Sei sulla pagina 1di 1

4 3 2 1

NOTE: DOUBLE PLASTERBOARD MR NOTE: DOUBLE PLASTERBOARD MR IS


IS REPLACED WITH SINGLE REPLACED WITH SINGLE NOTE: ALL GUESTROOMS & GUESTROOM CORRIDORS & LIFT LOBBIES ON 9TH LEVEL (TOWER B) HAVE ADDITIONAL LAYER OF
PLASTERBOARD MR 15mm THICK IN ACCOUSTIC INSULATION OVER PLASTERBOARD. THICKNESS OF THIS LAYER IS 100-150mm (IN ACCORDANCE WITH ACCOUSTIC
PLASTERBOARD MR 15mm THICK IN
PUBLIC AREAS ON SUBSTRUCTURE PUBLIC AREAS ON SUBSTRUCTURE (AS REPORT).
137.5 (VOID FOR PLUMBING PIPES) (AS PER CONTRACTOR) PER CONTRACTOR)
DRYWALL (AS PER
25 15 AR DESIGN, IN ACCORDANCE PORCELAIN TILES
WITH FIRE-SAFETY & ACOUSTIC ON ADHESIVE
DOUBLE PLASTERBOARD MR 150 REPORT)
ON SUBSTRUCTURE (AS PER
PORCELAIN TILES
DRYWALL (AS PER DESIGN CONSULTANTS
CONTRACTOR) AR DESIGN, IN ACCORDANCE WITH FIRE-
40 ON ADHESIVE SAFETY & ACOUSTIC REPORT). CEILING HANGER
15
25 15 DOUBLE NOTE: FOR PA AREAS DRYWALL IS (AS PER PRODUCER) MARINA PLAZA, LEVEL 10
150 WATERPROOFING (AS PLASTERBOARDS MR ON REPLACED WITH PLASTERED MASONRY
WATERPROOFING
OFFICES 1004/1006, DUBAI UAE
SUBSTRUCTURE (AS PER WALL
PER ARCHITECTURAL
CONTRACTOR) WATERPROOFING (AS PER ARCH. t +971 4 3825200
DESIGN) DESIGN)
(AS PER ARCH.DESIGN) P.O. BOX NO. 112955, DUBAI UAE
WATERPROOFING ACCOUSTIC
WALL TYPE W203
(AS PER ARCH.DESIGN) SEALANT (COLOR TO
INSULATION (AS PER ALUMINUM TRIM www.perkinswill.com
NOTE ABOVE) (COLOR TO BE
BE MATCHED WITH

MIN. 100
CEMENT SCREED MATCHED WITH
ACTUATOR PLATE TILES COLOR) CEILING COLOR)
(SERVICE FOR
(SLOPED)
STRUCTURE & MEP
WATERTANK) CEMENT SCREED
PORCELAIN TILES (SLOPED)
ON ADHESIVE
PORCELAIN TILES 15 1515
FLOOR DRAIN ON ADHESIVE
C (AS PER PLUMBING PLASTERBOARD
C MEINHARDT
DESIGN) MR
PORCELAIN TILES GOLD & DIAMOND PARK, BUILDING 4
ON ADHESIVE SUSPENDED CEILING
UNIT 130, SHEIKH ZAYED RD. DUBAI UAE

35 15

15
SUPPORT

min.25
50
(AS PER PRODUCER) t: +971 4 341 6686 P.O. BOX NO. 38349
CONCEALED
WATERTANK
(AS PER SPECIFICATION) RIGID INSULATION WALL MASONRY (AS
(AS PER ARCH.DESIGN)
LINEAR FLOOR DRAIN
(AS PER SPEC & PLUMBING DESIGN)
PER AR/ID DESIGN) ARCHITECT OF RECORD
DRYWALL OR MASONRY WALL (AS PER PLASTER
AR DESIGN, IN ACCORDANCE WITH RC SLAB INSULATION RIGID INSULATION
FIRE-SAFETY & ACOUSTIC REPORT) (AS PER STRUCTURAL DESIGN) (AS PER (AS PER ARCH.DESIGN) TILES ON
ARCH.DESIGN) ADHESIVE

TYPICAL WET DETAIL - CONCEALED TANK - GR & PA TYPICAL WET DETAIL - FLOOR DRAIN & TANK - GR & PA TYPICAL WET DETAIL - FLOOR LINEAR DRAIN - GR & PA TYPICAL CEILING DETAIL - WET AREA - DR & PA
1 1:5
2 1:5
3 1:5
4 1:5 ALBONIAN CONSULTANT ENGINEERS
25TH FLOOR JULPHAR TOWERS
NOTE: ALL GUESTROOMS & GUESTROOM CORRIDORS & LIFT LOBBIES ON 9TH LEVEL (TOWER B) HAVE ADDITIONAL LAYER OF NOTE: ALL GUESTROOMS & GUESTROOM CORRIDORS & LIFT LOBBIES ON 9TH LEVEL (TOWER B) HAVE ADDITIONAL LAYER OF DAFAN AL NAKHEEL, RAS AL KHAIMAH
ACCOUSTIC INSULATION OVER PLASTERBOARD. THICKNESS OF THIS LAYER IS 100-150mm (IN ACCORDANCE WITH ACCOUSTIC ACCOUSTIC INSULATION OVER PLASTERBOARD. THICKNESS OF THIS LAYER IS 100-150mm (IN ACCORDANCE WITH ACCOUSTIC t: +971 7 228 8641 P.O. BOX NO. 13085
REPORT). REPORT).

PROJECT
ALUMINUM TRIM (COLOR TO BE
MATCHED WITH CEILING PAINT FINISH
TILES ON ADHESIVE .12.
DOUBLE PLASTERBOARD
ON SUBSTRUCTURE (AS
ACCOUSTIC
INSULATION (AS PER
CEILING HANGER
(AS PER PRODUCER)
COLOR)
WATERPROOFING
(AS PER
RAK AMI MOVENPICK
SS METAL SUPPORT
HOTEL & RESORT
PER CONTRACTOR) CEILING HANGER
NOTE ABOVE) (AS PER PRODUCER) ARCH.DESIGN) TO BE FIXED TO
SOLID BLOCKING IN
DRYWALL (AS PER DOUBLE THE DRYWALLS
AR DESIGN, IN SUSPENDED CEILING
PLASTERBOARD MR (AS
ACCORDANCE WITH FIRE- ALUMINUM TRIM SUPPORT
PER MANUFACTURER)
SAFETY & ACOUSTIC (COLOR TO BE MATCHED WITH (AS PER PRODUCER)
MIN.50 25 GLASS DOOR (AS
REPORT) CEILING COLOR) MINERAL WOOL
AS PER AR DESIGN (AS PER PER DOOR
PROTECTION ACCOUSTIC
ACOUSTIC REQ.) SCHEDULE), HINGES
PROFILE (TO BE INSULATION (AS PER 20 TO BE FIXED TO
TAPED AND NOTE ABOVE) PLASTERBOARD METAL THE METAL
SPACKLED) (CEILING FINISH AS SUBSTRUCTURE SUPPORT
PER RC PLAN)

25
(AS PER
SHADOW GAP MANUFACTURES)
10

25
CEMENT SCREED

15
60
TILES 15
RAK AMI HOTEL FZ LLC
GRILLE (AS PER MEP)
100

ON ADHESIVE PLASTERBOARD 50 150


(CEILING FINISH AS

125

140

140
PER RC PLAN) LED STRIP
t: +971 07 2035004

125
150
(AS PER
35 15

LIGHTING PLAN)
www.almarjanisland.com
SUSPENDED CEILING
50

SUPPORT
(AS PER PRODUCER) DRYWALL (AS
PER AR DESIGN)

25
DRYWALL (AS PER AR/ID DESIGN). PAINT FINISH (AS PAINT FINISH (AS
DOUBLE
PLASTERBOARD (AS TIMBER FRAME NOTES
NOTE: IF DRYWALL IS NOT FIXED TO THE CEILING PER WF PLAN) PLASTERBOARD 15 40
RC SLAB (REFER TO THE PER WF PLAN) PER MANUFACTURER)
RC SLAB, IT NEED TO BE ABOVE LEVEL OF (CEILING FINISH AS 1. PROJECT BASE LEVEL ±0.00m IS EQUAL TO +5.500m RAK
STRUCTURAL DRAWINGS)
SUSPENDED CEILING HEIGHT MIN.100MM PER RC PLAN) PAINT FINISH (AS PER SHADOW GAP
DATUM.
WALL FINISHES PLAN)
RIGID INSULATION (AS SUSPENDED CEILING
PER AR DESIGN) SUPPORT SOLID BLOCKING (AS CORNER PROTECTION
(AS PER PRODUCER) PER CONTRACTOR) PROFILE (TO BE TAPED
AND SPACKLED)
TYPICAL GUESTROOM FLOOR DETAIL 02 - DRY AREA TYPICAL CEILING DETAIL - DRY AREA - GR & PA TYPICAL GUESTROOM CORRIDOR CEILING DETAIL TYP. GUESTROOM WET GLASS DOOR DETAIL - PLAN
5 1:5
6 1:5
7 1:5
8 1:5
B B

NOTE: ALL GUESTROOMS & GUESTROOM CORRIDORS & LIFT LOBBIES ON 9TH LEVEL (TOWER B) HAVE ADDITIONAL LAYER OF NOTE: ALL GUESTROOMS & GUESTROOM CORRIDORS & LIFT LOBBIES ON 9TH LEVEL (TOWER B) HAVE ADDITIONAL LAYER OF
ACCOUSTIC INSULATION OVER PLASTERBOARD. THICKNESS OF THIS LAYER IS 100-150mm (IN ACCORDANCE WITH ACCOUSTIC
REFERENCE DRAWINGS
ACCOUSTIC INSULATION OVER PLASTERBOARD. THICKNESS OF THIS LAYER IS 100-150mm (IN ACCORDANCE WITH ACCOUSTIC
REPORT). CEILING REPORT). 1. GENERAL AND STANDARD DETAILS:- I00 SERIES.
HANGER 2. KEYPLANS:- I10 SERIES.
WOODEN PANEL ON SUBSTRUCTURE 3. PLANS & SECTIONAL ELEVATIONS:- I44 SERIES.
(AS PER (AS PER MANUFACTURER)
DOUBLE 4. JOINERY UNIT DETAILS:- I50 SERIES.
PRODUCER) 5. WET AREAS:- I52 SERIES.
DOUBLE PLASTERBOARD (FINISH DOUBLE PLASTERBOARD CEILING HANGER 6. ID DETAILS:- I61 SERIES.
AS PER WF PLAN) PLASTERBOARD (AS PER DOUBLE
(AS PER PRODUCER) 7. DOOR AND PARTITIONS DETAILS:- I62 SERIES.
(FINISH AS PER MANUFACTURER) PLASTERBOARD MR (AS
TILES ON ADHESIVE TIMBER FRAME 8. SCHEDULES:- I64 SERIES.
WF PLAN) PER MANUFACTURER) SUSPENDED CEILING
WATERPROOFING (AS PER ID DOOR
AS PER MANUFACTURER DETAILS) MINERAL WOOL WATERPROOFING SUPPORT
(AS PER ARCH.DESIGN) (AS PER PRODUCER)
(AS PER ACOUSTIC (AS PER
DOUBLE REQ.) 140 ARCH.DESIGN)
PLASTERBOARD MR 350 (AS PER AR)
WALLPAPER SUSPENDED 125 15 ACCOUSTIC
INSULATION (AS PER LED STRIP KEYPLAN
MINERAL WOOL FINISH AS PER CEILING SUPPORT (AS PER LIGHTING PLAN) PLASTERBOARD

min.100
TIMBER DOOR NOTE ABOVE)
(AS PER ACOUSTIC REQ.) SCHEDULE (AS PER (CEILING FINISH AS
(AS PER ID DOOR MANUFACTURER)
20 AS PER PLAN 140 TILES ON ADHESIVE ACCOUSTIC INSULATION PER RC PLAN)
DETAILS)
(AS PER NOTE ABOVE)
GLASS DOOR

25
MIN. 100
40 15 125 125 SELF-LEVELED
CEMENT SCREED
20 15

GRILLE (AS PER MEP) 15 15 20


SS DOOR STOPPER
TILES ON 25 50 150
(TO BE FLOOR TO
ADHESIVE

125
CEILING FIXED WITH

150
SILICON TO WALL) PLASTERBOARD 60

40
(AS PER
20 15 PLASTERBOARD (AS
MANUFACTURER)
PER MANUFACTURER)
175

140

25
ALUMINUM TRIM
35 15

(COLOR TO BE
50

MATCHED WITH SS DOOR STOPPER PLASTERBOARD


TIMBER FRAME CEILING FINIS (FIXED WITH SILICON) DRYWALL (AS PER
(CEILING FINISH AS
COLOR) PER RC PLAN) AR DESIGN)
DOUBLE DOUBLE
PLASTERBOARD PLASTERBOARD
SUSPENDED CEILING
SHADOW GAP 15 mm
WALLPAPER RC SLAB (REFER TO THE TIMBER FRAME SUPPORT ISSUE CHART
CORNER PROTECTION FINISH AS PER STRUCTURAL DRAWINGS) (AS PER PRODUCER)
PROFILE (TO BE TAPED SCHEDULE GLASS DOOR (AS PER DOOR
AND SPACKLED) SCHEDULE)

TYP. GUESTROOM WET GLASS DOOR DETAIL - PLAN TYPICAL GR CON. DOOR TRESHOLD DETAIL TYP. GUESTROOM WET GLASS DOOR HEAD DETAIL TYPICAL GUESTROOM CORRIDOR CEILING DOOR DETAIL
9 1:5
10 1:5
11 12
1:5 1:5

NOTE: ALL GUESTROOMS & GUESTROOM CORRIDORS & LIFT LOBBIES ON 9TH LEVEL (TOWER B) HAVE ADDITIONAL LAYER OF
ACCOUSTIC INSULATION OVER PLASTERBOARD. THICKNESS OF THIS LAYER IS 100-150mm (IN ACCORDANCE WITH ACCOUSTIC
REPORT).
CEILING HANGER (AS
ACCOUSTIC PER MANUFACTURER)
INSULATION (AS PER ALUMINUM TRIM (COLOR TO BE 1 CONSTRUCTION ADDENDUM 1 03-04-2019
NOTE ABOVE) MATCHED WITH CEILING PAINT FINISH
.12. COLOR)
0 CONSTRUCTION 08-11-2018
MARK ISSUE DATE

GLASS PARTITION (AS CEILING HANGER Job Number 390282.000


PER DOOR DETAILS) (AS PER PRODUCER)
Drawn M.F.
STAINLESS STEEL SUSPENDED CEILING
FRAME SUPPORT Checked B.S.
(AS PER PRODUCER)
A A
10

Approved J.M.
PLASTERBOARD MR
WATERPROOFING
(AS PER DESIGN) 20 (PAINTED, AS PER RC
PLANS) TITLE
WATERPROOFING
CEMENT SCREED STAINLESS STEEL
(AS PER ARCH.DESIGN)
(SLOPED) FRAME 37.5x20mm PLASTERBOARD
TILES (CEILING FINISH AS
TILES
PER RC PLAN)
TYPICAL DETAILS
ON ADHESIVE ON ADHESIVE (IN SOME

150
20 CASES TILES WITHIN THE GRILLE (AS PER MEP)
SHOWER ARE RECESSED
150 VARIES (AS PER RCP)

200
FOR 10mm)
LED STRIP
10

(AS PER LIGHTING


GLASS PARTITION
35 15

PLAN)
(AS PER PARTITION
50

DETAILS) WALL (AS PER AR / ID SHEET NUMBER

50
DESIGN)
FINISH ON PLASTER
RC SLAB (AS PER PLASTERBOARD
(AS PER WF PLAN)
STRUCTURAL DESIGN) (CEILING FINISH AS

I61-02
PER RC PLAN) CORNER PROTECTION
PROFILE (TO BE TAPED
SUSPENDED CEILING AND SPACKLED)
SUPPORT
(AS PER PRODUCER)

TYPICAL WET FLOOR DETAIL - GLASS PARTITION - GR & PA TYPICAL CEILING DETAIL - GLASS PARTITION - GR & PA TYPICAL CEILING COVE DETAIL - PA
13 1:5
14 1:5 16 1:5

4 3 2 1

Potrebbero piacerti anche