REPORT ON GEOTECHNICAL WORKS

FOR

25MW SOLAR FARM NEAR UITM PASIR GUDANG,


JOHOR.

MAY 2019

PREPARED FOR

SPIC ENERGY MALAYSIA BERHAD


G-02, Menara Amcorp, Amcorp Trade Center,
18 Jalan Persiaran Barat, 46050 Petaling Jaya,
Selangor Darul Ehsan.

D- 6, Jln. Permatang Gedong, Taman Sejati Indah,


08000 Sungai Petani, Kedah.
Tel : 04 – 4310 944
Fax : 04 – 4310 944

MZ ERAT SERVICES
LIST OF CONTENTS

PARTICULARS

AUTHENTICATION OF THE FACTUAL REPORT


1.0 Soil investigation report
2.0 Geotechnical assessment and design report
3.0 Electrical resistivity report
4.0 Photographs
5.0 Location plan

1
SOIL INVESTIGATION REPORT

2
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

CONTENTS
Item Particulars Page

1.0 INTRODUCTION 2
2.0 OBJECTIVES 2
3.0 SCOPE OFWORKS 2
4.0 FIELD EXPLORATION AND IN-SITU TESTING 3
4.1 Deep Boring 3
4.2 Standard Penetration Test 3
4.3 Rock Drilling 4
4.4 Sampling In Boreholes 4
4.5 Termination Criteria 5
4.6 Soil Investigation Work Schedule 5
5.0 MACKINTOSH PROBES (MP) TESTS 6
6.0 LABORATORY TESTING 6
7.0 SOIL CLASSIFICATION SYSTEM 7
8.0 RELATIVE DENSITY OF SAND 7
9.0 CONSISTENCY OF CLAY AND SILT 7

APPENDICES :

APPENDIX A : BOREHOLE LOG


APPENDIX B : MACKINTOSH PROBES TEST RESULTS
APPENDIX C : LABORATARY TEST RESULTS

1
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

1.0 INTRODUCTION

This is a site investigation report for the project, “GEOTECHNICAL WORKS FOR
25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.”

2.0 OBJECTIVES

i. To obtain geotechnical information at the site so as to provide data in the


evaluation of subsequent construction of the proposed project.
ii. To explore the subsoil condition at the proposed site by exploratory
boreholes
iii. To obtain disturbed and undisturbed samples for visual examination to
determine the physical parameters of the soil
iv. To obtain shear strength of the soil
v. To measure the ground water table at the site

3.0 SCOPE OF WORKS

All together fourteen (14) numbers of deep borehole, thirty (30) number of
mackintosh probes and twelve (12) survey alignments electrical resistivity using
pole-dipole array with 100 m – 200 m in length were carried out at the proposed
site. The locations of the test position are as shown in site plan. The site
investigation works were carried out in compliance with relevant test methods and
procedures as specified in the specification and work instruction.

2
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

4.0 FIELD EXPLORATION AND IN-SITU TESTING

4.1 DEEP BORING

4.1.1 Boring Plant

The boring plant used were YWE type which is capable of boring and drilling to
depths indicated in the Bill Of Quantities and Drawings. This boring rig is also
suitable for advancing borehole, sampling, insitu testing and rock drilling in
accordance with the relevant specifications of each of these operations.

The method for advancing the boreholes were rotary boring, continuous
samplings, rotary drilling or a combination of these methods. Using these
methods, enable us to observe the soil strata encountered. When undisturbed
samples were taken reasonably clean hole was provided and the portion of the soil
to be sampled not unduly disturbed.
The size of the boreholes were such that all the requirement of size in sampling,
in-situ testing, etc. were satisfied. For this project, boring into soil was terminated
as instructed by the S.O’s representative at the site.

4.2 STANDARD PENETRATION TEST

Standard Penetration Test (SPT) was carried out in accordance with clause 3.3 BS
1377: Part 9:1990, :Determination of the penetration resistance using the split-
barrel sampler”, using a self - tripping hammer of 63.5 + 0.5 kg. weight of an
approved design. Generally, it was carried out in all types of soil excepts the very
soft and soft clays, The test were carried out 1.5 meter interval thereafter or
change of strata or as instructed by the S.O’s representative.

3
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

The value of N as defined in British Standard (BS) was reported together with the
number of blow counts for each 75mm penetration of the sampling tube. The blow
counts for the first 150mm penetration (the seating drive) which do not contribute
the value of N was also included. Two examples are 2, 3, 6, 7, 10, 19 will give
N=42 and 10, 12, 35, 15/25mm will give N=50/100mm.

When a penetration resistance of 50 blows for 25mm penetration was


encountered in the seating drive, the test would be stopped and the SPT value
would be recorded as N=50/25mm. The soil samples recovered from the split
barrel were then preserved as disturbed samples for subsequent laboratory
testing.

4.3 ROCK DRILLING

The procedure for rock drilling used is in accordance with BS 5930:1981. The
diameter of the core barrels used were such as to produce a rock core of 54.0mm
diameter size ie. NMLC or NX core barrels. The Core Recovery Ratio (CRR) and the
Rock Quality Designation (RQD) were also reported for each core run.

The CRR meant the ratio length of good quality cores over the drilling length
expressed to the nearest 5% and the RQD was the ratio of the total length of
good quality cores each exceeding 100mm in length over the drilling run correct to
the nearest 5 %. Good quality rock is defined as intact core having a fully circular
circumference or in the case of broken rock fragments assembled to from cores
with fully circular circumference

4.4 SAMPLING IN BOREHOLES

Disturbed samples were obtained by means of split spoon sampler, which were
equipped with flap retainer or basket retainer or other attachments necessary for

4
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

cohesionless soil. The minimum amount of soil samples obtained were such that
the quantity is sufficient to carry out various classifications test.

Disturbed samples were normally preserved immediately after being recovered, in


double layered heavy gauge polyethene bags sealed to form an air tight bag.

Undisturbed samples were taken with thin-walled tube sampler described in BS


5930 or as directed. About 40mm of the soil were removed from the top and
bottom of the thin-walled sampling tube, and then the ends of the tube were filled
with nom-shrinking microcrystalline wax in layers to a thickness of about 40mm.
All samples are then taken and clearly labelled and legibly marked with the name
of the project, depth of sampling, date taken and the type of sample. The
minimum length of the tube was 600mm.

4.5 TERMINATION CRITERIA

BOREHOLE

The field exploration shall be terminated when:

i. Five (5) consecutive SPT, N > 50/300mm of hard layers or a maximum depth
of 30.00m has been reached ( whichever arrives first)
ii. 3.00 m length of continuous good coring for Igneous/Metamorphic rocks and
6.00m in Sedimentary rocks.
iii. SPT to be carried out at 1.5m interval.

4.6 SOIL INVESTIGATION WORK SCHEDULE

The field were carried out by the respective personnel and in accordance with
procedures and equipment as described above. The drilling works had started on
12 April 2019 and successfully completed on 24 April 2019.

5
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

5.0 MACKINTOSH PROBES (MP) TESTS

Mackintosh probes equipment consist of series of 15mm diameter spring steel


rods. The length of the rods is 1.22m each and connected together by screws
coupling. A hardened steel tip of 2.5mm diameter with cross section area of 5cm
square is driven into the soil with the help of a falling hammer. The weight of the
hammer is 5kg. And the height of fall is 0.3m. In operation the total number of
blows required for every 0.3m penetration is recorded. The penetration is
continues until 400 blows/0.3m or less is encountered.

The maximum resistance of 400 blows/0.3m (300mm) penetration was achieved


at a maximum depth of 15.00m or shallower. The results of Mackintosh probes are
attached in APPENDIX B.

6.0 LABORATORY TESTING

Soil laboratory tests were carried out in accordance with the procedures in MS
1056 : 2005, BS 1377 : 1990.

a. Moisture Content
b. Atterberg Limits (Liquid & Plastic Limit and plasticity Index)
c. Particle Size Distribution (PSD) – Coarse and Fine Grained.
d. Bulk and Dry Density
e. Specific Gravity
f. One – Dimensional Consolidation test
g. Unconsolidated undrained triaxial compression test (UU)
h. Sulphate Content
i. pH Value

6
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

7.0 SOIL CLASSIFICATION SYSTEM

The classification of soil as presented in this report follows the British Soil
Classification System as shown in Jadual 1 and Jadual 2.

8.0 RELATIVE DENSITY OF SAND

The relationship between the SPT results and the relative density of the sand
strata encountered in the borehole is shown in Jadual 3.

9.0 CONSISTENCY OF CLAY AND SILT

The relationship between the SPT results and Unconfined Compressive Strength of
clay and silt encountered in the shown in Jadual 3.

7
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

APPENDIX A
BOREHOLE LOG
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 1 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 1 Type of Drill : Rotary Wash Boring (YWE) Date : 22.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Yellow with brown and red dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5

_ 1.50 Soft to medium stiff, red with brown and yellow X


X
X
X
X
X
X
MHS 1.50 - P1 0 0 1 1 1 1 4 80%
dappled sandy SILT of high plasticity with X
X
X
X
X
X
X
1.95 D2
X X X X
traces of gravel X X X
X X X X
X X X
3

_ 3.00 Red with brown and yellow dappled sandy SILT X


X
X
X
X
X
X
3.00 - UD1 56%
X X X X
X X X 3.50
X X X X
X X X
X X X X
X X X
4.5

_ 4.50 Medium stiff, red with yellow and light grey X


X
X
X
X
X
X
MIS 4.50 - P2 2 2 2 1 1 1 5 42%
dappled sandy SILT of intermediate plasticity X
X
X
X
X
X
X
4.95 D3
X X X X
with a little gravel X X X
X X X X
X X X

_ 6.00 Medium stiff, red with yellow and brown X


X
X
X
X
X
X
MIS 6.00 - P3 2 1 1 2 2 2 7 40%
6

dappled sandy SILT of intermediate plasticity X


X
X
X
X
X
X
6.45 D4
with a little gravel X
X
X
X
X
X
X

X X X X
X X X

Depth (m)
_ 7.50 Stiff, ditto. X
X
X
X
X
X
X
MIS 7.50 - P4 4 2 1 1 2 3 7 53% 7.5

X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

_ 9.00 Stiff, ditto. X


X
X
X
X
X
X
MIS 9.00 - P5 3 2 2 2 1 2 7 55% 9 12
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Very stiff, brown with red and yellow dappled


X X X X
_ X X X 10.50 - P6 2 3 3 3 5 5 16 46% 10.5

sandy SILT X
X
X
X
X
X
X
10.95 D7
X X X X
X X X
X X X X
X X X
+++++++++
_ 12.00 Light grey with dark grey and red slightly weathered +++++ 12.00 - C1 CR = 1500 mm 12
+++++++++
good GRANITE +++++ 13.50 CRr = 1500/1500 mm
+++++++++
+++++
RQD =100.0%
+++++++++
+++++
+++++++++
_ 13.50 Light grey with dark grey and red slightly weathered +++++ 13.50 - C2 CR = 1500 mm
+++++++++ 13.5
good GRANITE +++++ 15.00 CRr = 1400/1500 mm
+++++++++
+++++
RQD = 92.0%
+++++++++
End of Borehole At 15.00 m +++++
NOTES: LEGEND: Ground Water Level = 9.80m
S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 2 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 23.04.2019-24.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Red with brown and yelllow dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5

_ 1.50 Soft, red with yellow and brown dappled sandy X


X
X
X
X
X
X
MHS 1.50 - P1 0 0 0 1 1 1 3 55%
SILT of high plasticity with traces of gravel X
X
X
X
X
X
X
1.95 D2
X X X X
X X X
X X X X
X X X
3

_ 3.00 Medium stiff, ditto. X


X
X
X
X
X
X
MHS 3.00 - P2 1 1 1 2 1 2 6 48%
X X X X
X X X 3.45 D3
X X X X
X X X
X X X X
X X X
4.5

_ 4.50 Red with yellow and brown dappled sandy SILT X


X
X
X
X
X
X
4.50 - UD1 60%
X X X X
X X X 5.00
X X X X
X X X
X X X X
X X X

_ 6.00 Medium stiff, red with yellow and brown dappled X


X
X
X
X
X
X
6.00 - P3 1 1 2 2 1 2 7 60%
6

sandy SILT X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X
X X X

Depth (m)
_ 7.50 Medium stiff, brown with yellow dappled sandy X
X
X
X
X
X
X
MIS 7.50 - P4 1 1 1 2 1 1 5 55% 7.5

SILT of intermediate plasticity with traves X


X
X
X
X
X
X
7.95 D5
X X X X
of gravel X X X
X X X X
X X X

_ 9.00 Medium stiff, brown with red spotted sandy X


X
X
X
X
X
X
MHS 9.00 - P5 1 1 2 2 2 1 7 55% 9 12
SILT of high plasticity X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Medium stiff to stiff, ditto.


X X X X
_ X X X 10.50 - P6 1 1 2 2 2 2 8 55% 10.5
X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Medium stiff, brown with white dappled sandy


X X X X
_ X X X MHS 12.00 - P7 1 2 1 1 2 2 6 55% 12

SILT of high plasticity X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Hard, white with brown dappled sandy SILT


X X X X
_ X X X 13.50 - P8 2 4 6 9 9 12 36 55%
13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 3.80m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 2 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 23.04.2019-24.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Hard, dark grey with brown and white dappled


X X X X
X X X 15.00 - P9 3 6 12 26 12 50 60% 15.5

_ sandy SILT X
X
X
X
X
X
X
15.33 D10 30 mm
X X X X
X X X
X X X X
X X X 0
16.50 Hard, ditto.
X X X X
X X X 16.50 - P10 8 8 10 15 25 50 57% 17

_
X
X
X
X
X
X
X
16.85 D11 50 mm
X X X X
X X X
X X X X
X X X
+++++++++
16.90 Light grey with dark grey and light red mottled +++++ 16.90 - C1 CR = 1500 mm
+++++++++ 18.5
_ slightly weathered good GRANITE +++++ 18.40 CRr = 1500/1500 mm
+++++++++
+++++
RQD = 95.0%
+++++++++
+++++
+++++++++
18.40 Ditto +++++ 18.40 - C2 CR = 1500 mm
+++++++++
_ +++++ 19.90 CRr = 1450/1500 mm 20

+++++++++
+++++
RQD = 90.0%
+++++++++
+++++

Depth (m)
_ End of Borehole At 19.90 m 21.5

_ 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 3.80m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 3 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019-19.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish red SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, mottled red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 1 2 2 2 7 88%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Medium stiff to stiff, brownish red sandy SILT X


X
X
X
X
X
X
MIS 3.00 - P2 2 1 2 1 2 3 8 100%
of intermediate plasticity with traces of X
X
X
X
X
X
X
3.45 D2
gravel X
X
X
X
X
X
X

X X X X 4.5
X X X

_ 4.50 Stiff, mottled brown sandy SILT of high X


X
X
X
X
X
X
MHS 4.50 - P3 1 2 2 1 3 4 10 100%
plasticity with traces of gravel X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Very stiff, brownish red sandy SILT of X


X
X
X
X
X
X
MHS 6.00 - P4 2 4 3 6 3 4 16 88%
high plasticity with traces of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Very stiff, ditto. X


X
X
X
X
X
X
MHS 7.50 - P5 3 4 4 4 4 6 18 88%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Very stiff, ditto. X X X X 9


_ 9.00 X X X MHS 9.00 - P6 2 4 3 3 4 6 16 100% 29
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Very stiff, mottled brown sandy SILT


X X X X
_ X X X 10.50 - P7 4 3 5 4 5 5 19 77% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Very stiff, ditto.


X X X X
_ X X X 12.00 - P8 3 4 4 6 6 6 22 88% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, brownish red sandy SILT


X X X X
_ X X X 13.50 - P9 4 3 5 5 7 10 27 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 10.58m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 3 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019-19.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Hard, mottled red SILT


X X X X
X X X 15.00 - P10 6 9 23 27 50 100% 15.5

_ with traces of gravel X


X
X
X
X
X
X
15.30 D10 75 mm
X X X X
X X X
X X X X
X X X 0
16.50 Hard, ditto.
X X X X
X X X 16.50 - P11 7 12 19 31 50 100% 17

_
X
X
X
X
X
X
X
16.78 D11 55 mm
X X X X
X X X
X X X X
X X X

18.00 Hard, mottled red SILT


X X X X
X X X 18.00 - P12 5 9 29 21 50 100%
18.5
_ with traces of gravel X
X
X
X
X
X
X
18.25 D12 25 mm
X X X X
X X X
X X X X
X X X

19.50 Hard, ditto.


X X X X
X X X 19.50 - P13 23 17 50 50 90%
_
X
X
X
X
X
X
X
19.70 P13 50 mm 20

X X X X
X X X
X X X X
X X X

21.00 Hard, mottled brown SILT


X X X X
X X X 21.00 - P14 29 21 50 100%

Depth (m)
_ with traces of gravel X
X
X
X
X
X
X
21.14 D14 65 mm 21.5

X X X X
X X X
X X X X
X X X
X X X X
X X X

_ End of Borehole At 21.10 m 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 10.58m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 4 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Yellow with brown and red dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5
. . . . .
_ 1.50 Loose, red with brown and yellow dappled . . . . SML 1.50 - P1 2 2 2 2 2 2 8 33%
. . . . .
silty SAND of low plasticity with a little . . . . 1.95 D2
. . . . .
gravel . . . .
. . . . .
. . . .
3
. . . . .
_ 3.00 Red with brown and yellow dappled silty SAND . . . . 3.00 - UD1 60%
. . . . .
. . . . 3.50
. . . . .
. . . .
. . . . .
. . . .
4.5
. . . . .
_ 4.50 Loose, ditto. . . . . 4.50 - P2 2 2 2 2 2 2 8 55%
. . . . .
. . . . 4.95 D3
. . . . .
. . . .
. . . . .
. . . .
. . . . .
_ 6.00 Loose to medium dense, red with brown and yellow . . . . SML 6.00 - P3 2 2 2 2 3 3 10 55%
6

. . . . .
dappled silty SAND of low plasticity with . . . . 6.45 D4
. . . . .
a little gravel . . . .
. . . . .
. . . .

Depth (m)
. . . . .
_ 7.50 Medium dense, ditto. . . . . SML 7.50 - P4 3 4 4 4 3 3 14 26% 7.5

. . . . .
. . . . 7.95 D5
. . . . .
. . . .
. . . . .
. . . .

_ 9.00 Stiff to very stiff, red with yellow and brown X


X
X
X
X
X
X
MIS 9.00 - P5 1 2 3 3 5 4 15 55% 9 27
dappled sandy SILT of intermediate plasticity X
X
X
X
X
X
X
9.45 D6
X X X X
with a little gravel X X X
X X X X
X X X

10.50 Stiff, ditto.


X X X X
_ X X X MIS 10.50 - P6 2 2 2 2 3 2 9 55% 10.5
X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Medium stiff to stiff, ditto.


X X X X
_ X X X 12.00 - P7 2 2 2 2 2 2 8 55% 12
X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, ditto.


X X X X
_ X X X 13.50 - P8 2 2 2 3 3 3 11 44%
13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 10.30m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 4 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X
+++++++++
14.70 Reddish with light grey dappled slightly weathered +++++ 14.70 - C1 CR = 1500 mm 15.5
+++++++++
_ good GRANITE +++++ 16.20 CRr = 1300/1500 mm
+++++++++
+++++
RQD = 90.0%
+++++++++
+++++ 0
+++++++++
16.20 light grey and grey with red dappled slightly weathered +++++ 16.20 - C2 CR = 1500 mm 17
+++++++++
_ good GRANITE +++++ 17.70 CRr = 1350/1500 mm
+++++++++
+++++
RQD = 89.0%
+++++++++
+++++
+++++++++
+++++
18.5
_

End of Borehole At 17.70 m


_ 20

Depth (m)
_ 21.5

_ 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 10.30m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 5 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 19.04.2019 - 20.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Red with yellow and brown dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5

_ 1.50 Soft to medium stiff, red with yellow and brown X


X
X
X
X
X
X
MHS 1.50 - P1 1 1 1 1 1 1 4 24%
dappled sandy SILT of high plasticity X
X
X
X
X
X
X
1.95 D2
X X X X
with traces of gravel X X X
X X X X
X X X
3

_ 3.00 Yellow with brown and red dappled sandy SILT X


X
X
X
X
X
X
3.00 - UD1 50%
X X X X
X X X 3.45
X X X X
X X X
X X X X
X X X
4.5

_ 4.50 Medium stiff to stiff, ditto. X


X
X
X
X
X
X
MHS 4.50 - P2 1 1 2 2 2 2 8 51%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X

_ 6.00 Stiff, red with yellow and brown dappled sandy X


X
X
X
X
X
X
MHS 6.00 - P3 2 2 3 2 2 3 10 66%
6

SILT of high plasticity with traces of X


X
X
X
X
X
X
6.45 D4
gravel X
X
X
X
X
X
X

X X X X
X X X

Depth (m)
_ 7.50 Stiff, ditto. X
X
X
X
X
X
X
7.50 - P4 2 3 4 3 3 4 14 55% 7.5

X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

_ 9.00 Stiff to very stiff, ditto X


X
X
X
X
X
X
MHS 9.00 - P5 2 2 3 4 4 4 15 55% 9 27
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Medium stiff, ditto.


X X X X
_ X X X 10.50 - P6 1 1 1 2 1 2 6 55% 10.5
X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Medium stiff, ditto.


X X X X
_ X X X MHS 12.00 - P7 2 1 2 1 2 2 7 55% 12
X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, pink with yellow and light grey dappled


X X X X
_ X X X 13.50 - P8 1 2 2 2 3 2 9 55%
13.5
sandy SILT X
X
X
X
X
X
X
13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 7.45 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 5 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 19.04.2019 - 20.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Stiff, pink with yellow and light grey dappled


X X X X
X X X 15.00 - P9 3 3 3 3 3 3 12 55% 15.5

_ sandy SILT X
X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Medium stiff, yellow with light grey and brown
X X X X
X X X 16.50 - P10 1 1 1 2 2 2 7 55% 17

_ dappled sandy SILT X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Stiff, ditto.


X X X X
X X X 18.00 - P11 1 2 2 2 2 3 9 55%
X X X X 18.5
_ X X X 18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Stiff, purple with light grey and yellow dappled


X X X X
X X X 19.50 - P12 1 2 2 3 3 3 11 55%
_ sandy SILT X
X
X
X
X
X
X
19.95 D13 20

X X X X
X X X
X X X X
X X X

21.00 Stiff to very stiff, yellow with light grey and purple
X X X X
X X X 21.00 - P13 1 2 2 4 4 5 15 55%

Depth (m)
_ dappled sandy SILT X
X
X
X
X
X
X
21.45 P14 21.5

X X X X
X X X
X X X X
X X X

22.50 Very stiff, yellow with brown and light grey


X X X X
X X X 22.50 - P14 2 3 4 6 6 9 25 55%
_ dappled sandy SILT X
X
X
X
X
X
X
22.95 D15 23

X X X X
X X X
X X X X
X X X

24.00 Hard, yellow with brown and light grey with pink
X X X X
X X X 24.00 - P15 5 6 8 8 11 11 38 55%
_ dappled sandy SILT X
X
X
X
X
X
X
24.45 D16 24.5
X X X X
X X X
X X X X
X X X

25.50 Hard, ditto.


X X X X
X X X 25.50 - P16 5 7 9 12 12 12 45 55%
X X X X
_ X X X 25.95 D17 26
X X X X
X X X
X X X X
X X X

27.00 Hard, ditto


X X X X
X X X 27.00 - P17 6 7 10 12 15 13 50 57%
_
X
X
X
X
X
X
X
27.435 D18 60 mm
X X X X 27.5

X X X
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 7.45 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 5 Reduced Level : Supervisor : Fauzi


Sheet No. : 3 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 19.04.2019 - 20.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


00 10 20 30 40 50
mm mm mm mm mm mm
10 20 30 40 50
27.50

X X X X
_ X X X
X X X X
X X X

28.50 Hard, yellow with brown and light grey with pink
X X X X
X X X 28.50 - P18 5 8 11 13 12 14 50 43%
dappled sandy SILT X
X
X
X
X
X
X
28.95 D19 29
1
X X X X
_ X X X
X X X X
X X X

30.00 Hard, ditto.


X X X X
X X X 30.00 - P19 2 7 8 11 16 15 50 51%
X X X X
X X X 30.45 D20 30.5
2
X X X X
_ X X X
X X X X
X X X
X X X X
X X X

End of Borehole At 30.45 m 32


3
_

33.5

_ 4

35

Depth (m)
_ 5

36.5

_ 6
0

38

_
7

39.5

_
8

41

_
9

42.5
NOTES: LEGEND: Ground Water Level = 7.45 m
S = Standard Penetration Test (SPT) REMARKS 10
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 6 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019-19.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Yellow with brown and red dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5

_ 1.50 Soft to medium stiff, red with yellow dappled sandy X


X
X
X
X
X
X
MHS 1.50 - P1 1 1 1 1 1 1 4 62%
SILT of high plasticity X
X
X
X
X
X
X
1.95 D2
X X X X
X X X
X X X X
X X X
3

_ 3.00 Red with yellow dappled sandy CLAY X


X
X
X
X
X
X
3.00 - UD1 60%
X X X X
X X X 3.50
X X X X
X X X
X X X X
X X X
4.5

_ 4.50 Stiff, yellow with brown and red dappled sandy X


X
X
X
X
X
X
MHS 4.50 - P2 2 2 2 3 3 3 11 62%
SILT of high plasticity with traces of gravel X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X

_ 6.00 Medium stiff to stiff, yellow with brown and red X


X
X
X
X
X
X
MHS 6.00 - P3 1 1 1 2 2 3 8 53%
6

dappled sandy SILT of high plasticity X


X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X
X X X

Depth (m)
_ 7.50 Medium stiff, yellow with brown and light grey X
X
X
X
X
X
X
MHS 7.50 - P4 1 1 1 1 1 2 5 62% 7.5

dappled sandy SILT of high plasticity X


X
X
X
X
X
X
7.95 D5
X X X X
X X X
X X X X
X X X

_ 9.00 Medium stiff, ditto. X


X
X
X
X
X
X
9.00 - P5 1 1 1 1 2 2 6 57% 9 11
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Soft to medium stiff, brown with pink and yellow


X X X X
_ X X X MHS 10.50 - P6 1 1 1 1 1 1 4 44% 10.5

with light grey dappled sandy SILT of high X


X
X
X
X
X
X
10.95 D7
plasticity X
X
X
X
X
X
X

X X X X
X X X

12.00 Medium stiff, brown with pink and yellow with


X X X X
_ X X X 12.00 - P7 1 1 1 2 2 2 7 55% 12

light grey dappled sandy SILT X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Medium stiff, red with yellow and light grey


X X X X
_ X X X 13.50 - P8 1 1 1 2 1 2 6 51%
13.5
with brown dappled sandy SILT X
X
X
X
X
X
X
13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 6.88m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 6 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019-19.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Medium stiff, red with yellow and light grey


X X X X
X X X 15.00 - P9 5 1 1 1 2 2 6 57% 15.5

_ with brown dappled sandy SILT X


X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Stiff, red with yellow and light grey with brown
X X X X
X X X 16.50 - P10 2 1 2 3 3 3 11 55% 17

_ dappled sandy SILT X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Medium stiff, red with yellow and light grey with
X X X X
X X X 18.00 - P11 1 1 1 2 1 2 6 57%
18.5
_ brown dappled sandy SILT X
X
X
X
X
X
X
18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Very stiff, red with dark grey and light grey with
X X X X
X X X 19.50 - P12 3 3 4 4 8 9 25 62%
_ brown dappled sandy SILT X
X
X
X
X
X
X
19.95 D13 20

X X X X
X X X
X X X X
X X X
+++++++++
20.20 Reddish to light grey slightly weathered +++++ 20.20 - C1 CR = 1500 mm

Depth (m)
+++++++++
_ good GRANITE +++++ 21.70 CRr = 1500/1500 mm 21.5

+++++++++
+++++
RQD = 93.0%
+++++++++
+++++
+++++++++
21.70 Reddish to light grey slightly weathered +++++ 21.70 - C2 CR = 1500 mm
+++++++++
_ good GRANITE +++++ 23.20 CRr = 1400/1500 mm 23

+++++++++
+++++
RQD = 90.0%
+++++++++
+++++

_ End of Borehole At 23.20 m 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 6.88m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 7 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 17.04.2019- 18.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Reddish brown SILT


X X X X
X X X
X X X X
X X X

1.00 Reddish brown SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 1 2 1 2 6 100%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Stiff, ditto. X


X
X
X
X
X
X
3.00 - P2 2 1 2 3 2 2 9 88%
X X X X
X X X 3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Medium stiff to stiff, ditto. X


X
X
X
X
X
X
4.50 - P3 3 2 1 3 2 2 8 100%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, mottled red sandy SILT of high X


X
X
X
X
X
X
MHS 6.00 - P4 3 2 3 1 3 3 10 44%
plasticity with traves of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 3 2 3 2 3 4 12 88%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Medium stiff, mottled brown sandy SILT of X X X X 9


_ 9.00 X X X MHS 9.00 - P6 4 2 3 1 1 2 7 88% 11
high plasticity with traves of gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Very stiff, mottled red sandy SILT


X X X X
_ X X X 10.50 - P7 4 5 4 6 5 6 21 66% 10.5

with traces of gravel X


X
X
X
X
X
X
10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Very stiff, ditto.


X X X X
_ X X X MHS 12.00 - P8 6 5 7 7 6 5 25 77% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, mottled brown SILT


X X X X
_ X X X 13.50 - P9 5 6 7 6 7 7 27 88% 13.5

with traces of gravel X


X
X
X
X
X
X
13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 4.85m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 7 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 17.04.2019- 18.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X
. . . . .
15.00 Very dense, mottled red silty SAND of low . . . . SML 15.00 - P10 10 13 50 50 100% 15.5
. . . . .
_ plasticity with traces of gravel . . . . 15.20 D10 50 mm
. . . . .
. . . .
. . . . .
. . . . 0
16.50 Hard, mottled red sandy SILT of high
X X X X
X X X MHS 16.50 - P11 27 23 50 100% 17

_ plasticity with traces of gravel X


X
X
X
X
X
X
60.00 D11 25 mm
X X X X
X X X
X X X X
X X X
+++++++++
17.00 Reddish to light grey slightly weathered +++++ 17.00 - C1 CR = 1500 mm
+++++++++ 18.5
_ good GRANITE +++++ 18.50 CRr = 1000/1500 mm
+++++++++
+++++
RQD = 90.0%
+++++++++
+++++
+++++++++
18.50 Hard, ditto. +++++ 18.50 - C2 CR = 1500 mm
+++++++++
_ +++++ 20.00 CRr = 1500/1500 mm 20

+++++++++
+++++
RQD = 92.0%
+++++++++
+++++
+++++++++
+++++

Depth (m)
_ 21.5

End of Borehole At 20.00 m

_ 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 4.85m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 8 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 15.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Red SILT X


X
X
X
X
X
X

X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 1 2 1 2 6 88%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Medium stiff to stiff, brownish red sandy SILT X


X
X
X
X
X
X
MIS 3.00 - P2 1 1 2 2 2 2 8 77%
of intermediate plasticity with traces of X
X
X
X
X
X
X
3.45 D2
gravel X
X
X
X
X
X
X

X X X X 4.5
X X X

_ 4.50 Stiff, ditto. X


X
X
X
X
X
X
4.50 - P3 1 2 3 3 2 3 11 66%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, brownish red sandy SILT of intermediate X


X
X
X
X
X
X
MIS 6.00 - P4 2 2 3 3 3 4 13 44%
plasticity with a little gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff to very stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 1 2 2 3 4 6 15 66%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Stiff, mottled red sandy SILT of intermediate X X X X 9


_ 9.00 X X X MIS 9.00 - P6 2 1 2 3 3 3 11 66% 20
plasticity with a little gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Stiff to very stiff, brownish red sandy SILT


X X X X
_ X X X 10.50 - P7 3 3 3 4 4 4 15 66% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Stiff, mottled red sandy SILT of high


X X X X
_ X X X MHS 12.00 - P8 2 2 2 3 3 4 12 79% 12

plasticity X
X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, ditto.


X X X X
_ X X X 13.50 - P9 3 4 3 3 5 10 21 77% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.63m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 8 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 15.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Hard, mottled red sandy SILT of intermediate


X X X X
X X X MIS 15.00 - P10 3 4 10 16 24 50 100% 15.5

_ plasticity with traces of gravel X


X
X
X
X
X
X
15.31 D10 10 mm
X X X X
X X X
X X X X
X X X 0
16.50 Hard, ditto.
X X X X
X X X 16.50 - P11 5 11 21 29 50 100% 17

_
X
X
X
X
X
X
X
16.75 D11 25 mm
X X X X
X X X
X X X X
X X X

18.00 Hard, mottled brown SILT


X X X X
X X X 18.00 - P12 10 15 50 50 100%
18.5
_ with traces of gravel X
X
X
X
X
X
X
18.20 D12 50 mm
X X X X
X X X
X X X X
X X X

19.50 Hard, ditto.


X X X X
X X X 19.50 - P13 13 17 50 50 90%
_
X
X
X
X
X
X
X
19.70 P13 50 mm 20

X X X X
X X X
X X X X
X X X

21.00 Hard, ditto.


X X X X
X X X 21.00 - P14 30 20 50 100%

Depth (m)
_
X
X
X
X
X
X
X
21.10 D14 25 mm 21.5

X X X X
X X X
X X X X
X X X
X X X X
X X X

_ End of Borehole At 21.10 m 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 12.63m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 9 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019 - 17.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Reddish brown SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red sandy SILT of X


X
X
X
X
X
X
MHS 1.50 - P1 1 1 1 1 2 2 6 77%
high plasticity with traces of gravel X
X
X
X
X
X
X
1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Medium stiff to stiff, ditto. X


X
X
X
X
X
X
3.00 - P2 2 1 2 1 2 3 8 100%
X X X X
X X X 3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Medium stiff, mottled red sandy SILT X


X
X
X
X
X
X
4.50 - P3 2 2 1 2 2 2 7 100%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, ditto. X


X
X
X
X
X
X
6.00 - P4 3 2 3 2 2 3 10 66%
X X X X
X X X 6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, brownish red sandy SILT of high X


X
X
X
X
X
X
MHS 7.50 - P5 1 2 2 3 2 2 9 66%
plasticity with traces of gravel X
X
X
X
X
X
X
7.95 D5
X X X X
X X X
X X X X
X X X

Stiff, yellowish red sandy SILT of high X X X X 9


_ 9.00 X X X MHS 9.00 - P6 2 3 2 2 3 5 12 82% 22
plasticity with traces of gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Stiff, brownish red sandy SILT of high


X X X X
_ X X X MHS 10.50 - P7 3 2 2 2 3 3 10 66% 10.5

plasticity with traces of gravel X


X
X
X
X
X
X
10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Stiff to very stiff, ditto.


X X X X
_ X X X 12.00 - P8 3 2 3 4 3 5 15 100% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, ditto.


X X X X
_ X X X MHS 13.50 - P9 2 3 2 3 4 5 14 77% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.49 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 9 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019 - 17.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, light grey red sandy SILT


X X X X
X X X 15.00 - P10 3 2 3 2 4 8 17 66% 15.5
X X X X
_ X X X 15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, brownish red sandy SILT
X X X X
X X X 16.50 - P11 2 3 3 4 6 8 21 82% 17

_ with traces of gravel X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Very stiff, mottled brown sandy SILT


X X X X
X X X 18.00 - P12 4 5 7 7 6 6 26 66%
X X X X 18.5
_ X X X 18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Very stiff, ditto.


X X X X
X X X 19.50 - P13 4 3 4 5 7 8 24 77%
X X X X
_ X X X 19.95 P13 20

X X X X
X X X
X X X X
X X X

21.00 Very stiff, ditto.


X X X X
X X X 21.00 - P14 3 4 4 6 6 8 24 66%

Depth (m)
X X X X
_ X X X 21.45 D14 21.5

X X X X
X X X
X X X X
X X X

22.50 Very stiff, mottled red sandy SILT


X X X X
X X X 22.50 - P15 4 3 3 4 6 6 19 88%
X X X X
_ X X X 22.95 D15 23

X X X X
X X X
X X X X
X X X

24.00 Very stiff, ditto.


X X X X
X X X 24.00 - P16 4 5 4 6 7 6 23 100%
X X X X
_ X X X 24.45 D16 24.5
X X X X
X X X
X X X X
X X X

25.50 Very stiff, ditto.


X X X X
X X X 25.50 - P17 3 4 3 4 5 9 21 100%
X X X X
_ X X X 25.95 D17 26
X X X X
X X X
X X X X
X X X

27.00 Very stiff, light grey brown sandy SILT


X X X X
X X X 27.00 - P18 4 3 4 6 5 10 25 88%
X X X X
_ X X X 27.45 D18
X X X X 27.5

X X X
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.49 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 9 Reduced Level : Supervisor : Fauzi


Sheet No. : 3 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019 - 17.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


00 10 20 30 40 50
mm mm mm mm mm mm
10 20 30 40 50
27.50

X X X X
_ X X X
X X X X
X X X

28.50 Very stiff, light grey brown sandy SILT


X X X X
X X X 28.50 - P19 5 5 7 7 8 7 29 100%
X X X X
X X X 28.98 D19 29
1
X X X X
_ X X X
X X X X
X X X

30.00 Hard, mottled red SILT


X X X X
X X X 30.00 - P20 4 5 6 8 8 9 31 88%
with traces of sand X
X
X
X
X
X
X
30.45 D20 30.5
2
X X X X
_ X X X
X X X X
X X X
X X X X
X X X

32
3
_
End of Borehole At 30.45 m

33.5

_ 4

35

Depth (m)
_ 5

36.5

_ 6
0

38

_
7

39.5

_
8

41

_
9

42.5
NOTES: LEGEND: Ground Water Level = 12.49 m
S = Standard Penetration Test (SPT) REMARKS 10
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 10 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish red SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Stiff, brownish red sandy SILT X


X
X
X
X
X
X
1.50 - P1 1 1 2 2 2 3 9 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Loose to medium dense, mottled red silty SAND X


X
X
X
X
X
X
SML 3.00 - P2 1 2 2 3 3 2 10 66%
of low plasticity with traces of gravel X
X
X
X
X
X
X
3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Medium dense, ditto. X


X
X
X
X
X
X
4.50 - P3 1 2 2 3 3 3 11 88%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, brownish red sandy SILT of intermediate X


X
X
X
X
X
X
MIS 6.00 - P4 2 2 2 3 2 2 9 55%
plasticity with traces of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 3 3 3 2 3 4 12 66%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Medium dense,mottled red silty SAND of low X X X X 9


_ 9.00 X X X SML 9.00 - P6 3 4 3 4 4 6 17 66% 31
plasticity with a little gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Medium dense, ditto.


X X X X
_ X X X SML 10.50 - P7 2 3 3 4 4 4 15 55% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Stiff to very stiff, brownish red sandy SILT


X X X X
_ X X X MIS 12.00 - P8 2 3 4 4 3 4 15 88% 12

of intermediate plasticity with traces of gravel X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, ditto.


X X X X
_ X X X 13.50 - P9 3 3 4 4 5 7 20 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 14.87m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 10 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, mottled red SILT


X X X X
X X X 15.00 - P10 3 4 6 6 6 8 26 77% 15.5

_ with traces of sand X


X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Hard, ditto.
X X X X
X X X 16.50 - P11 4 4 4 6 7 33 50 75% 17

_
X
X
X
X
X
X
X
16.90 D11 25 mm
X X X X
X X X
X X X X
X X X

18.00 Hard, light grey red SILT


X X X X
X X X 18.00 - P12 10 15 50 50 100%
18.5
_
X
X
X
X
X
X
X
18.19 D12 40 mm
X X X X
X X X
X X X X
X X X

19.50 Hard, mottled red SILT


X X X X
X X X 19.50 - P13 13 17 50 50 100%
_ with traces of sand X
X
X
X
X
X
X
19.70 P13 50 mm 20

X X X X
X X X
X X X X
X X X

21.00 Hard, ditto.


X X X X
X X X 21.00 - P14 26 24 50 100%

Depth (m)
_
X
X
X
X
X
X
X
21.13 D14 55 mm 21.5

X X X X
X X X
X X X X
X X X

22.50 Hard, mottled red SILT


X X X X
X X X 22.50 - P15 30 20 50 100%
_ with traces of gravel X
X
X
X
X
X
X
22.6 D15 25 mm 23

X X X X
X X X
X X X X
X X X

_ End of Borehole At 22.60 m 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 14.87m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 11 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish red SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 80%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 1 2 1 2 2 7 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X
. . . . .
_ 3.00 Loose, brownish red silty SAND of low . . . . SML 3.00 - P2 1 1 1 1 2 2 6 80%
. . . . .
plasticity with traces of gravel . . . . 3.45 D2
. . . . .
. . . .
. . . . .
4.5
. . . .

_ 4.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
4.50 - P3 1 2 1 2 1 3 7 100%
with traces of sand X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, mottled red sandy SILT of high X


X
X
X
X
X
X
MHS 6.00 - P4 3 4 3 2 2 2 9 100%
plasticity with traces of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 2 3 2 3 3 3 11 77%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Stiff, brownish red sandy SILT of high X X X X 9


_ 9.00 X X X MHS 9.00 - P6 2 2 3 2 3 2 10 77% 17
plasticity X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Stiff, ditto.


X X X X
_ X X X 10.50 - P7 2 3 2 3 2 4 11 88% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Very stiff, mottled red sandy SILT of high


X X X X
_ X X X MHS 12.00 - P8 3 1 3 2 3 8 16 88% 12

plasticity with traces of gravel X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, ditto.


X X X X
_ X X X 13.50 - P9 2 3 3 6 6 6 21 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.40 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 11 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, mottled brown sandy SILT of high


X X X X
X X X MHS 15.00 - P10 3 4 4 6 6 9 25 100% 15.5

_ plasticity with traces of gravel X


X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, brownish red SILT
X X X X
X X X 16.50 - P11 3 4 4 6 6 11 27 88% 17

_ with traces of gravel X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Very stiff, ditto.


X X X X
X X X 18.00 - P12 7 9 5 4 6 14 29 100%
X X X X 18.5
_ X X X 18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Very stiff, ditto.


X X X X
X X X 19.50 - P13 4 6 5 6 6 10 27 88%
X X X X
_ X X X 19.95 P13 20

X X X X
X X X
X X X X
X X X

21.00 Very stiff, mottled red SILT


X X X X
X X X 21.00 - P14 6 9 5 5 6 10 26 100%

Depth (m)
X X X X
_ X X X 21.45 D14 21.5

X X X X
X X X
X X X X
X X X

22.50 Hard, mottled brown SILT


X X X X
X X X 22.50 - P15 4 7 26 24 50 100%
_ with traces of sand X
X
X
X
X
X
X
22.75 D15 25 mm 23

X X X X
X X X
X X X X
X X X

24.00 Hard, mottled red SILT


X X X X
X X X 24.00 - P16 6 9 18 32 50 86%
_ with traces of gravel X
X
X
X
X
X
X
24.29 D16 65 mm 24.5
X X X X
X X X
X X X X
X X X

25.50 Hard, ditto.


X X X X
X X X 25.50 - P17 9 13 50 50 90%
_
X
X
X
X
X
X
X
25.70 D17 50 mm
26
X X X X
X X X
X X X X
X X X

27.00 Hard, mottled brown SILT


X X X X
X X X 27.00 - P18 11 16 31 19 50 80%
_
X
X
X
X
X
X
X
27.235 D18 10 mm
X X X X 27.5

X X X
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.40 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 11 Reduced Level : Supervisor : Fauzi


Sheet No. : 3 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


00 10 20 30 40 50
mm mm mm mm mm mm
10 20 30 40 50
27.50

X X X X
_ X X X
X X X X
X X X

28.50 Hard, mottled brown SILT


X X X X
X X X 28.50 - P19 15 17 50 50 100%
with traces of gravel X
X
X
X
X
X
X
28.68 D19 30 mm 29
1
X X X X
_ X X X
X X X X
X X X
X X X X
X X X

End of Borehole At 28.68 m X


X
X
X
X
X
X
30.5
2

32
3
_

33.5

_ 4

35

Depth (m)
_ 5

36.5

_ 6
0

38

_
7

39.5

_
8

41

_
9

42.5
NOTES: LEGEND: Ground Water Level = 12.40 m
S = Standard Penetration Test (SPT) REMARKS 10
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 12 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 12.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Reddish brown sandy SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff to stiff, mottled brown SILT X


X
X
X
X
X
X
1.50 - P1 2 1 2 2 2 2 8 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Stiff, brownish red sandy SILT of intermediate X


X
X
X
X
X
X
MIS 3.00 - P2 1 2 2 3 2 3 10 55%
plasticity with traves of gravel X
X
X
X
X
X
X
3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Stiff, mottled brown sandy SILT X


X
X
X
X
X
X
4.50 - P3 3 3 3 2 3 4 12 55%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, reddish brown sandy SILT of intermediate X


X
X
X
X
X
X
MIS 6.00 - P4 2 2 3 4 3 4 14 66%
plasticity with a little gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff ditto. X


X
X
X
X
X
X
7.50 - P5 2 3 3 3 3 3 12 66%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X
. . . . .
Medium dense, red with yellow and brown dappled
9
_ 9.00 . . . . SMI 9.00 - P6 2 2 2 3 3 3 11 55% 20
. . . . .
silty SAND of intermediate plasticity with . . . . 9.45 D6
. . . . .
traces of gravel . . . .
. . . . .
. . . .

10.50 Stiff, red with yellow and brown dappled sandy


X X X X
_ X X X MIS 10.50 - P7 1 2 3 3 4 4 14 77% 10.5

SILT of intermediate plasticity with X


X
X
X
X
X
X
10.95 D7
traces of gravel X
X
X
X
X
X
X

X X X X
X X X

12.00 Stiff, yellowish brown sandy SILT


X X X X
_ X X X 12.00 - P8 2 2 2 3 4 5 14 88% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, ditto.


X X X X
_ X X X 13.50 - P9 2 2 2 2 4 4 12 77% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 10.90 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 12 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 12.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Stiff, brownish yellow sandy SILT of high


X X X X
X X X MHS 15.00 - P10 1 2 2 2 4 5 13 100% 15.5

_ plasticity X
X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, ditto.
X X X X
X X X 16.50 - P11 2 3 4 6 6 8 24 100% 17
X X X X
_ X X X 16.78 D11
X X X X
X X X
X X X X
X X X
+++++++++
17.00 Reddish with light grey dappled slightly weathered +++++ 18.00 - C1 CR = 1500 mm
+++++++++ 18.5
_ good GRANITE +++++ 18.25 CRr = 1300/1500 mm
+++++++++
+++++
RQD = 88.0%
+++++++++
+++++
+++++++++
18.50 Ditto +++++ 19.50 - C2 CR = 1500 mm
+++++++++
_ +++++ 19.70 CRr = 1250/1500 mm 20

+++++++++
+++++
RQD = 93.0%
+++++++++
+++++
+++++++++
+++++

Depth (m)
_ End of Borehole At 19.70 m 21.5

_ 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 10.90 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 13 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish sandy SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 70%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 2 1 2 1 6 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Medium stiff , brownish red sandy SILT of X


X
X
X
X
X
X
MHS 3.00 - P2 2 2 1 1 2 3 7 88%
high plasticity X
X
X
X
X
X
X
3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Medium stiff to stiff, mottled brown SILT X


X
X
X
X
X
X
4.50 - P3 1 2 2 2 2 2 8 77%
with traces of sand X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, mottled brown sandy SILT of high X


X
X
X
X
X
X
MHS 6.00 - P4 2 2 2 3 2 4 11 66%
plasticity with traces of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 1 2 2 2 3 3 10 77%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Stiff, ditto. X X X X 9
_ 9.00 X X X MHS 9.00 - P6 2 2 2 2 3 3 10 55% 18
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Stiff, ditto.


X X X X
_ X X X 10.50 - P7 2 2 3 2 2 4 11 66% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Stiff, reddish brown sandy SILT of high


X X X X
_ X X X MHS 12.00 - P8 1 3 2 3 3 3 11 88% 12

plasticity with traces of gravel X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, ditto.


X X X X
_ X X X 13.50 - P9 2 2 3 3 3 3 12 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 9.58 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 13 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, brown with grey and red dappled sandy
X X X X
X X X 15.00 - P10 2 2 4 5 6 7 22 88% 15.5

_ SILT with traces of gravel X


X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, brownish red sandy SILT
X X X X
X X X 16.50 - P11 2 3 5 5 6 8 24 66% 17

_ with traces of gravel X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Hard, ditto.


X X X X
X X X 18.00 - P12 4 6 9 13 16 12 50 77%
18.5
_
X
X
X
X
X
X
X
18.40 D12 25 mm
X X X X
X X X
X X X X
X X X

19.50 Hard, mottled brown SILT


X X X X
X X X 19.50 - P13 4 6 9 13 16 12 50 88%
_ with traces of sand X
X
X
X
X
X
X
19.89 P13 15 mm 20

X X X X
X X X
X X X X
X X X

21.00 Hard, light grey with red and brown dappled sandy
X X X X
X X X MlS 21.00 - P14 6 4 12 15 23 50 90%

Depth (m)
_ SILT of low plasticity with some gravel X
X
X
X
X
X
X
21.35 D14 50 mm 21.5

X X X X
X X X
X X X X
X X X

22.50 Hard, mottled greyish brown sandy SILT


X X X X
X X X 22.50 - P15 5 8 25 25 50 80%
_ with traces of gravel X
X
X
X
X
X
X
22.77 D15 45 mm 23

X X X X
X X X
X X X X
X X X

24.00 Hard, ditto.


X X X X
X X X 24.00 - P16 8 10 20 30 50 86%
_
X
X
X
X
X
X
X
24.25 D16 25 mm 24.5
X X X X
X X X
X X X X
X X X
X X X X
X X X

_
26

End of Borehole At 24.25 m

_
27.5

NOTES: LEGEND: Ground Water Level = 9.58 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 14 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019-14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish red SILT


X X X X
X X X
X X X X
X X X

1.00 Red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 1 2 2 2 7 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Stiff, brownish red sandy SILT of intermediate X


X
X
X
X
X
X
MIS 3.00 - P2 2 2 2 2 2 3 9 77%
plasticity with traces of gravel X
X
X
X
X
X
X
3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Stiff, brownish red sandy SILT of high X


X
X
X
X
X
X
MHS 4.50 - P3 2 2 3 2 3 3 11 66%
plasticity X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, ditto. X


X
X
X
X
X
X
6.00 - P4 3 2 3 3 4 4 14 55%
X X X X
X X X 6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff to very stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 2 3 3 4 4 4 15 73%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Very stiff, brownish red sandy SILT of high X X X X 9


_ 9.00 X X X MHS 9.00 - P6 3 3 3 4 4 6 17 44% 31
plasticity with traces of gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Very stiff, light grey red sandy SILT


X X X X
_ X X X 10.50 - P7 3 4 5 6 8 8 27 100% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Very stiff, ditto.


X X X X
_ X X X 12.00 - P8 3 3 7 8 7 5 27 100% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, ditto.


X X X X
_ X X X 13.50 - P9 3 2 3 5 7 10 25 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 8.30 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 14 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019-14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, mottled red sandy SILT of high


X X X X
X X X MHS 15.00 - P10 3 4 5 6 8 8 27 100% 15.5

_ plasticity X
X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, ditto.
X X X X
X X X 16.50 - P11 2 3 5 3 7 7 22 100% 17
X X X X
_ X X X 16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Very stiff, mottled red sandy SILT


X X X X
X X X 18.00 - P12 2 3 4 4 6 10 24 88%
18.5
_ with traces of gravel X
X
X
X
X
X
X
18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Very stiff, ditto.


X X X X
X X X 19.50 - P13 3 4 3 5 8 9 25 100%
X X X X
_ X X X 19.95 P13 20

X X X X
X X X
X X X X
X X X

21.00 Very stiff, mottled red SILT


X X X X
X X X 21.00 - P14 4 4 6 7 5 9 27 88%

Depth (m)
_ with traces of sand X
X
X
X
X
X
X
21.45 D14 21.5

X X X X
X X X
X X X X
X X X

22.50 Very stiff, light grey red SILT


X X X X
X X X 22.50 - P15 4 4 5 7 7 7 26 77%
_ with traces of sand X
X
X
X
X
X
X
22.95 D15 23

X X X X
X X X
X X X X
X X X

24.00 Very stiff to hard, ditto.


X X X X
X X X 24.00 - P16 3 4 4 6 10 10 30 66%
X X X X
_ X X X 24.45 D16 24.5
X X X X
X X X
X X X X
X X X

25.50 Hard, light grey red SILT


X X X X
X X X 25.50 - P17 10 15 50 50 100%
_ with traces of gravel X
X
X
X
X
X
X
25.70 D17 50 mm
26
X X X X
X X X
X X X X
X X X

27.00 Hard, light grey red sandy SILT of intermediate


X X X X
X X X MIS 27.00 - P18 9 12 50 50 100%
_ plasticity with some gravel X
X
X
X
X
X
X
27.20 D18 50 mm
X X X X 27.5

X X X
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 8.30 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 14 Reduced Level : Supervisor : Fauzi


Sheet No. : 3 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019-14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


00 10 20 30 40 50
mm mm mm mm mm mm
10 20 30 40 50
27.50

X X X X
_ X X X
X X X X
X X X

28.50 Hard, mottled red SILT


X X X X
X X X 28.50 - P19 12 13 29 21 50 100%
with traces of gravel X
X
X
X
X
X
X
28.75 D19 25 mm 29
1
X X X X
_ X X X
X X X X
X X X

30.00 Hard, ditto.


X X X X
X X X 30.00 - P20 13 21 50 50 100%
X
X
X
X
X
X
X
30.18 D20 30 mm 30.5
2
X X X X
_ X X X
X X X X
X X X

31.50 Hard, ditto.


X X X X
X X X 31.50 - P21 27 23 50 100%
X
X
X
X
X
X
X
31.60 D21 25 mm 32

X X X X 3
_ X X X
X X X X
X X X
X X X X
X X X

33.5

_ End of Borehole At 31.60 m 4

35

Depth (m)
_ 5

36.5

_ 6
0

38

_
7

39.5

_
8

41

_
9

42.5
NOTES: LEGEND: Ground Water Level = 8.30 m
S = Standard Penetration Test (SPT) REMARKS 10
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

APPENDIX B
MACKINTOSH PROBES TEST RESULTS
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 1 Penetration Position : MP 2 Penetration Position : MP 3


(m) (m) (m)
Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 50 0 100 200 300 400 0 - 0.3 105 0 100 200 300 400 0 - 0.3 102 0 100 200 300 400
0 0
0.3 - 0.6 58 0 0 0.3 - 0.6 62 0 0 0.3 - 0.6 56
50 105 102
0.6 - 0.9 42 0.6 - 0.9 47 0.6 - 0.9 37
58 62 56
0.9 - 1.2 27 0.9 - 1.2 70 0.9 - 1.2 60
42 47 37
1.2 - 1.5 28 1 1.2 - 1.5 147 1 1.2 - 1.5 74 1
27 70 60
1.5 - 1.8 59 1.5 - 1.8 96 1.5 - 1.8 86
28 147 74
1.8 - 2.1 36 1.8 - 2.1 77 1.8 - 2.1 120 86
59 96
2.1 - 2.4 50 2 2.1 - 2.4 103 2 77
2.1 - 2.4 109 2
120
36
2.4 - 2.7 99 2.4 - 2.7 100 103
2.4 - 2.7 143 109
50
2.7 - 3.0 96 99
2.7 - 3.0 92 100
2.7 - 3.0 156 143
3.0 - 3.3 103 3 96
3.0 - 3.3 100 3 92 3.0 - 3.3 193 3 156
3.3 - 3.6 115 103 3.3 - 3.6 100 100 3.3 - 3.6 212 193
3.6 - 3.9 127 115 3.6 - 3.9 119 100 3.6 - 3.9 200 212
3.9 - 4.2 111 127 3.9 - 4.2 132 4
119 3.9 - 4.2 241 4
200
4
4.2 - 4.5 151 111 4.2 - 4.5 160 132 4.2 - 4.5 244 241
4.5 - 4.8 136 151 4.5 - 4.8 147 160 4.5 - 4.8 295 244
4.8 - 5.1 177 136 4.8 - 5.1 166 147 4.8 - 5.1 299 295
5 5 5
5.1 - 5.4 200 177 5.1 - 5.4 193 166 5.1 - 5.4 273 299

5.4 - 5.7 246 200 5.4 - 5.7 205 193 5.4 - 5.7 305 273
305
5.7 - 6.0 299 246 5.7 - 6.0 265 205 5.7 - 6.0 400
6 6 265 6 400
6.0 - 6.3 400 299 6.0 - 6.3 300 6.0 - 6.3
400 300
6.3 - 6.6 6.3 - 6.6 400 6.3 - 6.6
400
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.10 m Final Depth 6.42 m Final Depth 8.85 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 4 Penetration Position : MP 5 Penetration Position : MP 6


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 120 0 100 200 300 400 0 - 0.3 108 0 100 200 300 400 0 - 0.3 21 0 100 200 300 400
0 0
0.3 - 0.6 56 0 0 0.3 - 0.6 89 0 0 0.3 - 0.6 14
120 108 21
0.6 - 0.9 46 0.6 - 0.9 72 0.6 - 0.9 32
56 89 14
0.9 - 1.2 60 0.9 - 1.2 85 0.9 - 1.2 47
46 72 32
1.2 - 1.5 43 1 1.2 - 1.5 8 1 1.2 - 1.5 65 1
60 85 47
1.5 - 1.8 53 1.5 - 1.8 75 1.5 - 1.8 59
43 8 65
1.8 - 2.1 80 1.8 - 2.1 83 1.8 - 2.1 84 59
53 75
2.1 - 2.4 103 2 2.1 - 2.4 91 2 83
2.1 - 2.4 84 2
84
80
2.4 - 2.7 155 2.4 - 2.7 113 91
2.4 - 2.7 93 84
103
2.7 - 3.0 111 155
2.7 - 3.0 121 113
2.7 - 3.0 105 93
3.0 - 3.3 121 3 111
3.0 - 3.3 151 3 121 3.0 - 3.3 130 3 105
3.3 - 3.6 169 121 3.3 - 3.6 123 151 3.3 - 3.6 155 130
3.6 - 3.9 180 169 3.6 - 3.9 105 123 3.6 - 3.9 172 155
3.9 - 4.2 192 180 3.9 - 4.2 127 4
105 3.9 - 4.2 192 4
172
4
4.2 - 4.5 200 192 4.2 - 4.5 185 127 4.2 - 4.5 172 192
4.5 - 4.8 200 200 4.5 - 4.8 190 185 4.5 - 4.8 199 172
4.8 - 5.1 241 200 4.8 - 5.1 200 190 4.8 - 5.1 172 199
5 5 5
5.1 - 5.4 222 241 5.1 - 5.4 247 200 5.1 - 5.4 199 172

5.4 - 5.7 317 222 5.4 - 5.7 369 247 5.4 - 5.7 215 199
215
5.7 - 6.0 339 317 5.7 - 6.0 310 369 5.7 - 6.0 200
6 6 310 6 200
6.0 - 6.3 400 339 6.0 - 6.3 400 6.0 - 6.3 240
400 400 240
6.3 - 6.6 6.3 - 6.6 6.3 - 6.6 150
150
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9 205
205
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 275 7
275
7.2 - 7.5 7.2 - 7.5 7.2 - 7.5 319 319
7.5 - 7.8 7.5 - 7.8 7.5 - 7.8 400 400
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.10 m Final Depth 6.11 m Final Depth 6.76 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 7 Penetration Position : MP 8 Penetration Position : MP 9


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 32 0 100 200 300 400 0 - 0.3 20 0 100 200 300 400 0 - 0.3 52 0 100 200 300 400
0 0
0.3 - 0.6 25 0 0 0.3 - 0.6 38 0 0 0.3 - 0.6 30
32 20 52
0.6 - 0.9 30 0.6 - 0.9 40 0.6 - 0.9 45
25 38 30
0.9 - 1.2 51 0.9 - 1.2 35 0.9 - 1.2 69
30 40 45
1.2 - 1.5 73 1 1.2 - 1.5 57 1 1.2 - 1.5 54 1
51 35 69
1.5 - 1.8 69 1.5 - 1.8 37 1.5 - 1.8 72
73 57 54
1.8 - 2.1 80 1.8 - 2.1 63 1.8 - 2.1 60 72
69 37
2.1 - 2.4 80 2 2.1 - 2.4 144 2 63
2.1 - 2.4 84 2
60
80
2.4 - 2.7 101 2.4 - 2.7 102 144
2.4 - 2.7 100 84
80
2.7 - 3.0 125 101
2.7 - 3.0 100 102
2.7 - 3.0 100 100
3.0 - 3.3 150 3 125
3.0 - 3.3 131 3 100 3.0 - 3.3 121 3 100
3.3 - 3.6 169 150 3.3 - 3.6 120 131 3.3 - 3.6 153 121
3.6 - 3.9 140 169 3.6 - 3.9 155 120 3.6 - 3.9 169 153
3.9 - 4.2 147 140 3.9 - 4.2 130 4
155 3.9 - 4.2 131 4
169
4
4.2 - 4.5 136 147 4.2 - 4.5 147 130 4.2 - 4.5 169 131
4.5 - 4.8 150 136 4.5 - 4.8 169 147 4.5 - 4.8 150 169
4.8 - 5.1 170 150 4.8 - 5.1 153 169 4.8 - 5.1 173 150
5 5 5
5.1 - 5.4 177 170 5.1 - 5.4 191 153 5.1 - 5.4 188 173

5.4 - 5.7 182 177 5.4 - 5.7 200 191 5.4 - 5.7 193 188
193
5.7 - 6.0 195 182 5.7 - 6.0 169 200 5.7 - 6.0 204
6 6 169 6 204
6.0 - 6.3 227 195 6.0 - 6.3 247 6.0 - 6.3 246
227 247 246
6.3 - 6.6 251 6.3 - 6.6 269 6.3 - 6.6 269
251 269 269
6.6 - 6.9 269 6.6 - 6.9 292 6.6 - 6.9 301
269 292 301
6.9 - 7.2 284 7 6.9 - 7.2 400 7 6.9 - 7.2 400 7
284 400 400
7.2 - 7.5 310 7.2 - 7.5 7.2 - 7.5
310
7.5 - 7.8 400 7.5 - 7.8 7.5 - 7.8
400
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 7.90 m Final Depth 7.01 m Final Depth 7.15 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 10 Penetration Position : MP 11 Penetration Position : MP 12


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 86 0 100 200 300 400 0 - 0.3 56 0 100 200 300 400 0 - 0.3 40 0 100 200 300 400
0 0
0.3 - 0.6 45 0 0 0.3 - 0.6 23 0 0 0.3 - 0.6 30
86 56 40
0.6 - 0.9 52 0.6 - 0.9 31 0.6 - 0.9 50
45 23 30
0.9 - 1.2 90 0.9 - 1.2 45 0.9 - 1.2 41
52 31 50
1.2 - 1.5 121 1 1.2 - 1.5 40 1 1.2 - 1.5 63 1
90 45 41
1.5 - 1.8 154 1.5 - 1.8 64 1.5 - 1.8 60
121 40 63
1.8 - 2.1 139 1.8 - 2.1 72 1.8 - 2.1 66 60
154 64
2.1 - 2.4 200 2 2.1 - 2.4 96 2 72
2.1 - 2.4 80 2
66
139
2.4 - 2.7 169 2.4 - 2.7 83 96
2.4 - 2.7 90 80
200
2.7 - 3.0 172 169
2.7 - 3.0 111 83
2.7 - 3.0 77 90
3.0 - 3.3 188 3 172
3.0 - 3.3 150 3 111 3.0 - 3.3 93 3 77
3.3 - 3.6 157 188 3.3 - 3.6 141 150 3.3 - 3.6 115 93
3.6 - 3.9 177 157 3.6 - 3.9 169 141 3.6 - 3.9 100 115
3.9 - 4.2 214 177 3.9 - 4.2 139 4
169 3.9 - 4.2 123 4
100
4
4.2 - 4.5 256 214 4.2 - 4.5 155 139 4.2 - 4.5 131 123
4.5 - 4.8 199 256 4.5 - 4.8 177 155 4.5 - 4.8 165 131
4.8 - 5.1 217 199 4.8 - 5.1 200 177 4.8 - 5.1 140 165
5 5 5
5.1 - 5.4 264 217 5.1 - 5.4 205 200 5.1 - 5.4 188 140

5.4 - 5.7 231 264 5.4 - 5.7 192 205 5.4 - 5.7 200 188
200
5.7 - 6.0 240 231 5.7 - 6.0 249 192 5.7 - 6.0 239
6 6 249 6 239
6.0 - 6.3 269 240 6.0 - 6.3 267 6.0 - 6.3 292
269 267 292
6.3 - 6.6 292 6.3 - 6.6 313 6.3 - 6.6 400
292 313 400
6.6 - 6.9 400 6.6 - 6.9 400 6.6 - 6.9
400 400
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.81 m Final Depth 6.70 m Final Depth 6.46 n

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 13 Penetration Position : MP 14 Penetration Position : MP 15


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 32 0 100 200 300 400 0 - 0.3 41 0 100 200 300 400 0 - 0.3 27 0 100 200 300 400
0 0
0.3 - 0.6 21 0 0 0.3 - 0.6 53 0 0 0.3 - 0.6 40
32 41 27
0.6 - 0.9 33 0.6 - 0.9 45 0.6 - 0.9 40
21 53 40
0.9 - 1.2 30 0.9 - 1.2 60 0.9 - 1.2 63
33 45 40
1.2 - 1.5 49 1 1.2 - 1.5 60 1 1.2 - 1.5 50 1
30 60 63
1.5 - 1.8 62 1.5 - 1.8 77 1.5 - 1.8 46
49 60 50
1.8 - 2.1 53 1.8 - 2.1 56 1.8 - 2.1 50 46
62 77
2.1 - 2.4 77 2 2.1 - 2.4 65 2 56
2.1 - 2.4 50 2
50
53
2.4 - 2.7 61 2.4 - 2.7 41 65
2.4 - 2.7 59 50
77
2.7 - 3.0 74 61
2.7 - 3.0 65 41
2.7 - 3.0 70 59
3.0 - 3.3 96 3 74
3.0 - 3.3 43 3 65 3.0 - 3.3 70 3 70
3.3 - 3.6 121 96 3.3 - 3.6 70 43 3.3 - 3.6 91 70
3.6 - 3.9 130 121 3.6 - 3.9 70 70 3.6 - 3.9 99 91
3.9 - 4.2 119 130 3.9 - 4.2 96 4
70 3.9 - 4.2 122 4
99
4
4.2 - 4.5 146 119 4.2 - 4.5 115 96 4.2 - 4.5 116 122
4.5 - 4.8 170 146 4.5 - 4.8 131 115 4.5 - 4.8 139 116
4.8 - 5.1 192 170 4.8 - 5.1 150 131 4.8 - 5.1 169 139
5 5 5
5.1 - 5.4 205 192 5.1 - 5.4 175 150 5.1 - 5.4 222 169

5.4 - 5.7 240 205 5.4 - 5.7 191 175 5.4 - 5.7 277 222
277
5.7 - 6.0 215 240 5.7 - 6.0 233 191 5.7 - 6.0 292
6 6 233 6 292
6.0 - 6.3 251 215 6.0 - 6.3 269 6.0 - 6.3 400
251 269 400
6.3 - 6.6 277 6.3 - 6.6 310 6.3 - 6.6
277 310
6.6 - 6.9 300 6.6 - 6.9 400 6.6 - 6.9
300 400
6.9 - 7.2 400 7 6.9 - 7.2 7 6.9 - 7.2 7
400
7.2 - 7.5 7.2 - 7.5 7.2 - 7.5
7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 7.01 m Final Depth 6.70 m Final Depth 6.42 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 16 Penetration Position : MP 17 Penetration Position : MP 18


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 35 0 100 200 300 400 0 - 0.3 40 0 100 200 300 400 0 - 0.3 46 0 100 200 300 400
0 0
0.3 - 0.6 41 0 0 0.3 - 0.6 30 0 0 0.3 - 0.6 45
35 40 46
0.6 - 0.9 65 0.6 - 0.9 45 0.6 - 0.9 50
41 30 45
0.9 - 1.2 50 0.9 - 1.2 53 0.9 - 1.2 70
65 45 50
1.2 - 1.5 45 1 1.2 - 1.5 40 1 1.2 - 1.5 86 1
50 53 70
1.5 - 1.8 40 1.5 - 1.8 54 1.5 - 1.8 54
45 40 86
1.8 - 2.1 61 1.8 - 2.1 47 1.8 - 2.1 65 54
40 54
2.1 - 2.4 73 2 2.1 - 2.4 60 2 47
2.1 - 2.4 77 2
65
61
2.4 - 2.7 65 2.4 - 2.7 85 60
2.4 - 2.7 92 77
73
2.7 - 3.0 73 65
2.7 - 3.0 109 85
2.7 - 3.0 90 92
3.0 - 3.3 90 3 73
3.0 - 3.3 131 3 109 3.0 - 3.3 139 3 90
3.3 - 3.6 125 90 3.3 - 3.6 144 131 3.3 - 3.6 145 139
3.6 - 3.9 129 125 3.6 - 3.9 160 144 3.6 - 3.9 157 145
3.9 - 4.2 144 129 3.9 - 4.2 152 4
160 3.9 - 4.2 143 4
157
4
4.2 - 4.5 163 144 4.2 - 4.5 169 152 4.2 - 4.5 165 143
4.5 - 4.8 156 163 4.5 - 4.8 190 169 4.5 - 4.8 181 165
4.8 - 5.1 214 156 4.8 - 5.1 222 190 4.8 - 5.1 207 181
5 5 5
5.1 - 5.4 200 214 5.1 - 5.4 243 222 5.1 - 5.4 193 207

5.4 - 5.7 214 200 5.4 - 5.7 295 243 5.4 - 5.7 225 193
225
5.7 - 6.0 280 214 5.7 - 6.0 300 295 5.7 - 6.0 273
6 6 300 6 273
6.0 - 6.3 400 280 6.0 - 6.3 400 6.0 - 6.3 253
400 400 253
6.3 - 6.6 6.3 - 6.6 6.3 - 6.6 294
294
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9 400
400
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.46 m Final Depth 6.40 m Final Depth 6.40 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 19 Penetration Position : MP 20 Penetration Position : MP 21


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 43 0 100 200 300 400 0 - 0.3 40 0 100 200 300 400 0 - 0.3 30 0 100 200 300 400
0 0
0.3 - 0.6 50 0 0 0.3 - 0.6 40 0 0 0.3 - 0.6 36
43 40 30
0.6 - 0.9 35 0.6 - 0.9 25 0.6 - 0.9 51
50 40 36
0.9 - 1.2 42 0.9 - 1.2 36 0.9 - 1.2 40
35 25 51
1.2 - 1.5 30 1 1.2 - 1.5 24 1 1.2 - 1.5 59 1
42 36 40
1.5 - 1.8 20 1.5 - 1.8 35 1.5 - 1.8 64
30 24 59
1.8 - 2.1 24 1.8 - 2.1 60 1.8 - 2.1 43 64
20 35
2.1 - 2.4 35 2 2.1 - 2.4 51 2 60
2.1 - 2.4 34 2
43
24
2.4 - 2.7 37 2.4 - 2.7 40 51
2.4 - 2.7 60 34
35
2.7 - 3.0 59 37
2.7 - 3.0 40 40
2.7 - 3.0 69 60
3.0 - 3.3 40 3 59
3.0 - 3.3 65 3 40 3.0 - 3.3 81 3 69
3.3 - 3.6 69 40 3.3 - 3.6 73 65 3.3 - 3.6 89 81
3.6 - 3.9 52 69 3.6 - 3.9 49 73 3.6 - 3.9 99 89
3.9 - 4.2 66 52 3.9 - 4.2 65 4
49 3.9 - 4.2 54 4
99
4
4.2 - 4.5 77 66 4.2 - 4.5 72 65 4.2 - 4.5 77 54
4.5 - 4.8 60 77 4.5 - 4.8 90 72 4.5 - 4.8 96 77
4.8 - 5.1 96 60 4.8 - 5.1 123 90 4.8 - 5.1 135 96
5 5 5
5.1 - 5.4 108 96 5.1 - 5.4 105 123 5.1 - 5.4 110 135

5.4 - 5.7 131 108 5.4 - 5.7 139 105 5.4 - 5.7 125 110
125
5.7 - 6.0 169 131 5.7 - 6.0 170 139 5.7 - 6.0 163
6 6 170 6 163
6.0 - 6.3 257 169 6.0 - 6.3 246 6.0 - 6.3 214
257 246 214
6.3 - 6.6 293 6.3 - 6.6 282 6.3 - 6.6 252
293 282 252
6.6 - 6.9 400 6.6 - 6.9 311 6.6 - 6.9 293
400 311 293
6.9 - 7.2 7 6.9 - 7.2 400 7 6.9 - 7.2 400 7
400 400
7.2 - 7.5 7.2 - 7.5 7.2 - 7.5
7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.72 m Final Depth 7.00 m Final Depth 7.00 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 22 Penetration Position : MP 23 Penetration Position : MP 24


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 45 0 100 200 300 400 0 - 0.3 56 0 100 200 300 400 0 - 0.3 45 0 100 200 300 400
0 0
0.3 - 0.6 67 0 0 0.3 - 0.6 77 0 0 0.3 - 0.6 32
45 56 45
0.6 - 0.9 79 0.6 - 0.9 89 0.6 - 0.9 20
67 77 32
0.9 - 1.2 54 0.9 - 1.2 54 0.9 - 1.2 33
79 89 20
1.2 - 1.5 67 1 1.2 - 1.5 50 1 1.2 - 1.5 41 1
54 54 33
1.5 - 1.8 43 1.5 - 1.8 50 1.5 - 1.8 40
67 50 41
1.8 - 2.1 69 1.8 - 2.1 61 1.8 - 2.1 36 40
43 50
2.1 - 2.4 78 2 2.1 - 2.4 42 2 61
2.1 - 2.4 50 2
36
69
2.4 - 2.7 93 2.4 - 2.7 65 42
2.4 - 2.7 43 50
78
2.7 - 3.0 133 93
2.7 - 3.0 71 65
2.7 - 3.0 54 43
3.0 - 3.3 123 3 133
3.0 - 3.3 77 3 71 3.0 - 3.3 65 3 54
3.3 - 3.6 149 123 3.3 - 3.6 83 77 3.3 - 3.6 77 65
3.6 - 3.9 101 149 3.6 - 3.9 121 83 3.6 - 3.9 69 77
3.9 - 4.2 120 101 3.9 - 4.2 105 4
121 3.9 - 4.2 84 4
69
4
4.2 - 4.5 145 120 4.2 - 4.5 143 105 4.2 - 4.5 99 84
4.5 - 4.8 192 145 4.5 - 4.8 155 143 4.5 - 4.8 125 99
4.8 - 5.1 210 192 4.8 - 5.1 165 155 4.8 - 5.1 151 125
5 5 5
5.1 - 5.4 188 210 5.1 - 5.4 135 165 5.1 - 5.4 131 151

5.4 - 5.7 249 188 5.4 - 5.7 150 135 5.4 - 5.7 169 131
169
5.7 - 6.0 292 249 5.7 - 6.0 209 150 5.7 - 6.0 236
6 6 209 6 236
6.0 - 6.3 323 292 6.0 - 6.3 269 6.0 - 6.3 257
323 269 257
6.3 - 6.6 400 6.3 - 6.6 321 6.3 - 6.6 400
400 321 400
6.6 - 6.9 6.6 - 6.9 400 6.6 - 6.9
400
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.72 m Final Depth 6.70 m Final Depth 6.40 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 25 Penetration Position : MP 26 Penetration Position : MP 27


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 39 0 100 200 300 400 0 - 0.3 43 0 100 200 300 400 0 - 0.3 51 0 100 200 300 400
0 0
0.3 - 0.6 77 0 0 0.3 - 0.6 40 0 0 0.3 - 0.6 53
39 43 51
0.6 - 0.9 61 0.6 - 0.9 39 0.6 - 0.9 41
77 40 53
0.9 - 1.2 53 0.9 - 1.2 31 0.9 - 1.2 35
61 39 41
1.2 - 1.5 31 1 1.2 - 1.5 77 1 1.2 - 1.5 120 1
53 31 35
1.5 - 1.8 81 1.5 - 1.8 74 1.5 - 1.8 101
31 77 120
1.8 - 2.1 74 1.8 - 2.1 83 1.8 - 2.1 93 101
81 74
2.1 - 2.4 109 2 2.1 - 2.4 94 2 83
2.1 - 2.4 84 2
93
74
2.4 - 2.7 100 2.4 - 2.7 130 94
2.4 - 2.7 141 84
109
2.7 - 3.0 143 100
2.7 - 3.0 150 130
2.7 - 3.0 114 141
3.0 - 3.3 154 3 143
3.0 - 3.3 111 3 150 3.0 - 3.3 134 3 114
3.3 - 3.6 130 154 3.3 - 3.6 170 111 3.3 - 3.6 129 134
3.6 - 3.9 101 130 3.6 - 3.9 143 170 3.6 - 3.9 150 129
3.9 - 4.2 151 101 3.9 - 4.2 169 4
143 3.9 - 4.2 174 4
150
4
4.2 - 4.5 171 151 4.2 - 4.5 188 169 4.2 - 4.5 163 174
4.5 - 4.8 194 171 4.5 - 4.8 167 188 4.5 - 4.8 163 163
4.8 - 5.1 103 194 4.8 - 5.1 188 167 4.8 - 5.1 183 163
5 5 5
5.1 - 5.4 204 103 5.1 - 5.4 167 188 5.1 - 5.4 240 183

5.4 - 5.7 256 204 5.4 - 5.7 288 167 5.4 - 5.7 270 240
270
5.7 - 6.0 207 256 5.7 - 6.0 290 288 5.7 - 6.0 291
6 6 290 6 291
6.0 - 6.3 281 207 6.0 - 6.3 270 6.0 - 6.3 284
281 270 284
6.3 - 6.6 400 6.3 - 6.6 400 6.3 - 6.6 400
400 400 400
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.41 m Final Depth 6.12 m Final Depth 6.39 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 28 Penetration Position : MP 29 Penetration Position : MP 30


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 86 0 100 200 300 400 0 - 0.3 97 0 100 200 300 400 0 - 0.3 63 0 100 200 300 400
0 0
0.3 - 0.6 52 0 0 0.3 - 0.6 40 0 0 0.3 - 0.6 41
86 97 63
0.6 - 0.9 46 0.6 - 0.9 33 0.6 - 0.9 30
52 40 41
0.9 - 1.2 33 0.9 - 1.2 45 0.9 - 1.2 35
46 33 30
1.2 - 1.5 66 1 1.2 - 1.5 105 1 1.2 - 1.5 84 1
33 45 35
1.5 - 1.8 74 1.5 - 1.8 90 1.5 - 1.8 100
66 105 84
1.8 - 2.1 105 1.8 - 2.1 76 1.8 - 2.1 80 100
74 90
2.1 - 2.4 93 2 2.1 - 2.4 125 2 76
2.1 - 2.4 93 2
80
105
2.4 - 2.7 125 2.4 - 2.7 103 125
2.4 - 2.7 90 93
93
2.7 - 3.0 146 125
2.7 - 3.0 145 103
2.7 - 3.0 113 90
3.0 - 3.3 130 3 146
3.0 - 3.3 167 3 145 3.0 - 3.3 125 3 113
3.3 - 3.6 131 130 3.3 - 3.6 150 167 3.3 - 3.6 103 125
3.6 - 3.9 153 131 3.6 - 3.9 171 150 3.6 - 3.9 121 103
3.9 - 4.2 110 153 3.9 - 4.2 153 4
171 3.9 - 4.2 147 4
121
4
4.2 - 4.5 155 110 4.2 - 4.5 169 153 4.2 - 4.5 155 147
4.5 - 4.8 188 155 4.5 - 4.8 192 169 4.5 - 4.8 170 155
4.8 - 5.1 222 188 4.8 - 5.1 225 192 4.8 - 5.1 199 170
5 5 5
5.1 - 5.4 254 222 5.1 - 5.4 267 225 5.1 - 5.4 241 199

5.4 - 5.7 240 254 5.4 - 5.7 293 267 5.4 - 5.7 225 241
225
5.7 - 6.0 281 240 5.7 - 6.0 290 293 5.7 - 6.0 290
6 6 290 6 290
6.0 - 6.3 288 281 6.0 - 6.3 400 6.0 - 6.3 314
288 400 314
6.3 - 6.6 400 6.3 - 6.6 6.3 - 6.6 400
400 400
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.42 m Final Depth 6.12 m Final Depth 6.41 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR.

APPENDIX C
LABORATORY TEST RESULT
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ '              


8'      
'            
'            
'            
'            

%+ '              


'            
8'      
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ '              


8'      
'            
'            
'            
'            

%+ '              


8'      
'            
'            
'            
'            

%+ '              


8'      
'            
'            
'            
'            
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQIRU  PP
6LHYH$QDO\VLV7HVW  PP
3DVVLQJ  PP
 PP  
 PP   
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '





' '



     

 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&
&/$<
&/$
/$<
/$
/$
$<
< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











' 





     

 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1'*5$9(/ &/$<6,/76$1'
&/$
&/$<
&/
&/$<
/$
/ $<
$<  *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP 
 PP   
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '




' '



     

 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/
/ &/$<6,/76$1'
&/
&/$<
&/$
&/$<
/$
/$$<
< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 







3HUFHQWDJH3DVVLQJ











'







     

 

     
3DUWLFOHVL]H PP
3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/
&/$<
&/$
&/$<
/$
/$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
 3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP 
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       







3HUFHQWDJH3DVVLQJ










' '




' '



     

 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/$<
&/
&/$
&/$<
/$
/ $<
$<  *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQIRU  PP
6LHYH$QDO\VLV7HVW  PP
3DVVLQJ  PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











'







     
 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/
/ &/$<6,/76$1'
&/$<
&/$
&
&/
/$
/ $  *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP 
 PP   
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '




' '



     
 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1'*5$9(/ &/$<6,/76$1'
&/$<
&/$
&/
&/$
/ $ *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











'






     

 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/
/ &/$<6,/76$1'
&/
&/$
&/$<
&/$
/$<
/$<
/$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP 
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       







3HUFHQWDJH3DVVLQJ










' '

' 


 '



      

     
3DUWLFOHVL]H PP
3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/$<
&/
&/$
&/$ 
/$ *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
 3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 







3HUFHQWDJH3DVVLQJ











'






     

 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/$<
&/$
&/
&/$
/
/$<
$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQIRU  PP
6LHYH$QDO\VLV7HVW  PP
3DVVLQJ  PP
 PP
 PP
 PP 
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '




' '



     
 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/
/ &/$<6,/76$1'
&/$<
&/$
&
&/
/$
/ $  *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











' 




     

 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1'*5$9(/ &/$<6,/76$1'
&/$
&/$<
&/$<
/$
/$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP 
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '





' '



     

 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/
/ &/$<6,/76$1'
&/$
&/$<
&/$<
/$
$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 







3HUFHQWDJH3DVVLQJ











'







     

 

 
     
3DUWLFOHVL]H PP
3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/
&/$
&/$<
&/$<
/
/$$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
 3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP 
 PP  
 PP   
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       







3HUFHQWDJH3DVVLQJ










' '



 
' '



     

 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/$<
&/$
&/
&/$<
/
/$$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQIRU  PP
6LHYH$QDO\VLV7HVW  PP
3DVVLQJ  PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











'







     

 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/
&/$
&/$<
&/$
/$<
/$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP  
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '





' '



     

 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1'*5$9(/ &/$<6,/76$1'
&/
&/$
&/$<
&/$<
/$
/ $<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











'






     
 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/$
&/$<
&/
&/$
/
/$<
$<
$<  *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       







3HUFHQWDJH3DVVLQJ










' '

' 


 '



     

 


     
3DUWLFOHVL]H PP
3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/$
&/
&/$<
&/
/$<
/$$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
 3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 







3HUFHQWDJH3DVVLQJ











'






     

 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/
&/$<
&/$<
/$
/ $<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQIRU  PP
6LHYH$QDO\VLV7HVW  PP
3DVVLQJ  PP
 PP
 PP 
 PP   
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '



' '



     
 



     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/$
&/$<
&/
&/$
/$
/$<
$<
<  *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











' 






     

 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1'*5$9(/ &/$<6,/76$1'
&/$<
&/$
&/$
/$<
$<
$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQIRU  PP
6LHYH$QDO\VLV7HVW  PP
3DVVLQJ  PP
 PP
 PP  
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '




' '



     

 


     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/
&/$
&/$<
&/$
/$
/$<
$<
< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











'
 




     

 



     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1'*5$9(/ &/$<6,/76$1'
&/
&/$<
&/$
&/$
/$<
/$$<
< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP
 PP   
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       








3HUFHQWDJH3DVVLQJ










' '




' '



     

 

     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/
/ &/$<6,/76$1'
&/$<
&
&/
&/$
/$<
/$
/ $
$<
< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 







3HUFHQWDJH3DVVLQJ











'







     

 


     
3DUWLFOHVL]H PP
3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/$<
&/
&/
/$<
/$$<
$<  *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+ %+ %+ %+


'(37+ 0    

6$03/(12 ' ' ' '


 &OD\PP     
 6LOWPP     
 6DQGPP     
 *UDYHO     
 PP
 PP
 PP
 3DUWLFOH6L]H  PP
'LVWULEXWLRQ  PP
3DVVLQJ  PP
 PP
 PP
 PP  
 PP  
 PP   
 PP   
 PP    
 PP    
 PP    
 PP    
 PP    
 PP    

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' ' ' ' ' ' ' '
       
       
3DUWLFOH        
6L]H        
PP        
       
       
       







3HUFHQWDJH3DVVLQJ










' '




' '



     
 



     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/
&/$<
&/$
&/$<
/$
/$$<
<  *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
3$57,&/(6,=(',675,%87,21
'DWH
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

%25(+2/(12 %+
'(37+ 0 

6$03/(12 '
 &OD\PP  
 6LOWPP  
 6DQGPP  
 *UDYHO  
 PP
 PP
 PP
3DUWLFOH6L]H  PP
'LVWULEXWLRQIRU  PP
6LHYH$QDO\VLV7HVW  PP
3DVVLQJ  PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 
 PP 

3DUWLFOH'LDPHWHU PP IRU+\GURPHWHU7HVW 3DUWLFOH6L]H'LVWULEXWLRQIRU+\GURPHWHU7HVW 3DVVLQJ


6$03/(12 6$03/(12
' '
 
 
3DUWLFOH  
6L]H  
PP  
 
 
 








3HUFHQWDJH3DVVLQJ











'






     
 





     
3DUWLFOHVL]H PP 3DUWLFOHVL]H PP

&/$<6,/76$1' *5$9(/ &/$<6,/76$1'


&/
&/$
&/$<
&/$<
/$<
/$$< *5$9(/
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRHR   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
3F N3D

&F 




9RLG5DWLRH








     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU






   3UHVVXUH N3D   

3UHVVXUH9HUVXV0Y


0Y P01






     



3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
 3F N3D
&F 



9RLG5DWLRH












     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU






     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01








     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
3F N3D

&F 


9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU








     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01





     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
3F N3D
 &F 


9RLG5DWLRH








     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU








     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01






     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
 3F N3D
&F 


9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU







     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01







     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
3F N3D
 &F 


9RLG5DWLRH








     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU








     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01








     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
3F N3D

&F 


9RLG5DWLRH








     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU






     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y




0Y P01








     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
 3F N3D
&F 



9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU






     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01







     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 

3F N3D
&F 


9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU





     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y


0Y P01





     



3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
 3F N3D
&F 


9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y


&Y P\HDU





     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y




0Y P01







     






3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO J   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUHWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
 3F N3D
&F 


9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU






     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01








     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRHR   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
 3F N3D
&F 




9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU






   3UHVVXUH N3D   

3UHVVXUH9HUVXV0Y


0Y P01






     


3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
 3F N3D
&F 




9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y


&Y P\HDU






     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01






     





3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
21(',0(16,21$/&2162/,'$7,217(67 %63$57

3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5 %RUHKROH1R %+

*8'$1*-2+25 6DPSOH1R 8'

'HSWK P P

'DWH 

6SHFLPHQ6L]H PP    6SHFLILF*UDYLW\RI6RLO*V  

:WRI5LQJ:HW6RLO   +WRI6ROLGKR PP    '7RWDO'HIOHFWLRQ

,1,7,$/ ),1$/ +WRI6RLO6DPSOHK PP    HYRLG5DWLR +KR KR

:HLJKWRI5LQJ J    ,1,7,$/ ),1$/ GHFKDQJHLQ9RLG5DWLR

:HLJKWRI:HW6RLO J    9RLG5DWLRH   &YFRHII2I&RQVROLGDWLRQ

:HLJKWRI'U\6RLO J    %XON'HQVLW\ 0JP    0Y&RHII2I&RPSUHVVLELOLW\

:HLJKWRI:DWHU J    'U\'HQVLW\ 0JP    N&RHII2I3HUPHDELOLW\

:DWHU&RQWHQW     'HJUHHRI6DWXUDWLRQ    

$SSOLHG 3UHVVXUH 7RWDO 6DPSOH 6DPSOH +HLJKWRI 9RLGV5DWLR 0HDQ+W N

3UHVVXUH ,QFUHPHQW 'HIOHF +HLJKW +HLJKW 9RLGV RI6DPSOH 0Y W &Y Z&Y0Y

N1P GS N1P ' PP + PP +K  +KR PP H +KR KR GH KP PP P01 PLQ P\U  PV

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      (

     

      !5(&29(5<

      !5(&29(5<


6DPSOH%+8'P
3UHVVXUH9HUVXV9RLG5DWLR



HR 
3F N3D

&F 


9RLG5DWLRH










     
3UHVVXUH N3D

3UHVVXUH9HUVXV&Y



&Y P\HDU








     
3UHVVXUH N3D

3UHVVXUH9HUVXV0Y



0Y P01





     




3UHVVXUH N3D
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
        
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 

1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    (',,$
$7
7(
(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH1 / UD1 / 3.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϭϵŬEͬŵϮφ сϯĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϯŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
     
     
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 

1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 


1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    (',$
,$7
7(
(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH2 / UD1 / 4.50m

150
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϮϭŬEͬŵϮφ сϮ ĚĞŐ
120
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϲ ŬEͬŵϮφ сϬĚĞŐ
90

60

Shear Stress (kN/m2)


30

0
0 30 60 90 120 150 180 210 240 270 300
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
     
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 

1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 


1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    0('
('
(',$
$7
7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH3 / UD1 / 1.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϮϬŬEͬŵϮφ сϰ ĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϱ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
        
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 


1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    50(
0(
0(',$
,$7
7(
(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH4 / UD1 / 3.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϮϰŬEͬŵϮφ сϯ ĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϵ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
        
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    ('
',,$
$7
7(
(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH5 / UD1 / 3.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϮϮ ŬEͬŵϮφ сϯĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϳ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
     
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    (',
',,,$7
' $7
$7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH6 / UD1 / 3.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϮϱŬEͬŵϮφ сϰ ĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϯϮ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    0(',
',,,$7
' $7
$7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH7 / UD1 / 1.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϭϬŬEͬŵϮφ сϱ ĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϭϱ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
        
        
     
     
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    0('
('
(',$7
$7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH8 / UD1 / 1.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϭϲŬEͬŵϮφ сϲ ĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϯ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
        
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    0('
('
(',$
$7
7(
(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH9 / UD1 / 1.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϭϴ ŬEͬŵϮφ сϲĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϱ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
        
     
     
     
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 

1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 


1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    ('
(',$
$7
7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH10 / UD1 / 1.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϮϬ ŬEͬŵϮφ сϲĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϴŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
     
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    (',,$
$7
7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH11 / UD1 / 1.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϮϯŬEͬŵϮφ сϱ ĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϯϬ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
     
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    50('
('
(',$
$7
7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH12 / UD1 / 2.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϭϴŬEͬŵϮφ сϱĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϰŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
        
        
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 

1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 


1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    0('
('
(',$
$7
7
7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH13 / UD1 / 1.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϭϳŬEͬŵϮφ сϰ ĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϮ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
,'($/(1*,1((5,1*/$%25$725<6'1%+'
81&2162/,'$7('81'5$,1('&2035(66,217(67 %63$57
3URMHFW *(27(&+1,&$/:25.6)250:62/$5)5201($58,703$6,5*8'$1*-2+25

'DWH7HVWHG
6$03/(%+8'P 7HVWHG%\-$<$

63(&,0(1/$735(6685( $63(&,0(1N3D  %63(&,0(1N3D  &63(&,0(1N3D 


'HIOHFW $[LDO &RUUHFW 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU 3URYLQJ $[LDO 'HYLDWRU
5HDGLQJ 6WUDLQ $UHD 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV 5LQJ /RDG 6WUHVV
;PP  VTFP 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D 5HDGLQJ N1 N3D
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
        
     
     
     
     
     
     
  
  
  
  
  
  
  
  
  
  
  
  
  
  
6SHFLPHQ $ % &
0RLVWXUH&RQWHQW     6DPSOH+HLJKWPP 
%XON'HQVLW\0JP    6DPSOH'LDPHWHUPP 
'U\'HQVLW\0JP    6WUDLQ5DWHPPPLQ 
1RUPDO/RDG$W)DLOXUH N1    5LQJ)DFWRUN1GLY 

1RUPDO6WUHVV N3D   
/DWHUDO6WUHVV N3D    0('
('
(',$
',$7
7(
)$,/85(7<3(,17(50(',$7(
7RWDO1RUPDO6WUHVV N3D   
FAILURE ENVELOPE OF MOHR CIRCLES
SAMPLE NO : BH14 / UD1 / 1.00m

100
WĂƌƚŝĂůůLJ^ĂƚƵƌĂƚĞĚdŽƚĂů^ƚƌĞƐƐ;Žƚ >ŝŶĞͿ
сϭϲ ŬEͬŵϮφ сϰĚĞŐ
80
dŚĞŽƌĞƚŝĐĂů dŽƚĂů^ƚƌĞƐƐ;^ŽůŝĚ>ŝŶĞͿ
сϮϬ ŬEͬŵϮφ сϬĚĞŐ
60

40

Shear Stress (kN/m2)


20

0
0 20 40 60 80 100 120 140 160 180 200
Total Normal Stress (kN/m2)
GEOTECHNICAL ASSESSMENT AND
DESIGN REPORT

3
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

1.0 Introduction

A subsurface Investigation (SI) comprising fieldwork and lab test was carried out in the early of April
to middle of April 2019 which consists of eleven (14) boreholes. The SI was carried out by MZ ERAT
SERVICES and lab test was carried out by IDEAL ENGINEERING LABORATORY SDN BHD.

This brief report aims to present:-

- The interpreted subsoil profile


- The estimated allowable soil bearing capacity for screw pile foundation,
- The estimated pile length, working capacity and size for screw piled foundation,

The following assessment is based on the extracted field results and lab test results as presented in
Appendix 1.

2.0 Soil investigation

2.1 Standard Penetration Test (BH)

The Standard Penetration Test (SPT) N-value typically ranges from 0 blows/300mm (loose or
very soft) to 50 blows/300mm (Hard). The SPT blows counts from all the boreholes are
generally increasing with depth. The termination depth varies from 15.00m to 31.60m below
ground level (mbgl). The summary of the subsurface investigation boreholes is presented in
Table 1.

Date Reduce Termination Final Ground Water


Borehole Date Drilled
Finished level (RL) Depth (mbgl) Level (mbgl)
BH 1 22.4.2019 22.4.2019 78.60 15.00 9.80
BH 2 23.4.2019 24.4.2019 71.21 19.90 3.80
BH 3 18.4.2019 19.4.2019 67.66 21.10 10.58
BH 4 18.4.2019 18.4.2019 66.43 17.70 10.30
BH 5 19.4.2019 20.4.2019 61.00 30.45 7.45
BH 6 18.4.2019 19.4.2019 63.85 23.20 6.88
BH 7 17.4.2019 18.4.2019 57.43 20.00 4.85
BH 8 15.4.2019 15.4.2019 61.26 21.10 12.63
BH 9 16.4.2019 17.4.2019 65.03 30.45 12.49
BH 10 14.4.2019 14.4.2019 75.48 22.60 14.87
BH 11 16.4.2019 16.4.2019 68.64 28.68 12.40
BH 12 12.4.2019 12.4.2019 79.73 19.70 10.90
BH 13 13.4.2019 13.4.2019 70.27 24.25 9.58
BH 14 13.4.2019 14.4.2019 69.02 31.60 8.30
Table 1: Summary Of Boreholes (BH)
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

2.2 Mackintosh Probe (MP)


The Mackintosh probe typically ranges from 0 blows to 400 blows (Hard). The
termination depth varies from 6.10m to 8.85m below ground level (mbgl). The
test was carried out from 13.4.2019 until 18.4.2019. The summary of the
Mackintosh probe data is presented in Table 2.

Mackintosh Reduce level Termination


Probe (MP) (RL) Depth (mbgl)
MP 1 65.17 6.10
MP 2 70.27 6.42
MP 3 72.72 8.85
MP 4 69.02 6.10
MP 5 65.68 6.11
MP 6 70.00 6.76
MP 7 86.14 7.90
MP 8 72.25 7.01
MP 9 67.58 7.15
MP 10 63.30 6.81
MP 11 71.32 6.70
MP 12 69.47 6.46
MP 13 48.27 7.01
MP 14 58.76 6.70
MP 15 51.73 6.42
MP 16 57.24 6.46
MP 17 60.44 6.40
MP 18 83.07 6.40
MP 19 63.59 6.72
MP 20 62.64 7.00
MP 21 84.86 7.00
MP 22 74.69 6.72
MP 23 77.60 6.70
MP 24 78.84 6.40
MP 25 71.96 6.41
MP 26 53.85 6.12
MP 27 42.22 6.39
MP 28 55.87 6.42
MP 29 54.89 6.12
MP 30 72.10 6.41
Table 2: Summary Of Mackintosh Probe (MP)
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

3.0 Subsurface Profile

Based on the subsoil characteristic; the simplified geotechnical model for the proposed site shall be
divided into 3 (three) lines which show some different in categories:

3.1 Line 1 (BH 1 & BH 5)

The approximately 0.0-4.50m thick top soil consists of Soft to medium stiff Sandy SILT layer
with SPT N value ranging from 4 blows/300mm to 10 blows/300mm. This is underlain by
Medium stiff to stiff Sandy SILT and Stiff Sandy SILT with SPT N-value ranging from 5
blows/300mm to 16 blows/300mm. Then layer stiff to very stiff sandy SILT with SPT N-value
ranging from 10 blows/300mm to 38 blows/300mm. Granite and hard sandy SILT beneath
the Very Stiff. Granite bedrock was encountered at depth 12.00m to 15.00m for BH 1 and
hard sandy SILT was encountered at depth 24.00 to 30.45 during the subsurface
investigation works.

The summary of the inferred subsoil profiles based on the borelogs is presented in Table 2a
below:-

SPT N
Borehole Depth (m.b.g.l) Soil Description
(Blows/300mm)
BH 1 1.50 – 4.50 N=4 Soft to medium stiff Sandy SILT
4.50 – 10.50 5 < N < 16 Medium stiff to stiff Sandy SILT
10.50 – 12.00 10 < N < 30 Very stiff Sandy SILT
12.00 – 15.00 GRANITE
BH 5 1.50 – 4.50 8 < N < 10 Soft to medium stiff Sandy SILT
4.50 – 21.00 6 < N < 15 Stiff Sandy SILT
21.00 – 24.00 15 < N < 38 Stiff to Very Stiff Sandy SILT
24.00 – 30.45 45 < N < 50 Hard sandy SILT
Table 2a: Summary Of Inferred Subsoil Profiles (Line 1)
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞
3.2 Line 2 (BH 1, BH 4, BH 6 & BH 8)

The approximately 0.0-18.00m thick top soil consists of Medium Dense or Stiff to Medium
Stiff Layer with SPT N value ranging from 5 blows/300mm to 16 blows/300mm. This is
underlain by Stiff to Very Stiff with SPT N-value ranging from 11 blows/300mm to 21
blows/300mm. Granite beneath the Very Stiff. Granite bedrock was encountered at depth
12.00m to 20.00m for BH 1, BH 4, BH 6 and BH 8 during the subsurface investigation works.

The summary of the inferred subsoil profiles based on the borelogs is presented in Table 2b
below:-

SPT N
Borehole Depth (m.b.g.l) Soil Description
(Blows/300mm)
BH 1 1.50 – 4.50 N=4 Soft to medium stiff Sandy SILT
4.50 – 10.50 5 < N < 16 Medium stiff to stiff Sandy SILT
10.50 – 12.00 10 < N < 30 Very stiff Sandy SILT
12.00 – 15.00 GRANITE
BH 4 1.50 – 7.50 8 < N < 10 Loose to medium dense Silty SAND
7.50 – 9.00 14 < N < 15 Medium Dense Silty SAND
9.00 – 14.70 9 < N < 15 Stiff to Very Stiff Sandy SILT
14.70 – 17.70 GRANITE
BH 6 1.50 – 4.50 N=4 Soft to medium stiff Sandy SILT.
4.50 – 6.00 8 < N < 11 Stiff Sandy SILT
6.00 – 16.50 4<N<8 Medium stiff Sandy SILT
16.50 – 18.00 9 < N < 10 Stiff sandy SILT
18.00 – 20.20 8 < N < 11 Medium stiff to very stiff sandy SILT
20.20 – 21.70 GRANITE
BH 8 1.50 – 4.50 N=6 Medium stiff Sandy SILT.
4.50 – 15.00 11 < N < 21 Stiff to very stiff Sandy SILT
15.00 – 21.10 N = 50 Hard SILT
Table 2b: Summary Of Inferred Subsoil Profiles (Line 2)
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞
3.3 Line 3 (BH 2, BH 3, BH 7, BH 10 & BH 12)

The approximately 0.0-10.50m thick top soil consists of Medium Stiff Layer with SPT N value
ranging from 5 blows/300mm to 8 blows/300mm. This is underlain by stiff to very stiff with
range of depth from 13.50m to 18.00m. After that, hard silt layer which ended at depth
22.50m for BH 3 and BH 10. GRANITE bedrock was encountered at range of depth 16.90m to
18.00m for BH 2, BH 7 and BH 12 during the subsurface investigation works.

The summary of the inferred subsoil profiles based on the borelogs is presented in Table 2c
below:-

SPT N
Borehole Depth (m.b.g.l) Soil Description
(Blows/300mm)
BH 2 1.50 – 3.00 N=3 Soft Sandy SILT
3.00 – 13.50 5<N<8 Medium Stiff Sandy SILT
13.50 – 16.90 36 < N < 50 Hard Sandy SILT
16.90 – 19.90 GRANITE
BH 3 1.50 – 4.50 7<N<8 Medium Stiff Sandy SILT
4.50 – 15.00 10 < N < 27 Stiff to very stiff Sandy SILT
15.00 – 21.10 N = 50 Hard SILT
BH 7 1.50 – 10.50 6 < N < 12 Medium stiff SILT
10.50 – 15.00 21 < N < 27 Very Stiff SILT
15.00 – 17.00 N = 50 Hard SILT
17.00 – 20.00 GRANITE
BH 10 1.50 – 9.00 9 < N < 12 Stiff Sandy SILT
9.00 – 16.50 15 < N < 26 Stiff to very stiff sandy SILT
16.50 – 22.50 N = 50 Hard SILT
BH 12 1.50 – 3.00 N=8 Medium stiff to stiff SILT
3.00 – 16.50 10 < N < 14 Stiff Sandy SILT
16.50 – 18.00 36 < N < 50 Very stiff sandy SILT
18.00 – 19.70 GRANITE
Table 2c: Summary Of Inferred Subsoil Profiles (Line 3)
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

3.5 Overall Subsoil Profile

The summary of the inferred subsoil profiles for all borelogs is presented in Table 2d below and the
location of borehole and mackintosh probe is presented in Figure 1 below:-

SPT N
Borehole Depth (m.b.g.l) Soil Description
(Blows/300mm)
BH 1 1.50 – 4.50 N=4 Soft to medium stiff Sandy SILT
4.50 – 10.50 5 < N < 16 Medium stiff to stiff Sandy SILT
10.50 – 12.00 10 < N < 30 Very stiff Sandy SILT
12.00 – 15.00 GRANITE
BH 2 1.50 – 3.00 N=3 Soft Sandy SILT
3.00 – 13.50 5<N<8 Medium Stiff Sandy SILT
13.50 – 16.90 36 < N < 50 Hard Sandy SILT
16.90 – 19.90 GRANITE
BH 3 1.50 – 4.50 7<N<8 Medium Stiff Sandy SILT
4.50 – 15.00 10 < N < 27 Stiff to very stiff Sandy SILT
15.00 – 21.10 N = 50 Hard SILT
BH 4 1.50 – 7.50 8 < N < 10 Loose to medium dense Silty SAND
7.50 – 9.00 14 < N < 15 Medium Dense Silty SAND
9.00 – 14.70 9 < N < 15 Stiff to Very Stiff Sandy SILT
14.70 – 17.70 GRANITE
BH 5 1.50 – 4.50 8 < N < 10 Soft to medium stiff Sandy SILT
4.50 – 21.00 6 < N < 15 Stiff Sandy SILT
21.00 – 24.00 15 < N < 38 Stiff to Very Stiff Sandy SILT
24.00 – 30.45 45 < N < 50 Hard sandy SILT
BH 6 1.50 – 4.50 N=4 Soft to medium stiff Sandy SILT.
4.50 – 6.00 8 < N < 11 Stiff Sandy SILT
6.00 – 16.50 4<N<8 Medium stiff Sandy SILT
16.50 – 18.00 9 < N < 10 Stiff sandy SILT
18.00 – 20.20 8 < N < 11 Medium stiff to very stiff sandy SILT
20.20 – 21.70 GRANITE
BH 7 1.50 – 10.50 6 < N < 12 Medium stiff SILT
10.50 – 15.00 21 < N < 27 Very Stiff SILT
15.00 – 17.00 N = 50 Hard SILT
17.00 – 20.00 GRANITE
BH 8 1.50 – 4.50 N=6 Medium stiff Sandy SILT.
4.50 – 15.00 11 < N < 21 Stiff to very stiff Sandy SILT
15.00 – 21.10 N = 50 Hard SILT
BH 9 1.50 – 6.00 6<N<8 Medium stiff sandy SILT.
6.00 – 15.00 9 < N < 15 Stiff Sandy SILT
15.00 – 30.00 17 < N < 29 Very stiff sandy SILT
30.00 – 30.45 N = 50 Hard SILT
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

BH 10 1.50 – 9.00 9 < N < 12 Stiff Sandy SILT.


9.00 – 16.50 15 < N < 26 Stiff to very stiff sandy SILT
16.50 – 22.50 N = 50 Hard SILT
BH 11 1.50 – 6.00 6<N<7 Medium stiff sandy SILT.
6.00 – 12.00 9 < N < 11 Stiff Sandy SILT
12.00 – 22.50 16 < N < 29 Very stiff SILT
22.50 – 28.68 N = 50 Hard SILT
BH 12 1.50 – 3.00 N=8 Medium stiff to stiff SILT
3.00 – 16.50 10 < N < 14 Stiff Sandy SILT
16.50 – 18.00 36 < N < 50 Very stiff sandy SILT
18.00 – 19.70 GRANITE
BH 13 1.50 – 6.00 6<N<8 Medium SILT
6.00 – 15.00 10 < N < 12 Stiff Sandy SILT
15.00 – 18.00 22 < N < 24 Very stiff Sandy SILT
18.00 – 24.25 Hard Sandy SILT
N = 50
BH 14 1.50 – 9.00 6<N<7 Stiff to very stiff Sandy SILT
9.00 – 25.50 9 < N < 11 Very stiff Sandy SILT
25.50 – 31.60 N = 50 Hard SILT
Table 2d: Summary of Inferred Subsoil Profiles
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

LINE 1

LINE 2

LINE 3

Figure 1: Location Of Borehole (BH) and Mackintosh Probe (MP)


GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

Figure 2: Line 1 (BH 1 & BH 5)


GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

Figure 3: Line 2 (BH 1, BH 4, BH 6 & BH 8)


GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

Figure 4: Line 3 (BH 2, BH 3, BH 7, BH 10 & BH 12)


GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

4.0 Laboratory Testing Results

Laboratory test were carried out to determine the engineering characteristics of the soil. The
following laboratory test has been carried out in Table 3.

Classification Test Atterberg Limits, and Particle Size Distribution


Strength Test CIU Test, UU Test and UCS Test
Table 3 : Summary of Laboratory Test

4.1 Recommended Foundation Systems

The selection of appropriate foundation for the proposed structures depends on many factors such
as the bearing capacity of the ground, magnitude of column loads, subsoil profile, ground profile,
settlement and etc. Based on the subsurface investigation results, it is recommended to adopt
shallow foundations for light structures. Table 4 shows the foundation system based on borehole
results.

Foundation
BH Depth (m.b.g.l) SPT N Value Soil Description
Screw Pile
BH 1 1.50 – 4.50 N=4 Soft to medium stiff Sandy SILT
4.50 – 10.50 5 < N < 16 Medium stiff to stiff Sandy SILT Only for light
10.50 – 12.00 10 < N < 30 Very stiff Sandy SILT loading structure
12.00 – 15.00 GRANITE
BH 2 1.50 – 3.00 N=3 Soft Sandy SILT
3.00 – 13.50 5<N<8 Medium Stiff Sandy SILT Only for light
13.50 – 16.90 36 < N < 50 Hard Sandy SILT loading structure
16.90 – 19.90 GRANITE
BH 3 1.50 – 4.50 7<N<8 Medium Stiff Sandy SILT
Only for light
4.50 – 15.00 10 < N < 27 Stiff to very stiff Sandy SILT
loading structure
15.00 – 21.10 N = 50 Hard SILT
BH 4 1.50 – 7.50 8 < N < 10 Loose to medium dense Silty SAND
7.50 – 9.00 14 < N < 15 Medium Dense Silty SAND Only for light
9.00 – 14.70 9 < N < 15 Stiff to Very Stiff Sandy SILT loading structure
14.70 – 17.70 GRANITE
BH 5 1.50 – 4.50 8 < N < 10 Soft to medium stiff Sandy SILT
4.50 – 21.00 6 < N < 15 Stiff Sandy SILT Only for light
21.00 – 24.00 15 < N < 38 Stiff to Very Stiff Sandy SILT loading structure
24.00 – 30.45 45 < N < 50 Hard sandy SILT
BH 6 1.50 – 4.50 N=4 Soft to medium stiff Sandy SILT.
4.50 – 6.00 8 < N < 11 Stiff Sandy SILT
6.00 – 16.50 4<N<8 Medium stiff Sandy SILT
Only for light
16.50 – 18.00 9 < N < 10 Stiff sandy SILT
loading structure
18.00 – 20.20 8 < N < 11 Medium stiff to very stiff sandy SILT
20.20 – 21.70 GRANITE
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

BH 7 1.50 – 10.50 6 < N < 12 Medium stiff SILT


10.50 – 15.00 21 < N < 27 Very Stiff SILT Only for light
15.00 – 17.00 N = 50 Hard SILT loading structure
17.00 – 20.00 GRANITE
BH 8 1.50 – 4.50 N=6 Medium stiff Sandy SILT.
Only for light
4.50 – 15.00 11 < N < 21 Stiff to very stiff Sandy SILT
loading structure
15.00 – 21.10 N = 50 Hard SILT
BH 10 1.50 – 9.00 9 < N < 12 Stiff Sandy SILT.
9.00 – 16.50 Only for light
15 < N < 26 Stiff to very stiff sandy SILT
loading structure
16.50 – 22.50 N = 50 Hard SILT
BH 12 1.50 – 3.00 N=8 Medium stiff to stiff SILT
3.00 – 16.50 10 < N < 14 Stiff Sandy SILT Only for light
16.50 – 18.00 36 < N < 50 Very stiff sandy SILT loading structure
18.00 – 19.70 GRANITE
BH 13 1.50 – 6.00 6<N<8 Medium SILT
6.00 – 15.00 10 < N < 12 Stiff Sandy SILT Only for light
15.00 – 18.00 22 < N < 24 Very stiff Sandy SILT loading structure
18.00 – 24.25 Hard Sandy SILT
N = 50
BH 14 1.50 – 9.00 6<N<7 Stiff to very stiff Sandy SILT
9.00 – 25.50 Very stiff Sandy SILT Only for light
9 < N < 11
Hard SILT loading structure
25.50 – 31.60 N = 50
Table 4: Recommended Foundation System

4.2 Screw Pile Foundation

4.1.1 Geotechnical Capacity

The estimation of pile bearing capacity is generally based on the available SPT’N’
data using the Meyerhof’s Bearing Capacity Method (1984). The ultimate bearing
capacity of a single pile is equal to the sum of the ultimate resistance of the base of
the pile and the ultimate skin friction over the embedded shaft length of the pile.
The calculation is generally expressed as following:

Soil type Empirical factor, β


Clay 0.25
Silt 0.35
Sand 0.50
Table 5: Empirical Factor

Allowable pile working load (Qa) = (Qs/FOS + Qb/FOS)

Qs = ultimate positive skin friction below neutral depth

Qb = ultimate end bearing capacity at pile base

FOS = factor of safety (FOS = 2.0 for friction and FOS = 2.0 for end bearing).
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

4.2.2 Design Parameter

The geotechnical properties of the materials encountered during the soil investigation are
summarised below in Table 6. These properties have been derived based on the result of
site specific investigations and investigation completed on adjacent sites. The geotechnical
properties have been derived form a combination of :-

i. A field description of material characteristic;


ii. The result of laboratory tests;
iii. Empirical correlation with the result of standard penetration tests;
iv. Published and unpublished technical data.

*Effective cohesion, c’ = 0.1 x Cu

Cu = 7N

*Effective friction angle, ø’ = 27 + N/3

Index
Borehole Depth Properties
Material Description Strength Properties
(BH) (m) (Bulk
Density, Ɣ)
BH1 3.0 Soft Sandy SILT 18.5 Soil modulus,E = 2 x (SPT N) = 8 MPa
(4 < SPT N < 5) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.772
Effective cohesion, c’ = 2.8 kN/m2
Effective friction angle, ø’ = 28.3°
BH2 4.5 Medium stiff sandy clay 18.5 Soil modulus,E = 2 x (SPT N) = 10 MPa
(5 < SPT N < 8) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 1.037
Effective cohesion, c’ = 3.5 kN/m2
Effective friction angle, ø’ = 28.7°
BH 3 1.0 Medium Stiff Sandy CLAY 19.5 Soil modulus,E = 2 x (SPT N) = 14 MPa
(7 < SPT N < 8) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.667
Effective cohesion, c’ = 0 kN/m2
Effective friction angle, ø’ = 29.3°
BH 4 3.0 Loose to medium dense Silty SAND 19.5 Soil modulus,E = 2 x (SPT N) = 16 MPa
(8 < SPT N < 10) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.662
Effective cohesion, c’ = 5.6 kN/m2
Effective friction angle, ø’ = 29.7°
BH 5 3.0 Loose to medium dense Silty SAND 18.5 Soil modulus,E = 2 x (SPT N) = 16 MPa
(8 < SPT N < 10) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.758
Effective cohesion, c’ = 5.6 kN/m2
Effective friction angle, ø’ = 29.7°
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

BH 6 3.0 Soft to medium stiff Sandy CLAY 18.0 Soil modulus,E = 2 x (SPT N) = 8 MPa
(SPT N = 4) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.760
Effective cohesion, c’ = 2.8 kN/m2
Effective friction angle, ø’ = 28.3°
BH 7 1.0 Medium stiff SILT 17.0 Soil modulus,E = 2 x (SPT N) = 12 MPa
(6 < SPT N < 12) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 1.317
Effective cohesion, c’ = 4.2 kN/m2
Effective friction angle, ø’ = 29.0°
BH 8 1.0 Soft to medium stiff Sandy CLAY 19.0 Soil modulus,E = 2 x (SPT N) = 12 MPa
(SPT N = 6) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.821
Effective cohesion, c’ = 4.2 kN/m2
Effective friction angle, ø’ = 29.0°
BH 10 1.0 Stiff Sandy SILT 19.0 Soil modulus,E = 2 x (SPT N) = 18 MPa
(9 < SPT N < 12) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.764
Effective cohesion, c’ = 6.3 kN/m2
Effective friction angle, ø’ = 30°
BH 12 1.0 Medium stiff to stiff SILT 19.0 Soil modulus,E = 2 x (SPT N) = 16 MPa
(SPT N = 8) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.866
Effective cohesion, c’ = 5.6 kN/m2
Effective friction angle, ø’ = 29.7°
BH 13 1.0 Medium SILT 17.0 Soil modulus,E = 2 x (SPT N) = 12 MPa
(6 < SPT N < 8) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 1.018
Effective cohesion, c’ = 4.2 kN/m2
Effective friction angle, ø’ = 29.0°
BH 14 1.0 Stiff to very stiff Sandy CLAY Soil modulus,E = 2 x (SPT N) = 16 MPa
(6 < SPT N < 7) Undrained shear strength, Su = 5+7.5N kN/m2
Void’s ration, v = 0.866
Effective cohesion, c’ = 4.2 kN/m2
Effective friction angle, ø’ = 29.0°
Table 6: Interpreted Geotechnical Properties
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

4.2.3 Screw Pile Foundation

Generally screw piled foundation is suitable as the foundation system to support structures with
considerably low column loading.

The estimated values of qa for screw pile foundation for solar panel and building services based on
various borehole results are summarized in Table 7 and Table 8. The estimation of the designed
capacities for various screw piles are annexed in Appendix B.

Screw Pile Geotechnical Capacity, kN


BH N68mm Ø N76mm Ø
Depth (m) Capacity (kN) Depth (m) Capacity (kN)
SOLAR PANEL
BH 1 3.0 2.8 3.0 3.3
BH 2 3.0 3.5 3.0 4.1
BH 3 3.0 5.4 3.0 6.4
BH 4 3.0 7.5 3.0 8.9
BH 5 3.0 2.8 3.0 3.3
BH 6 3.0 2.1 3.0 2.4
BH 7 3.0 5.6 3.0 6.6
BH 8 3.0 5.1 3.0 6.1
BH 10 3.0 8.7 3.0 10.3
BH 12 3.0 6.6 3.0 7.7
Table 7: Estimated Pile Capacity and Length for Solar Panel

Screw Pile Geotechnical Capacity, kN


BH F140mm Ø F180mm Ø
Depth (m) Capacity (kN) Depth (m) Capacity (kN)
BUILDING SERVICES
BH 13 18.0 152.2 15.0 116.6
BH 14 15.0 127.4 12.0 139.1
Table 8: Estimated Pile Capacity and Length for Building Services

Square Pile Geotechnical Capacity, kN


BH 150mm x 150mm 200mm x 200mm
Depth (m) Capacity (kN) Depth (m) Capacity (kN)
BUILDING SERVICES
BH 13 16.0 124.1 12.0 106.5
BH 14 12.0 137.5 12.0 205.8
Table 9: Estimated Pile Capacity and Length for Building Services

The detailed calculation foundation design shall be undertaken by engineering consultant. The
design pressure for the spun pile foundation must be smaller than the soil allowable bearing
capacity; otherwise the pile foundation may be feasible at the proposed site. In such case, the
second option of bored pile foundation shall be adopted.
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

5.0 FOUNDATION FOR THE BUILDING SERVICES

5.1 Feasibility Of Deep Pile Foundation


Considering the subsoil condition where the top layer comprises of weak
material about 9m from ground surfaces, shallow foundation is not feasible and
may result a very high settlement. It is mostly due to presence of loose sandy
material at top and underlain by soft/weak material and intermediate debris. To
arrest the above site condition, as appropriate, sound and practical ground
improvement method shall be implemented to control the very high total and
differential settlement. Table 10 shows the estimated safe bearing capacity with
suitable ground improvement method.

Assume Proposed Proposed


Proposed
Column Suitable Suitable Pile Remarks
Structure
Load (Kn) Foundation Size
Building 100 Pile 150mm/200mm Pile
foundation SQ Pile foundation is
deemed
suitable to
support the
given loading
& foundation
base
Table 10: The Estimated Safe Bearing Capacity with Suitable Ground Improvement Method.

From the given loading detail and base foundation for building services, the
equivalent bearing pressure is very high and require piling instead of shallow
foundation.

5.2 Proposed Precast Concrete Piles.


The foundation loads of the proposed building are estimated from moderate
heavy to heavy where reported around 100kPa. Considering the subsoil condition
where the top layer comprises of weak material, the most suitable, safe and
sound foundation system is using precast concrete square pile. Based on the
given building structural loads, two size piles namely precast concrete square
piles (150mm SQ or 200mm SQ) are recommended and the estimated
geotechnical capacities are tabulated as Table 11 and Table 12 below:
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

Estimated Pile Axial Capacity


Pile Length Ultimate Pile Preposed Safe Pile
Borehole Pile Size (mm)
From Cut-Off Capacity (Kn) Axial Capacity (kN)
Level (M)
13 16.0 150 x 150 211.0 101.4
14 12.0 150 x 150 254.7 117.2
Table 11: Precast Concrete SQ Pile with Size 150mm X 150mm

Estimated Pile Axial Capacity


Pile Length Ultimate Pile Preposed Safe Pile
Borehole Pile Size (mm)
From Cut-Off Capacity (Kn) Axial Capacity (kN)
Level (M)
13 12.0 200 x 200 292.3 138.8
14 12.0 200 x 200 366.7 165.3
Table 12: Precast Concrete SQ Pile with Size 200mm X 200mm

The preliminary design calculation of the precast concrete piles is attached under
Appendix 2. Either hammer driven or hydraulic injection method can be adopted for
pile installation depending in site constraints and sensitivity of existing surrounding
structures.

5.3 Merit And Demerit Of Proposed Pile Foundation System


The merit and demerit of the proposed piling system is tabulated as follows:

Foundation Scheme Merits Demerits


Option 1 x Easier and faster x Delay in work due to
Precast concrete installation if no buried obstruction
150mm/200mm SQ Pile obstruction x Very low bearing
(Driven or Injection) x Cost effective capacity due to short
x Easily available embedment
x Required more
number of piles &
large capping
Option 2 x
Limited impact on x Costly
Screw pile (F140/F180) the environment x Required more
because installation number of piles &
keeps noise large capping
pollution to a
minimum
x Little /no ground
vibration
x Easily available
Table 13: Merit And Demerit Of Proposed Pile Foundation System
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR

ͧ͟͠͞

6.0 Summary

Based on the subsurface investigation results, our conclusions and recommendations are as follow:

i. Screw Pile foundation is feasible for light loaded structures or ancillary structure, i.e.
depending on the loading of proposed structures. The allowable soil bearing capacity ranges
from approximately 150.8kPa to 411.6kPa, depending on the depth and size of the screw
pile.
ii. For proposed pile foundation, precast concrete piles namely square pile are recommended
for building services.
iii. The feasibility of screw pile foundation is subjected to the ultimate design load. If the
allowable soil bearing capacity is greater than the ultimate design load of the structures,
then screw pile foundation can be adopted.
iv. Ground water table is measured to be approximately 13.8m -14.87m bgl.
v. The merits and demerits of both piling method are tabulated in the report.
APPENDIX 1
x SOIL INVESTIGATION (SI)
x TOPOGRAPHY SURVEY
x SOIL INVESTIGATION (SI)
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 1 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 1 Type of Drill : Rotary Wash Boring (YWE) Date : 22.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Yellow with brown and red dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5

_ 1.50 Soft to medium stiff, red with brown and yellow X


X
X
X
X
X
X
MHS 1.50 - P1 0 0 1 1 1 1 4 80%
dappled sandy SILT of high plasticity with X
X
X
X
X
X
X
1.95 D2
X X X X
traces of gravel X X X
X X X X
X X X
3

_ 3.00 Red with brown and yellow dappled sandy SILT X


X
X
X
X
X
X
3.00 - UD1 56%
X X X X
X X X 3.50
X X X X
X X X
X X X X
X X X
4.5

_ 4.50 Medium stiff, red with yellow and light grey X


X
X
X
X
X
X
MIS 4.50 - P2 2 2 2 1 1 1 5 42%
dappled sandy SILT of intermediate plasticity X
X
X
X
X
X
X
4.95 D3
X X X X
with a little gravel X X X
X X X X
X X X

_ 6.00 Medium stiff, red with yellow and brown X


X
X
X
X
X
X
MIS 6.00 - P3 2 1 1 2 2 2 7 40%
6

dappled sandy SILT of intermediate plasticity X


X
X
X
X
X
X
6.45 D4
with a little gravel X
X
X
X
X
X
X

X X X X
X X X

Depth (m)
_ 7.50 Stiff, ditto. X
X
X
X
X
X
X
MIS 7.50 - P4 4 2 1 1 2 3 7 53% 7.5

X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

_ 9.00 Stiff, ditto. X


X
X
X
X
X
X
MIS 9.00 - P5 3 2 2 2 1 2 7 55% 9 12
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Very stiff, brown with red and yellow dappled


X X X X
_ X X X 10.50 - P6 2 3 3 3 5 5 16 46% 10.5

sandy SILT X
X
X
X
X
X
X
10.95 D7
X X X X
X X X
X X X X
X X X
+++++++++
_ 12.00 Light grey with dark grey and red slightly weathered +++++ 12.00 - C1 CR = 1500 mm 12
+++++++++
good GRANITE +++++ 13.50 CRr = 1500/1500 mm
+++++++++
+++++
RQD =100.0%
+++++++++
+++++
+++++++++
_ 13.50 Light grey with dark grey and red slightly weathered +++++ 13.50 - C2 CR = 1500 mm
+++++++++ 13.5
good GRANITE +++++ 15.00 CRr = 1400/1500 mm
+++++++++
+++++
RQD = 92.0%
+++++++++
End of Borehole At 15.00 m +++++
NOTES: LEGEND: Ground Water Level = 9.80m
S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 2 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 23.04.2019-24.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Red with brown and yelllow dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5

_ 1.50 Soft, red with yellow and brown dappled sandy X


X
X
X
X
X
X
MHS 1.50 - P1 0 0 0 1 1 1 3 55%
SILT of high plasticity with traces of gravel X
X
X
X
X
X
X
1.95 D2
X X X X
X X X
X X X X
X X X
3

_ 3.00 Medium stiff, ditto. X


X
X
X
X
X
X
MHS 3.00 - P2 1 1 1 2 1 2 6 48%
X X X X
X X X 3.45 D3
X X X X
X X X
X X X X
X X X
4.5

_ 4.50 Red with yellow and brown dappled sandy SILT X


X
X
X
X
X
X
4.50 - UD1 60%
X X X X
X X X 5.00
X X X X
X X X
X X X X
X X X

_ 6.00 Medium stiff, red with yellow and brown dappled X


X
X
X
X
X
X
6.00 - P3 1 1 2 2 1 2 7 60%
6

sandy SILT X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X
X X X

Depth (m)
_ 7.50 Medium stiff, brown with yellow dappled sandy X
X
X
X
X
X
X
MIS 7.50 - P4 1 1 1 2 1 1 5 55% 7.5

SILT of intermediate plasticity with traves X


X
X
X
X
X
X
7.95 D5
X X X X
of gravel X X X
X X X X
X X X

_ 9.00 Medium stiff, brown with red spotted sandy X


X
X
X
X
X
X
MHS 9.00 - P5 1 1 2 2 2 1 7 55% 9 12
SILT of high plasticity X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Medium stiff to stiff, ditto.


X X X X
_ X X X 10.50 - P6 1 1 2 2 2 2 8 55% 10.5
X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Medium stiff, brown with white dappled sandy


X X X X
_ X X X MHS 12.00 - P7 1 2 1 1 2 2 6 55% 12

SILT of high plasticity X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Hard, white with brown dappled sandy SILT


X X X X
_ X X X 13.50 - P8 2 4 6 9 9 12 36 55%
13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 3.80m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 2 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 23.04.2019-24.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Hard, dark grey with brown and white dappled


X X X X
X X X 15.00 - P9 3 6 12 26 12 50 60% 15.5

_ sandy SILT X
X
X
X
X
X
X
15.33 D10 30 mm
X X X X
X X X
X X X X
X X X 0
16.50 Hard, ditto.
X X X X
X X X 16.50 - P10 8 8 10 15 25 50 57% 17

_
X
X
X
X
X
X
X
16.85 D11 50 mm
X X X X
X X X
X X X X
X X X
+++++++++
16.90 Light grey with dark grey and light red mottled +++++ 16.90 - C1 CR = 1500 mm
+++++++++ 18.5
_ slightly weathered good GRANITE +++++ 18.40 CRr = 1500/1500 mm
+++++++++
+++++
RQD = 95.0%
+++++++++
+++++
+++++++++
18.40 Ditto +++++ 18.40 - C2 CR = 1500 mm
+++++++++
_ +++++ 19.90 CRr = 1450/1500 mm 20

+++++++++
+++++
RQD = 90.0%
+++++++++
+++++

Depth (m)
_ End of Borehole At 19.90 m 21.5

_ 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 3.80m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 3 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019-19.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish red SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, mottled red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 1 2 2 2 7 88%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Medium stiff to stiff, brownish red sandy SILT X


X
X
X
X
X
X
MIS 3.00 - P2 2 1 2 1 2 3 8 100%
of intermediate plasticity with traces of X
X
X
X
X
X
X
3.45 D2
gravel X
X
X
X
X
X
X

X X X X 4.5
X X X

_ 4.50 Stiff, mottled brown sandy SILT of high X


X
X
X
X
X
X
MHS 4.50 - P3 1 2 2 1 3 4 10 100%
plasticity with traces of gravel X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Very stiff, brownish red sandy SILT of X


X
X
X
X
X
X
MHS 6.00 - P4 2 4 3 6 3 4 16 88%
high plasticity with traces of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Very stiff, ditto. X


X
X
X
X
X
X
MHS 7.50 - P5 3 4 4 4 4 6 18 88%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Very stiff, ditto. X X X X 9


_ 9.00 X X X MHS 9.00 - P6 2 4 3 3 4 6 16 100% 29
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Very stiff, mottled brown sandy SILT


X X X X
_ X X X 10.50 - P7 4 3 5 4 5 5 19 77% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Very stiff, ditto.


X X X X
_ X X X 12.00 - P8 3 4 4 6 6 6 22 88% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, brownish red sandy SILT


X X X X
_ X X X 13.50 - P9 4 3 5 5 7 10 27 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 10.58m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 3 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019-19.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Hard, mottled red SILT


X X X X
X X X 15.00 - P10 6 9 23 27 50 100% 15.5

_ with traces of gravel X


X
X
X
X
X
X
15.30 D10 75 mm
X X X X
X X X
X X X X
X X X 0
16.50 Hard, ditto.
X X X X
X X X 16.50 - P11 7 12 19 31 50 100% 17

_
X
X
X
X
X
X
X
16.78 D11 55 mm
X X X X
X X X
X X X X
X X X

18.00 Hard, mottled red SILT


X X X X
X X X 18.00 - P12 5 9 29 21 50 100%
18.5
_ with traces of gravel X
X
X
X
X
X
X
18.25 D12 25 mm
X X X X
X X X
X X X X
X X X

19.50 Hard, ditto.


X X X X
X X X 19.50 - P13 23 17 50 50 90%
_
X
X
X
X
X
X
X
19.70 P13 50 mm 20

X X X X
X X X
X X X X
X X X

21.00 Hard, mottled brown SILT


X X X X
X X X 21.00 - P14 29 21 50 100%

Depth (m)
_ with traces of gravel X
X
X
X
X
X
X
21.14 D14 65 mm 21.5

X X X X
X X X
X X X X
X X X
X X X X
X X X

_ End of Borehole At 21.10 m 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 10.58m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 4 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Yellow with brown and red dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5
. . . . .
_ 1.50 Loose, red with brown and yellow dappled . . . . SML 1.50 - P1 2 2 2 2 2 2 8 33%
. . . . .
silty SAND of low plasticity with a little . . . . 1.95 D2
. . . . .
gravel . . . .
. . . . .
. . . .
3
. . . . .
_ 3.00 Red with brown and yellow dappled silty SAND . . . . 3.00 - UD1 60%
. . . . .
. . . . 3.50
. . . . .
. . . .
. . . . .
. . . .
4.5
. . . . .
_ 4.50 Loose, ditto. . . . . 4.50 - P2 2 2 2 2 2 2 8 55%
. . . . .
. . . . 4.95 D3
. . . . .
. . . .
. . . . .
. . . .
. . . . .
_ 6.00 Loose to medium dense, red with brown and yellow . . . . SML 6.00 - P3 2 2 2 2 3 3 10 55%
6

. . . . .
dappled silty SAND of low plasticity with . . . . 6.45 D4
. . . . .
a little gravel . . . .
. . . . .
. . . .

Depth (m)
. . . . .
_ 7.50 Medium dense, ditto. . . . . SML 7.50 - P4 3 4 4 4 3 3 14 26% 7.5

. . . . .
. . . . 7.95 D5
. . . . .
. . . .
. . . . .
. . . .

_ 9.00 Stiff to very stiff, red with yellow and brown X


X
X
X
X
X
X
MIS 9.00 - P5 1 2 3 3 5 4 15 55% 9 27
dappled sandy SILT of intermediate plasticity X
X
X
X
X
X
X
9.45 D6
X X X X
with a little gravel X X X
X X X X
X X X

10.50 Stiff, ditto.


X X X X
_ X X X MIS 10.50 - P6 2 2 2 2 3 2 9 55% 10.5
X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Medium stiff to stiff, ditto.


X X X X
_ X X X 12.00 - P7 2 2 2 2 2 2 8 55% 12
X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, ditto.


X X X X
_ X X X 13.50 - P8 2 2 2 3 3 3 11 44%
13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 10.30m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 4 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X
+++++++++
14.70 Reddish with light grey dappled slightly weathered +++++ 14.70 - C1 CR = 1500 mm 15.5
+++++++++
_ good GRANITE +++++ 16.20 CRr = 1300/1500 mm
+++++++++
+++++
RQD = 90.0%
+++++++++
+++++ 0
+++++++++
16.20 light grey and grey with red dappled slightly weathered +++++ 16.20 - C2 CR = 1500 mm 17
+++++++++
_ good GRANITE +++++ 17.70 CRr = 1350/1500 mm
+++++++++
+++++
RQD = 89.0%
+++++++++
+++++
+++++++++
+++++
18.5
_

End of Borehole At 17.70 m


_ 20

Depth (m)
_ 21.5

_ 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 10.30m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 5 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 19.04.2019 - 20.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Red with yellow and brown dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5

_ 1.50 Soft to medium stiff, red with yellow and brown X


X
X
X
X
X
X
MHS 1.50 - P1 1 1 1 1 1 1 4 24%
dappled sandy SILT of high plasticity X
X
X
X
X
X
X
1.95 D2
X X X X
with traces of gravel X X X
X X X X
X X X
3

_ 3.00 Yellow with brown and red dappled sandy SILT X


X
X
X
X
X
X
3.00 - UD1 50%
X X X X
X X X 3.45
X X X X
X X X
X X X X
X X X
4.5

_ 4.50 Medium stiff to stiff, ditto. X


X
X
X
X
X
X
MHS 4.50 - P2 1 1 2 2 2 2 8 51%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X

_ 6.00 Stiff, red with yellow and brown dappled sandy X


X
X
X
X
X
X
MHS 6.00 - P3 2 2 3 2 2 3 10 66%
6

SILT of high plasticity with traces of X


X
X
X
X
X
X
6.45 D4
gravel X
X
X
X
X
X
X

X X X X
X X X

Depth (m)
_ 7.50 Stiff, ditto. X
X
X
X
X
X
X
7.50 - P4 2 3 4 3 3 4 14 55% 7.5

X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

_ 9.00 Stiff to very stiff, ditto X


X
X
X
X
X
X
MHS 9.00 - P5 2 2 3 4 4 4 15 55% 9 27
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Medium stiff, ditto.


X X X X
_ X X X 10.50 - P6 1 1 1 2 1 2 6 55% 10.5
X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Medium stiff, ditto.


X X X X
_ X X X MHS 12.00 - P7 2 1 2 1 2 2 7 55% 12
X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, pink with yellow and light grey dappled


X X X X
_ X X X 13.50 - P8 1 2 2 2 3 2 9 55%
13.5
sandy SILT X
X
X
X
X
X
X
13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 7.45 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 5 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 19.04.2019 - 20.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Stiff, pink with yellow and light grey dappled


X X X X
X X X 15.00 - P9 3 3 3 3 3 3 12 55% 15.5

_ sandy SILT X
X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Medium stiff, yellow with light grey and brown
X X X X
X X X 16.50 - P10 1 1 1 2 2 2 7 55% 17

_ dappled sandy SILT X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Stiff, ditto.


X X X X
X X X 18.00 - P11 1 2 2 2 2 3 9 55%
X X X X 18.5
_ X X X 18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Stiff, purple with light grey and yellow dappled


X X X X
X X X 19.50 - P12 1 2 2 3 3 3 11 55%
_ sandy SILT X
X
X
X
X
X
X
19.95 D13 20

X X X X
X X X
X X X X
X X X

21.00 Stiff to very stiff, yellow with light grey and purple
X X X X
X X X 21.00 - P13 1 2 2 4 4 5 15 55%

Depth (m)
_ dappled sandy SILT X
X
X
X
X
X
X
21.45 P14 21.5

X X X X
X X X
X X X X
X X X

22.50 Very stiff, yellow with brown and light grey


X X X X
X X X 22.50 - P14 2 3 4 6 6 9 25 55%
_ dappled sandy SILT X
X
X
X
X
X
X
22.95 D15 23

X X X X
X X X
X X X X
X X X

24.00 Hard, yellow with brown and light grey with pink
X X X X
X X X 24.00 - P15 5 6 8 8 11 11 38 55%
_ dappled sandy SILT X
X
X
X
X
X
X
24.45 D16 24.5
X X X X
X X X
X X X X
X X X

25.50 Hard, ditto.


X X X X
X X X 25.50 - P16 5 7 9 12 12 12 45 55%
X X X X
_ X X X 25.95 D17 26
X X X X
X X X
X X X X
X X X

27.00 Hard, ditto


X X X X
X X X 27.00 - P17 6 7 10 12 15 13 50 57%
_
X
X
X
X
X
X
X
27.435 D18 60 mm
X X X X 27.5

X X X
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 7.45 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 5 Reduced Level : Supervisor : Fauzi


Sheet No. : 3 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 19.04.2019 - 20.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


00 10 20 30 40 50
mm mm mm mm mm mm
10 20 30 40 50
27.50

X X X X
_ X X X
X X X X
X X X

28.50 Hard, yellow with brown and light grey with pink
X X X X
X X X 28.50 - P18 5 8 11 13 12 14 50 43%
dappled sandy SILT X
X
X
X
X
X
X
28.95 D19 29
1
X X X X
_ X X X
X X X X
X X X

30.00 Hard, ditto.


X X X X
X X X 30.00 - P19 2 7 8 11 16 15 50 51%
X X X X
X X X 30.45 D20 30.5
2
X X X X
_ X X X
X X X X
X X X
X X X X
X X X

End of Borehole At 30.45 m 32


3
_

33.5

_ 4

35

Depth (m)
_ 5

36.5

_ 6
0

38

_
7

39.5

_
8

41

_
9

42.5
NOTES: LEGEND: Ground Water Level = 7.45 m
S = Standard Penetration Test (SPT) REMARKS 10
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 6 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019-19.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


0 10 20 30 40 50
mm mm mm mm mm mm 0

_ 0.00 Yellow with brown and red dappled sandy SILT


X X X X
X X X D1
X X X X
X X X
X X X X
X X X
X X X X
X X X 1.5

_ 1.50 Soft to medium stiff, red with yellow dappled sandy X


X
X
X
X
X
X
MHS 1.50 - P1 1 1 1 1 1 1 4 62%
SILT of high plasticity X
X
X
X
X
X
X
1.95 D2
X X X X
X X X
X X X X
X X X
3

_ 3.00 Red with yellow dappled sandy CLAY X


X
X
X
X
X
X
3.00 - UD1 60%
X X X X
X X X 3.50
X X X X
X X X
X X X X
X X X
4.5

_ 4.50 Stiff, yellow with brown and red dappled sandy X


X
X
X
X
X
X
MHS 4.50 - P2 2 2 2 3 3 3 11 62%
SILT of high plasticity with traces of gravel X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X

_ 6.00 Medium stiff to stiff, yellow with brown and red X


X
X
X
X
X
X
MHS 6.00 - P3 1 1 1 2 2 3 8 53%
6

dappled sandy SILT of high plasticity X


X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X
X X X

Depth (m)
_ 7.50 Medium stiff, yellow with brown and light grey X
X
X
X
X
X
X
MHS 7.50 - P4 1 1 1 1 1 2 5 62% 7.5

dappled sandy SILT of high plasticity X


X
X
X
X
X
X
7.95 D5
X X X X
X X X
X X X X
X X X

_ 9.00 Medium stiff, ditto. X


X
X
X
X
X
X
9.00 - P5 1 1 1 1 2 2 6 57% 9 11
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Soft to medium stiff, brown with pink and yellow


X X X X
_ X X X MHS 10.50 - P6 1 1 1 1 1 1 4 44% 10.5

with light grey dappled sandy SILT of high X


X
X
X
X
X
X
10.95 D7
plasticity X
X
X
X
X
X
X

X X X X
X X X

12.00 Medium stiff, brown with pink and yellow with


X X X X
_ X X X 12.00 - P7 1 1 1 2 2 2 7 55% 12

light grey dappled sandy SILT X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Medium stiff, red with yellow and light grey


X X X X
_ X X X 13.50 - P8 1 1 1 2 1 2 6 51%
13.5
with brown dappled sandy SILT X
X
X
X
X
X
X
13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 6.88m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 6 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 18.04.2019-19.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Medium stiff, red with yellow and light grey


X X X X
X X X 15.00 - P9 5 1 1 1 2 2 6 57% 15.5

_ with brown dappled sandy SILT X


X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Stiff, red with yellow and light grey with brown
X X X X
X X X 16.50 - P10 2 1 2 3 3 3 11 55% 17

_ dappled sandy SILT X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Medium stiff, red with yellow and light grey with
X X X X
X X X 18.00 - P11 1 1 1 2 1 2 6 57%
18.5
_ brown dappled sandy SILT X
X
X
X
X
X
X
18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Very stiff, red with dark grey and light grey with
X X X X
X X X 19.50 - P12 3 3 4 4 8 9 25 62%
_ brown dappled sandy SILT X
X
X
X
X
X
X
19.95 D13 20

X X X X
X X X
X X X X
X X X
+++++++++
20.20 Reddish to light grey slightly weathered +++++ 20.20 - C1 CR = 1500 mm

Depth (m)
+++++++++
_ good GRANITE +++++ 21.70 CRr = 1500/1500 mm 21.5

+++++++++
+++++
RQD = 93.0%
+++++++++
+++++
+++++++++
21.70 Reddish to light grey slightly weathered +++++ 21.70 - C2 CR = 1500 mm
+++++++++
_ good GRANITE +++++ 23.20 CRr = 1400/1500 mm 23

+++++++++
+++++
RQD = 90.0%
+++++++++
+++++

_ End of Borehole At 23.20 m 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 6.88m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 7 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 17.04.2019- 18.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Reddish brown SILT


X X X X
X X X
X X X X
X X X

1.00 Reddish brown SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 1 2 1 2 6 100%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Stiff, ditto. X


X
X
X
X
X
X
3.00 - P2 2 1 2 3 2 2 9 88%
X X X X
X X X 3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Medium stiff to stiff, ditto. X


X
X
X
X
X
X
4.50 - P3 3 2 1 3 2 2 8 100%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, mottled red sandy SILT of high X


X
X
X
X
X
X
MHS 6.00 - P4 3 2 3 1 3 3 10 44%
plasticity with traves of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 3 2 3 2 3 4 12 88%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Medium stiff, mottled brown sandy SILT of X X X X 9


_ 9.00 X X X MHS 9.00 - P6 4 2 3 1 1 2 7 88% 11
high plasticity with traves of gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Very stiff, mottled red sandy SILT


X X X X
_ X X X 10.50 - P7 4 5 4 6 5 6 21 66% 10.5

with traces of gravel X


X
X
X
X
X
X
10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Very stiff, ditto.


X X X X
_ X X X MHS 12.00 - P8 6 5 7 7 6 5 25 77% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, mottled brown SILT


X X X X
_ X X X 13.50 - P9 5 6 7 6 7 7 27 88% 13.5

with traces of gravel X


X
X
X
X
X
X
13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 4.85m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 7 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 17.04.2019- 18.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X
. . . . .
15.00 Very dense, mottled red silty SAND of low . . . . SML 15.00 - P10 10 13 50 50 100% 15.5
. . . . .
_ plasticity with traces of gravel . . . . 15.20 D10 50 mm
. . . . .
. . . .
. . . . .
. . . . 0
16.50 Hard, mottled red sandy SILT of high
X X X X
X X X MHS 16.50 - P11 27 23 50 100% 17

_ plasticity with traces of gravel X


X
X
X
X
X
X
60.00 D11 25 mm
X X X X
X X X
X X X X
X X X
+++++++++
17.00 Reddish to light grey slightly weathered +++++ 17.00 - C1 CR = 1500 mm
+++++++++ 18.5
_ good GRANITE +++++ 18.50 CRr = 1000/1500 mm
+++++++++
+++++
RQD = 90.0%
+++++++++
+++++
+++++++++
18.50 Hard, ditto. +++++ 18.50 - C2 CR = 1500 mm
+++++++++
_ +++++ 20.00 CRr = 1500/1500 mm 20

+++++++++
+++++
RQD = 92.0%
+++++++++
+++++
+++++++++
+++++

Depth (m)
_ 21.5

End of Borehole At 20.00 m

_ 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 4.85m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 8 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 15.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Red SILT X


X
X
X
X
X
X

X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 1 2 1 2 6 88%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Medium stiff to stiff, brownish red sandy SILT X


X
X
X
X
X
X
MIS 3.00 - P2 1 1 2 2 2 2 8 77%
of intermediate plasticity with traces of X
X
X
X
X
X
X
3.45 D2
gravel X
X
X
X
X
X
X

X X X X 4.5
X X X

_ 4.50 Stiff, ditto. X


X
X
X
X
X
X
4.50 - P3 1 2 3 3 2 3 11 66%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, brownish red sandy SILT of intermediate X


X
X
X
X
X
X
MIS 6.00 - P4 2 2 3 3 3 4 13 44%
plasticity with a little gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff to very stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 1 2 2 3 4 6 15 66%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Stiff, mottled red sandy SILT of intermediate X X X X 9


_ 9.00 X X X MIS 9.00 - P6 2 1 2 3 3 3 11 66% 20
plasticity with a little gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Stiff to very stiff, brownish red sandy SILT


X X X X
_ X X X 10.50 - P7 3 3 3 4 4 4 15 66% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Stiff, mottled red sandy SILT of high


X X X X
_ X X X MHS 12.00 - P8 2 2 2 3 3 4 12 79% 12

plasticity X
X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, ditto.


X X X X
_ X X X 13.50 - P9 3 4 3 3 5 10 21 77% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.63m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 8 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 15.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Hard, mottled red sandy SILT of intermediate


X X X X
X X X MIS 15.00 - P10 3 4 10 16 24 50 100% 15.5

_ plasticity with traces of gravel X


X
X
X
X
X
X
15.31 D10 10 mm
X X X X
X X X
X X X X
X X X 0
16.50 Hard, ditto.
X X X X
X X X 16.50 - P11 5 11 21 29 50 100% 17

_
X
X
X
X
X
X
X
16.75 D11 25 mm
X X X X
X X X
X X X X
X X X

18.00 Hard, mottled brown SILT


X X X X
X X X 18.00 - P12 10 15 50 50 100%
18.5
_ with traces of gravel X
X
X
X
X
X
X
18.20 D12 50 mm
X X X X
X X X
X X X X
X X X

19.50 Hard, ditto.


X X X X
X X X 19.50 - P13 13 17 50 50 90%
_
X
X
X
X
X
X
X
19.70 P13 50 mm 20

X X X X
X X X
X X X X
X X X

21.00 Hard, ditto.


X X X X
X X X 21.00 - P14 30 20 50 100%

Depth (m)
_
X
X
X
X
X
X
X
21.10 D14 25 mm 21.5

X X X X
X X X
X X X X
X X X
X X X X
X X X

_ End of Borehole At 21.10 m 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 12.63m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 9 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019 - 17.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Reddish brown SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red sandy SILT of X


X
X
X
X
X
X
MHS 1.50 - P1 1 1 1 1 2 2 6 77%
high plasticity with traces of gravel X
X
X
X
X
X
X
1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Medium stiff to stiff, ditto. X


X
X
X
X
X
X
3.00 - P2 2 1 2 1 2 3 8 100%
X X X X
X X X 3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Medium stiff, mottled red sandy SILT X


X
X
X
X
X
X
4.50 - P3 2 2 1 2 2 2 7 100%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, ditto. X


X
X
X
X
X
X
6.00 - P4 3 2 3 2 2 3 10 66%
X X X X
X X X 6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, brownish red sandy SILT of high X


X
X
X
X
X
X
MHS 7.50 - P5 1 2 2 3 2 2 9 66%
plasticity with traces of gravel X
X
X
X
X
X
X
7.95 D5
X X X X
X X X
X X X X
X X X

Stiff, yellowish red sandy SILT of high X X X X 9


_ 9.00 X X X MHS 9.00 - P6 2 3 2 2 3 5 12 82% 22
plasticity with traces of gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Stiff, brownish red sandy SILT of high


X X X X
_ X X X MHS 10.50 - P7 3 2 2 2 3 3 10 66% 10.5

plasticity with traces of gravel X


X
X
X
X
X
X
10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Stiff to very stiff, ditto.


X X X X
_ X X X 12.00 - P8 3 2 3 4 3 5 15 100% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, ditto.


X X X X
_ X X X MHS 13.50 - P9 2 3 2 3 4 5 14 77% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.49 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 9 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019 - 17.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, light grey red sandy SILT


X X X X
X X X 15.00 - P10 3 2 3 2 4 8 17 66% 15.5
X X X X
_ X X X 15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, brownish red sandy SILT
X X X X
X X X 16.50 - P11 2 3 3 4 6 8 21 82% 17

_ with traces of gravel X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Very stiff, mottled brown sandy SILT


X X X X
X X X 18.00 - P12 4 5 7 7 6 6 26 66%
X X X X 18.5
_ X X X 18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Very stiff, ditto.


X X X X
X X X 19.50 - P13 4 3 4 5 7 8 24 77%
X X X X
_ X X X 19.95 P13 20

X X X X
X X X
X X X X
X X X

21.00 Very stiff, ditto.


X X X X
X X X 21.00 - P14 3 4 4 6 6 8 24 66%

Depth (m)
X X X X
_ X X X 21.45 D14 21.5

X X X X
X X X
X X X X
X X X

22.50 Very stiff, mottled red sandy SILT


X X X X
X X X 22.50 - P15 4 3 3 4 6 6 19 88%
X X X X
_ X X X 22.95 D15 23

X X X X
X X X
X X X X
X X X

24.00 Very stiff, ditto.


X X X X
X X X 24.00 - P16 4 5 4 6 7 6 23 100%
X X X X
_ X X X 24.45 D16 24.5
X X X X
X X X
X X X X
X X X

25.50 Very stiff, ditto.


X X X X
X X X 25.50 - P17 3 4 3 4 5 9 21 100%
X X X X
_ X X X 25.95 D17 26
X X X X
X X X
X X X X
X X X

27.00 Very stiff, light grey brown sandy SILT


X X X X
X X X 27.00 - P18 4 3 4 6 5 10 25 88%
X X X X
_ X X X 27.45 D18
X X X X 27.5

X X X
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.49 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 9 Reduced Level : Supervisor : Fauzi


Sheet No. : 3 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019 - 17.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


00 10 20 30 40 50
mm mm mm mm mm mm
10 20 30 40 50
27.50

X X X X
_ X X X
X X X X
X X X

28.50 Very stiff, light grey brown sandy SILT


X X X X
X X X 28.50 - P19 5 5 7 7 8 7 29 100%
X X X X
X X X 28.98 D19 29
1
X X X X
_ X X X
X X X X
X X X

30.00 Hard, mottled red SILT


X X X X
X X X 30.00 - P20 4 5 6 8 8 9 31 88%
with traces of sand X
X
X
X
X
X
X
30.45 D20 30.5
2
X X X X
_ X X X
X X X X
X X X
X X X X
X X X

32
3
_
End of Borehole At 30.45 m

33.5

_ 4

35

Depth (m)
_ 5

36.5

_ 6
0

38

_
7

39.5

_
8

41

_
9

42.5
NOTES: LEGEND: Ground Water Level = 12.49 m
S = Standard Penetration Test (SPT) REMARKS 10
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 10 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish red SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Stiff, brownish red sandy SILT X


X
X
X
X
X
X
1.50 - P1 1 1 2 2 2 3 9 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Loose to medium dense, mottled red silty SAND X


X
X
X
X
X
X
SML 3.00 - P2 1 2 2 3 3 2 10 66%
of low plasticity with traces of gravel X
X
X
X
X
X
X
3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Medium dense, ditto. X


X
X
X
X
X
X
4.50 - P3 1 2 2 3 3 3 11 88%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, brownish red sandy SILT of intermediate X


X
X
X
X
X
X
MIS 6.00 - P4 2 2 2 3 2 2 9 55%
plasticity with traces of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 3 3 3 2 3 4 12 66%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Medium dense,mottled red silty SAND of low X X X X 9


_ 9.00 X X X SML 9.00 - P6 3 4 3 4 4 6 17 66% 31
plasticity with a little gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Medium dense, ditto.


X X X X
_ X X X SML 10.50 - P7 2 3 3 4 4 4 15 55% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Stiff to very stiff, brownish red sandy SILT


X X X X
_ X X X MIS 12.00 - P8 2 3 4 4 3 4 15 88% 12

of intermediate plasticity with traces of gravel X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, ditto.


X X X X
_ X X X 13.50 - P9 3 3 4 4 5 7 20 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 14.87m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 10 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, mottled red SILT


X X X X
X X X 15.00 - P10 3 4 6 6 6 8 26 77% 15.5

_ with traces of sand X


X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Hard, ditto.
X X X X
X X X 16.50 - P11 4 4 4 6 7 33 50 75% 17

_
X
X
X
X
X
X
X
16.90 D11 25 mm
X X X X
X X X
X X X X
X X X

18.00 Hard, light grey red SILT


X X X X
X X X 18.00 - P12 10 15 50 50 100%
18.5
_
X
X
X
X
X
X
X
18.19 D12 40 mm
X X X X
X X X
X X X X
X X X

19.50 Hard, mottled red SILT


X X X X
X X X 19.50 - P13 13 17 50 50 100%
_ with traces of sand X
X
X
X
X
X
X
19.70 P13 50 mm 20

X X X X
X X X
X X X X
X X X

21.00 Hard, ditto.


X X X X
X X X 21.00 - P14 26 24 50 100%

Depth (m)
_
X
X
X
X
X
X
X
21.13 D14 55 mm 21.5

X X X X
X X X
X X X X
X X X

22.50 Hard, mottled red SILT


X X X X
X X X 22.50 - P15 30 20 50 100%
_ with traces of gravel X
X
X
X
X
X
X
22.6 D15 25 mm 23

X X X X
X X X
X X X X
X X X

_ End of Borehole At 22.60 m 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 14.87m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 11 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish red SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 80%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 1 2 1 2 2 7 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X
. . . . .
_ 3.00 Loose, brownish red silty SAND of low . . . . SML 3.00 - P2 1 1 1 1 2 2 6 80%
. . . . .
plasticity with traces of gravel . . . . 3.45 D2
. . . . .
. . . .
. . . . .
4.5
. . . .

_ 4.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
4.50 - P3 1 2 1 2 1 3 7 100%
with traces of sand X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, mottled red sandy SILT of high X


X
X
X
X
X
X
MHS 6.00 - P4 3 4 3 2 2 2 9 100%
plasticity with traces of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 2 3 2 3 3 3 11 77%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Stiff, brownish red sandy SILT of high X X X X 9


_ 9.00 X X X MHS 9.00 - P6 2 2 3 2 3 2 10 77% 17
plasticity X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Stiff, ditto.


X X X X
_ X X X 10.50 - P7 2 3 2 3 2 4 11 88% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Very stiff, mottled red sandy SILT of high


X X X X
_ X X X MHS 12.00 - P8 3 1 3 2 3 8 16 88% 12

plasticity with traces of gravel X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, ditto.


X X X X
_ X X X 13.50 - P9 2 3 3 6 6 6 21 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.40 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 11 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, mottled brown sandy SILT of high


X X X X
X X X MHS 15.00 - P10 3 4 4 6 6 9 25 100% 15.5

_ plasticity with traces of gravel X


X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, brownish red SILT
X X X X
X X X 16.50 - P11 3 4 4 6 6 11 27 88% 17

_ with traces of gravel X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Very stiff, ditto.


X X X X
X X X 18.00 - P12 7 9 5 4 6 14 29 100%
X X X X 18.5
_ X X X 18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Very stiff, ditto.


X X X X
X X X 19.50 - P13 4 6 5 6 6 10 27 88%
X X X X
_ X X X 19.95 P13 20

X X X X
X X X
X X X X
X X X

21.00 Very stiff, mottled red SILT


X X X X
X X X 21.00 - P14 6 9 5 5 6 10 26 100%

Depth (m)
X X X X
_ X X X 21.45 D14 21.5

X X X X
X X X
X X X X
X X X

22.50 Hard, mottled brown SILT


X X X X
X X X 22.50 - P15 4 7 26 24 50 100%
_ with traces of sand X
X
X
X
X
X
X
22.75 D15 25 mm 23

X X X X
X X X
X X X X
X X X

24.00 Hard, mottled red SILT


X X X X
X X X 24.00 - P16 6 9 18 32 50 86%
_ with traces of gravel X
X
X
X
X
X
X
24.29 D16 65 mm 24.5
X X X X
X X X
X X X X
X X X

25.50 Hard, ditto.


X X X X
X X X 25.50 - P17 9 13 50 50 90%
_
X
X
X
X
X
X
X
25.70 D17 50 mm
26
X X X X
X X X
X X X X
X X X

27.00 Hard, mottled brown SILT


X X X X
X X X 27.00 - P18 11 16 31 19 50 80%
_
X
X
X
X
X
X
X
27.235 D18 10 mm
X X X X 27.5

X X X
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 12.40 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 11 Reduced Level : Supervisor : Fauzi


Sheet No. : 3 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 16.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


00 10 20 30 40 50
mm mm mm mm mm mm
10 20 30 40 50
27.50

X X X X
_ X X X
X X X X
X X X

28.50 Hard, mottled brown SILT


X X X X
X X X 28.50 - P19 15 17 50 50 100%
with traces of gravel X
X
X
X
X
X
X
28.68 D19 30 mm 29
1
X X X X
_ X X X
X X X X
X X X
X X X X
X X X

End of Borehole At 28.68 m X


X
X
X
X
X
X
30.5
2

32
3
_

33.5

_ 4

35

Depth (m)
_ 5

36.5

_ 6
0

38

_
7

39.5

_
8

41

_
9

42.5
NOTES: LEGEND: Ground Water Level = 12.40 m
S = Standard Penetration Test (SPT) REMARKS 10
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 12 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 12.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Reddish brown sandy SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff to stiff, mottled brown SILT X


X
X
X
X
X
X
1.50 - P1 2 1 2 2 2 2 8 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Stiff, brownish red sandy SILT of intermediate X


X
X
X
X
X
X
MIS 3.00 - P2 1 2 2 3 2 3 10 55%
plasticity with traves of gravel X
X
X
X
X
X
X
3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Stiff, mottled brown sandy SILT X


X
X
X
X
X
X
4.50 - P3 3 3 3 2 3 4 12 55%
X X X X
X X X 4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, reddish brown sandy SILT of intermediate X


X
X
X
X
X
X
MIS 6.00 - P4 2 2 3 4 3 4 14 66%
plasticity with a little gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff ditto. X


X
X
X
X
X
X
7.50 - P5 2 3 3 3 3 3 12 66%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X
. . . . .
Medium dense, red with yellow and brown dappled
9
_ 9.00 . . . . SMI 9.00 - P6 2 2 2 3 3 3 11 55% 20
. . . . .
silty SAND of intermediate plasticity with . . . . 9.45 D6
. . . . .
traces of gravel . . . .
. . . . .
. . . .

10.50 Stiff, red with yellow and brown dappled sandy


X X X X
_ X X X MIS 10.50 - P7 1 2 3 3 4 4 14 77% 10.5

SILT of intermediate plasticity with X


X
X
X
X
X
X
10.95 D7
traces of gravel X
X
X
X
X
X
X

X X X X
X X X

12.00 Stiff, yellowish brown sandy SILT


X X X X
_ X X X 12.00 - P8 2 2 2 3 4 5 14 88% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, ditto.


X X X X
_ X X X 13.50 - P9 2 2 2 2 4 4 12 77% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 10.90 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 12 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 2 Type of Drill : Rotary Wash Boring (YWE) Date : 12.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Stiff, brownish yellow sandy SILT of high


X X X X
X X X MHS 15.00 - P10 1 2 2 2 4 5 13 100% 15.5

_ plasticity X
X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, ditto.
X X X X
X X X 16.50 - P11 2 3 4 6 6 8 24 100% 17
X X X X
_ X X X 16.78 D11
X X X X
X X X
X X X X
X X X
+++++++++
17.00 Reddish with light grey dappled slightly weathered +++++ 18.00 - C1 CR = 1500 mm
+++++++++ 18.5
_ good GRANITE +++++ 18.25 CRr = 1300/1500 mm
+++++++++
+++++
RQD = 88.0%
+++++++++
+++++
+++++++++
18.50 Ditto +++++ 19.50 - C2 CR = 1500 mm
+++++++++
_ +++++ 19.70 CRr = 1250/1500 mm 20

+++++++++
+++++
RQD = 93.0%
+++++++++
+++++
+++++++++
+++++

Depth (m)
_ End of Borehole At 19.70 m 21.5

_ 23

_ 24.5

_
26

_
27.5

NOTES: LEGEND: Ground Water Level = 10.90 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 13 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish sandy SILT


X X X X
X X X
X X X X
X X X

1.00 Brownish red SILT X


X
X
X
X
X
X
1.00 - UD1 70%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 2 1 2 1 6 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Medium stiff , brownish red sandy SILT of X


X
X
X
X
X
X
MHS 3.00 - P2 2 2 1 1 2 3 7 88%
high plasticity X
X
X
X
X
X
X
3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Medium stiff to stiff, mottled brown SILT X


X
X
X
X
X
X
4.50 - P3 1 2 2 2 2 2 8 77%
with traces of sand X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, mottled brown sandy SILT of high X


X
X
X
X
X
X
MHS 6.00 - P4 2 2 2 3 2 4 11 66%
plasticity with traces of gravel X
X
X
X
X
X
X
6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 1 2 2 2 3 3 10 77%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Stiff, ditto. X X X X 9
_ 9.00 X X X MHS 9.00 - P6 2 2 2 2 3 3 10 55% 18
X X X X
X X X 9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Stiff, ditto.


X X X X
_ X X X 10.50 - P7 2 2 3 2 2 4 11 66% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Stiff, reddish brown sandy SILT of high


X X X X
_ X X X MHS 12.00 - P8 1 3 2 3 3 3 11 88% 12

plasticity with traces of gravel X


X
X
X
X
X
X
12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Stiff, ditto.


X X X X
_ X X X 13.50 - P9 2 2 3 3 3 3 12 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 9.58 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 13 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, brown with grey and red dappled sandy
X X X X
X X X 15.00 - P10 2 2 4 5 6 7 22 88% 15.5

_ SILT with traces of gravel X


X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, brownish red sandy SILT
X X X X
X X X 16.50 - P11 2 3 5 5 6 8 24 66% 17

_ with traces of gravel X


X
X
X
X
X
X
16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Hard, ditto.


X X X X
X X X 18.00 - P12 4 6 9 13 16 12 50 77%
18.5
_
X
X
X
X
X
X
X
18.40 D12 25 mm
X X X X
X X X
X X X X
X X X

19.50 Hard, mottled brown SILT


X X X X
X X X 19.50 - P13 4 6 9 13 16 12 50 88%
_ with traces of sand X
X
X
X
X
X
X
19.89 P13 15 mm 20

X X X X
X X X
X X X X
X X X

21.00 Hard, light grey with red and brown dappled sandy
X X X X
X X X MlS 21.00 - P14 6 4 12 15 23 50 90%

Depth (m)
_ SILT of low plasticity with some gravel X
X
X
X
X
X
X
21.35 D14 50 mm 21.5

X X X X
X X X
X X X X
X X X

22.50 Hard, mottled greyish brown sandy SILT


X X X X
X X X 22.50 - P15 5 8 25 25 50 80%
_ with traces of gravel X
X
X
X
X
X
X
22.77 D15 45 mm 23

X X X X
X X X
X X X X
X X X

24.00 Hard, ditto.


X X X X
X X X 24.00 - P16 8 10 20 30 50 86%
_
X
X
X
X
X
X
X
24.25 D16 25 mm 24.5
X X X X
X X X
X X X X
X X X
X X X X
X X X

_
26

End of Borehole At 24.25 m

_
27.5

NOTES: LEGEND: Ground Water Level = 9.58 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 14 Reduced Level : Supervisor : Fauzi


Sheet No. : 1 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019-14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 0


0 10 20 30 40 50

_ 0.00 Brownish red SILT


X X X X
X X X
X X X X
X X X

1.00 Red SILT X


X
X
X
X
X
X
1.00 - UD1 100%
X X X X
X X X 1.50 1.5
X X X X
X X X

_ 1.50 Medium stiff, brownish red SILT X


X
X
X
X
X
X
1.50 - P1 1 2 1 2 2 2 7 66%
X X X X
X X X 1.95 D1
X X X X
X X X
3
X X X X
X X X

_ 3.00 Stiff, brownish red sandy SILT of intermediate X


X
X
X
X
X
X
MIS 3.00 - P2 2 2 2 2 2 3 9 77%
plasticity with traces of gravel X
X
X
X
X
X
X
3.45 D2
X X X X
X X X
X X X X 4.5
X X X

_ 4.50 Stiff, brownish red sandy SILT of high X


X
X
X
X
X
X
MHS 4.50 - P3 2 2 3 2 3 3 11 66%
plasticity X
X
X
X
X
X
X
4.95 D3
X X X X
X X X
X X X X
X X X 6

_ 6.00 Stiff, ditto. X


X
X
X
X
X
X
6.00 - P4 3 2 3 3 4 4 14 55%
X X X X
X X X 6.45 D4
X X X X
X X X
X X X X

Depth (m)
X X X
7.5

_ 7.50 Stiff to very stiff, ditto. X


X
X
X
X
X
X
7.50 - P5 2 3 3 4 4 4 15 73%
X X X X
X X X 7.95 D5
X X X X
X X X
X X X X
X X X

Very stiff, brownish red sandy SILT of high X X X X 9


_ 9.00 X X X MHS 9.00 - P6 3 3 3 4 4 6 17 44% 31
plasticity with traces of gravel X
X
X
X
X
X
X
9.45 D6
X X X X
X X X
X X X X
X X X

10.50 Very stiff, light grey red sandy SILT


X X X X
_ X X X 10.50 - P7 3 4 5 6 8 8 27 100% 10.5

X X X X
X X X 10.95 D7
X X X X
X X X
X X X X
X X X

12.00 Very stiff, ditto.


X X X X
_ X X X 12.00 - P8 3 3 7 8 7 5 27 100% 12

X X X X
X X X 12.45 D8
X X X X
X X X
X X X X
X X X

13.50 Very stiff, ditto.


X X X X
_ X X X 13.50 - P9 3 2 3 5 7 10 25 88% 13.5
X X X X
X X X 13.95 D9
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 8.30 m


S = Standard Penetration Test (SPT) REMARKS 15

_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 14 Reduced Level : Supervisor : Fauzi


Sheet No. : 2 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019-14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC. mm mm mm mm mm mm 14


0 10 20 30 40 50

X X X X
_ X X X
X X X X
X X X
X X X X
X X X

15.00 Very stiff, mottled red sandy SILT of high


X X X X
X X X MHS 15.00 - P10 3 4 5 6 8 8 27 100% 15.5

_ plasticity X
X
X
X
X
X
X
15.45 D10
X X X X
X X X
X X X X
X X X 0
16.50 Very stiff, ditto.
X X X X
X X X 16.50 - P11 2 3 5 3 7 7 22 100% 17
X X X X
_ X X X 16.95 D11
X X X X
X X X
X X X X
X X X

18.00 Very stiff, mottled red sandy SILT


X X X X
X X X 18.00 - P12 2 3 4 4 6 10 24 88%
18.5
_ with traces of gravel X
X
X
X
X
X
X
18.45 D12
X X X X
X X X
X X X X
X X X

19.50 Very stiff, ditto.


X X X X
X X X 19.50 - P13 3 4 3 5 8 9 25 100%
X X X X
_ X X X 19.95 P13 20

X X X X
X X X
X X X X
X X X

21.00 Very stiff, mottled red SILT


X X X X
X X X 21.00 - P14 4 4 6 7 5 9 27 88%

Depth (m)
_ with traces of sand X
X
X
X
X
X
X
21.45 D14 21.5

X X X X
X X X
X X X X
X X X

22.50 Very stiff, light grey red SILT


X X X X
X X X 22.50 - P15 4 4 5 7 7 7 26 77%
_ with traces of sand X
X
X
X
X
X
X
22.95 D15 23

X X X X
X X X
X X X X
X X X

24.00 Very stiff to hard, ditto.


X X X X
X X X 24.00 - P16 3 4 4 6 10 10 30 66%
X X X X
_ X X X 24.45 D16 24.5
X X X X
X X X
X X X X
X X X

25.50 Hard, light grey red SILT


X X X X
X X X 25.50 - P17 10 15 50 50 100%
_ with traces of gravel X
X
X
X
X
X
X
25.70 D17 50 mm
26
X X X X
X X X
X X X X
X X X

27.00 Hard, light grey red sandy SILT of intermediate


X X X X
X X X MIS 27.00 - P18 9 12 50 50 100%
_ plasticity with some gravel X
X
X
X
X
X
X
27.20 D18 50 mm
X X X X 27.5

X X X
X X X X
X X X
X X X X
X X X

NOTES: LEGEND: Ground Water Level = 8.30 m


S = Standard Penetration Test (SPT) REMARKS 29
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio
X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
BORANG
MZ ERAT SERVICES MZ / SI - 01
DEEP BORING LOG

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR. Job No

Borehole No. : 14 Reduced Level : Supervisor : Fauzi


Sheet No. : 3 of 3 Type of Drill : Rotary Wash Boring (YWE) Date : 13.04.2019-14.04.2019
DEPTH DESCRIPTION OF SOIL SAMPLE
(meter) CONSISTENCY, COLOUR Legend BSCS DEPTH No. Field Test N R/r SPT Plot
RELATIVE DENSITY, GRAIN (meter) 75 75 75 75 75 75 (%) No of Blows (N)

SIZE, TEXTURE ETC.


00 10 20 30 40 50
mm mm mm mm mm mm
10 20 30 40 50
27.50

X X X X
_ X X X
X X X X
X X X

28.50 Hard, mottled red SILT


X X X X
X X X 28.50 - P19 12 13 29 21 50 100%
with traces of gravel X
X
X
X
X
X
X
28.75 D19 25 mm 29
1
X X X X
_ X X X
X X X X
X X X

30.00 Hard, ditto.


X X X X
X X X 30.00 - P20 13 21 50 50 100%
X
X
X
X
X
X
X
30.18 D20 30 mm 30.5
2
X X X X
_ X X X
X X X X
X X X

31.50 Hard, ditto.


X X X X
X X X 31.50 - P21 27 23 50 100%
X
X
X
X
X
X
X
31.60 D21 25 mm 32

X X X X 3
_ X X X
X X X X
X X X
X X X X
X X X

33.5

_ End of Borehole At 31.60 m 4

35

Depth (m)
_ 5

36.5

_ 6
0

38

_
7

39.5

_
8

41

_
9

42.5
NOTES: LEGEND: Ground Water Level = 8.30 m
S = Standard Penetration Test (SPT) REMARKS 10
_ _ _ _ _
D = Disturbed sample _ _ _ _ CLAY
N = SPT Result
R/r = Recovery ratio X X X X CONSISTENCY / RELATIVE DENSITY
VS = Vane Shear Test X X X SILT
Cu = Undrained Shear Strength Fauzi
Cohesive Soil (N) Non Cohesive Soil (N)
Cr = Remoulded Shear Strength . . . . . .
……………………………
St = Sensivity . . . . . SAND Supervisor
UD = 50 mm dia. undisturbed sample 0-2 Very Soft 0-4 Very Loose ( Site Investigation)
P = 50mm dia. undisturbed piston sample 2-4 Soft 4 - 10 Loose
M = Mazier Sample GRAVEL 4-8 Medium Stiff 10 - 30 Medium Dense
W = Water sample 8 - 15 Stiff 30 - 50 Dense
C = Core sample (Rock) 15 - 30 Very Stiff 50 > Very Dense Shiham
+++++++
RQD = Rock Quality Designation (%) +++++++ GRANITE 30 > Hard ……………………………
WL = Water level ( Geologist / T.Officer )
BSCS = British Standard Classification System
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 1 Penetration Position : MP 2 Penetration Position : MP 3


(m) (m) (m)
Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 50 0 100 200 300 400 0 - 0.3 105 0 100 200 300 400 0 - 0.3 102 0 100 200 300 400
0 0
0.3 - 0.6 58 0 0 0.3 - 0.6 62 0 0 0.3 - 0.6 56
50 105 102
0.6 - 0.9 42 0.6 - 0.9 47 0.6 - 0.9 37
58 62 56
0.9 - 1.2 27 0.9 - 1.2 70 0.9 - 1.2 60
42 47 37
1.2 - 1.5 28 1 1.2 - 1.5 147 1 1.2 - 1.5 74 1
27 70 60
1.5 - 1.8 59 1.5 - 1.8 96 1.5 - 1.8 86
28 147 74
1.8 - 2.1 36 1.8 - 2.1 77 1.8 - 2.1 120 86
59 96
2.1 - 2.4 50 2 2.1 - 2.4 103 2 77
2.1 - 2.4 109 2
120
36
2.4 - 2.7 99 2.4 - 2.7 100 103
2.4 - 2.7 143 109
50
2.7 - 3.0 96 99
2.7 - 3.0 92 100
2.7 - 3.0 156 143
3.0 - 3.3 103 3 96
3.0 - 3.3 100 3 92 3.0 - 3.3 193 3 156
3.3 - 3.6 115 103 3.3 - 3.6 100 100 3.3 - 3.6 212 193
3.6 - 3.9 127 115 3.6 - 3.9 119 100 3.6 - 3.9 200 212
3.9 - 4.2 111 127 3.9 - 4.2 132 4
119 3.9 - 4.2 241 4
200
4
4.2 - 4.5 151 111 4.2 - 4.5 160 132 4.2 - 4.5 244 241
4.5 - 4.8 136 151 4.5 - 4.8 147 160 4.5 - 4.8 295 244
4.8 - 5.1 177 136 4.8 - 5.1 166 147 4.8 - 5.1 299 295
5 5 5
5.1 - 5.4 200 177 5.1 - 5.4 193 166 5.1 - 5.4 273 299

5.4 - 5.7 246 200 5.4 - 5.7 205 193 5.4 - 5.7 305 273
305
5.7 - 6.0 299 246 5.7 - 6.0 265 205 5.7 - 6.0 400
6 6 265 6 400
6.0 - 6.3 400 299 6.0 - 6.3 300 6.0 - 6.3
400 300
6.3 - 6.6 6.3 - 6.6 400 6.3 - 6.6
400
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.10 m Final Depth 6.42 m Final Depth 8.85 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 4 Penetration Position : MP 5 Penetration Position : MP 6


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 120 0 100 200 300 400 0 - 0.3 108 0 100 200 300 400 0 - 0.3 21 0 100 200 300 400
0 0
0.3 - 0.6 56 0 0 0.3 - 0.6 89 0 0 0.3 - 0.6 14
120 108 21
0.6 - 0.9 46 0.6 - 0.9 72 0.6 - 0.9 32
56 89 14
0.9 - 1.2 60 0.9 - 1.2 85 0.9 - 1.2 47
46 72 32
1.2 - 1.5 43 1 1.2 - 1.5 8 1 1.2 - 1.5 65 1
60 85 47
1.5 - 1.8 53 1.5 - 1.8 75 1.5 - 1.8 59
43 8 65
1.8 - 2.1 80 1.8 - 2.1 83 1.8 - 2.1 84 59
53 75
2.1 - 2.4 103 2 2.1 - 2.4 91 2 83
2.1 - 2.4 84 2
84
80
2.4 - 2.7 155 2.4 - 2.7 113 91
2.4 - 2.7 93 84
103
2.7 - 3.0 111 155
2.7 - 3.0 121 113
2.7 - 3.0 105 93
3.0 - 3.3 121 3 111
3.0 - 3.3 151 3 121 3.0 - 3.3 130 3 105
3.3 - 3.6 169 121 3.3 - 3.6 123 151 3.3 - 3.6 155 130
3.6 - 3.9 180 169 3.6 - 3.9 105 123 3.6 - 3.9 172 155
3.9 - 4.2 192 180 3.9 - 4.2 127 4
105 3.9 - 4.2 192 4
172
4
4.2 - 4.5 200 192 4.2 - 4.5 185 127 4.2 - 4.5 172 192
4.5 - 4.8 200 200 4.5 - 4.8 190 185 4.5 - 4.8 199 172
4.8 - 5.1 241 200 4.8 - 5.1 200 190 4.8 - 5.1 172 199
5 5 5
5.1 - 5.4 222 241 5.1 - 5.4 247 200 5.1 - 5.4 199 172

5.4 - 5.7 317 222 5.4 - 5.7 369 247 5.4 - 5.7 215 199
215
5.7 - 6.0 339 317 5.7 - 6.0 310 369 5.7 - 6.0 200
6 6 310 6 200
6.0 - 6.3 400 339 6.0 - 6.3 400 6.0 - 6.3 240
400 400 240
6.3 - 6.6 6.3 - 6.6 6.3 - 6.6 150
150
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9 205
205
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 275 7
275
7.2 - 7.5 7.2 - 7.5 7.2 - 7.5 319 319
7.5 - 7.8 7.5 - 7.8 7.5 - 7.8 400 400
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.10 m Final Depth 6.11 m Final Depth 6.76 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 7 Penetration Position : MP 8 Penetration Position : MP 9


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 32 0 100 200 300 400 0 - 0.3 20 0 100 200 300 400 0 - 0.3 52 0 100 200 300 400
0 0
0.3 - 0.6 25 0 0 0.3 - 0.6 38 0 0 0.3 - 0.6 30
32 20 52
0.6 - 0.9 30 0.6 - 0.9 40 0.6 - 0.9 45
25 38 30
0.9 - 1.2 51 0.9 - 1.2 35 0.9 - 1.2 69
30 40 45
1.2 - 1.5 73 1 1.2 - 1.5 57 1 1.2 - 1.5 54 1
51 35 69
1.5 - 1.8 69 1.5 - 1.8 37 1.5 - 1.8 72
73 57 54
1.8 - 2.1 80 1.8 - 2.1 63 1.8 - 2.1 60 72
69 37
2.1 - 2.4 80 2 2.1 - 2.4 144 2 63
2.1 - 2.4 84 2
60
80
2.4 - 2.7 101 2.4 - 2.7 102 144
2.4 - 2.7 100 84
80
2.7 - 3.0 125 101
2.7 - 3.0 100 102
2.7 - 3.0 100 100
3.0 - 3.3 150 3 125
3.0 - 3.3 131 3 100 3.0 - 3.3 121 3 100
3.3 - 3.6 169 150 3.3 - 3.6 120 131 3.3 - 3.6 153 121
3.6 - 3.9 140 169 3.6 - 3.9 155 120 3.6 - 3.9 169 153
3.9 - 4.2 147 140 3.9 - 4.2 130 4
155 3.9 - 4.2 131 4
169
4
4.2 - 4.5 136 147 4.2 - 4.5 147 130 4.2 - 4.5 169 131
4.5 - 4.8 150 136 4.5 - 4.8 169 147 4.5 - 4.8 150 169
4.8 - 5.1 170 150 4.8 - 5.1 153 169 4.8 - 5.1 173 150
5 5 5
5.1 - 5.4 177 170 5.1 - 5.4 191 153 5.1 - 5.4 188 173

5.4 - 5.7 182 177 5.4 - 5.7 200 191 5.4 - 5.7 193 188
193
5.7 - 6.0 195 182 5.7 - 6.0 169 200 5.7 - 6.0 204
6 6 169 6 204
6.0 - 6.3 227 195 6.0 - 6.3 247 6.0 - 6.3 246
227 247 246
6.3 - 6.6 251 6.3 - 6.6 269 6.3 - 6.6 269
251 269 269
6.6 - 6.9 269 6.6 - 6.9 292 6.6 - 6.9 301
269 292 301
6.9 - 7.2 284 7 6.9 - 7.2 400 7 6.9 - 7.2 400 7
284 400 400
7.2 - 7.5 310 7.2 - 7.5 7.2 - 7.5
310
7.5 - 7.8 400 7.5 - 7.8 7.5 - 7.8
400
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 7.90 m Final Depth 7.01 m Final Depth 7.15 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 10 Penetration Position : MP 11 Penetration Position : MP 12


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 86 0 100 200 300 400 0 - 0.3 56 0 100 200 300 400 0 - 0.3 40 0 100 200 300 400
0 0
0.3 - 0.6 45 0 0 0.3 - 0.6 23 0 0 0.3 - 0.6 30
86 56 40
0.6 - 0.9 52 0.6 - 0.9 31 0.6 - 0.9 50
45 23 30
0.9 - 1.2 90 0.9 - 1.2 45 0.9 - 1.2 41
52 31 50
1.2 - 1.5 121 1 1.2 - 1.5 40 1 1.2 - 1.5 63 1
90 45 41
1.5 - 1.8 154 1.5 - 1.8 64 1.5 - 1.8 60
121 40 63
1.8 - 2.1 139 1.8 - 2.1 72 1.8 - 2.1 66 60
154 64
2.1 - 2.4 200 2 2.1 - 2.4 96 2 72
2.1 - 2.4 80 2
66
139
2.4 - 2.7 169 2.4 - 2.7 83 96
2.4 - 2.7 90 80
200
2.7 - 3.0 172 169
2.7 - 3.0 111 83
2.7 - 3.0 77 90
3.0 - 3.3 188 3 172
3.0 - 3.3 150 3 111 3.0 - 3.3 93 3 77
3.3 - 3.6 157 188 3.3 - 3.6 141 150 3.3 - 3.6 115 93
3.6 - 3.9 177 157 3.6 - 3.9 169 141 3.6 - 3.9 100 115
3.9 - 4.2 214 177 3.9 - 4.2 139 4
169 3.9 - 4.2 123 4
100
4
4.2 - 4.5 256 214 4.2 - 4.5 155 139 4.2 - 4.5 131 123
4.5 - 4.8 199 256 4.5 - 4.8 177 155 4.5 - 4.8 165 131
4.8 - 5.1 217 199 4.8 - 5.1 200 177 4.8 - 5.1 140 165
5 5 5
5.1 - 5.4 264 217 5.1 - 5.4 205 200 5.1 - 5.4 188 140

5.4 - 5.7 231 264 5.4 - 5.7 192 205 5.4 - 5.7 200 188
200
5.7 - 6.0 240 231 5.7 - 6.0 249 192 5.7 - 6.0 239
6 6 249 6 239
6.0 - 6.3 269 240 6.0 - 6.3 267 6.0 - 6.3 292
269 267 292
6.3 - 6.6 292 6.3 - 6.6 313 6.3 - 6.6 400
292 313 400
6.6 - 6.9 400 6.6 - 6.9 400 6.6 - 6.9
400 400
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.81 m Final Depth 6.70 m Final Depth 6.46 n

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 13 Penetration Position : MP 14 Penetration Position : MP 15


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 32 0 100 200 300 400 0 - 0.3 41 0 100 200 300 400 0 - 0.3 27 0 100 200 300 400
0 0
0.3 - 0.6 21 0 0 0.3 - 0.6 53 0 0 0.3 - 0.6 40
32 41 27
0.6 - 0.9 33 0.6 - 0.9 45 0.6 - 0.9 40
21 53 40
0.9 - 1.2 30 0.9 - 1.2 60 0.9 - 1.2 63
33 45 40
1.2 - 1.5 49 1 1.2 - 1.5 60 1 1.2 - 1.5 50 1
30 60 63
1.5 - 1.8 62 1.5 - 1.8 77 1.5 - 1.8 46
49 60 50
1.8 - 2.1 53 1.8 - 2.1 56 1.8 - 2.1 50 46
62 77
2.1 - 2.4 77 2 2.1 - 2.4 65 2 56
2.1 - 2.4 50 2
50
53
2.4 - 2.7 61 2.4 - 2.7 41 65
2.4 - 2.7 59 50
77
2.7 - 3.0 74 61
2.7 - 3.0 65 41
2.7 - 3.0 70 59
3.0 - 3.3 96 3 74
3.0 - 3.3 43 3 65 3.0 - 3.3 70 3 70
3.3 - 3.6 121 96 3.3 - 3.6 70 43 3.3 - 3.6 91 70
3.6 - 3.9 130 121 3.6 - 3.9 70 70 3.6 - 3.9 99 91
3.9 - 4.2 119 130 3.9 - 4.2 96 4
70 3.9 - 4.2 122 4
99
4
4.2 - 4.5 146 119 4.2 - 4.5 115 96 4.2 - 4.5 116 122
4.5 - 4.8 170 146 4.5 - 4.8 131 115 4.5 - 4.8 139 116
4.8 - 5.1 192 170 4.8 - 5.1 150 131 4.8 - 5.1 169 139
5 5 5
5.1 - 5.4 205 192 5.1 - 5.4 175 150 5.1 - 5.4 222 169

5.4 - 5.7 240 205 5.4 - 5.7 191 175 5.4 - 5.7 277 222
277
5.7 - 6.0 215 240 5.7 - 6.0 233 191 5.7 - 6.0 292
6 6 233 6 292
6.0 - 6.3 251 215 6.0 - 6.3 269 6.0 - 6.3 400
251 269 400
6.3 - 6.6 277 6.3 - 6.6 310 6.3 - 6.6
277 310
6.6 - 6.9 300 6.6 - 6.9 400 6.6 - 6.9
300 400
6.9 - 7.2 400 7 6.9 - 7.2 7 6.9 - 7.2 7
400
7.2 - 7.5 7.2 - 7.5 7.2 - 7.5
7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 7.01 m Final Depth 6.70 m Final Depth 6.42 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 16 Penetration Position : MP 17 Penetration Position : MP 18


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 35 0 100 200 300 400 0 - 0.3 40 0 100 200 300 400 0 - 0.3 46 0 100 200 300 400
0 0
0.3 - 0.6 41 0 0 0.3 - 0.6 30 0 0 0.3 - 0.6 45
35 40 46
0.6 - 0.9 65 0.6 - 0.9 45 0.6 - 0.9 50
41 30 45
0.9 - 1.2 50 0.9 - 1.2 53 0.9 - 1.2 70
65 45 50
1.2 - 1.5 45 1 1.2 - 1.5 40 1 1.2 - 1.5 86 1
50 53 70
1.5 - 1.8 40 1.5 - 1.8 54 1.5 - 1.8 54
45 40 86
1.8 - 2.1 61 1.8 - 2.1 47 1.8 - 2.1 65 54
40 54
2.1 - 2.4 73 2 2.1 - 2.4 60 2 47
2.1 - 2.4 77 2
65
61
2.4 - 2.7 65 2.4 - 2.7 85 60
2.4 - 2.7 92 77
73
2.7 - 3.0 73 65
2.7 - 3.0 109 85
2.7 - 3.0 90 92
3.0 - 3.3 90 3 73
3.0 - 3.3 131 3 109 3.0 - 3.3 139 3 90
3.3 - 3.6 125 90 3.3 - 3.6 144 131 3.3 - 3.6 145 139
3.6 - 3.9 129 125 3.6 - 3.9 160 144 3.6 - 3.9 157 145
3.9 - 4.2 144 129 3.9 - 4.2 152 4
160 3.9 - 4.2 143 4
157
4
4.2 - 4.5 163 144 4.2 - 4.5 169 152 4.2 - 4.5 165 143
4.5 - 4.8 156 163 4.5 - 4.8 190 169 4.5 - 4.8 181 165
4.8 - 5.1 214 156 4.8 - 5.1 222 190 4.8 - 5.1 207 181
5 5 5
5.1 - 5.4 200 214 5.1 - 5.4 243 222 5.1 - 5.4 193 207

5.4 - 5.7 214 200 5.4 - 5.7 295 243 5.4 - 5.7 225 193
225
5.7 - 6.0 280 214 5.7 - 6.0 300 295 5.7 - 6.0 273
6 6 300 6 273
6.0 - 6.3 400 280 6.0 - 6.3 400 6.0 - 6.3 253
400 400 253
6.3 - 6.6 6.3 - 6.6 6.3 - 6.6 294
294
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9 400
400
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.46 m Final Depth 6.40 m Final Depth 6.40 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 19 Penetration Position : MP 20 Penetration Position : MP 21


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 43 0 100 200 300 400 0 - 0.3 40 0 100 200 300 400 0 - 0.3 30 0 100 200 300 400
0 0
0.3 - 0.6 50 0 0 0.3 - 0.6 40 0 0 0.3 - 0.6 36
43 40 30
0.6 - 0.9 35 0.6 - 0.9 25 0.6 - 0.9 51
50 40 36
0.9 - 1.2 42 0.9 - 1.2 36 0.9 - 1.2 40
35 25 51
1.2 - 1.5 30 1 1.2 - 1.5 24 1 1.2 - 1.5 59 1
42 36 40
1.5 - 1.8 20 1.5 - 1.8 35 1.5 - 1.8 64
30 24 59
1.8 - 2.1 24 1.8 - 2.1 60 1.8 - 2.1 43 64
20 35
2.1 - 2.4 35 2 2.1 - 2.4 51 2 60
2.1 - 2.4 34 2
43
24
2.4 - 2.7 37 2.4 - 2.7 40 51
2.4 - 2.7 60 34
35
2.7 - 3.0 59 37
2.7 - 3.0 40 40
2.7 - 3.0 69 60
3.0 - 3.3 40 3 59
3.0 - 3.3 65 3 40 3.0 - 3.3 81 3 69
3.3 - 3.6 69 40 3.3 - 3.6 73 65 3.3 - 3.6 89 81
3.6 - 3.9 52 69 3.6 - 3.9 49 73 3.6 - 3.9 99 89
3.9 - 4.2 66 52 3.9 - 4.2 65 4
49 3.9 - 4.2 54 4
99
4
4.2 - 4.5 77 66 4.2 - 4.5 72 65 4.2 - 4.5 77 54
4.5 - 4.8 60 77 4.5 - 4.8 90 72 4.5 - 4.8 96 77
4.8 - 5.1 96 60 4.8 - 5.1 123 90 4.8 - 5.1 135 96
5 5 5
5.1 - 5.4 108 96 5.1 - 5.4 105 123 5.1 - 5.4 110 135

5.4 - 5.7 131 108 5.4 - 5.7 139 105 5.4 - 5.7 125 110
125
5.7 - 6.0 169 131 5.7 - 6.0 170 139 5.7 - 6.0 163
6 6 170 6 163
6.0 - 6.3 257 169 6.0 - 6.3 246 6.0 - 6.3 214
257 246 214
6.3 - 6.6 293 6.3 - 6.6 282 6.3 - 6.6 252
293 282 252
6.6 - 6.9 400 6.6 - 6.9 311 6.6 - 6.9 293
400 311 293
6.9 - 7.2 7 6.9 - 7.2 400 7 6.9 - 7.2 400 7
400 400
7.2 - 7.5 7.2 - 7.5 7.2 - 7.5
7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.72 m Final Depth 7.00 m Final Depth 7.00 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 22 Penetration Position : MP 23 Penetration Position : MP 24


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 45 0 100 200 300 400 0 - 0.3 56 0 100 200 300 400 0 - 0.3 45 0 100 200 300 400
0 0
0.3 - 0.6 67 0 0 0.3 - 0.6 77 0 0 0.3 - 0.6 32
45 56 45
0.6 - 0.9 79 0.6 - 0.9 89 0.6 - 0.9 20
67 77 32
0.9 - 1.2 54 0.9 - 1.2 54 0.9 - 1.2 33
79 89 20
1.2 - 1.5 67 1 1.2 - 1.5 50 1 1.2 - 1.5 41 1
54 54 33
1.5 - 1.8 43 1.5 - 1.8 50 1.5 - 1.8 40
67 50 41
1.8 - 2.1 69 1.8 - 2.1 61 1.8 - 2.1 36 40
43 50
2.1 - 2.4 78 2 2.1 - 2.4 42 2 61
2.1 - 2.4 50 2
36
69
2.4 - 2.7 93 2.4 - 2.7 65 42
2.4 - 2.7 43 50
78
2.7 - 3.0 133 93
2.7 - 3.0 71 65
2.7 - 3.0 54 43
3.0 - 3.3 123 3 133
3.0 - 3.3 77 3 71 3.0 - 3.3 65 3 54
3.3 - 3.6 149 123 3.3 - 3.6 83 77 3.3 - 3.6 77 65
3.6 - 3.9 101 149 3.6 - 3.9 121 83 3.6 - 3.9 69 77
3.9 - 4.2 120 101 3.9 - 4.2 105 4
121 3.9 - 4.2 84 4
69
4
4.2 - 4.5 145 120 4.2 - 4.5 143 105 4.2 - 4.5 99 84
4.5 - 4.8 192 145 4.5 - 4.8 155 143 4.5 - 4.8 125 99
4.8 - 5.1 210 192 4.8 - 5.1 165 155 4.8 - 5.1 151 125
5 5 5
5.1 - 5.4 188 210 5.1 - 5.4 135 165 5.1 - 5.4 131 151

5.4 - 5.7 249 188 5.4 - 5.7 150 135 5.4 - 5.7 169 131
169
5.7 - 6.0 292 249 5.7 - 6.0 209 150 5.7 - 6.0 236
6 6 209 6 236
6.0 - 6.3 323 292 6.0 - 6.3 269 6.0 - 6.3 257
323 269 257
6.3 - 6.6 400 6.3 - 6.6 321 6.3 - 6.6 400
400 321 400
6.6 - 6.9 6.6 - 6.9 400 6.6 - 6.9
400
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.72 m Final Depth 6.70 m Final Depth 6.40 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 25 Penetration Position : MP 26 Penetration Position : MP 27


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 39 0 100 200 300 400 0 - 0.3 43 0 100 200 300 400 0 - 0.3 51 0 100 200 300 400
0 0
0.3 - 0.6 77 0 0 0.3 - 0.6 40 0 0 0.3 - 0.6 53
39 43 51
0.6 - 0.9 61 0.6 - 0.9 39 0.6 - 0.9 41
77 40 53
0.9 - 1.2 53 0.9 - 1.2 31 0.9 - 1.2 35
61 39 41
1.2 - 1.5 31 1 1.2 - 1.5 77 1 1.2 - 1.5 120 1
53 31 35
1.5 - 1.8 81 1.5 - 1.8 74 1.5 - 1.8 101
31 77 120
1.8 - 2.1 74 1.8 - 2.1 83 1.8 - 2.1 93 101
81 74
2.1 - 2.4 109 2 2.1 - 2.4 94 2 83
2.1 - 2.4 84 2
93
74
2.4 - 2.7 100 2.4 - 2.7 130 94
2.4 - 2.7 141 84
109
2.7 - 3.0 143 100
2.7 - 3.0 150 130
2.7 - 3.0 114 141
3.0 - 3.3 154 3 143
3.0 - 3.3 111 3 150 3.0 - 3.3 134 3 114
3.3 - 3.6 130 154 3.3 - 3.6 170 111 3.3 - 3.6 129 134
3.6 - 3.9 101 130 3.6 - 3.9 143 170 3.6 - 3.9 150 129
3.9 - 4.2 151 101 3.9 - 4.2 169 4
143 3.9 - 4.2 174 4
150
4
4.2 - 4.5 171 151 4.2 - 4.5 188 169 4.2 - 4.5 163 174
4.5 - 4.8 194 171 4.5 - 4.8 167 188 4.5 - 4.8 163 163
4.8 - 5.1 103 194 4.8 - 5.1 188 167 4.8 - 5.1 183 163
5 5 5
5.1 - 5.4 204 103 5.1 - 5.4 167 188 5.1 - 5.4 240 183

5.4 - 5.7 256 204 5.4 - 5.7 288 167 5.4 - 5.7 270 240
270
5.7 - 6.0 207 256 5.7 - 6.0 290 288 5.7 - 6.0 291
6 6 290 6 291
6.0 - 6.3 281 207 6.0 - 6.3 270 6.0 - 6.3 284
281 270 284
6.3 - 6.6 400 6.3 - 6.6 400 6.3 - 6.6 400
400 400 400
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.41 m Final Depth 6.12 m Final Depth 6.39 m

FAUZI SHIHAM

Tested: Checked:
MZ ERAT SERVICES
D- 6, JALAN PERMATANG GEDONG, TAMAN SEJATI INDAH,
08000 SUNGAI PETANI, KEDAH DARUL AMAN.

MACKINTOSH PROBE Date 13.04.2019-18.04.2019

PROJECT : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR GUDANG, JOHOR.

Penetration Position : MP 28 Penetration Position : MP 29 Penetration Position : MP 30


(m) (m) (m)
Blows Blows Blows
0 - 0 0 No of Blows 0 - 0 0 No of Blows 0 - 0 0 No of Blows
0 - 0.3 86 0 100 200 300 400 0 - 0.3 97 0 100 200 300 400 0 - 0.3 63 0 100 200 300 400
0 0
0.3 - 0.6 52 0 0 0.3 - 0.6 40 0 0 0.3 - 0.6 41
86 97 63
0.6 - 0.9 46 0.6 - 0.9 33 0.6 - 0.9 30
52 40 41
0.9 - 1.2 33 0.9 - 1.2 45 0.9 - 1.2 35
46 33 30
1.2 - 1.5 66 1 1.2 - 1.5 105 1 1.2 - 1.5 84 1
33 45 35
1.5 - 1.8 74 1.5 - 1.8 90 1.5 - 1.8 100
66 105 84
1.8 - 2.1 105 1.8 - 2.1 76 1.8 - 2.1 80 100
74 90
2.1 - 2.4 93 2 2.1 - 2.4 125 2 76
2.1 - 2.4 93 2
80
105
2.4 - 2.7 125 2.4 - 2.7 103 125
2.4 - 2.7 90 93
93
2.7 - 3.0 146 125
2.7 - 3.0 145 103
2.7 - 3.0 113 90
3.0 - 3.3 130 3 146
3.0 - 3.3 167 3 145 3.0 - 3.3 125 3 113
3.3 - 3.6 131 130 3.3 - 3.6 150 167 3.3 - 3.6 103 125
3.6 - 3.9 153 131 3.6 - 3.9 171 150 3.6 - 3.9 121 103
3.9 - 4.2 110 153 3.9 - 4.2 153 4
171 3.9 - 4.2 147 4
121
4
4.2 - 4.5 155 110 4.2 - 4.5 169 153 4.2 - 4.5 155 147
4.5 - 4.8 188 155 4.5 - 4.8 192 169 4.5 - 4.8 170 155
4.8 - 5.1 222 188 4.8 - 5.1 225 192 4.8 - 5.1 199 170
5 5 5
5.1 - 5.4 254 222 5.1 - 5.4 267 225 5.1 - 5.4 241 199

5.4 - 5.7 240 254 5.4 - 5.7 293 267 5.4 - 5.7 225 241
225
5.7 - 6.0 281 240 5.7 - 6.0 290 293 5.7 - 6.0 290
6 6 290 6 290
6.0 - 6.3 288 281 6.0 - 6.3 400 6.0 - 6.3 314
288 400 314
6.3 - 6.6 400 6.3 - 6.6 6.3 - 6.6 400
400 400
6.6 - 6.9 6.6 - 6.9 6.6 - 6.9
6.9 - 7.2 7 6.9 - 7.2 7 6.9 - 7.2 7

7.2 - 7.5 7.2 - 7.5 7.2 - 7.5


7.5 - 7.8 7.5 - 7.8 7.5 - 7.8
7.8 - 8.1 8 7.8 - 8.1 8 7.8 - 8.1 8
8.1 - 8.4 8.1 - 8.4 8.1 - 8.4
8.4 - 8.7 8.4 - 8.7 8.4 - 8.7
8.7 - 9.0 9 8.7 - 9.0 9 8.7 - 9.0 9
9.0 - 9.3 9.0 - 9.3 9.0 - 9.3
9.3 - 9.6 9.3 - 9.6 9.3 - 9.6
9.6 - 9.9 10
9.6 - 9.9 10
9.6 - 9.9 10
9.9 - 10.2 9.9 - 10.2 9.9 - 10.2
10.2 - 10.5 10.2 - 10.5 10.2 - 10.5
10.5 - 10.8 10.5 - 10.8 10.5 - 10.8
11 11 11
10.8 - 11.1 10.8 - 11.1 10.8 - 11.1
11.1 - 11.4 11.1 - 11.4 11.1 - 11.4
11.4 - 11.7 11.4 - 11.7 11.4 - 11.7
12 12 12
11.7 - 12.0 11.7 - 12.0 11.7 - 12.0
12.0 - 12.3 12.0 - 12.3 12.0 - 12.3
12.3 - 12.6 12.3 - 12.6 12.3 - 12.6
12.6 - 12.9 13 12.6 - 12.9 13 12.6 - 12.9 13

12.9 - 13.2 12.9 - 13.2 12.9 - 13.2


13.2 - 13.5 13.2 - 13.5 13.2 - 13.5
13.5 - 13.8 14 13.5 - 13.8 14 13.5 - 13.8 14
13.8 - 14.1 13.8 - 14.1 13.8 - 14.1
14.1 - 14.4 14.1 - 14.4 14.1 - 14.4
14.4 - 14.7 15 14.4 - 14.7 15 14.4 - 14.7 15
Depth (m) Depth (m) Depth (m)
14.7 - 15.0 14.7 - 15.0 14.7 - 15.0
Final Depth: 6.42 m Final Depth 6.12 m Final Depth 6.41 m

FAUZI SHIHAM

Tested: Checked:
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ '              


8'      
'            
'            
'            
'            

%+ '              


'            
8'      
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ '              


8'      
'            
'            
'            
'            

%+ '              


8'      
'            
'            
'            
'            

%+ '              


8'      
'            
'            
'            
'            
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            
352-(.*(27(&+1,&$/:25.6)250:62/$5)5201($58,70
,'($/(1*,1((5,1* 3$6,5*8'$1*-2+25
/$%25$725<6'1%+'
6XPPDU\2I/DERUDWRU\7HVW5HVXOWV 'DWH

',0(16,21$/ 8&7 8875,$;,$/ 0(&+$1,&$/$1'


&,87(67 &+(0,&$/7(676 $77(5%(5*/,0,76
%+ 6DPSOH 'HSWK 0& %8/. '5< &2162/,'$7,21 7(67 &2035(66,21 +<'520(7(5$1$/<6,6
6* 2UJDQLF &KORULGH 7RWDO 6XOSKDWH S+
'(1 '(1 92,' 3F &F T & I & I &
I
// 3/ 3, /6 *5$9(/ 6$1' 6,/7 &/$<
0DWWHU &RQWHQW 6XOSKDWH &RQWHQW 9DOXH
1R 1R P 
0JP 0JP 5$7,2 N1P N1P N1P $QJOH N1P $QJOH N1P $QJOH    PJ/        

%+ 8'      


'              
'            
'            
'            
'            

%+ 8'      


'              
'            
'            
'            
'            
MP 24 MP 28
BH 5 MP 26
BH 1 MP 25
BH 9

MP 27
MP 23

BH 4
MP 19
BH 11
MP 22 MP 30
MP 29
BH 6 MP 13
MP 20

BH 8
BH 2
MP 17 MP 15
MP 10

MP 21 BH 3 MP 12
MP 18 MP 16 MP 1 MP 5
BH 7 MP' 6 BH 14
BH 10 MP 2 MP 4
MP 8 MP 3
MP 11
MP 14 BH 13
BH 12
MP 9
MP 7
x TOPOGRAPHY SURVEY
90°10'00" 90°20'30" 313.114 90°26'30" 90°12'30" 89°51'30" 424.102 90°17'30" 89°51'00" 90°03'30" 243.750
/ / / / / / / / / /
116.716 183.586 152.546 / 250.735 / /
151.359
0°38'50"
42.571
P/E
/

0°34'00"
75.289
167.771
179°30'40"

0°34'00"
71.423
/
Fance

0°34'00"
10.368
199°55'40"

0°36'30" 107.042
52.255
//
/

199°55'40"
0°36'30" 20.117
66.605 270°00'00" 270°00'00" 270°00'00"

136.912 150.000 150.000


Drain
/

0°36'30"
60.230
/

0°36'30"
44.901
79.210

0
273°34'10"

395.26
70.405
290°31'30"

'10"
102.402

225°10
274°15'00"

/ / /
286°02'20"
'30"
178.985
228°0663.947
298°30'00
/
202.669 "
271°56'00"
75.009

22.617
271°56'00"

270°00'00" 260.169
/
17.096
267°51'40"

1°15'00" 199°00'00"
24.603
289°00'00"

33.036 23.772
252°11'30"

236°05'5
18.002
17.096 0"

/ / / / / / / /
90°10'00"
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
90°20'30" 313.114 / / / / / / / / / / / /
/ /
/ /
/
/ / / / / / / / / / / / / / /
/
/ / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / /
/
90°26'30" / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / /
90°12'30" 89°51'30" 424.102 /
/
/ / / / / / / / / / / / / / / / / / / / / /
/
/

/
116.716 /
/

183.586 152.546

/
/
0°38'50"

/
42.571

/ /
/
P/E

CH 7100
/
CH 6900

CH 7000

/ /
/
/ /
0°34'00"

/ /
75.289

/
/
/
/
/
/
/

/
/

/
/

/
/

/
/

/
0°34'00" PEMBANGUNAN UNIT LUAS (EKAR) PERATUS

/
/
71.423
/ /
/

/
/

/
/

/
Fance /
/
/

0°34'00"
/
/

10.368
/
/

/
/

/
/

/
/

0°36'30"
/

/
/
/
/

/
/
52.255 /
/
/
/

/
/
/

/
/

/
/
/

/
/

/
/

/
/
/
/

/
/
/

/
/

/
/

/
/

/
/
/
/

/
/
/

0°36'30"
/
/
/

66.605
/
/

/
/

/
/

/
/

Drain
/
/

/ / / / / /
/
/

/
/

/
/

/
/

/ /
/

/ /
/
/

/ /
/
/ /

/ /
/
/

/
/ /
/
0°36'30" /
/
/

/
/

/ /
/ /

60.230 /
/

/
/

/ / /
/

/ / / / /
/
/
/
/
/

0°36'30"
/
/

44.901
/

79.210
273°34'10"
05
/

°3
/
/

70.4 1'30"
290
/
/

/

102.402
274°15'00"
/ 22
/

/
286°0 0" /

'3 /

/
178.9 2'20" 06 7 /

/
85 8° 94 /
/

/
MECHANICAL & ELECTRICAL CONSULTANT :
/
/
22 63. /

/ /

/
29 /

/
/
/
8°3
/
/
0'0 /

/ /
20 0" /
2.6
69
271°56'00"
75.009

22.617
271°56'00"

270°00'00" 260.169
03

17.096
267°51'40"

1°15'00"
24.6°00'00"

199
289

°0
33.036 23.7 0'00"
72
17

°11'3

23 18.0
0"

'50
05 02
252 .096 "

PELAN SUSUNATUR
PELAN KUNCI / PELAN LOKASI / PELAN TAPAK
APPENDIX 2
x CALCULATION FOR SCREW PILE
o SOLAR PANEL
ƒ N68
ƒ N76
o BUILDING SERVICES
ƒ F90
ƒ F114
x CALCULATION FOR PRECAST SQ PILE
o BUILDING DERVICES
ƒ 150mm x 150mm
ƒ 200mm x 200mm
x CALCULATION FOR PAD FOOTING
CALCULATION FOR SCREW PILE
x SOLAR PANEL
o N68
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 9.80 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH1 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.1 1.1 3.6 4.7 1.8
1.5 SILT 4 - - 2.2 3.3 3.6 6.9 2.8
3.0 SILT 4 - - 2.5 5.7 4.5 10.3 4.4
4.5 SILT 5 - - 3.3 9.0 6.4 15.3 6.6
6.0 SILT 7 - - 3.8 12.8 6.4 19.2 8.5
7.5 SILT 7 - - 3.8 16.6 6.4 23.0 10.4
9.0 SILT 7 - - 6.3 22.9 14.5 37.4 16.3
10.5 SILT 16 - - 18.0 40.9 72.6 113.5 44.6
12.0 SAND 50 - - 32.0 72.9 72.6 145.5 60.7
13.5 SAND 50 - - -144.2 -71.3 0.0 -71.3 -35.6
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 3.80 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH2 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 0.8 0.8 2.7 3.5 1.3
1.5 SILT 3 - - 2.5 3.3 5.4 8.7 3.5
3.0 SILT 6 - - 3.3 6.5 5.4 12.0 5.1
4.5 SILT 6 - - 3.5 10.1 6.4 16.4 7.2
6.0 SILT 7 - - 3.3 13.3 4.5 17.9 8.2
7.5 SILT 5 - - 3.3 16.6 6.4 23.0 10.4
9.0 SILT 7 - - 4.1 20.7 7.3 28.0 12.8
10.5 SILT 8 - - 3.8 24.5 5.4 30.0 14.1
12.0 SILT 6 - - 11.4 36.0 32.7 68.6 28.9
13.5 SILT 36 - - 23.4 59.4 45.4 104.8 44.8
15.0 SILT 50 - - 27.2 86.6 45.4 132.0 58.4
16.5 SILT 50 - - 7.3 93.9 72.6 166.5 71.2
16.9 SAND 50 - - 32.0 125.9 72.6 198.6 87.2
18.4 SAND 50 - - -196.5 -70.6 0.0 -70.6 -35.3
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 10.58 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH3 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.9 1.9 6.4 8.3 3.1
1.5 SILT 7 - - 4.1 6.0 7.3 13.3 5.4
3.0 SILT 8 - - 4.9 10.9 9.1 20.0 8.5
4.5 SILT 10 - - 7.1 18.0 14.5 32.5 13.8
6.0 SILT 16 - - 9.3 27.2 16.3 43.6 19.1
7.5 SILT 18 - - 9.3 36.5 14.5 51.0 23.1
9.0 SILT 16 - - 9.5 46.0 17.3 63.3 28.8
10.5 SILT 19 - - 11.2 57.2 20.0 77.2 35.3
12.0 SILT 22 - - 13.3 70.5 24.5 95.1 43.4
13.5 SILT 27 - - 21.0 91.5 45.4 136.9 60.9
15.0 SILT 50 - - 27.2 118.8 45.4 164.2 74.5
16.5 SILT 50 - - 27.2 146.0 45.4 191.4 88.1
18.0 SILT 50 - - 27.2 173.2 45.4 218.6 101.7
19.5 SILT 50 - - 27.2 200.5 45.4 245.9 115.4
21.0 SILT 50 - - -190.7 9.8 0.0 9.8 4.9
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 10.30 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH4 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 2.2 2.2 11.6 13.8 5.0
1.5 SAND 8 - - 5.1 7.3 11.6 18.9 7.5
3.0 SAND 8 - - 5.1 12.4 11.6 24.1 10.1
4.5 SAND 8 - - 5.8 18.2 14.5 32.7 13.9
6.0 SAND 10 - - 7.7 25.9 20.3 46.2 19.7
7.5 SAND 14 - - 9.3 35.2 13.6 48.8 22.1
9.0 SILT 15 - - 6.5 41.7 8.2 49.9 23.6
10.5 SILT 9 - - 4.6 46.4 7.3 53.6 25.6
12.0 SILT 8 - - 5.2 51.5 10.0 61.5 29.1
13.5 SILT 11 - - 13.3 64.8 72.6 137.5 56.6
14.7 SAND 50 - - 32.0 96.9 72.6 169.5 72.6
16.2 SAND 50 - - -173.0 -76.2 0.0 -76.2 -38.1
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 7.45 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH5 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.1 1.1 3.6 4.7 1.8
1.5 SILT 4 - - 2.2 3.3 3.6 6.9 2.8
3.0 SILT 4 - - 3.3 6.5 7.3 13.8 5.7
4.5 SILT 8 - - 4.9 11.4 9.1 20.5 8.7
6.0 SILT 10 - - 6.5 18.0 12.7 30.7 13.2
7.5 SILT 14 - - 7.9 25.9 13.6 39.5 17.5
9.0 SILT 15 - - 5.7 31.6 5.4 37.0 17.6
10.5 SILT 6 - - 3.5 35.1 6.4 41.5 19.7
12.0 SILT 7 - - 4.4 39.5 8.2 47.7 22.5
13.5 SILT 9 - - 5.7 45.2 10.9 56.1 26.2
15.0 SILT 12 - - 5.2 50.4 6.4 56.7 27.3
16.5 SILT 7 - - 4.4 54.7 8.2 62.9 30.1
18.0 SILT 9 - - 5.4 60.2 10.0 70.2 33.4
19.5 SILT 11 - - 7.1 67.3 13.6 80.9 38.2
21.0 SILT 15 - - 10.9 78.2 22.7 100.9 46.7
22.5 SILT 25 - - 17.2 95.3 34.5 129.8 59.2
24.0 SILT 38 - - 22.6 117.9 40.9 158.8 72.6
25.5 SILT 45 - - 25.9 143.8 45.4 189.2 87.0
27.0 SILT 50 - - 27.2 171.1 45.4 216.4 100.7
28.5 SILT 50 - - 27.2 198.3 45.4 243.7 114.3
30.0 SILT 50 - - -272.4 -74.1 0.0 -74.1 -37.0
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 6.88 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH6 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.1 1.1 3.6 4.7 1.8
1.5 SILT 4 - - 2.2 3.3 1.5 4.7 2.1
3.0 CLAY 4 24.0 - 7.7 11.0 10.0 20.9 8.8
4.5 SILT 11 - - 5.2 16.1 7.3 23.4 10.5
6.0 SILT 8 - - 3.5 19.7 4.5 24.2 11.4
7.5 SILT 5 - - 3.0 22.7 5.4 28.1 13.2
9.0 SILT 6 - - 2.7 25.4 3.6 29.0 13.9
10.5 SILT 4 - - 3.0 28.4 6.4 34.7 16.3
12.0 SILT 7 - - 3.5 31.9 5.4 37.4 17.8
13.5 SILT 6 - - 3.3 35.2 5.4 40.6 19.4
15.0 SILT 6 - - 4.6 39.8 10.0 49.8 23.2
16.5 SILT 11 - - 4.6 44.5 5.4 49.9 24.0
18.0 SILT 6 - - 8.4 52.9 22.7 75.6 34.0
19.5 SILT 25 - - 9.5 62.4 72.6 135.1 55.4
20.2 SAND 50 - - 32.0 94.5 72.6 167.1 71.5
21.7 SAND 50 - - -231.8 -137.3 0.0 -137.3 -68.7
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 4.85 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH7 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.6 1.6 5.4 7.1 2.6
1.5 SILT 6 - - 4.1 5.7 8.2 13.9 5.6
3.0 SILT 9 - - 4.6 10.4 7.3 17.6 7.6
4.5 SILT 8 - - 4.9 15.3 9.1 24.3 10.7
6.0 SILT 10 - - 6.0 21.2 10.9 32.1 14.3
7.5 SILT 12 - - 5.2 26.4 6.4 32.8 15.3
9.0 SILT 7 - - 7.6 34.0 19.1 53.1 23.4
10.5 SILT 21 - - 12.5 46.6 22.7 69.3 30.9
12.0 SILT 25 - - 14.2 60.7 24.5 85.3 38.5
13.5 SILT 27 - - 21.0 81.7 45.4 127.1 56.0
15.0 SILT 50 - - 27.2 109.0 45.4 154.3 69.6
16.5 SILT 50 - - 9.1 118.0 72.6 190.7 83.2
17.0 SAND 50 - - 32.0 150.1 72.6 222.7 99.2
18.5 SAND 50 - - -197.6 -47.5 0.0 -47.5 -23.8
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 12.63 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH8 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.6 1.6 5.4 7.1 2.6
1.5 SILT 6 - - 3.8 5.4 7.3 12.7 5.1
3.0 SILT 8 - - 5.2 10.6 10.0 20.6 8.6
4.5 SILT 11 - - 6.5 17.2 11.8 29.0 12.5
6.0 SILT 13 - - 7.6 24.8 13.6 38.4 16.9
7.5 SILT 15 - - 7.1 31.9 10.0 41.9 19.3
9.0 SILT 11 - - 7.1 38.9 13.6 52.6 24.0
10.5 SILT 15 - - 7.4 46.3 10.9 57.2 26.8
12.0 SILT 12 - - 9.0 55.3 19.1 74.4 34.0
13.5 SILT 21 - - 19.3 74.6 45.4 120.0 52.4
15.0 SILT 50 - - 27.2 101.9 45.4 147.3 66.1
16.5 SILT 50 - - 27.2 129.1 45.4 174.5 79.7
18.0 SILT 50 - - 27.2 156.3 45.4 201.7 93.3
19.5 SILT 50 - - 27.2 183.6 45.4 229.0 106.9
21.0 SILT 50 - - -190.7 -7.1 0.0 -7.1 -3.5
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 14.87 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH10 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 2.5 2.5 8.2 10.6 3.9
1.5 SILT 9 - - 5.2 7.6 14.5 22.2 8.7
3.0 SAND 10 - - 6.7 14.4 16.0 30.3 12.5
4.5 SAND 11 - - 6.4 20.8 8.2 28.9 13.1
6.0 SILT 9 - - 5.7 26.5 10.9 37.4 16.9
7.5 SILT 12 - - 7.9 34.4 24.7 59.1 25.4
9.0 SAND 17 - - 10.3 44.6 21.8 66.4 29.6
10.5 SAND 15 - - 9.6 54.3 13.6 67.9 31.7
12.0 SILT 15 - - 9.5 63.8 18.2 81.9 37.9
13.5 SILT 20 - - 12.5 76.3 23.6 99.9 46.0
15.0 SILT 26 - - 20.7 97.0 45.4 142.4 63.6
16.5 SILT 50 - - 27.2 124.3 45.4 169.6 77.3
18.0 SILT 50 - - 27.2 151.5 45.4 196.9 90.9
19.5 SILT 50 - - 27.2 178.7 45.4 224.1 104.5
21.0 SILT 50 - - 27.2 206.0 45.4 251.4 118.1
22.5 SILT 50 - - -204.3 1.7 0.0 1.7 0.8
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 10.90 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH12 sand silt clay Limestone
Screw Pile Size (mm) 68 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 2.2 2.2 7.3 9.4 3.5
1.5 SILT 8 - - 4.9 7.1 9.1 16.2 6.6
3.0 SILT 10 - - 6.0 13.1 10.9 24.0 10.2
4.5 SILT 12 - - 7.1 20.2 12.7 32.9 14.3
6.0 SILT 14 - - 7.1 27.2 10.9 38.1 17.3
7.5 SILT 12 - - 6.3 33.5 16.0 49.5 22.1
9.0 SAND 11 - - 8.0 41.5 12.7 54.2 25.0
10.5 SILT 14 - - 7.6 49.1 12.7 61.9 28.8
12.0 SILT 14 - - 7.1 56.2 10.9 67.1 31.7
13.5 SILT 12 - - 6.8 63.0 11.8 74.8 35.4
15.0 SILT 13 - - 10.1 73.1 21.8 94.9 43.8
16.5 SILT 24 - - 20.2 93.3 72.6 165.9 70.8
18.0 SAND 50 - - 32.0 125.3 72.6 197.9 86.9
19.5 SAND 50 - - -208.3 -83.0 0.0 -83.0 -41.5
CALCULATION FOR SCREW PILE
x SOLAR PANEL
o N76
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 9.80 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH1 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.2 1.2 4.5 5.8 2.1
1.5 SILT 4 - - 2.4 3.7 4.5 8.2 3.3
3.0 SILT 4 - - 2.7 6.4 5.7 12.1 5.1
4.5 SILT 5 - - 3.7 10.0 7.9 18.0 7.7
6.0 SILT 7 - - 4.3 14.3 7.9 22.2 9.8
7.5 SILT 7 - - 4.3 18.6 7.9 26.5 11.9
9.0 SILT 7 - - 7.0 25.6 18.1 43.7 18.8
10.5 SILT 16 - - 20.1 45.7 90.7 136.4 53.1
12.0 SAND 50 - - 35.8 81.5 90.7 172.2 71.0
13.5 SAND 50 - - -161.2 -79.7 0.0 -79.7 -39.8
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 3.80 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH2 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 0.9 0.9 3.4 4.3 1.6
1.5 SILT 3 - - 2.7 3.7 6.8 10.5 4.1
3.0 SILT 6 - - 3.7 7.3 6.8 14.1 5.9
4.5 SILT 6 - - 4.0 11.3 7.9 19.2 8.3
6.0 SILT 7 - - 3.7 14.9 5.7 20.6 9.3
7.5 SILT 5 - - 3.7 18.6 7.9 26.5 11.9
9.0 SILT 7 - - 4.6 23.1 9.1 32.2 14.6
10.5 SILT 8 - - 4.3 27.4 6.8 34.2 16.0
12.0 SILT 6 - - 12.8 40.2 40.8 81.0 33.7
13.5 SILT 36 - - 26.2 66.4 56.7 123.1 52.1
15.0 SILT 50 - - 30.4 96.8 56.7 153.5 67.3
16.5 SILT 50 - - 8.1 104.9 90.7 195.7 82.7
16.9 SAND 50 - - 35.8 140.7 90.7 231.5 100.6
18.4 SAND 50 - - -219.7 -78.9 0.0 -78.9 -39.5
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 10.58 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH3 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 2.1 2.1 7.9 10.1 3.7
1.5 SILT 7 - - 4.6 6.7 9.1 15.8 6.4
3.0 SILT 8 - - 5.5 12.2 11.3 23.5 9.9
4.5 SILT 10 - - 7.9 20.1 18.1 38.2 16.1
6.0 SILT 16 - - 10.4 30.4 20.4 50.9 22.0
7.5 SILT 18 - - 10.4 40.8 18.1 58.9 26.4
9.0 SILT 16 - - 10.7 51.4 21.5 73.0 32.9
10.5 SILT 19 - - 12.5 63.9 25.0 88.9 40.3
12.0 SILT 22 - - 14.9 78.8 30.6 109.5 49.6
13.5 SILT 27 - - 23.4 102.3 56.7 159.0 70.0
15.0 SILT 50 - - 30.4 132.7 56.7 189.4 85.3
16.5 SILT 50 - - 30.4 163.2 56.7 219.9 100.5
18.0 SILT 50 - - 30.4 193.6 56.7 250.3 115.7
19.5 SILT 50 - - 30.4 224.1 56.7 280.8 130.9
21.0 SILT 50 - - -213.1 11.0 0.0 11.0 5.5
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 10.30 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH4 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 2.4 2.4 14.5 17.0 6.1
1.5 SAND 8 - - 5.7 8.2 14.5 22.7 8.9
3.0 SAND 8 - - 5.7 13.9 14.5 28.4 11.8
4.5 SAND 8 - - 6.4 20.3 18.1 38.5 16.2
6.0 SAND 10 - - 8.6 28.9 25.4 54.3 22.9
7.5 SAND 14 - - 10.4 39.3 17.0 56.3 25.3
9.0 SILT 15 - - 7.3 46.6 10.2 56.8 26.7
10.5 SILT 9 - - 5.2 51.8 9.1 60.9 28.9
12.0 SILT 8 - - 5.8 57.6 12.5 70.1 33.0
13.5 SILT 11 - - 14.9 72.4 90.7 163.2 66.5
14.7 SAND 50 - - 35.8 108.3 90.7 199.0 84.4
16.2 SAND 50 - - -193.4 -85.1 0.0 -85.1 -42.6
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 7.45 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH5 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.2 1.2 4.5 5.8 2.1
1.5 SILT 4 - - 2.4 3.7 4.5 8.2 3.3
3.0 SILT 4 - - 3.7 7.3 9.1 16.4 6.7
4.5 SILT 8 - - 5.5 12.8 11.3 24.1 10.2
6.0 SILT 10 - - 7.3 20.1 15.9 36.0 15.3
7.5 SILT 14 - - 8.8 28.9 17.0 45.9 20.1
9.0 SILT 15 - - 6.4 35.3 6.8 42.1 19.9
10.5 SILT 6 - - 4.0 39.3 7.9 47.2 22.3
12.0 SILT 7 - - 4.9 44.1 10.2 54.3 25.5
13.5 SILT 9 - - 6.4 50.5 13.6 64.1 29.8
15.0 SILT 12 - - 5.8 56.3 7.9 64.3 30.8
16.5 SILT 7 - - 4.9 61.2 10.2 71.4 34.0
18.0 SILT 9 - - 6.1 67.3 12.5 79.8 37.8
19.5 SILT 11 - - 7.9 75.2 17.0 92.2 43.3
21.0 SILT 15 - - 12.2 87.4 28.4 115.7 53.1
22.5 SILT 25 - - 19.2 106.5 43.1 149.6 67.6
24.0 SILT 38 - - 25.3 131.8 51.0 182.8 82.9
25.5 SILT 45 - - 28.9 160.7 56.7 217.4 99.3
27.0 SILT 50 - - 30.4 191.2 56.7 247.9 114.5
28.5 SILT 50 - - 30.4 221.6 56.7 278.3 129.7
30.0 SILT 50 - - -304.4 -82.8 0.0 -82.8 -41.4
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 6.88 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH6 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.2 1.2 4.5 5.8 2.1
1.5 SILT 4 - - 2.4 3.7 1.8 5.5 2.4
3.0 CLAY 4 24.0 - 8.6 12.2 12.5 24.7 10.3
4.5 SILT 11 - - 5.8 18.0 9.1 27.1 12.0
6.0 SILT 8 - - 4.0 22.0 5.7 27.7 12.9
7.5 SILT 5 - - 3.3 25.3 6.8 32.1 14.9
9.0 SILT 6 - - 3.0 28.4 4.5 32.9 15.7
10.5 SILT 4 - - 3.3 31.7 7.9 39.7 18.5
12.0 SILT 7 - - 4.0 35.7 6.8 42.5 20.1
13.5 SILT 6 - - 3.7 39.3 6.8 46.1 21.9
15.0 SILT 6 - - 5.2 44.5 12.5 57.0 26.4
16.5 SILT 11 - - 5.2 49.7 6.8 56.5 27.1
18.0 SILT 6 - - 9.4 59.1 28.4 87.5 39.0
19.5 SILT 25 - - 10.7 69.8 90.7 160.5 65.1
20.2 SAND 50 - - 35.8 105.6 90.7 196.3 83.0
21.7 SAND 50 - - -259.1 -153.5 0.0 -153.5 -76.7
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 4.85 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH7 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.8 1.8 6.8 8.6 3.2
1.5 SILT 6 - - 4.6 6.4 10.2 16.6 6.6
3.0 SILT 9 - - 5.2 11.6 9.1 20.6 8.8
4.5 SILT 8 - - 5.5 17.0 11.3 28.4 12.3
6.0 SILT 10 - - 6.7 23.7 13.6 37.4 16.4
7.5 SILT 12 - - 5.8 29.5 7.9 37.5 17.4
9.0 SILT 7 - - 8.5 38.1 23.8 61.9 27.0
10.5 SILT 21 - - 14.0 52.1 28.4 80.4 35.5
12.0 SILT 25 - - 15.8 67.9 30.6 98.5 44.1
13.5 SILT 27 - - 23.4 91.3 56.7 148.0 64.6
15.0 SILT 50 - - 30.4 121.8 56.7 178.5 79.8
16.5 SILT 50 - - 10.1 131.9 90.7 222.6 96.2
17.0 SAND 50 - - 35.8 167.7 90.7 258.5 114.1
18.5 SAND 50 - - -220.9 -53.1 0.0 -53.1 -26.6
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 12.63 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH8 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 1.8 1.8 6.8 8.6 3.2
1.5 SILT 6 - - 4.3 6.1 9.1 15.2 6.1
3.0 SILT 8 - - 5.8 11.9 12.5 24.3 10.1
4.5 SILT 11 - - 7.3 19.2 14.7 33.9 14.5
6.0 SILT 13 - - 8.5 27.7 17.0 44.7 19.5
7.5 SILT 15 - - 7.9 35.6 12.5 48.1 22.0
9.0 SILT 11 - - 7.9 43.5 17.0 60.5 27.4
10.5 SILT 15 - - 8.2 51.8 13.6 65.4 30.4
12.0 SILT 12 - - 10.0 61.8 23.8 85.6 38.8
13.5 SILT 21 - - 21.6 83.4 56.7 140.1 60.6
15.0 SILT 50 - - 30.4 113.9 56.7 170.6 75.8
16.5 SILT 50 - - 30.4 144.3 56.7 201.0 91.0
18.0 SILT 50 - - 30.4 174.7 56.7 231.4 106.3
19.5 SILT 50 - - 30.4 205.2 56.7 261.9 121.5
21.0 SILT 50 - - -213.1 -7.9 0.0 -7.9 -4.0
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 14.87 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH10 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 2.7 2.7 10.2 12.9 4.8
1.5 SILT 9 - - 5.8 8.5 18.1 26.7 10.3
3.0 SAND 10 - - 7.5 16.0 20.0 36.0 14.7
4.5 SAND 11 - - 7.2 23.2 10.2 33.4 15.0
6.0 SILT 9 - - 6.4 29.6 13.6 43.2 19.3
7.5 SILT 12 - - 8.8 38.4 30.8 69.3 29.5
9.0 SAND 17 - - 11.5 49.9 27.2 77.1 34.0
10.5 SAND 15 - - 10.7 60.6 17.0 77.6 36.0
12.0 SILT 15 - - 10.7 71.3 22.7 94.0 43.2
13.5 SILT 20 - - 14.0 85.3 29.5 114.8 52.5
15.0 SILT 26 - - 23.1 108.4 56.7 165.1 73.1
16.5 SILT 50 - - 30.4 138.9 56.7 195.6 88.3
18.0 SILT 50 - - 30.4 169.3 56.7 226.0 103.6
19.5 SILT 50 - - 30.4 199.8 56.7 256.5 118.8
21.0 SILT 50 - - 30.4 230.2 56.7 286.9 134.0
22.5 SILT 50 - - -228.3 1.9 0.0 1.9 0.9
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING SOLAR PANEL

SCREW PILE (N-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 10.90 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH12 sand silt clay Limestone
Screw Pile Size (mm) 76 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 2.4 2.4 9.1 11.5 4.2
1.5 SILT 8 - - 5.5 7.9 11.3 19.3 7.7
3.0 SILT 10 - - 6.7 14.6 13.6 28.2 11.8
4.5 SILT 12 - - 7.9 22.5 15.9 38.4 16.6
6.0 SILT 14 - - 7.9 30.4 13.6 44.1 19.8
7.5 SILT 12 - - 7.0 37.4 20.0 57.4 25.4
9.0 SAND 11 - - 9.0 46.4 15.9 62.3 28.5
10.5 SILT 14 - - 8.5 54.9 15.9 70.8 32.8
12.0 SILT 14 - - 7.9 62.8 13.6 76.4 36.0
13.5 SILT 12 - - 7.6 70.4 14.7 85.2 40.1
15.0 SILT 13 - - 11.3 81.7 27.2 108.9 49.9
16.5 SILT 24 - - 22.5 104.2 90.7 195.0 82.4
18.0 SAND 50 - - 35.8 140.1 90.7 230.8 100.3
19.5 SAND 50 - - -232.8 -92.7 0.0 -92.7 -46.4
CALCULATION FOR SCREW PILE
x BUILDING SERVICES
o F140
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING BUILDING SERVICES

SCREW PILE (F-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 9.58 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH13 sand silt clay Limestone
Screw Pile Size (mm) 140 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 3.4 3.4 23.1 26.5 9.4
1.5 SILT 6 - - 7.3 10.7 26.9 37.6 14.3
3.0 SILT 7 - - 8.4 19.1 30.8 49.9 19.8
4.5 SILT 8 - - 10.7 29.7 42.3 72.1 29.0
6.0 SILT 11 - - 11.8 41.5 38.5 80.0 33.6
7.5 SILT 10 - - 11.2 52.7 38.5 91.2 39.2
9.0 SILT 10 - - 11.8 64.5 42.3 106.8 46.4
10.5 SILT 11 - - 12.3 76.8 42.3 119.2 52.5
12.0 SILT 11 - - 12.9 89.7 46.2 135.9 60.3
13.5 SILT 12 - - 19.1 108.8 84.7 193.5 82.6
15.0 SILT 22 - - 25.8 134.6 92.4 226.9 98.1
16.5 SILT 24 - - 41.5 176.1 192.4 368.5 152.2
18.0 SILT 50 - - 56.1 232.2 192.4 424.6 180.2
19.5 SILT 50 - - 56.1 288.2 192.4 480.7 208.3
21.0 SILT 50 - - 56.1 344.3 192.4 536.7 236.3
22.5 SILT 50 - - 56.1 400.4 192.4 592.8 264.3
24.0 SILT 50 - - -448.6 -48.2 0.0 -48.2 -24.1
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING BUILDING SERVICES

SCREW PILE (F-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 8.30 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH14 sand silt clay Limestone
Screw Pile Size (mm) 140 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 3.9 3.9 26.9 30.9 10.9
1.5 SILT 7 - - 9.0 12.9 34.6 47.5 18.0
3.0 SILT 9 - - 11.2 24.1 42.3 66.4 26.2
4.5 SILT 11 - - 14.0 38.1 53.9 92.0 37.0
6.0 SILT 14 - - 16.3 54.4 57.7 112.1 46.4
7.5 SILT 15 - - 17.9 72.3 65.4 137.8 58.0
9.0 SILT 17 - - 24.7 97.0 103.9 200.9 83.1
10.5 SILT 27 - - 30.3 127.3 103.9 231.2 98.3
12.0 SILT 27 - - 29.2 156.5 96.2 252.7 110.3
13.5 SILT 25 - - 29.2 185.6 103.9 289.5 127.4
15.0 SILT 27 - - 27.5 213.1 84.7 297.8 134.8
16.5 SILT 22 - - 25.8 238.9 92.4 331.3 150.2
18.0 SILT 24 - - 27.5 266.4 96.2 362.6 165.3
19.5 SILT 25 - - 29.2 295.5 103.9 399.4 182.4
21.0 SILT 27 - - 29.7 325.2 100.1 425.3 196.0
22.5 SILT 26 - - 31.4 356.7 115.5 472.1 216.8
24.0 SILT 30 - - 44.9 401.5 192.4 593.9 264.9
25.5 SILT 50 - - 56.1 457.6 192.4 650.0 292.9
27.0 SILT 50 - - 56.1 513.7 192.4 706.1 321.0
28.5 SILT 50 - - 56.1 569.7 192.4 762.2 349.0
30.0 SILT 50 - - 56.1 625.8 192.4 818.2 377.1
31.5 SILT 50 - - -588.8 37.0 0.0 37.0 18.5
CALCULATION FOR SCREW PILE
x BUILDING SERVICES
o F180
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING BUILDING SERVICES

SCREW PILE (F-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 9.58 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH13 sand silt clay Limestone
Screw Pile Size (mm) 180 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 4.3 4.3 38.2 42.5 14.9
1.5 SILT 6 - - 9.4 13.7 44.5 58.2 21.7
3.0 SILT 7 - - 10.8 24.5 50.9 75.4 29.2
4.5 SILT 8 - - 13.7 38.2 70.0 108.2 42.4
6.0 SILT 11 - - 15.1 53.4 63.6 117.0 47.9
7.5 SILT 10 - - 14.4 67.8 63.6 131.4 55.1
9.0 SILT 10 - - 15.1 82.9 70.0 152.9 64.8
10.5 SILT 11 - - 15.9 98.8 70.0 168.8 72.7
12.0 SILT 11 - - 16.6 115.4 76.3 191.7 83.1
13.5 SILT 12 - - 24.5 139.9 140.0 279.8 116.6
15.0 SILT 22 - - 33.2 173.0 152.7 325.7 137.4
16.5 SILT 24 - - 53.4 226.4 318.1 544.5 219.2
18.0 SILT 50 - - 72.1 298.5 318.1 616.6 255.3
19.5 SILT 50 - - 72.1 370.6 318.1 688.7 291.3
21.0 SILT 50 - - 72.1 442.7 318.1 760.8 327.4
22.5 SILT 50 - - 72.1 514.8 318.1 832.9 363.4
24.0 SILT 50 - - -576.8 -62.0 0.0 -62.0 -31.0
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES Date
Design By:
Checked By:
PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR Approved By:

BUILDING BUILDING SERVICES

SCREW PILE (F-SERIES)


Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 8.30 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH14 sand silt clay Limestone
Screw Pile Size (mm) 180 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearing) 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT N aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 5.0 5.0 44.5 49.6 17.4
1.5 SILT 7 - - 11.5 16.6 57.3 73.8 27.4
3.0 SILT 9 - - 14.4 31.0 70.0 101.0 38.8
4.5 SILT 11 - - 18.0 49.0 89.1 138.1 54.2
6.0 SILT 14 - - 20.9 69.9 95.4 165.4 66.8
7.5 SILT 15 - - 23.1 93.0 108.1 201.2 82.6
9.0 SILT 17 - - 31.7 124.7 171.8 296.5 119.6
10.5 SILT 27 - - 38.9 163.7 171.8 335.4 139.1
12.0 SILT 27 - - 37.5 201.2 159.0 360.2 153.6
13.5 SILT 25 - - 37.5 238.6 171.8 410.4 176.6
15.0 SILT 27 - - 35.3 274.0 140.0 413.9 183.6
16.5 SILT 22 - - 33.2 307.1 152.7 459.8 204.5
18.0 SILT 24 - - 35.3 342.5 159.0 501.5 224.3
19.5 SILT 25 - - 37.5 380.0 171.8 551.7 247.2
21.0 SILT 27 - - 38.2 418.2 165.4 583.6 264.2
22.5 SILT 26 - - 40.4 458.6 190.9 649.4 292.9
24.0 SILT 30 - - 57.7 516.2 318.1 834.3 364.1
25.5 SILT 50 - - 72.1 588.3 318.1 906.4 400.2
27.0 SILT 50 - - 72.1 660.4 318.1 978.5 436.2
28.5 SILT 50 - - 72.1 732.5 318.1 1050.6 472.3
30.0 SILT 50 - - 72.1 804.6 318.1 1122.7 508.3
31.5 SILT 50 - - -757.0 47.6 0.0 47.6 23.8
CALCULATION FOR PRECAST SQ
PILE
x BUILDING SERVICES
o 150mm x 150mm
CALCULATION OF BEARING CAPACITY BASED ON SPT VALUES Date
Design By
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR Checked By
PROJECT
GUDANG, JOHOR Approved By
BUILDING BUILDING SERVICES

Square RC Pile
Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 9.58 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH 13 sand silt clay Limestone
Pile Size (mm) 150 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearin 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT (N) aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 4.6 4.6 33.8 38.3 13.5
1.5 SILT 6 - - 9.9 14.5 39.4 53.9 20.4
3.0 SILT 7 - - 11.5 26.0 45.0 71.0 28.0
4.5 SILT 8 - - 14.5 40.5 61.9 102.4 40.9
6.0 SILT 11 - - 16.1 56.6 56.3 112.9 47.1
7.5 SILT 10 - - 15.3 71.9 56.3 128.2 54.7
9.0 SILT 10 - - 16.1 88.0 61.9 149.9 64.6
10.5 SILT 11 - - 16.8 104.8 61.9 166.7 73.0
12.0 SILT 11 - - 17.6 122.4 67.5 189.9 83.7
13.5 SILT 12 - - 43.4 165.8 123.8 289.5 124.1
16.0 SILT 22 - - 11.7 177.5 135.0 312.5 133.7
16.5 SILT 24 - - 56.6 234.1 281.3 515.3 210.8
18.0 SILT 50 - - 76.5 310.6 281.3 591.8 249.0
19.5 SILT 50 - - 76.5 387.1 281.3 668.3 287.3
21.0 SILT 50 - - 76.5 463.6 281.3 744.8 325.5
22.5 SILT 50 - - 76.5 540.1 281.3 821.3 363.8
24.0 SILT 50 - - -612.0 -71.9 0.0 -71.9 -36.0
CALCULATION OF BEARING CAPACITY BASED ON SPT VALUES Date
Design By
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR Checked By
PROJECT
GUDANG, JOHOR Approved By
BUILDING BUILDING SERVICES

Square RC Pile
Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 8.30 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH 14 sand silt clay Limestone
Pile Size (mm) 150 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearin 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT (N) aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 5.4 5.4 39.4 44.7 15.8
1.5 SILT 7 - - 12.2 17.6 50.6 68.2 25.7
3.0 SILT 9 - - 15.3 32.9 61.9 94.8 37.1
4.5 SILT 11 - - 19.1 52.0 78.8 130.8 52.3
6.0 SILT 14 - - 22.2 74.2 84.4 158.6 65.2
7.5 SILT 15 - - 24.5 98.7 95.6 194.3 81.2
9.0 SILT 17 - - 33.7 132.3 151.9 284.2 116.8
10.5 SILT 27 - - 41.3 173.7 151.9 325.5 137.5
12.0 SILT 27 - - 39.8 213.4 140.6 354.1 153.6
13.5 SILT 25 - - 39.8 253.2 151.9 405.1 177.2
15.0 SILT 27 - - 37.5 290.7 123.8 414.5 186.6
16.5 SILT 22 - - 35.2 325.9 135.0 460.9 207.9
18.0 SILT 24 - - 37.5 363.4 140.6 504.0 228.6
19.5 SILT 25 - - 39.8 403.2 151.9 555.0 252.2
21.0 SILT 27 - - 40.5 443.7 146.3 590.0 270.6
22.5 SILT 26 - - 42.8 486.5 168.8 655.3 299.5
24.0 SILT 30 - - 61.2 547.7 281.3 829.0 367.6
25.5 SILT 50 - - 76.5 624.2 281.3 905.5 405.9
27.0 SILT 50 - - 76.5 700.7 281.3 982.0 444.1
28.5 SILT 50 - - 76.5 777.2 281.3 1058.5 482.4
30.0 SILT 50 - - 76.5 853.7 281.3 1135.0 520.6
31.5 SILT 50 - - -803.3 50.5 0.0 50.5 25.2
CALCULATION FOR PRECAST SQ
PILE
x BUILDING SERVICES
o 200mm x 200mm
CALCULATION OF BEARING CAPACITY BASED ON SPT VALUES Date
Design By
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR Checked By
PROJECT
GUDANG, JOHOR Approved By
BUILDING BUILDING SERVICES

Square RC Pile
Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 9.58 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH 13 sand silt clay Limestone
Pile Size (mm) 200 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearin 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT (N) aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 6.1 6.1 60.0 66.1 23.1
1.5 SILT 6 - - 13.3 19.4 70.0 89.4 33.0
3.0 SILT 7 - - 15.3 34.7 80.0 114.7 44.0
4.5 SILT 8 - - 19.4 54.1 110.0 164.1 63.7
6.0 SILT 11 - - 21.4 75.5 100.0 175.5 71.1
7.5 SILT 10 - - 20.4 95.9 100.0 195.9 81.3
9.0 SILT 10 - - 21.4 117.3 110.0 227.3 95.3
10.5 SILT 11 - - 22.4 139.7 110.0 249.7 106.5
12.0 SILT 11 - - 23.5 163.2 120.0 283.2 121.6
13.5 SILT 12 - - 57.8 221.0 220.0 441.0 183.8
16.0 SILT 22 - - 15.6 236.6 240.0 476.6 198.3
16.5 SILT 24 - - 75.5 312.1 500.0 812.1 322.7
18.0 SILT 50 - - 102.0 414.1 500.0 914.1 373.7
19.5 SILT 50 - - 102.0 516.1 500.0 1016.1 424.7
21.0 SILT 50 - - 102.0 618.1 500.0 1118.1 475.7
22.5 SILT 50 - - 102.0 720.1 500.0 1220.1 526.7
24.0 SILT 50 - - -816.0 -95.9 0.0 -95.9 -47.9
CALCULATION OF BEARING CAPACITY BASED ON SPT VALUES Date
Design By
GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR Checked By
PROJECT
GUDANG, JOHOR Approved By
BUILDING BUILDING SERVICES

Square RC Pile
Maximum Column Load (kN) Meyerhof Formulae:
Minimum Column Load (kN) Qs=k1xNavxAs
Water Level (m) 8.30 Qb=k2xNbxAb
Ground Level (m) Qu=SQs+Qb
Formation Level (m) Qa=SQs/Fs+Qb/Fb
Cut(+ve) / Fill (-ve) (m)
No borehole BH 14 sand silt clay Limestone
Pile Size (mm) 200 k1= 2 1.7 aCu RQD
Fs (skin) 2 k2= 400 250 100 -
Factor of Safety: Fb (bearin 3

ALLOWABLE WORKING LOAD (kN)

Depth (m) Soil SPT (N) aCu UCS (kN/m2) Qs SQs Qb Qu Qa


0.0 SILT 0 - - 7.1 7.1 70.0 77.1 26.9
1.5 SILT 7 - - 16.3 23.5 90.0 113.5 41.7
3.0 SILT 9 - - 20.4 43.9 110.0 153.9 58.6
4.5 SILT 11 - - 25.5 69.4 140.0 209.4 81.3
6.0 SILT 14 - - 29.6 98.9 150.0 248.9 99.5
7.5 SILT 15 - - 32.6 131.6 170.0 301.6 122.5
9.0 SILT 17 - - 44.9 176.5 270.0 446.5 178.2
10.5 SILT 27 - - 55.1 231.5 270.0 501.5 205.8
12.0 SILT 27 - - 53.0 284.6 250.0 534.6 225.6
13.5 SILT 25 - - 53.0 337.6 270.0 607.6 258.8
15.0 SILT 27 - - 50.0 387.6 220.0 607.6 267.1
16.5 SILT 22 - - 46.9 434.5 240.0 674.5 297.3
18.0 SILT 24 - - 50.0 484.5 250.0 734.5 325.6
19.5 SILT 25 - - 53.0 537.5 270.0 807.5 358.8
21.0 SILT 27 - - 54.1 591.6 260.0 851.6 382.5
22.5 SILT 26 - - 57.1 648.7 300.0 948.7 424.4
24.0 SILT 30 - - 81.6 730.3 500.0 1230.3 531.8
25.5 SILT 50 - - 102.0 832.3 500.0 1332.3 582.8
27.0 SILT 50 - - 102.0 934.3 500.0 1434.3 633.8
28.5 SILT 50 - - 102.0 1036.3 500.0 1536.3 684.8
30.0 SILT 50 - - 102.0 1138.3 500.0 1638.3 735.8
31.5 SILT 50 - - -1071.0 67.3 0.0 67.3 33.7
CALCULATION FOR PAD FOOTING
x BUILDING SERVICES
o 1000mm x 1000mm
BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES

PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR
BUILDING BUILDING SERVICES

Pad Footing
Maximum Column Load (kN) Data
Minimum Column Load (kN) gdry (kN/m3) 18
Water Level (m) 9.58 Cu (kN/m2) 35.91
Ground Level (m) Assume Width B
Formation Level (m)
Cut(+ve) / Fill (-ve) (m) 0.00
No borehole BH13 phi Nc Nq Ng
N Value 6 0 5.7 1 
Factor of Safety: 3

ALLOWABLE WORKING LOAD (kN)

Ultimate Bearing Capacity

Qult = 1.3cNc + gDfNq + 0.4gBNg


= 1.3(35.91)(5.7) + 18(1.5)(1) D= 1.5 m
= 293.0931 kN/m2

Minimum Bearing Capacity


B

qall = 293/3
= 97.6977 kN/m2

Allowable Bearing Capacity 96 kN/m2


BEARING CAPACITY CALCULATION BASED ON S.P.T. VALUES

PROJECT GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UITM PASIR GUDANG, JOHOR
BUILDING BUILDING SERVICES

Pad Footing
Maximum Column Load (kN) Data
3
Minimum Column Load (kN) gdry (kN/m ) 18
2
Water Level (m) 9.58 Cu (kN/m ) 41.9
Ground Level (m) Assume Width B
Formation Level (m)
Cut(+ve) / Fill (-ve) (m) 0.00
No borehole BH14 phi Nc Nq Ng
N Value 7 0 5.7 1 
Factor of Safety: 3

ALLOWABLE WORKING LOAD (kN)

Ultimate Bearing Capacity

Qult = 1.3cNc + gDfNq + 0.4gBNg


= 1.3(41.9)(5.7) + 18(1.5)(1) D= 1.5 m
= 337.479 kN/m2

Minimum Bearing Capacity


B

qall = 337/3
= 112.493 kN/m2

Allowable Bearing Capacity 100 kN/m2


APPENDIX 3
x KEMREX COMPANY CATALOGUE
o N-SERIES
o F-SERIES
KEMREX INNOVISION SDN BHD

TECHNOLOGY DESIGN PROFILE


EMREX E
innoVISION
Foundation
to conventional construction solutions and predominantly concrete-type or wetwork foundation.

KEMREX TECHNOLOGY is a visionary solution developed for the future today. The technology
reinvent traditional methodology for more practical and cost productive result in construction.

Innovative Technology
Our Technology will increase performance and delivery
lead time in almost all construction management
lifecycle to meet the demand of global expansion.

02
With more than 50 years of combined experiences of the company

Kemrex Innovision Sdn Bhd have developed diverse niche


understanding of conventional foundation limitations and issues.
With that combined knowledge, we have designed and developed-
this German-engineered technology to be adoptable into
geological needs of the local environment.

After many man-hours of R&D coupled with various world standards

the market requirement.

The main advantages of our solution are its time and cost saving
potential, durable yet eco-friendly to the environment, easier access
with nominal logistics into work area and without need of excessive
digging, wastage of framework & water as well as unnessary heavy
logistics for construction material such as rebar, cement and sand
associated with conventional method.

Company Vision
The Company envisage to be the most preferred
engineering solution intergrator in the ASEAN region by

box solutions and embracing best practice methodolo-


gies in the construction lifecycle.

Philosophy of INNO-VISION
We derived our branding ‘Inno-vision’ from a combination
of two words, INNOVATIVE & VISION to coin our universal
Business Philosophy of Bridging Innovation in all our solu--
-
ment for an improved and sustainable future.

03
E MREX E
innoVISION
Product Intro

Ground Screw N Series is ideal


for various lightweight
structural characteristics.

Suitable for fence, solar farm,


lighting poles, signages, patios
and others Ground Screw F Series is ideal for homes

N SERIES
F SERIES
or modular structure application. You
can load up to 20 Tons per point on

characteristics.

Suitable for 2-storey houses, hotels,

retail kiosks, security post and


street-side cafe. it can also be used as
hybrid system combined with reinforce
concrete sub-structure such as pile cap &

FS SERIES
pilling.

Ground Screw FS Series is ideal for structure

footing.

Suitable for building, load transfer modules,


lighting poles, telecommunication towers
and others.

04
E MREX
Values
E
innoVISION

WHY HOW WHAT






tO FSTImprovementtP t"QQMJcaUJPOPGUIF tTecIOPMPHJDBMMZ GBCSJcatFE


ConvFOUJPOBM.FUIPE State-oGUIe-ArUtFDIOPMPHZ TZstFNUIaUFOTVrFT
t&OTVrFTPVSEnvirPONFOU tO FSTBMternatFNPrF ConsistencZPerGomance
JTQrotectFE SVTUBJOBCMFsZstem tVBSJBCMFPQUJPOTUser
FSJFOElZBQQMJcations

Impact To Environment
Re-useable
e for
f
No Need for Soil Delay
No D elaay for
el for
Excavation Curing
C urinng
g
or Applications
tions

No Usage of
!"#23.4$#"&# Minimum
mum Labor Consistency in
5$6$17#
Cement Dependency
Dependen
ende cy Perfo
f rmance
Performance

Less Usage of Framework


No Frame
amework
ame Improveed
Improved
8$33#23.4$#"&#9.7$'# Productivity
Productiv
vity
Water Wastage
astag

No Usage of Reduce Extensive


e Exttensive
!"#23.4$#"&#:$;.'# New Knowledge
d
<'"1#
Rebar Iron TTransport
ransport & CO2
Transfo
f rmation
Transformation
Emission

05
EMREX E X
innoVISION
About Us

FAST : KEMREX gravel penetration technology with its

ease for perfectly vertical, low-cost and mass installation.

DURABLE : KEMREX foundation technology is wrough from a


single piece of steel and hot-dip galvanized for maximum
strength and endurance.

SAFE : KEMREX technology with it’s signature conic shape,


compacts the soil while ensuring maximum safety and stability.

ECO-FRIENDLY : and
reposition solutions with its ease-to-detach connection
between the screw and substrate.

STATE-OF-THE-ART FOUNDATIONS made with KEMREX


engineered ground screws set the new standards for
maximum durability and stability, statically tested, safe
time and money, no digging or concreting necessary,
eco-friendly and long service life.

KEMREX prefab solutions could be used in various type


of construction, solar support structure for solar farm
and solar PV rooftop, modular or prefabricated
construction, building renovation works, landscape
design features and outdoor lighting design.

06
E
EMRE E X
innoVISION
Performance

THE PATENTED FLANGE ANGLE OF THE SCREW

KEMREX GROUND SCREW FLEX-S MOUNTING WILL ALSO COMPACT THE SURROUNDING SOIL TO

SYSTEM ENSURES 90 DEGREE ANGLE OF OFFER STURDIER GRIP OF THE DENSITY GROUND
PENETRATION INTO THE GROUND IS ACHIEVED. WRAPPING THE FOUNDATION SYSTEM.

07
E MREX E
innoVISION
Series Application

KEMREX N Series suitable for usage with landscape


features such as fencing, street light, orientation signage,
solar panel, patio, small electric post and etc.

LANDSCAPE SIGNAGE

08
SOL"3PANEL

FENCING

PATIO

09
E MREX E
innoVISION
Series Application

KEMREX F/FF Series suitable for the structure with


prefabricated footing and conventional structure such
as 2-storey house, light weight structure, concrete
fence, playground, tree stabilizer, raised house, car
park shades, billboard and etc. A KEMREX F/FF Series
can carry a load up to 20 Tons per point.

PLAYGROUND TREESTABILIZER

10
3"*4&%)064&

C"3P"3,4)"%&4

R .0/010-&#*--#0"3%

11
E MREX E
innoVISION
Series Application

that can anchor the receiving load to its


customised connector with ease and stability.
Suitable for billboard, street light, building
construction, telecommunication post/ tower
and etc.

#*--#0"3%4536$563&

12
453&&5-*()5

#6*-%*/($0/4536$5*0/

5&-&$0..6/*$"5*0/508&3

13
E
EM REX
E
innoVISION
Reference
Solar Mounting System & Control Room

Terrace & Outdoor Patio

Car Park Shade & Shelter

14
Exhibition & Event

Landscape & Playground

Fence & Hoarding

15
Building & Construction

16
E
EM REX
E
innoVISION
Local Portfolio 3 STOREY BUILDING EXTENSION
SETIA ALAM

1 STOREY CHALET & RAISED VILLA


PULAU PERHENTIAN

FACTORY SECURITY FENCE


SERI ALAM INDUSTRIAL PARK

SOUND BARRIER HOARDING


DASH HIGHWAY, DAMANSARA PERDANA

17
E
EM REXE
innoVISION
Business Prospects

18
E
EM REX
E
innoVISION
International Business Addresses
Location of

KEMREX INNOVISION4%/#)%
NO. 6-3-2 JALAN SETIA PRIMA U13/B, SETIA ALAM, 40170 SHAH ALAM, SELANGOR
TEL : +603- 3358 5669 FAX : +603-3344 8277

Bangkok

CITY CENTER BANGPLEE


OFFICE
THAILANDD HQ
H
TTower
Bhiraj To wer
MRREX
nEXVISION
EmQuartier,
e @ EEmQuartie
er Q ti
BANGPLEEE OFFICE
OF EMREX
REX n VISION
27/5 Moo 7 KKing Kaew-Teparak Rd.,
Floor 35,6899 Sukhumvit Road
R (Soi 33), Bangplee Yai,
Klongton Nuea, Vadhana 10110, Thailand Bangplee, Samutprakarn 10540, Thailand
TEL: +66 2 715-0400-3 FAX: +66 2 715-0500 TEL: +66 8 2751-0900 FAX: +66 8 9001-9001

KM.39 CHIANG MAI


FACTORY OFFICE
KM.39 OFFICE
OFF
FF E
MREX
REX n VISION CHIANGG MAI
M OFFICE
MA
888 Mooo 22, M
EMREEXX
O FICE
Mae Hi
n VISION
Hia SSubdistrict.,
bdi i
59/1 Mooo 9 Bangwua, Bangpakong,
Ba Muang Di
District,
i
Thailand,
Chachoengsao 24180 Tha Chiang Mai 50200, Thailand
TEL: +66 2751-1466 FAFAX: +66 2751-1561 TEL: +66 9 5678-9494

19
E innoVISION
Contact Us
GC.com/kisC.mZ kemrex.mZ wasap.mZ

KEMREX INNOVISION SDN BHD


NO. 6-3-2 JALAN SETIA PRIMA U13/B, SETIA ALAM, 40170 SHAH ALAM, SELANGOR

sales@kemrex.my
SeriesNDescription
Generation Compression Tension Horizontal Price
KEM N68x600 350kg* 200 kg* 150 kg* 1,000baht/pile

KEM N68x800 600kg* 400 kg* 280 kg* 1,500baht/pile

KEM N68x1000 1,000kg* 800 kg* 400 kg* 1,800baht/pile

KEM N68x1200 1,500kg* 1,000 kg* 450 kg* 2,200baht/pile

KEM N68x1500 1,800kg* 1,100 kg* 500 kg* 2,600baht/pile

KEM N68x2000 2,000kg* 1,200 kg* 650 kg* 3,000baht/pile

KEM N76x1200 2,000kg* 1,500 kg* 750 kg* 2,700baht/pile

KEM N76x1600 2,500kg* 1,800 kg* 1,000kg* 3,200baht/pile

KEM N76x2000 3,500kg* 2,500 kg* 1,300kg* 3,700baht/pile

KEM N76x2400 N/A N/A N/A 4,000baht/pile


SeriesFDescription
Generation Compression Tension Horizontal Price
KEM F68x1200x220 1,500 kg* 1,000 kg* 500 kg* 2,200baht/pile

KEM F76x1200x220 2,000 kg* 1,500kg* 750 kg* 3,400baht/pile

KEM F76x1600x220 2,900 kg* 1,900kg* 1,200 kg* 4,200 baht/pile

KEM F76x2000x220 3,800 kg* 2,500kg* 1,300 kg* 4,600baht/pile

KEMF76x2400x220 5,000 kg* 3,300kg* 1,400 kg* 5,000baht/pile

KEMF90x2000x220 5,500 kg* 3,500kg* 1,400 kg* 5,300baht/pile

KEM F114x2000x220 6,600 kg* 3,750kg* 1,700 kg* 6,500baht/pile

KEM F140x1700x250 7,000 kg* 3,500kg* 1,500 kg* 9,000baht/pile

KEM F140x2500x300 8,000 kg* 4,000kg* 2,200 kg* 11,800baht/pile

KEM F140x3000x250 10,000 kg* 5,000kg* 2,500 kg* 12,500baht/pile

KEM F180x3000x300 12,000 kg* 7,000kg* 3,500 kg* 19,500baht/pile

KEM F219x3000x300 18,000 kg* 9,000kg* 4,500 kg* 29,500baht/pile


ELECTRICAL RESISTIVITY REPORT

4
Technical Report

Electrical Resistivity Works for 25MW Solar


Farm Near UiTM Pasir Gudang, Johor

19th April 2019

Prepared by:
Assoc. Prof. Dr. Mohd Ashraf Mohamad Ismail
Table of Contents

1 Introduction ................................................................................ 1
1.1 General ................................................................................. 1
1.2 Objectives of the Study ........................................................ 1
1.3 Scope of Work ...................................................................... 1
1.3.1 2-D Electrical Resistivity Survey ...................................... 1
2 Summary of Events .................................................................... 2
3 Personnel and Equipment ........................................................... 2
3.1 Personal ................................................................................ 2
3.1.1 USM Geophysical Survey Team ....................................... 2
3.2 List of Equipment ................................................................. 3
3.2.1 Electrical Resistivity Equipment’s .................................... 3
4 Field Procedure........................................................................... 4
4.1 Electrical Resistivity Survey ................................................ 4
4.1.1 Interpretation Technique ................................................... 7
5 Result and Discussion ................................................................ 9
5.1 Study area and activities....................................................... 9
5.2 Resistivity results interpretation......................................... 22
6 Conclusion ................................................................................ 63
7 References ................................................................................ 64
1 Introduction
1.1 General
Usains Biomics Laboratory Testing Services Sdn. Bhd is contracted by MZ Erat Services Sdn. Bhd.
to carry out electrical resistivity survey for subsurface characterization at Proposed Development
for 25 MW Solar Farm near UiTM Pasir Gudang, Johor.

1.2 Objectives of the Study


The objective of this electrical resistivity survey is to measure soil resistivity of non-surface level
below 0.5 m, 1.0 m, 1.5 m, 2.0 m, 5.0 m and 10.0 m at solar farm area. If soil resistivity within
10m is relatively high (≥1000Ω.m)additional testing for soil resistivity at 10 - 25m depth would
be required. Provide measurements for 10 points across entire area, evenly distributed and not
located at water surface.

Measure soil resistivity of non-water surface level below 1.0m, 2.0m, 3.0m, 5.0m, 10.0m and
20.0m at switchgear station area. If soil resistivity within 0.5 to 10m is relatively low (≤100Ω.m)
soil resistivity measurement at 10 - 50m depth is not required. Provide measurements for at least
2 points across station area with even distribution

1.3 Scope of Work


The fulfil the objectives of the study as specified above, scope of work for both the 2-D electrical
resistivity survey comprises the following:

12 survey alignments using Wenner-Schlumberger array. The length of the spread for each
survey alignment is based on the pre-planned layout given by the client and as specified in Table
below.

Line No. Array Type Approximate maximum depth of investigation Length


Wenner-
Line 1-12 30-40 m 200 m
Schlumberger

1.3.1 2-D Electrical Resistivity Survey


Electrical resistivity survey is often carried out to infer the subsurface condition from the
electrical resistivity anomaly obtained from the electrical resistivity measurement. Electrical
1
resistivity methods measured the resistivity of the earth materials to infer the kind of material
beneath the surface. The differences in resistivity of the earth materials will be used to identify
and infer the different lithology and the hydrogeological condition. In general, a very large areas
can be covered by using this method. The electrical resistivity equipment is shown in Figure 1.
Meanwhile, the common array used for electrical resistivity survey layout is shown in Figure 2.
The example of the data acquisition process for the electrical resistivity result is shown in Figure
3.

2 Summary of Events
The work is planned to be conducted in 3 working days as detailed out below:

Date Time Task

7.15 am - Mobilization from USM engineering campus


18h and 20th
April 9.30 am - Arrive at site
2019 10.30am - Start electrical resistivity survey
7.00pm - Demobilization to USM Engineering Campus

3 Personnel and Equipment


3.1 Personal
3.1.1 USM Geophysical Survey Team
The following geophysical survey team from USM have been provided on site for the electrical
resistivity survey operation and also for the results analysis and interpretation.

No. Name Function


Assoc. Prof. Dr. Mohd Ashraf Mohamad Geophysicist and Geotechnical
1.
Ismail engineer
2. Ahmad Halmi Ghazali Senior Assistant Engineer
3. Muhamad Khairi Wahab Senior Assistant Engineer
4. Muhammad Nabil Semail Senior Assistant Engineer
Geophysicist and Geotechnical
5. Rais Yusoh
Engineer

2
3.2 List of Equipment
3.2.1 Electrical Resistivity Equipment’s

The following equipment were used for the electrical resistivity survey as shown Table 1 and -
Figure 1.

Table 1: Electrical resistivity survey equipment

No. Item Quantity

1. Terrameter, ABEM LS 1
2. Laptop 1
3. Multi-purpose Cable 100m 2
4. Jumpers 42
5. Non Polarized electrode 41
6 Cable Adapter (to laptop) 1
7. Connection Cable (SAS 4000 & ES 10-64) 1
8. Battery Cable 1
9. 12 volt Battery 4
9. 2 lb Hammer 4
10. Lap top 1
11. Remote cable 2
12. GPS 2

3
Figure 1: ABEM SAS 4000 system.

4 Field Procedure
4.1 Electrical Resistivity Survey
The origin of the resistivity is based on the four electrodes that are currents, c1 and c2 and
potentials, p1 and p2 due to study by Schlumberger brothers in 1920. Reynolds (2011) mentioned
that quantitative interpretations and conventional sounding surveys were normally used for the
next 60 years after the Schlumberger brothers’ work. In this method, the center point of the
electrode arrays remains fixed, but the electrode spacing is increased to gain detail information
about the subsurface. There are some common arrays used in resistivity survey and their
geometric factors are based on change of spacing between electrodes as shown in Figure

4
Figure 2: Common arrays used in resistivity survey and their geometric factors (Loke, 1994)

Electrical imaging system is now mainly carried out with a multi-electrode resistivity meter

system. Such surveys use a number (usually 25 to 100) of electrodes laid out in a straight line

with a constant spacing. A computer-controlled system is then used to automatically select the

active electrodes for each measure (Griffith and Barker, 1993). Throughout the survey conducted

in the proposed site, the pole-dipole protocol has been used with the ABEM SAS4000 system.

Figure 3 shows the arrangement of resistivity survey line. The data collected in the survey can be

interpreted using an inexpensive microcomputer.

5
Figure 3: The arrangement of electrodes for a 2-D electrical survey and the sequence of
measurement used to build up a resistivity section.

The resistivity method basically measures the resistivity distribution of the subsurface material.
Table 2 and 3 shows the resistivity value of some of the typical rocks, soil materials and water
(Keller and Frischknecht 1966). Igneous and metamorphic rocks typically have high resistivity
values. The resistivity of these rocks is mainly dependent on the degree of fracturing. Since the
water table in Malaysia is generally shallow, the fractures are commonly filled with ground
water. The greater the fracturing, the lower is the resistivity value of the rock. As an example,
the resistivity of granite varies from 5000 ohm-m in wet condition to 10,000 ohm-m when it is
dry. When these rocks are saturated with ground water, the resistivity values are low to
moderate, from a few ohm-m to a less than a hundred ohm-m. Soils above the water table is
drier and has a higher resistivity value of several hundred to several thousand ohm-m, while soils
below the water table generally have resistivity values of less than 100 ohm-m. Also clay has a
significantly lower resistivity than sand.

6
Table 2: Resistivity of some common rocks and soil materials in survey area (Keller and
Frischknecht 1966)
Material Resistivity (ohm-m)
Alluvium 10 to 800
Sand 60 to1000
Clay 1 to 100
Groundwater (fresh) 10 to 100
Sandstone 8 - 4 x 103
Shale 20 - 2 x 103
Limestone 50 - 4 x 103
Granite 5000 to 1,000,000

Table 3: Electrical resistivity of some types of waters (Keller and Frischknecht 1966)
Type of water Resistivity (ohm-m)
Precipitation 30 - 1000
Surface water, in areas of igneous rock 30 – 500
Surface water, in areas of sedimentary rock 10 - 100
Groundwater, in areas of igneous rock 30 - 150
Groundwater, in areas of sedimentary rock >1
Sea water ≈ 0.2
Drinking water (max. salt content 0.25%) > 1.8
Water for irrigation and stock watering (max. salt content > 0.65
0.25%)

4.1.1 Interpretation Technique

RES2DINV program is used to process converted raw data in extension of .DAT format. After field
survey, the resistance measurements are reduced to apparent resistivity values by inversion
process. RES2DINV used a least-squares inversion scheme to determine the appropriate
resistivity value so that the calculated apparent resistivity values agree with the measured
values. The inversion process is carried out to obtain three types of resistivity section which
consist of calculated apparent resistivity, measured apparent resistivity and inverse model
resistivity (Figure 4). The misfit between measured and calculated apparent resistivity produce
root mean square (RMS) values. The RMS error may be due to random error and systematic
error. Random error may cause by the effect of telluric current that give influence to the whole
resistivity readings while systemic error may cause by infirm contact between electrode and
earth. The resistivity contour value is adjusted based on geological information that fit the
resistivity range with different colors.

7
Figure 4: Example of the produced resistivity section by RES2DINV.

8
5 Result and Discussion
5.1 Study area and activities
This section presents the geological condition of the study area, interpretation of electrical
resistivity results and related description on the subsurface conditions for the investigation area
and survey alignment. Figure 5 shows the geological map of the study area. Meanwhile, the
survey alignments and survey alignments with borehole locations are given in Figure 6, 7 and
Table 4. Data acquisition activities area for the 12 survey lines are shown in Figure 8 to Figure
27. From the geological map of the study area is underlain by granite bedrock with various
residual soil thickness depending on weathering intensity and topography. The average thickness
of the completely decomposed or highly decomposed granite varies between 15 m to more than
30 m as observed from the borehole investigations results.

Figure 5: Geological Map of the study area

9
Figure 6: Plan view of the 2D ground resistivity investigation area with the survey alignment for
R1 to R12 with the location of the boreholes

Figure 7: 2-D electrical resistivity survey alignments with the position of the line as details out
in Table 4

10
Table 4: Location of the electrical resistivity survey alignments

Station Latitude Longitude


R1_0m 1.528675 103.86266
R1_200m 1.526893 103.86198
R2_0m 1.525618 103.86309
R2_200m 1.526819 103.86176
R3_0m 1.526508 103.86363
R3_200m 1.528253 103.86386
R4_0m 1.525082 103.86503
R4_200m 1.526112 103.86353
R5_0m 1.527819 103.86481
R5_200m 1.529152 103.86371
R6_0m 1.525871 103.86468
R6_200m 1.527597 103.86531
R7_0m 1.525337 103.86481
R7_200m 1.526101 103.86642
R8_0m 1.525883 103.86736
R8_200m 1.526758 103.86587
R9_0m 1.524879 103.86662
R9_200m 1.525758 103.86821
R10_0m 1.524437 103.86843
R10_200m 1.526178 103.8688
R11_0m 1.524859 103.86853
R11_200m 1.525702 103.8702
R12_0m 1.524666 103.86999
R12_200m 1.526345 103.86989

11
Figure 8: Overview of electrical resistivity data acquisition at site

Figure 9: Overview of electrical resistivity data acquisition at site

12
Figure 10: Overview of electrical resistivity data acquisition at site

Figure 11: Overview of electrical resistivity data acquisition at site

13
Figure 12: Overview of electrical resistivity data acquisition at site

Figure 13: Overview of electrical resistivity data acquisition at site

14
Figure 14: Overview of electrical resistivity data acquisition at site

Figure 15: Overview of electrical resistivity data acquisition at site

15
Figure 16: Overview of electrical resistivity data acquisition at site

Figure 17: Overview of electrical resistivity data acquisition at site

16
Figure 18: Overview of electrical resistivity data acquisition at site

Figure 19: Overview of electrical resistivity data acquisition at site

17
Figure 20: Overview of electrical resistivity data acquisition at site

Figure 21: Overview of electrical resistivity data acquisition at site

18
Figure 22: Overview of electrical resistivity data acquisition at site

Figure 23: Overview of electrical resistivity data acquisition at site

19
Figure 24: Overview of electrical resistivity data acquisition at site

Figure 25: Overview of electrical resistivity data acquisition at site

20
Figure 26: Overview of electrical resistivity data acquisition at site

Figure 27: Overview of electrical resistivity data acquisition at site

21
5.2 Resistivity results interpretation
These results will examine the applicability of electrical resistivity survey to determine the
electrical resistivity values of the earth materials based on the effect of the physical properties
on resistivity. Using the electrical resistivity methods, the true resistivity distribution in the
subsurface can be estimated from the apparent resistivity measured from the electrodes pegged
on the ground surface. The electrical resistivity profile for R1 to R12 as shown in Figure 30 to
Figure 41 are generated using the 2-D model of RES2D inversion technique.

From the acquired results, it is notable that the electrical resistivity values of all models vary from
as low as 100 ohm.m to more than 3000 ohm.m (Figure 54). Meanwhile the values of electrical
resistivity to the various range of earth materials compiled by various researchers are given in
Table 5, 6 and 7. The broad range of this electrical resistivity values act as an indicator to the
heterogeneity of the subsurface materials which is normally a typical condition encountered in
the residual soil slope of granitic bedrock. An Idealized feature in a highly to completely
weathered granite cut slope with variables engineering properties and weathering grades is
shown in Fig. 10.

In general, the highest values are mainly due to granitic rock (bedrock or boulder in shallower
depth) marked by with high resistivity values ranging from 1500 ohm-m to more than 3000
ohm.m and indicated by moderately weathered to slightly weathered granitic rock. The
moderate resistivity values ranging from 750-1500 ohm.m consists of disintegrated zone to
completely weathered earth materials and residual soil of gravelly, sandy, silty and clayey in
moderate to low saturation conditions. The low resistivity values less than 750 ohm.m is
characterized by the gravelly, sandy, silty and clayey soil in moderate to high degree of
saturation. Although, the electrical resistivity profile managed to depict the present of
completely and highly decomposed granite, the core boulders and bedrock ranging however,
due to the limitation of the electrode spacing which is only 5 m, the existence of some smaller
core boulders might not be encountered and is believed to be existence and littering in the
moderate resistivity zones. The 1-D electrical resistivity values at the X – 101 m (center of the
line) for all the resistivity survey alignments are given in Table 8 to Table 19 to and Figure 42 to
Figure 53. Figure 54 shows the variation of 1-D electrical resistivity values for all the 12 lines.
22
Table 4: Correlation between electrical resistivity values (ohm-m) to the indicator of
weathering and weathering grades in granitic bedrock

Resistivity Electrical Weathering Grades (Modified


Value Color Range Resistivity after ISRM, 1978)
(ohm-m) Indicator
Low Electrical Saturated
<100 Resistivity Gravelly/Sand/Silt/Clay or
Value saturated fractured rock
100 - 750 Moderate x Gravelly/Sand/Silt/Clay (V to
Electrical VI)
750 -
Resistivity x Bleached Zone to
1500
Value Disintegrated Zone (V to IV)
x Rust Front – Highly
Weathered to Slightly
High Electrical
Weathered (IV to II)
>1500 Resistivity
x Slightly weathered to Fresh
Value
Granite (II to I)
x Fresh Granite (I)

Figure 28: Grades of weathering in granitic rock according to the ISRM 1978 weathering grades
(modified after Thuro and Scholz, 2003)

23
Figure 29: An Idealized feature in a highly to completely weathered granite cut slope
(Jamaluddin, T. A, 1999)

Table 5: Resistivity correlation (Liu and Evett, 2005)

24
Table 6: Typical Resistivity Values of Earth Materials (Lee, 2002)

Table 7: Resistivity’s of some common rocks, minerals and chemicals (Keller and Frishcknecht
1966, Daniels and Alberty 1996 and Loke 1999)

25
R1
BH1

Figure 30: 2D ground resistivity result for R1 using Res2DINV software

26
R2
BH2

Figure 31: 2D ground resistivity result for R2 using Res2DINV software

27
R3
BH4

Figure 32: 2D ground resistivity result for R3 using Res2DINV software

28
R4
BH3

Figure 33: 2D ground resistivity result for R4 using Res2DINV software

29
R5
BH5

Figure 34: 2D ground resistivity result for R5 using Res2DINV software

30
R6
BH6

Figure 35: 2D ground resistivity result for R6 using Res2DINV software

31
R7
BH7

Figure 36: 2D ground resistivity result for R7 using Res2DINV software

32
R8
BH8

Figure 37: 2D ground resistivity result for R8 using Res2DINV software

33
R9
BH10

Figure 38: 2D ground resistivity result for R9 using Res2DINV software

34
R10
BH12

Figure 39: 2D ground resistivity result for R10 using Res2DINV software

35
R11
BH13 BH14

Figure 40: 2D ground resistivity result for R11 using Res2DINV software

36
R12

BH14

Figure 41: 2D ground resistivity result for R12 using Res2DINV software

37
Table 8: 1D ground resistivity result for R1 using Res2DINV software

R1
X Y Z
101 -2 944
101 -4 1070
101 -6 1309
101 -7 1539
101 -9 1685
101 -11 1768
101 -13 1800
101 -15 1806
101 -17 1800
101 -19 1799
101 -21 1803
101 -22 1815
101 -24 1820
101 -26 1821
101 -28 1819
101 -30 1824
101 -32 1823
101 -34 1832
101 -36 1833

38
Resistivity (ohm.m)
0
0 200 400 600 800 1000 1200 1400 1600 1800 2000
944, -2

1070, -4
-5
1309, -6

1539, -7

1685, -9
-10
1768, -11

1800, -13

-15 1806, -15

1800, -17

1799, -19
Depth (m)

-20 R1
1803, -21

1815, -22

1820, -24
-25
1821, -26

1819, -28

-30 1824, -30

1823, -32

1832, -34
-35
1833, -36

-40

Figure 42: 1D ground resistivity result for R1 using Res2DINV software

39
Table 9: 1D ground resistivity result for R2 using Res2DINV software

R2
X Y Z
101 -2 586
101 -4 598
101 -6 593
101 -7 527
101 -9 392
101 -11 324
101 -13 417
101 -15 678
101 -17 923
101 -19 1053
101 -21 1101
101 -22 1103
101 -24 1098
101 -26 1095
101 -28 1093
101 -30 1092
101 -32 1092
101 -34 1092
101 -36 1091

40
Resistivity (ohm.m)
0
0 200 400 600 800 1000 1200
586, -2

598, -4
-5
593, -6

527, -7

392, -9
-10
324, -11

417, -13

-15 678, -15

923, -17

1053, -19
Depth (m)

-20 R2
1101, -21

1103, -22

1098, -24
-25
1095, -26

1093, -28

-30 1092, -30

1092, -32

1092, -34
-35
1091, -36

-40

Figure 43: 1D ground resistivity result for R2 using Res2DINV software

41
Table 10: 1D ground resistivity result for R3 using Res2DINV software

R3
X Y Z
101 -2 1811
101 -4 1995
101 -6 2295
101 -7 2481
101 -9 2411
101 -11 1808
101 -13 1044
101 -15 759
101 -17 713
101 -19 715
101 -21 725
101 -22 727
101 -24 729
101 -26 729
101 -28 730
101 -30 730
101 -32 723
101 -34 696
101 -36 654

42
Resistivity (ohm.m)
0
0 500 1000 1500 2000 2500 3000
1811, -2

1995, -4
-5
2295, -6

2481, -7

2411, -9
-10
1808, -11

1044, -13

-15 759, -15

713, -17

715, -19
Depth (m)

-20 R3
725, -21

727, -22

729, -24
-25
729, -26

730, -28

-30 730, -30

723, -32

696, -34
-35
654, -36

-40

Figure 44: 1D ground resistivity result for R3 using Res2DINV software

43
Table 11: 1D ground resistivity result for R4 using Res2DINV software

R4
X Y Z
101 -2 845
101 -4 855
101 -6 858
101 -7 830
101 -9 762
101 -11 706
101 -13 686
101 -15 683
101 -17 683
101 -19 684
101 -21 684
101 -22 684
101 -24 684
101 -26 683
101 -28 683
101 -30 683
101 -32 684
101 -34 684
101 -36 684

44
Resistivity (ohm.m)
0
0 100 200 300 400 500 600 700 800 900 1000
845, -2

855, -4
-5
858, -6

830, -7

762, -9
-10
706, -11

686, -13

-15 683, -15

683, -17

684, -19
Depth (m)

-20 R4
684, -21

684, -22

684, -24
-25
683, -26

683, -28

-30 683, -30

684, -32

684, -34
-35

-40

Figure 45: 1D ground resistivity result for R4 using Res2DINV software

45
Table 12: 1D ground resistivity result for R5 using Res2DINV software

R5
X Y Z
101 -2 674
101 -4 713
101 -6 728
101 -7 667
101 -9 493
101 -11 384
101 -13 367
101 -15 366
101 -17 367
101 -19 367
101 -21 368
101 -22 368
101 -24 369
101 -26 370
101 -28 370
101 -30 370
101 -32 371
101 -34 372
101 -36 372

46
Resistivity (ohm.m)
0
0 100 200 300 400 500 600 700 800
674, -2

713, -4
-5
728, -6

667, -7

493, -9
-10
384, -11

367, -13

-15 366, -15

367, -17

367, -19
Depth (m)

-20 R5
368, -21

368, -22

369, -24
-25
370, -26

370, -28

-30 370, -30

371, -32

372, -34
-35
372, -36

-40

Figure 46: 1D ground resistivity result for R5 using Res2DINV software

47
Table 13: 1D ground resistivity result for R6 using Res2DINV software

R6
X Y Z
101 -2 563
101 -4 636
101 -6 685
101 -7 683
101 -9 638
101 -11 558
101 -13 476
101 -15 417
101 -17 361
101 -19 304
101 -21 259
101 -22 230
101 -24 214
101 -26 205
101 -28 199
101 -30 193
101 -32 186
101 -34 176
101 -36 166

48
Resistivity (ohm.m)
0
0 100 200 300 400 500 600 700 800
563, -2

636, -4
-5
685, -6

683, -7

638, -9
-10
558, -11

476, -13

-15 417, -15

361, -17

304, -19
Depth (m)

-20 R6
259, -21

230, -22

214, -24
-25
205, -26

199, -28

-30 193, -30

186, -32

176, -34
-35
166, -36

-40

Figure 47: 1D ground resistivity result for R6 using Res2DINV software

49
Table 14: 1D ground resistivity result for R7 using Res2DINV software

R7
X Y Z
101 -2 906
101 -4 907
101 -6 900
101 -7 885
101 -9 867
101 -11 855
101 -13 842
101 -15 812
101 -17 777
101 -19 736
101 -21 687
101 -22 637
101 -24 600
101 -26 582
101 -28 572
101 -30 569
101 -32 565
101 -34 563
101 -36 561

50
Resistivity (ohm.m)
0
0 100 200 300 400 500 600 700 800 900 1000
906, -2

907, -4
-5
900, -6

885, -7

867, -9
-10
855, -11

842, -13

-15 812, -15

777, -17

736, -19
Depth (m)

-20 R7
687, -21

637, -22

600, -24
-25
582, -26

572, -28

-30 569, -30

565, -32

563, -34
-35
561, -36

-40

Figure 48: 1D ground resistivity result for R7 using Res2DINV software

51
Table 15: 1D ground resistivity result for R8 using Res2DINV software

R8
X Y Z
101 -2 1935
101 -4 1891
101 -6 1929
101 -7 1943
101 -9 1855
101 -11 1583
101 -13 1220
101 -15 927
101 -17 772
101 -19 744
101 -21 748
101 -22 752
101 -24 755
101 -26 755
101 -28 756
101 -30 757
101 -32 757
101 -34 759
101 -36 760

52
Resistivity (ohm.m)
0
0 500 1000 1500 2000 2500
1935, -2

1891, -4
-5
1929, -6

1943, -7

1855, -9
-10
1583, -11

1220, -13

-15 927, -15

772, -17

744, -19
Depth (m)

-20 R8
748, -21

752, -22

755, -24
-25
755, -26

756, -28

-30 757, -30

757, -32

759, -34
-35
760, -36

-40

Figure 49: 1D ground resistivity result for R1 using Res2DINV software

53
Table 16: 1D ground resistivity result for R9 using Res2DINV software

R9
X Y Z
101 -2 2525
101 -4 3271
101 -6 3393
101 -7 2942
101 -9 1600
101 -11 754
101 -13 651
101 -15 709
101 -17 859
101 -19 1074
101 -21 1207
101 -22 1245
101 -24 1255
101 -26 1257
101 -28 1259
101 -30 1256
101 -32 1260
101 -34 1260
101 -36 1259

54
Resistivity (ohm.m)
0
0 500 1000 1500 2000 2500 3000 3500 4000
2525, -2

3271, -4
-5
3393, -6

2942, -7

1600, -9
-10
754, -11

651, -13

-15 709, -15

859, -17

1074, -19
Depth (m)

-20 R9
1207, -21

1245, -22

1255, -24
-25
1257, -26

1259, -28

-30 1256, -30

1260, -32

1260, -34
-35
1259, -36

-40

Figure 50: 1D ground resistivity result for R9 using Res2DINV software

55
Table 17: 1D ground resistivity result for R10 using Res2DINV software

R10
X Y Z
101 -2 1819
101 -4 1649
101 -6 1508
101 -7 1284
101 -9 932
101 -11 728
101 -13 716
101 -15 757
101 -17 835
101 -19 941
101 -21 1102
101 -22 1292
101 -24 1447
101 -26 1556
101 -28 1635
101 -30 1684
101 -32 1739
101 -34 1788
101 -36 1833

56
Resistivity (ohm.m)
0
0 200 400 600 800 1000 1200 1400 1600 1800 2000
1819, -2

1649, -4
-5
1508, -6

1284, -7

932, -9
-10
728, -11

716, -13

-15 757, -15

835, -17

941, -19
Depth (m)

-20 R10
1102, -21

1292, -22

1447, -24
-25
1556, -26

1635, -28

-30 1684, -30

1739, -32

1788, -34
-35
1833, -36

-40

Figure 51: 1D ground resistivity result for R10 using Res2DINV software

57
Table 18: 1D ground resistivity result for R11 using Res2DINV software

R11
X Y Z
101 -2 1020
101 -4 1062
101 -6 1125
101 -7 1159
101 -9 1119
101 -11 922
101 -13 657
101 -15 493
101 -17 417
101 -19 398
101 -21 393
101 -22 385
101 -24 375
101 -26 361
101 -28 344
101 -30 324
101 -32 304
101 -34 288
101 -36 280

58
Resistivity (ohm.m)
0
0 200 400 600 800 1000 1200 1400
1020, -2

1062, -4
-5
1125, -6

1159, -7

1119, -9
-10
922, -11

657, -13

-15 493, -15

417, -17

398, -19
Depth (m)

-20 R11
393, -21

385, -22

375, -24
-25
361, -26

344, -28

-30 324, -30

304, -32

288, -34
-35
280, -36

-40

Figure 52: 1D ground resistivity result for R11 using Res2DINV software

59
Table 19: 1D ground resistivity result for R12 using Res2DINV software

R12
X Y Z
101 -2 878
101 -4 854
101 -6 794
101 -7 713
101 -9 621
101 -11 565
101 -13 560
101 -15 597
101 -17 642
101 -19 676
101 -21 711
101 -22 754
101 -24 808
101 -26 870
101 -28 926
101 -30 958
101 -32 1010
101 -34 1087
101 -36 1180

60
Resistivity (ohm.m)
0
0 200 400 600 800 1000 1200 1400
878, -2

854, -4
-5
794, -6

713, -7

621, -9
-10
565, -11

560, -13

-15 597, -15

642, -17

676, -19
Depth (m)

-20 R12
711, -21

754, -22

808, -24
-25
870, -26

926, -28

-30 958, -30

1010, -32

1087, -34
-35
1180, -36

-40

Figure 53: 1D ground resistivity result for R12 using Res2DINV software

61
Resistivity (ohm.m)
0
0 500 1000 1500 2000 2500 3000 3500 4000

-5

-10

R1
R2
-15
R3
R4
R5
Depth (m)

R6
-20
R7
R8
R9
R10
-25
R11
R12

-30

-35

-40

Figure 54: 1D ground resistivity result for R1 to R12 using Res2DINV software

62
6 Conclusion
From the findings of this study, the electrical resistivity models have indicated that the presence
of heterogeneous and irregularity weathering profile with the presence of core boulders varies
in sizes littering the residual soil slope. The presence of discrete and distinctive features such as
the core boulders as inferred from the electrical resistivity results is strongly controlled by the
discontinuities inherited from the main rock and may preserved as the relict discontinuities
which might be quite difficult to be mapped as it is not always visible, and the slope surface is
covered by vegetation and boulders. As observed from all the electrical resistivity models,
moderate resistivity values become the primary electrical resistivity boundaries present in the
models. This finding is true for granitic residual soils in general, where the residual soils are often
in hard state and mainly consist of sand and gravel with the moderate traces of silty to clayey
materials.

In conclusion the electrical resistivity results have managed to provide more meaningful
information in delineating zones of different earth materials which can be correlated to the
different degree of weathering grades. However, boreholes are needed and should be positioned
at an appropriate location to confirm the findings from the electrical resistivity results. Generally,
geophysics is the guide that capable to covers larger section/area and the borehole gave exact
data but confine to a single point observation.

63
7 References

Daniels, F., and Alberty, R.A., 1966. Physical Chemistry. John Wiley and Sons, Inc.

Griffiths D.H. and Barker R.D.,1993. Two-dimensional resistivity imaging and


modelling in areas of complex geology. Journal of Applied Geophysics, 29,
211-226.

Jamaluddin, T. A, 1999. Relict Structures and the Cut Slopes Failures in Highly
Weathered Rocks – The Malaysian Experience. Proceedings 2nd Asian
Somposium on Engineering Geology and The Environment.

Keller G.V. and Frischknecht F.C.,1966. Electrical methods in geophysical


prospecting. Pergamon Press Inc., Oxford.

Koefoed O., 1979. Geosounding Principles 1: Resistivity sounding measurements.


Elsevier Science Publishing Company, Amsterdam.

Lee T.S., 2002. Slope Stability and Stabilization Methods, 2nd ed. John Wiley and
Sons, Inc, New York.

Liu, C., and Evett, J. B., 1992.Soils and foundations. Prentice Hall International.

Loke, M.H., 1999. Time-lapse resistivity imaging inversion. Proceedings of the 5th
Meeting of the Environmental and Engineering Geophysical Society
European Section, Em1.

Loke, M.H., 1994. The inversion of two-dimensional resistivity data. Unpublished


PhD thesis, University Of Birmingham.

Thuro, K and Scholz, M, 2003. Deep Weathering and Alteration in Granite – A


Products of Coupled Processes. GeoPoc 2003.

64
PHOTOGRAPHS

5
MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 1 (BH1) on Progress

Disturb Sample BH 1 at depth 6.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 2 (BH2) on Progress

Disturb Sample BH 2 at depth 9.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 3 (BH3) on Progress

Disturb Sample BH 3 at depth 18.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 4 (BH4) on Progress

Disturb Sample BH 4 at depth 12.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 5 (BH5) on Progress

Disturb Sample BH 5 at depth 27.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 6 (BH6) on Progress

Coring Sample BH 6 at depth 20.20 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 7 (BH7) on Progress

Disturb Sample BH 7 at depth 6.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 8 (BH8) on Progress

Disturb Sample BH 8 at depth 18.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 9 (BH9) on Progress

Disturb Sample BH 9 at depth 12.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 10 (BH10) on Progress

Disturb Sample BH 10 at depth 6.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 11 (BH11) on Progress

Disturb Sample BH 11 at depth 9.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 12 (BH12) on Progress

Disturb Sample BH 12 at depth 9.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 13 (BH13) on Progress

Disturb Sample BH 13 at depth 18.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

Borehole 14 (BH14) on Progress

Disturb Sample BH 14 at depth 3.00 m


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Mackintosh Probes


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Mackintosh Probes


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Mackintosh Probes


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Mackintosh Probes


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Mackintosh Probes


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Stand Pipe BH 1

General view for Stand Pipe BH 2


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Stand Pipe BH 3

General view for Stand Pipe BH 4


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Stand Pipe BH 5

General view for Stand Pipe BH 6


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Stand Pipe BH 7

General view for Stand Pipe BH 8


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Stand Pipe BH 9

General view for Stand Pipe BH 10


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Stand Pipe BH 11

General view for Stand Pipe BH 12


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Stand Pipe BH 13

General view for Stand Pipe BH 14


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Electrical Resistivity


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Electrical Resistivity


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Electrical Resistivity


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Electrical Resistivity


MZ ERAT SERVICES
Projek : GEOTECHNICAL WORKS FOR 25MW SOLAR FARM NEAR UiTM PASIR
GUDANG, JOHOR.

General view for Electrical Resistivity


LOCATION PLAN

6
MP 24 MP 28
BH 5 MP 26
BH 1 MP 25
BH 9

MP 27
MP 23

BH 4
MP 19
BH 11
MP 22 MP 30
MP 29
BH 6 MP 13
MP 20

BH 8
BH 2
MP 17 MP 15
MP 10

MP 21 BH 3 MP 12
MP 18 MP 16 MP 1 MP 5
BH 7 MP' 6 BH 14
BH 10 MP 2 MP 4
MP 8 MP 3
MP 11
MP 14 BH 13
BH 12
MP 9
MP 7
COORDINATE BOREHOLE

Potrebbero piacerti anche