Sei sulla pagina 1di 1

CL

0.85 2.00 0.85

CREST WIDTH
0.30 0.50 1.20 1.84

0.20

0.20
TOP OF REVETMENT, ELEV = 17.368m.

FREEBOARD = 17.068m.
STONE MASONRY, 0.30m THK.

0.40
ORIGINAL GROUND

VAR.
CONCRETE FACING

HANDLAID ROCK EMBANKMENT

3.55
0.60

2.00 m. MAXIMUM
HIGHEST FLOOD LEVEL, ELEV = 15.056m.

0.40

HAND-LAID ROCK EMBANKMENT 0.40

TOP OF PILE CAP, ELEV = 13.818m.


ORDINARY FLOOD LEVEL, ELEV = 13.758m.

0.40
TOP OF STEEL SHEET PILE ELEV = 13.568

SEE PILE CAP DETAIL

RIVER BED
SEE PILE CAP DETAIL
MLLW, LEVEL = 12.46m.
PROPOSED STEEL SHEET PILE
(GSP-2) @ 6.00m. LENGTH

TYPICAL SECTION OF REVETMENT


SCALE 1 : 25 MTS.

PROJECT TITLE: SHEET CONTENTS: DESIGNED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO:
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGH WAYS PLANS FOR THE


REGION XIII CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM TYPICAL SECTION OF REVETMENT
OFFICE OF THE DISTRICT ENGINEER ALONG SURIGAO RIVER B 1
LOCATION : BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE NESAH B. DAPAR GINA P. SORIANO EMMANUEL J. CABANOS HENRY CRUZ J. MARAPAO
SURIGAO DEL NORTE 1ST ENGINEERING DISTRICT RP1 5
SURIGAO CITY SOURCE OF FUND: REGULAR INFRA CY 2018
ENGINEER II CHIEF PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
APPROPRIATION: 70,000,000.00
1ST DISTRICT PLANNING AND DESIGN SECTION