Sei sulla pagina 1di 3

Job No: CBSCL 102 Rev 0

Project : SEC Headquarters Date 1/12/16


Client: Shapoorji Pallonji Designed by AB.SAYED
Office Tower Metal Deck Checked by HN

(Detail-A SD-SS-MW-TW-RF-8098-REV 01.)


SC9 BASE PLATE DESIGN WITH SHEAR KEY CONNECTION bf
b
1-Input data
m
PN= -3388 KN Axial compression
Qx= 4224 KN SHEAR- MAJOR a

Qy= 143 KN SHEAR- MINOR p


d dw 0.95d N
FY= 345 Mpa f yield steel
FC` 45 Mpa concrete copm. Strength a
tbp= 40 mm Base plate thikness m
D= 300 mm shear key length g
G= 25 mm grout thikness n 0.80bf n
B
Shear key dimension Base plate dimension
dw= 600 mm N= 1050
bF= 450 mm B= 500
tf 40 mm dw (column) 800
tw= 50 mm bf (column) 423

Ix= 0.00341 m4 Sx= 0.0113608888889 m3


Iy= 0.00061 m4 Sy= 0.0027240740741 m3

2- Concrete bearing check (major axis)


ɸ= 0.65
A1=bF*(D-G)= 123750 mm2
Pb =1.3 ɸ fc' A1= 4705.594 KN D4.6.2 ACI349-06 >Qx OK
See DG1 pg28
3- Concrete bearing check (minor axis)
ɸ= 0.65
2
A2=dw*(D-G)= 165000 mm
pb =1.3ɸ fc' A2= 6274.125 KN D4.6.2 ACI349-06 >Qy OK
See DG1 pg28
4- Shear key flexure chek (major axis)
ɸ= 0.9
Mux=QY*((D-G)/2+G)= 686.4 KN.m
ɸ Mn = ɸ * fy * sx= 3527.556 KN.m >Mux OK

5- Shear key flexure chek (minor axis)


ɸ= 0.9
Mux=QX*((d-g)/2+g)= 23.2375 KN.m
ɸ Mn = ɸ * fy * sy= 845.825 KN.m >Muy OK

6- Check shear strength (major axis)


Ash (effective shear area)=dw*tw= 0.030 m2
ɸ= 1
ɸ Vn=ɸ*0.6*Ash*fy= 6210 KN Eq(J4-3) AISC >Qx OK

7-Check shear strength (minor axis)


Ashy (effective shear area)=2*(bf*Tf)= 0.036 m2
ɸ= 1
ɸ Vn=ɸ*0.6*Ashy*fy= 7452 KN Eq(J4-3) AISC >Qy OK

8- Check bearing of base plate on concrete


Job No: CBSCL 102 Rev 0
Project : SEC Headquarters Date 1/12/16
Client: Shapoorji Pallonji Designed by AB.SAYED
Office Tower Metal Deck Checked by HN
ɸ= 0.6
A1= 525000 mm2 A2= 1050000 mm2
Pb =0.85ɸfcA1= 12048.75 KN (J8-1) AISC 360-05 >PN OK
pb =0.85ɸfcA1*(A2/A1)^1/2= 17039.51 KN (J8-2) AISC 360-05 >PN OK
Job No: CBSCL 102 Rev 0
Project : SEC Headquarters Date 1/12/16
Client: Shapoorji Pallonji Designed by AB.SAYED
Office Tower Metal Deck Checked by HN
9- Check Base plate thikness
t= 40mm
m=(H-0.95*dw)/2= 145 mm
n=(B-0.8bf)/2= 80.8 mm
Fb=PN/(N*B)= 6.453333 n/mm2
MpL (Moment plate)=Fb*max (m,n)2/2= 67841 N.mm
ɸ= 0.9
ɸ Mn = ɸ * Fy *t2/6= 82800 N.mm >MpL OK
10-Check weld for base plate
2
electrode E70XX FU= 483 n/mm
FW= 0.6 Fexx*(1+sin^1.5Ɵ)= 289.8 n/mm2 (J2-4) AISC 360-05

a- CHCEK FOR Qx
LW= 2588 mm S= 14 mm
Aw= 25616.024 mm2
ɸ= 0.75
ɸRn=ɸ*FW*AW= 5567.643 KN eq(J2-4) AISC 360-05 >Qx, OK

b- CHCEK FOR Qy
LW= 1656 mm S= 14 mm
Aw= 16391.088 mm2
ɸ= 0.75
ɸRn=ɸ*FW*AW= 3562.603 KN eq(J2-4) AISC 360-05 >Qy, OK

11- Check weld for shear key


Use full pentration weld
12- Design of anchors between shear key base plate and column base plate

Potrebbero piacerti anche