Sei sulla pagina 1di 9

CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬

Eastern Region Branch ‫فرع المنطقة الشرقـية‬


APPR'D

CHK'D
REVISED AS PER SEC-EOA COMMENTS
ISSUED FOR BASE DESIGN SUBMITTAL

R.
NE
OW
ITS
OF
DESCRIPTION T
EN
NS
CO
EN
ITT
WR
E

INDOOR AND OUTDOOR


TH
T
OU
TH

LIGHTING SYSTEM
WI
NT
ME
CU

DESIGN CALCULATIONS
DO
S
THI
OM
FR
D
NE
RA

BY TAI
AQL OB
BE
ALL
SH
1 04-10-06
01-03-06

RT
PA
DATE IN
OR
LL
FU
NO. 0 IN
N
TIO
REVISIONS UC
OD
DRAWN
PR
RE
NO
BY:- S. M. AQEEL CO.
Y
DATE:- 18-12-2005 CIT
TRI

CHECKED
EC
EL
UDI
BY:- R. AGARWAL SA
OF
DATE:- 04-10-06 TY
ER

OPRG. DEPT
OP
PR
LE
BY SO
E
DATE:- TH
E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 1 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD
CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬
Eastern Region Branch ‫فرع المنطقة الشرقـية‬
APPR'D

CHK'D
INDOOR LIGHTING

1. Scope

The PTS-1074 section 3.02.A.16 requires to provide indoor lighting for new 33/13.8kV
REVISED AS PER SEC-EOA COMMENTS

switchgear building in Sadea Substation as per the SES-P-119.25.


ISSUED FOR BASE DESIGN SUBMITTAL

2. Design Basis

Indoor lighting system for all rooms is designed using “Easy Plan Express Ver.2.4” software R.
provided by Saudi Lighting Co. All the lighting fixtures are considered from Saudi Lighting NE
OW
Co. for the design. ITS
OF
DESCRIPTION T
EN
NS
CO

3 AC Indoor Normal Lighting


EN
ITT
WR
E

3.1. Illumination levels


TH
T
OU
TH

As per SES p-119.25, the following minimum illumination levels are considered for the Indoor
WI
NT
ME
lighting design for different rooms and Battery rooms. CU
DO
 Relay / Control Room / Office 400 lux S
THI

 Battery Room 200 lux


OM
FR

 33/13.8 kV Switchgear Room 300 lux


D
NE
RA

 Basement 100 lux


BY TAI
AQL OB

 Record Room
BE
300 lux ALL
SH
1 04-10-06

 Workshop
01-03-06

500 lux RT
PA

 Toilet 100 lux


DATE IN
OR

 Existing building to be used as Store 100 lux


LL
FU
NO. 0 IN
N
TIO
REVISIONS UC
OD
DRAWN 3.2. Lighting fixtures PR
RE
NO
BY:- S. M. AQEEL CO.

DATE:- 18-12-2005
In general, industrial indoor wrap around fluorescent lighting fixtures are considered for the Y
CIT

switchgear rooms. Wherever false ceiling is provided, commercial indoor recess mounted
TRI

CHECKED
EC

fluorescent fixtures are provided in Workshop, Control and Relay room, etc. Explosion proof
EL
UDI
BY:- R. AGARWAL
fixtures for battery rooms have been considered.
SA
OF
DATE:- 04-10-06 TY
ER

OPRG. DEPT
OP
PR
LE
BY SO
E
DATE:- TH
E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 2 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD
CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬
Eastern Region Branch ‫فرع المنطقة الشرقـية‬
APPR'D

The following types of light fixtures are considered for design of AC Normal Lighting in New
CHK'D Switchgear Building

Sr. SLC Product


Description Fixture Type
No. Number
4x40W Commercial Indoor
REVISED AS PER SEC-EOA COMMENTS

1 Control and Relay room 5712A/44XB.2FU Recess mounted fluorescent


ISSUED FOR BASE DESIGN SUBMITTAL

lighting fixture

2x40W Industrial Indoor wrap


2 33 kV Switchgear room 7266/24XH.CL.FU around fluorescent lighting
fixture R.
NE
OW
ITS

2x40W Indoor wrap around


OF

3 13.8 kV Switchgear room 7266/24XH.CL.FU


DESCRIPTION T

fluorescent lighting fixture


EN
NS
CO
EN

2x40W Indoor wrap around


ITT

4 Basement 7266/24XH.CL.FU
WR
E
fluorescent lighting fixture TH
T
OU
TH

2x40W Indoor Explosion proof WI

5 Battery Room eLLK-92036/36.262 NT

fluorescent lighting fixture ME


CU
DO
S

4x40W Commercial Indoor


THI
OM

6 Record Room 5712A/44XB.2FU Recess mounted fluorescent


FR
D

lighting fixture
NE
RA

BY TAI
AQL OB
BE
ALL
4x40W Commercial Indoor SH
1 04-10-06
01-03-06

RT

DATE 7 Workshop 5712A/44XB.2FU Recess mounted fluorescent PA


IN

lighting fixture OR
LL
FU
NO. 0 IN

2x40W Commercial Indoor


N
TIO
REVISIONS
8 Toilet 5712A/24XB.2FU Recess mounted fluorescent
UC
OD
DRAWN
lighting fixture
PR
RE
NO
BY:- S. M. AQEEL CO.
Y
DATE:- 18-12-2005 CIT
TRI

CHECKED
EC
EL
UDI
BY:- R. AGARWAL
3.3. Mounting SA
OF
DATE:- 04-10-06 TY
ER

OPRG. DEPT Mounting height of light fitting is in line with SES - P -119.25. However, for the rooms with
OP
PR

false ceiling, fixture height is matched with the false ceiling.


LE
BY SO
E
DATE:- TH
E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 3 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD
CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬
Eastern Region Branch ‫فرع المنطقة الشرقـية‬
APPR'D

CHK'D 3.4. Design Parameters

The following design parameters are considered for illumination design.


a. As per section 4.1.2 of SES-P-119.25, reflectance factors are
-Ceiling : 30
-Walls : 30
REVISED AS PER SEC-EOA COMMENTS

-Floor : 20
ISSUED FOR BASE DESIGN SUBMITTAL

b) Lamp dirt deposition factor : 0.95


c) Lamp lumen depreciation factor : 0.85
d) Total maintenance factor = 0.95 x 0.85 =0.8

Refer Annex-V for manufacturer’s recommendation for the above mentioned depreciation R.
factors. NE
OW
ITS
OF
DESCRIPTION T
EN

3.5. Work plane height NS


CO
EN
ITT

Work plane height is considered as 1Mtr as per SES-P-119.25, Cl. 4.1.8 for AC normal
WR
E

lighting.
TH
T
OU
TH
WI
NT
ME
CU
DO
4. DC Emergency Lighting S
THI
OM
FR

As per section 5.4 of SES-P-119.25, average maintained illumination level of 10 lux at the D
NE

floor is considered for design of lighting.


RA

BY TAI
AQL OB
BE
ALL

DC Emergency lighting with 60W Incandescent Ceiling mounted/suspended fixture powered


SH
1 04-10-06
01-03-06

RT

by 125V Substation battery (SLC Product No. 8513S/11-60.GP for normal rooms and
PA
DATE IN

AB501U for battery room) are proposed. The Emergency lighting loads are considered in
OR
LL

Battery sizing calculation.


FU
NO. 0 IN
N
TIO
REVISIONS UC
The emergency lighting main supply shall be automatically switched on in the event of an AC OD
DRAWN
PR

lighting failure. Manual control switches shall be provided so as to have manual control on RE
NO
BY:- S. M. AQEEL
these fittings for maintenance. CO.
Y
DATE:- 18-12-2005 CIT
TRI

CHECKED Work plane height is considered from floor for design calculation and other design
EC
EL

parameters are similar to the AC lighting design parameters.


UDI
BY:- R. AGARWAL SA
OF
DATE:- 04-10-06 TY
ER

OPRG. DEPT
OP
PR
LE
BY SO
E
DATE:- TH
E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 4 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD
CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬
Eastern Region Branch ‫فرع المنطقة الشرقـية‬
APPR'D

CHK'D 4.1. Lighting fixtures

The following types of light fixtures are considered for design of DC Normal Lighting in New
Switchgear Building
REVISED AS PER SEC-EOA COMMENTS

SLC Product
Description Fixture Type
ISSUED FOR BASE DESIGN SUBMITTAL

No. Number
1x60W Incandescent lighting
1 Control and Relay room 8513S/11-60.GP
fixture
1x60W Incandescent lighting
2 33 kV Switchgear room 8513S/11-60.GP
fixture R.

1x60W Incandescent lighting NE

3 13.8 kV Switchgear room 8513S/11-60.GP


OW

fixture
ITS
OF

1x60W Incandescent lighting


DESCRIPTION T

4 Basement 8513S/11-60.GP
EN

fixture
NS
CO
EN
ITT
1x60W Incandescent lighting WR
5 Battery Room AB501U E
fixture TH
T
OU

1x60W Incandescent lighting TH

6 Record Room 8513S/11-60.GP


WI

fixture
NT
ME

1x60W Incandescent lighting


CU

7 Toilet 8513S/11-60.GP
DO

fixture
S
THI
OM
FR
D
NE
RA

BY TAI
AQL OB
BE

5. Exit Lights ALL


SH
1 04-10-06
01-03-06

RT
PA

Wall or ceiling mounted “EXIT” light fittings


DATE IN
OR
LL
FU

(SLC catalogue No. 5273FW/108XB.E3 for Switchgear and control rooms


NO. 0 IN
N
TIO
REVISIONS UC

SLC catalogue No. EE11PLA.T143WR for battery room with built–in battery packs are
OD
DRAWN
PR
RE

BY:- S. M. AQEEL
provided above the Exit doors and at strategic exit locations so as to make visible the exit NO
CO.

DATE:- 18-12-2005
route in case of failure of AC lighting. Y
CIT
TRI

CHECKED
EC

The above mentioned fixtures shall be provided with “EXIT” and its Arabic equivalent text in EL
UDI
BY:- R. AGARWAL
RED on WHITE background.
SA
OF
DATE:- 04-10-06 TY
ER

OPRG. DEPT Supply voltage shall be fed from 127V AC branch circuit and the self contained sealed lead
OP
PR

acid rechargeable standby batteries suitable for 90 minutes illumination.


LE
BY SO
E
DATE:- TH
E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 5 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD
CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬
Eastern Region Branch ‫فرع المنطقة الشرقـية‬
APPR'D

CHK'D 6. Indoor Portable Emergency Lighting Fixtures

Portable CRH-N2LPS6222.A emergency flood lighting fixtures having built-in Battery packs
have been proposed for main entrances.

SLC Product No. ALCO 460/ELT50N2512 has been proposed for control room, Switchgear
REVISED AS PER SEC-EOA COMMENTS

rooms and basement, etc. for EGRESS lighting.


ISSUED FOR BASE DESIGN SUBMITTAL

These fittings shall be provided at locations and access ways leading to an Exit to illuminate
the exit ways for safe passage. The battery shall be suitable for charging from 127V AC
dedicated plug-in supply. The self contained rechargeable standby batteries are suitable for
1.5 hours illumination. A test push button shall be provided at an accessible height to test the R.
healthiness of the fitting. NE
OW
ITS
OF
DESCRIPTION
2 x 25 W explosion proof fixtures (Product No. H2PHE6S20-20) have been used for battery T
EN

room. NS
CO
EN
ITT

For lighting fixtures details see Annex-V.


WR
E
TH
T
OU
TH
WI
NT
ME
CU
DO
S
THI
OM
FR
D
NE
RA

BY TAI
AQL OB
BE
ALL
SH
1 04-10-06
01-03-06

RT
PA
DATE IN
OR
LL
FU
NO. 0 IN
N
TIO
REVISIONS UC
OD
DRAWN
PR
RE
NO
BY:- S. M. AQEEL CO.
Y
DATE:- 18-12-2005 CIT
TRI

CHECKED
EC
EL
UDI
BY:- R. AGARWAL SA
OF
DATE:- 04-10-06 TY
ER

OPRG. DEPT
OP
PR
LE
BY SO
E
DATE:- TH
E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 6 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD
CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬
Eastern Region Branch ‫فرع المنطقة الشرقـية‬
APPR'D

CHK'D OUTDOOR LIGHTING

1. Scope

The PTS-1074 section 3.02.A.16 requires to provide outdoor lighting and outdoor receptacles
for the new substation area as per SES-P-119.25.
REVISED AS PER SEC-EOA COMMENTS
ISSUED FOR BASE DESIGN SUBMITTAL

2. Design Basis

Outdoor lighting for New S/S is designed using “EASY PLACE Ver.2.2” software provided by
Saudi Lighting Co. All the lighting fixtures are considered from Saudi Lighting Co. for the R.
design. NE
OW
ITS
OF
DESCRIPTION
A minimum maintained illumination level of 20 Lux is required for design of outdoor lighting T
EN

(As per SEC-P-119.25, Cl. 5.1). The lighting software results show an illumination level of NS
CO

more than 20 Lux all around the new 13.8kv switchgear building, transformers areas, and all
EN
ITT

outdoor area.
WR
E
TH
T

However software showing minimum value of 4 lux is due to the reason that it has calculated
OU
TH

minimum lux level below new switchgear building (as there would be no lighting below
WI
NT
ME
building). CU
DO
S
THI
The following light loss factors are considered for design (as per manufacturer OM
FR

recommendation as required by Cl.3.1.3 of SES-P-119.25) D


NE
RA

BY TAI
AQL OB

2.1) Lamp Lumen Depreciation factor (LLD) = 0.9


BE
ALL
SH
1 04-10-06
01-03-06

RT

2.2) Lamp Dirt Depreciation factor (LDD) = 0.8


PA
DATE IN
OR
LL

Total light loss factor = LLD X LDD = 0.7


FU
NO. 0 IN
N
TIO
REVISIONS UC
Please refer Annex-V for manufacturer’s recommendation for the above mentioned OD
DRAWN
PR

depreciation factors. RE
NO
BY:- S. M. AQEEL CO.
Y
DATE:- 18-12-2005 For S/S building outdoor lighting, flood lights are mounted on the parapet of the wall around
CIT
TRI

CHECKED the S/S Building. For area lighting, flood lights are mounted on 10.0 m high lighting poles.
EC
EL
UDI
BY:- R. AGARWAL SA
OF
DATE:- 04-10-06 TY

3. Incandescent light fixtures


ER

OPRG. DEPT
OP
PR
LE
BY SO
1 x 60W Incandescent lighting fixtures are considered for entrances i.e. double leaf and E
DATE:- TH
single leaf doors. E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 7 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD
CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬
Eastern Region Branch ‫فرع المنطقة الشرقـية‬
APPR'D

CHK'D 4. Lighting fixtures

The following types of light fixtures are considered for design of outdoor lighting:

Sr.
Description SLC Product Number Fixture Type
REVISED AS PER SEC-EOA COMMENTS

No.
ISSUED FOR BASE DESIGN SUBMITTAL

1. Flood light (Area Lighting) PF-400W/5-400BP.66 1x 400W HPSV Lamp

Flood light (Building


2. PF-400W/5-250BP.66 1x 250W HPSV Lamp R.

Parapet / Wall Mounted) NE


OW
ITS
OF

1x60 W Incandescent
DESCRIPTION T

3. Building Entrance 8513W/11-60.GP


EN

lighting fixture
NS
CO
EN
ITT
WR
E
The location of flood lighting fixtures are shown in the Drawing No EA-731119, Outdoor Lighting TH
T
and Small Power Layout. OU
TH
WI
NT
ME
CU
DO
S
THI
OM
FR
D
NE
RA

BY TAI
AQL OB
BE
ALL
SH
1 04-10-06
01-03-06

RT
PA
DATE IN
OR
LL
FU
NO. 0 IN
N
TIO
REVISIONS UC
OD
DRAWN
PR
RE
NO
BY:- S. M. AQEEL CO.
Y
DATE:- 18-12-2005 CIT
TRI

CHECKED
EC
EL
UDI
BY:- R. AGARWAL SA
OF
DATE:- 04-10-06 TY
ER

OPRG. DEPT
OP
PR
LE
BY SO
E
DATE:- TH
E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 8 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD
CERT'D Saudi Electricity Company ‫الشركـة السعوديـة للكـهرباء‬
Eastern Region Branch ‫فرع المنطقة الشرقـية‬
APPR'D

CHK'D
ATTACHEMENTS

Annexure - I Calculation Sheets for AC Normal lighting for New 33/13.8 kV


Substation Building using SLC software
REVISED AS PER SEC-EOA COMMENTS

Annexure - II Calculation Sheets for DC Emergency lighting for New 33/13.8 kV


ISSUED FOR BASE DESIGN SUBMITTAL

Substation Building using SLC software


Annexure - III Calculation Sheets for Outdoor lighting using SLC software

Annexure – IV Calculation Sheets for Normal and Emergency lighting for Existing R.
NE

Substation Building (to be used as Store) using SLC software OW


ITS
OF

Annexure - V Catalogue for Proposed Lighting fixtures & Manufacturer’s


DESCRIPTION T
EN

recommendations
NS
CO
EN
ITT
WR
E
TH
T
OU
TH
WI
NT
ME
CU
DO
S
THI
OM
FR
D
NE
RA

BY TAI
AQL OB
BE
ALL
SH
1 04-10-06
01-03-06

RT
PA
DATE IN
OR
LL
FU
NO. 0 IN
N
TIO
REVISIONS UC
OD
DRAWN
PR
RE
NO
BY:- S. M. AQEEL CO.
Y
DATE:- 18-12-2005 CIT
TRI

CHECKED
EC
EL
UDI
BY:- R. AGARWAL SA
OF
DATE:- 04-10-06 TY
ER

OPRG. DEPT
OP
PR
LE
BY SO
E
DATE:- TH
E

ENG'G. DEPT.
AR
N
REI
BY:- HE
ED
DATE:-
AIN
NT

CERTIFIED.
CO
N
TIO
BY:- MA
OR
DATE:-
INF
E

DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
TH
THIS DRAWING IS NOT D
TO BE USED FOR AN
CONSTRUCTION OF
REINFORCEMENT OF 33/13.8KV SADEA S/S A DA106 EE-731075 9 OF 9 1
ING
FOR ORDERING AW
MATERIALS UNTIL INDOOR & OUTDOOR LIGHTING SYSTEM DESIGN DR

CALCULATION
S
CERTIFIED AND
AL JOUF SAUDI ARABIA JOB ORDER NO. – 430304-01001 DWG. CONT. SHT. EE -731070
THI
DATED

SEC-ERB CAD-E (2002/03)


WORD

Potrebbero piacerti anche