Energy Division • Staff Resources
• Market Position • Range of Services
• Fields of Activity Energy Division • Technical Departments Energy Division
• Major Clients Energy Division • Project References
Lahmeyer
Lahmeyer International
International 20132013 2
Company Data
Lahmeyer Group: 12 Affiliated Consolidated Companies
Foundation: 1966
Headquarter: Bad Vilbel, Germany
Employees (2012): 1,560 (Group)
Turnover (2012): 157 million Euro (Group)
Sites: Company Sites and Subsidiaries in 21 Countries
Projects: In 165 Countries
Activity: Technical and economic planning and consulting services
Fields (Group):
Hydropower Water Building &
Energy & Water Supply & Transportation
Resources Sanitation
Corporate Energy Division Hydropower & Water Water Supply Building & Lahmeyer International
Departments Resources Division & Sanitation Division Transportation Division (India) Pvt. Ltd
Personnel LI Business Unit LI Business Unit Lahmeyer GKW Consult Lahmeyer Rhein-Main Energy
Power Plants & Hydropower & Water GmbH GmbH
Controlling and Electrical Grids Resources
Mannheim, Germany Bad Vilbel, Germany Hydropower & Water
Accounting Resources
LI Business Unit Lahmeyer
Lahmeyer Berlin GmbH
Treasury Renewables & Hydroprojekt GmbH Transportation
Berlin, Germany
Economics Weimar, Germany
Tax
Lahmeyer International Hidro Dizayn Group Lahmeyer München
Qatar L.L.C. Ankara, Turkey Ingenieur-
Information Doha, Qatar
Technology gesellschaft mbH
000 Lahmeyer Lahmeyer Agua y Munich, Germany
Legal International Rus Energía
Moscow, Russia Lima, Peru
Internal Audit Units of Lahmeyer International GmbH
Consulting Engineers
Lahmeyer Nigeria Ltd.
Marketing & Subsidiaries
Business Develop- Abuja, Nigeria
ment Coordination Lahmeyer IDP
Consult Inc.
Internal Services Manila, Philippines
Lahmeyer International 2013 4
History of Lahmeyer International
1890: Wilhelm Lahmeyer founded W. Lahmeyer & Co. in Frankfurt, Germany:
Designed Power Plants, built Generators, established Electricity Supplies
1897: One of the first BOT scheme in Romania: HEPP Sinaia, 4 x 250 kW
1898: Wilhelm Lahmeyer Cofounder of RWE
1966: Engineering department of Lahmeyer AG transformed into Lahmeyer International GmbH
1993: Lahmeyer established subsidiary in India: Lahmeyer International India
2007: Lahmeyer has been taken over by Capiton
2009: Lahmeyer has opened subsidary in Russia: OOO Lahmeyer International Rus
2010: Acquisition of the Turkish group Hidro Dizayn with its subsidiary Hidrolin in Georgia
2012: Acquisition of IDP Consult, Philippines and GKW Consult, Germany
Fairness Innovation
We value fairness We are committed
in all our dealings to improving our
with clients, partners position further
and colleagues. and to pursuing
growth.
Lahmeyer Project
Lahmeyer Company
Local Office
Principal Business Areas
Power Transmission and Distribution Wind Energy Sustainable Water and Land Resources Development Controlling and Accounting
GE2 Ernst-Wilhelm Kleine GE6 Dr. Patric Kleineidam GW2 Michael Chegwin ZUC / ZFR Tanja Magnus
Privately Financed Projects Energy Economics and Planning Geotechnical Engineering, Geology and Dams Treasury
GE3 Ingolf Hoffmann GE7 Dr. Alexis Bonneschky GW3 Bernhard Stabel ZFI Drew Patrick
Thermal Power Plants Business Development Hydropower and Hydraulic Structures Design Tax
GE4 Michael Wünnemann GEV-R Bernhard Menzel GW4 Egon Failer (acting) ZST Matthias Vogel
Business Development Project Controlling Contract Management and Cost Control Information Technology
GEV Franz Neulinger GEC-R Lars Lindner GW5 Egon Failer ZIT Andreas Morgenstern
Project Controlling
Lahmeyer International 2013 9
GWC Thomas Kleinschmidt
Energy Division
• Lahmeyer International
• Business Unit Power Plants and Electrical Grids
• Business Unit Renewables and Economics
• Branch Offices Abu Dhabi, Saudi-Arabia, Morocco,
Greece, Italy, Turkey, Indonesia, Kazakhstan
• OOO Lahmeyer International Rus
• Lahmeyer IDP Consult Inc.
• Lahmeyer International Qatar
• Consulting Engineers Lahmeyer Nigeria
Project Controlling
Entities part of the division
Entity, not part of division
GEC © Lahmeyer Martin
Martin
International Braun
Braun 2013
GmbH 11
Lahmeyer International 2013
Market Position - Power
2010 2011 2012
Top 100 International Design Firms in Power Top 100 International Design Firms in Power Top 100 International Design Firms in Power
Rank Firm $ Million Rank Firm $ Million Rank Firm $ Million
1 WorleyParsons Ltd. 356.8 1 WorleyParsons Ltd. 385.3 1 WorleyParsons Ltd. 451.1
2 AMEC Plc. 251.8 2 AMEC Plc. 330.8 2 SNC-Lavalin Int‘l Inc. 407.5
3 SNC-Lavalin Int‘l Inc. 238.1 3 China Chengda Eng. Corp. 316.9 3 Pöyry 292.0
4 Pöyry 220.0 4 SNC-Lavalin Int‘l Inc. 293.5 4 Jacobs 282.5
5 CH2M HILL 207.4 5 Jacobs 276.9 5 AMEC PLC 253.9
6 AF AB 187.0 6 Pöyry 221.0 6 Parsons Brinckerhoff 236.9
7 Parsons Brinckerhoff 180.1 7 AF AB 219.1 7 AF AB 222.3
8 AECOM Technology Corp. 171.3 8 AECOM Technology Corp. 210.8 8 AECOM Technology Corp. 221.2
9 China Chengda Eng. Co. Ltd. 161.9 9 Black & Veatch 178.8 9 China Chengda Eng. Co. Ltd. 211.5
14 Lahmeyer International 110.1 15 Lahmeyer International 110.5 13 Lahmeyer International 170.9
Source: ENR Sourcebook, December 2010, 2011, 2012/ McGraw-Hill Construction, New York City, USA
2 Lahmeyer International 47.9 2 AECOM Technology Corp. 58.5 2 AECOM Technology Corp. 84.0
7 AF AB 29.8
Source: ENR Sourcebook, December 2010, 2011, 2012/ McGraw-Hill Construction, New York City, USA
Source: ENR Sourcebook, December 2010, 2011, 2012/ McGraw-Hill Construction, New York City, USA
1 AECOM Technology Corp. 70.3 1 AECOM Technology Corp. 74.6 1 AECOM Technology Corp. 73.0
2 Parsons Brinckerhoff Inc. 46.6 2 Balfour Beatty Plc 43.9 2 Parsons Brinckerhoff Inc. 53.6
3 Mott MacDonald Group Ltd. 37.7 3 Mott MacDonald Group Ltd. 37.8 3 Mott MacDonald Group Ltd. 46.9
5 Fichtner GmbH & Co. KG 25.0 5 WorleyParsons Ltd. 34.9 5 Lahmeyer International 35.7
6 Lahmeyer International 23.0 6 Lahmeyer International 26.6 6 Fichtner GmbH & Co. KG 34.0
Source: ENR Sourcebook, December 2010, 2011, 2012/ McGraw-Hill Construction, New York City, USA
Source: ENR Sourcebook, December 2010, 2011, 2012/ McGraw-Hill Construction, New York City, USA
1 Fichtner GmbH & Co. KG 19.0 1 Fichtner GmbH & Co. KG 16.5
Source: ENR Sourcebook, December 2010, 2011, 2012/ McGraw-Hill Construction, New York City, USA
• Bankable Feasibility Study • Banker‘s Engineer • Owner´s Engineering • Conceptual, Basic and
• Market Studies and Analyses • Studies e.g. Due Services Detail Design
• Tariff and Pricing Studies Diligence • Market Studies • Design Review
• Project Management • Project Monitoring • Energy Planning • Supervision of
• Tender Preparation • Institutional & Subcontractors
• Bid Evaluation Regulatory Support • Procurement
• Contracting • Business Development Management
• Design, Design Approval Support • Workshop Inspection
• Project Finance Advisory Services
• Factory Acceptance Tests
• Supervision of Erection &
Commissioning
• Operation and Maintenance
• Organisation • Timing
– Organisational Concept – Definition of Project Schedule
– Interfacing – Scheduling and Controlling of Activities
– PCMS Implementation – Capacity Planning and Controlling
• Information • Cost
– Project Documentation – Cost and Liquidity Planning
– Meetings – Cost Minimising Strategies
– Task Control – Profitability Analysis
• Quality – Risk Assessments
– QM System Implementation – Benchmarking
– Definition of Project Aims
– Definition of Quality Guidelines
• Studies • Pre-Engineering
– Reconnaissance – Conceptual Design
– Site Investigation – Rehabilitation Assessment
– Pre-feasibility and Feasibility Studies – Site and Route Survey
– Bankable Studies – Network System Planning
– Environmental Impact Assessment – Network Calculation and Analysis
– Due Diligence
– Risk Assessment
– Asset Valuation
• Permission Management
• Specifications – With or without Pre-Defined
– Functional Specifications for EPC Contractors
Concepts
– Detailed Specifications for Lot-Wise
Tenders
• Battery Storage
• Overhead Lines , Underground and Sea Cables • Utility Telecommunication, Smart Grid Technologies
• Network Planning and Power System Analysis • Cyber Security and Integrated Network Technology
Management of Division
Martin Braun
Michael Wünnemann Franz Neulinger Martin Braun
Project
Thermal Business Controlling Project
Power Plants Development Controlling
Martin Braun
Bernhard Menzel Lars Lindner
Project
Business Project Controlling
Development Controlling
Technical Data
• 380 kV GIS Switchgear 7 Bays
• Coupling 380/220 kV 2 x 500 MVA
• 220 kV GIS Switchgear 13 Bays
• Coupling 220/50 kV 2 x 80 MVA
• 50 kV GIS Switchgear 8 Bays
• 16 kV Switchgear 14 Feeders
• 220 kV Cable 5 Systems, 300 A
• Unit Transformer 3 x 100 MVA, 220/13 kV
• Step-up Transformer 2 x 50 MVA, 220/9.5 kV
• 9.5 kV Switchgear 5 Feeders
• Generator Busduct 5 Systems
Services
• Study of Alternative Solutions, Cost Estimate
• Basic and Detail Design
• Permit Design Documents
• Tender Documents, Tender Evaluation
• Review of Contractor Design and Project Monitoring
• Site Supervision for Electrical Equipment
Lahmeyer International 2013 43
ENERGY
Scheibengipfeltunnel Reutlingen
Road Tunnel Installations, Germany
Client: City of Reutlingen, Civil Works Office
Technical Data
• Length of Tunnel 1,910 m
• Power Demand 1,100 kVA
• Ventilation Load
- Fresh Air Fan 2 x 140 kVA
- Jet Fan 12 x 22 kVA
- Exhaust Air Fan 2 x 140 kVA
• Lighting System
- Basic Lighting 35 kVA
- Adaption Lighting 90 kVA
Services
• Determination of Basic Criteria
• Preliminary Design and Cost Estimate
• Detailed Design
• Definition of Electrical Requirements for Civil Design
Technical Data
• 110 kV Transmission Line
Interconnection (new) 4 OHL
• 110 kV Substation (new) 2 Feeders
• Arc Suppression Coil (exchange)
• Station Service Power Supply AC/DC (new)
• Switchgear Building (new)
• Protection and Substation Remote Control (new)
Services
• Conceptual Design
• Preparation of Tender Documents
• Bid Evaluation and Assistance in Contract Negotiation
• Design Review of Contractor’s Design
• Supervision of Erection and Commissioning
• Review of As-Build Documents
Technical Data
• New 400/132 kV Grid Station Mahawi
• Existing 220/33 kV Substations at Mahawi and Wathba
Conversion into 132/33 kV Substations
• 132/11 kV Substation at Mohd, Bin Zayed City
• Related 400/132 kV Cable and 400/220 kV OHL Works
Services
• Planning & Conceptual Design
• Preliminary Route Reconnaissance and Survey
• Tendering & Evaluation
• Contract Administration & Follow-up
• Design Approval
• Site Supervision during Construction
• Cable Energisation and Reactive Power Compensation Studies
Technical Data
• 107 km of 66 kV Overhead Line
• Extension of 66/33/11 kV Substation in Tete City
• 66/33 kV Substation with 10 MVA Transformer in Manje
• 640 km of 33 kV Distribution Lines and 80 km of Low Voltage
0.4/0.23 kV Reticulation including Street Lighting
• 60 Distribution Transformer Stations 33/0.4/0.23 kV
• Extension of EDM’s Telecommunication Facilities
• New 1500 Service Connections
• Crossing Luangwa River (Overhead Line Span 750 m)
• Crossing of the Zambezi River by 66 kV Power Cable
Services
• Project Management
• Technical Diagnosis
• Environmental Impact Study/Management Plan
• Detailed Design and Survey
• Tender Document Preparation
• Assistance during Tendering and Contract Negotiations
• Project Implementation, Site Supervision and Cost Control
Lahmeyer International 2013 • Training of Engineers 47
ENERGY
Electricity Market Support Project
Transmission and Distribution, Georgia
Client: Georgian State Electrosystem (GSE), Tbilisi
Technical Data
• SCADA/EMS System installed at National Dispatch Center and
39 Substations/ Hydropower Plants/Thermal Power Plants
• Telecommunication Network based on Fibre Optics (OPGW,
ADSS, FOC), PLC and Microwave Links, TCP/IP Protocol (SDH
over IP)
Services
• Technical Support in all Procurement matters in Accordance
with Relevant World Bank Guidelines
• Preparation of Technical Specifications and Bidding Documents
• Assistance in Tendering, Bid Evaluation, Contract Negotiations
and Contract Management
• Design Approval, Acceptance Tests and Site Supervision
• Training to GSE Staff
• Implementation of a Project Management System to monitor
Project Progress and Development
Rehabilitation and Upgrade of System Dispatch, Communication and Metering
Technical Data
• Nominal Load 2 x 300 MW
• Steam Parameter 530 °C, 160/42 bar
• Fuel Oil Hard Coal
• Steam Turbine Condensing/ River Water Cooled
Services
1992 -1996 up to Financial Close
• Appraisal of the Portuguese Electrical Supply System
• Assessment of the Security Package Documents
• Preparation of Technical/Envir. Due Diligence, Risk Assessment
• Assessment of Technical/Commercial Viability of the Plant
• Audit of Financial Model Inputs
1997 - 2006 after Financial Close
• Site Supervision Services during Implementation
• Regular Reporting during Operation
2006 Due Diligence for Refinancing and the LCPD Works
2006 - 2008 Additional FGD and DENOX Plants
• Review of Design Concept and Project Contracts
2008 - 2016 Regular Reporting during Operation
Lahmeyer International 2013 49
ENERGY
Aden Power Plant, 70 MW
Diesel Power Plants, Yemen
Client: Public Electricity Corporation (PEC)
Technical Data
• Four-Stroke Medium Speed Diesel Generator Sets
• Capacity, Speed 7 x 10 MW, 600 rpm
• Generation 11 kV/50 Hz
• Fuel Type Heavy Fuel Oil
• Construction Period 2004 - 2006
Services
• Project Management
• Review of Contractual Documents
• Contractor’s Design Review and Approval
• Review of Proposed Testing Procedures
• Witness of Factory Tests
• Site Supervision during Construction, Erection, Commissioning,
Reliability and Performance Testing
• Assistance in Training Client’s Counterpart Personnel
• Services during Defects Liability Period
Technical Data
• Capacity
- Open Cycle / CCPP 1,820 MWel / 3,200 MWel
• Configuration CCPP 5 x (3+3+1)
• Gas Turbines 15 x GE Frame 7FA
• Cooling System Once through Sea Water
• Electrical Connection 400 kV
• Fuel / Back-up Fuel Natural Gas / Fuel Oil
• Extension I
• Block 6 630 MWel
• Configuration CCPP 1 x (3+3+1)
Services
• Project Management
• Contract Management
• Design Review and Approval
• Procurement Review Services
• Site Construction Supervision
Project Management Consult • Factory and Workshop Inspection
• Testing and Commissioning Supervision
Lahmeyer International 2013 52
ENERGY
Ekibastuz Power Plant Unit 3
Coal Fired Power Plants, Kazakhstan
Client: JSC ‘Ekibastuz GRES-2
Technical Data
• Capacity of Existing Units 2 x 500 MWel
• Proposed Capacity of Unit 3 > 600 MWel
• Fuel Hard Coal
• Cooling System Once through Water Cooling
• Electrical Connection 1,150 kV
• Height of Flue Gas Stack 419.7 m (1,377 ft)
Services
• Advisory Services of Existing Tender Specifications
• Engineering Services and Design Review
• Factory Inspections
• Rehabilitation of Existing Main House
• Site Supervision during Implementation
• Monitoring of Commissioning
Technical Data
• Fuel Hard Coal
• Net Thermal Efficiency > 46 %
• Live Steam 285 bar / 600 °C
• Reheat Steam 610 °C
• Flue Gas Temperature Upstream
of Electrostatic Precipitator approx. 115 °C
• Exhaust Temperature Downstream
of Flue Gas Desulphurisation approx. 50 °C
Services
• Coordination of Interfaces
• Preparation of Licensing Procedures
• Preparation of Technical Specifications
• Assistance in Technical Contract Negotiations and Technical
Evaluation of Bids and Contract Award
2 x 800 MW Units
Technical Data
• Phase II
• Total Capacity (CCPP) 1,200 MWel
• Desalination Plant SW-MSF 55 MIGD
• 400 kV Substation
Services
Phase II
• Basic Design
• Preparation of Tender Documents
• Evaluation of Tenders
• Assistance during Contract Negotiations
• Compilation of Contract Documents
• Review and Approval of Drawings
• Project Cost and Time Schedule Control
• Workshop and Site Quality Assurance
• Transfer of Know-how
Station L Phase II • Supervision of Construction, Erection and Commissioning
• Services during Warranty Period
Technical Data
• 1 MW PV Rooftop Power Plant
• Biggest Roof-Top PV Plant in the Country
Services
• Update of Pre-Feasibility Study
• Conceptual Design of the Rooftop PV Plant
• Elaboration of Tender Documents and Technical Assistance
during Tendering Process
• Construction Supervision, Witnessing of Commissioning and
Provisional Acceptance
• Monitoring of Plant Performance during Guarantee Period and
Final Acceptance
Technical Data
• First Geothermal Power Plant with a Capacity of some 55 MWel
• Thermal Water Temperatures up to 230 °C
• Two Phase Medium (Steam and Liquefied Water)
• Flow rates up to 60 kg/sec per well
Services
• Preparation of Specifications for the Power Plant
• Design of the Fluid Collection and Injection System
• Preparation of EPC Tender Documents
• Supervision of Construction, Erection, Commissioning
• Supervision of Operation Power Plant Systems and Production
Field for the First Year of Operation
Technical Data
• Six nearly Equal Wood Fired CHP Plants
• Mainly Fresh Wood Chips from the Forest
• Electrical Capacity max. 4.995 MWel
• Thermal Capacity up to 10 MWth
Services
• Third Party Position for the Clients
• Arbitration Services while Projects under Construction and
during Commissioning, Performance Test and Trial Run
• Opine on Differences between Owner and EPC Contractor
• Propose Solutions to Disagreements in Technical Regards
Technical Consultant and Third Party during Performance Test and Trial Run
Execution 2011
Technical Data
• First Phase approx. 100 MWp
Services
• Master Plan Study
• Site Investigation
• Conceptual Design
• Grid Connection Study
• Solar Resource Review
• Energy Yield Prediction
• Constructability Study
• Review of Environmental Impact Assessment
• EPC and O&M Bidder Pre-Qualification
• Preparation of the Technical & Financial Request for Proposal
(RFP)
• Assisting in the Bidding Process
• Technical Bid Evaluation Report
• Commission Management Newsletters
Technical Data
• Capacity 17 MW
• Technology Concentrating Solar Power (Tower)
• Thermal Energy Storage Molten Salt
• Operating Hours 6,000 hours/year
Services
• Administrative Due Diligence
• Review of Permits, Authorisations, EPC and O&M Contracts
• Technical Review of Basic Design
• Meteorological Data Analysis
• Simulation of the Central Solar Tower Power Plant
• Estimation of the Annual Energy Yield
• Investment and O&M Costs Analysis
• Review of the Technical Inputs of the Financial Model
• Identification of the Main Project Risks
• Construction / Commissioning Supervision
• Warranty Period Supervision
Lender‘s Engineers for a 17 MW Solar Tower Power Plant – Solar Tres
Technical Data
Haouma
• Total Capacity 50.6 MW
• Turbines Siemens SWT 2.3-93
Akhfennir
• Total Capacity 101.87 MW
• Turbines Ecotecnia E74 – 1.67 MW
Foum El Oued
• Total Capacity 50.6 MW
• Turbines Siemens SWT 2.3-93
Services
• Detailed Design Review
• Construction Supervision
• Interface Management
• Cost and Quality Control
• Acceptance Test Supervision
• Approval of Contractors Documentation
Technical Data
• Total Capacity 98 MW
• Turbine Capacity 2 MW
Services
• Overall Project Management
• Complete Feasibility Study
• Complete Detailed Wind Farm Planning
• Environmental Impact Assessments
• Tendering of Wind Turbines and Infrastructure Lots
• Definition of the Private Participation Concept
• Setting up Financing Structure and Identification of Potential
Financiers and Banks
• Preparation of Agreements (LLAs, PPA) and Necessary
Documents for Execution of Permit Procedures
• Preparation of all Contracts
• All Factory Inspections, Site Supervision during Site Preparation,
Installation and Commissioning
• Operation Supervision
Technical Data
• More than 60 different Wind Farm Projects
• Wind Farm Sizes ranging from 10 - 176 MW
Services
• Bankable Wind Studies
• Desktop Studies
• Micrositing
• Technical Environmental Impact Studies
• Supervision of Purchase and Supervision of Installation of
Measurement Equipment
• Monthly Wind Data Analysis
Execution 2011
Technical Data
• Total Capacity in the Baltic Sea 48.3 MW
• Total Number of Wind Turbines 21
• Turbine Manufacturers Siemens
• Turbine Type SWT-2.3-93/2,300 kW
• Sub Station 1
• Monopile-Foundation
Services
• Check and Organisation of the Documentation,
Set-Actual-Comparison
• Random Check of Actual Construction
Execution 2011
Technical Data
• Total Capacity approx. 108 MW
• Total Wind Farms 4
• Total Number of Wind Turbines 64
• Turbine Manufacturers Vestas
• Turbine Type V52, V90-2.0 MW, V90-3.0 MW
Services
• Site Visit
• Wind Resource and Energy Yield Assessments
• Review of Technical Project Concept
• Review of Permits and Licences
• Turbine Supply Contract Review
• Review of BoP Works Contract
• Maintenance and Service Agreement Review
• Construction Monitoring
Execution 2010
Technical Data
• Installed Capacity 370 MW
• Number of Wind Farms 3
Services
• Assessment of Wind Resources
• Loss Assessment
• Recommendation of Measurement Concepts
• Site Evaluation
• Preliminary Wind Farm Layout
• Definition of Technical Planning Aspects
Technical Data
• Installed Capacity 3,528 MW
• Number of Wind Farms 185
Services
• Detailed Re-Powering Analysis for Selected Wind Farms
• Categorisation of all Wind Farms regarding Re-Powering
• M&R cost Forecast for Wind Farm Portfolio
• Evaluation of Technical Retrofit Programs for Selected Wind
Farms
• Detailed Technical Reviewing for one Wind Farm, consisting of
- Wind Study
- Equator Principles
- Contracts and Agreements
Services
• Determination of Economic Potential for Wind and Solar
Energies in Egypt and Key Challenges
• Integration of Renewable Energies in the Electricity Power
Supply
• Development of Technology Policy and Promotion of National
Manufacturing
• Definition of Institutional Support Structure for Wind and Solar
Energies
• Development of Wind and Solar Sector Framework and Road
Map for Implementation
• Feasibility Study for Concentrating Solar Power Plant,
Kom Ombo
Services
• In-depth Data Review and Analysis under a Long Term
Perspective in order to reliably forecast Russia’s and Ukraine’s
Power Systems
• Development of a Power System Simulation Model in order
to adequately display Russia’s Several Territorial Electricity
Systems as well as the Ukrainian Unified Electricity System
based on dispatch Data Analysis
• Third Party Verification of the developed Power System
Simulation Model and the corresponding Carbon Emission
Factors for the Purpose of Official Approval under the UNFCCC
• Training in Climate Trading Mechanisms and International
Regulations, Principles of Power System Operation / Expansion
and System Modelling for Emission Factor Calculation
Services
• Review and Assessment of the Current State of Global Solar
Energy Market Incentive Frame-works and their Potential
Application in the Kingdom of Saudi Arabia
• Assessment of International Policy Frameworks that foster Solar
Energy and particularly Solar Thermal Energy Development
using an Incentives-based Approach
• System Scenario Analysis with Successive Penetration Levels
and different Distribution Cases (PV/CSP w&w/o Storage) for
2010 - 2020
• Policy Recommendation with Parameters to guide the Client
and the Government of Saudi Arabia in the RES Policy
Development
• Proposition of Solar Energy Market Incentives Program as a
Foundation for Solar Energy Adoption, Technology
Development, Industry Sector Capacity and Growth
Services
• Load and Generation Forecast
• Evaluation of Technology and Size of Generating Units
• Calculation of Fuel switching of the Existing, Committed or
Future Plant according to the Availability of LNG
• Fuel Price Projection
• Calculation of Carbon Emissions and Incurred Costs
• Assessment of Political and/or Regulatory Issues
• Assessment/Application EU Environmental Restrictions and
Policies
• Determination of the Timing for the Installation of Unit 6 of
Vasilikos Power Station
• Preparation of an Optimised Conceptual Site Layout for the
Development
• Evaluation of Technical, Economic and Environmental Aspects
• Determination of the Optimum Power Supply System
Development Plan
Lahmeyer International GmbH, Friedberger Str. 173, 61118 Bad Vilbel, Germany