MEYCO® MP 367 Foam 16/12/05

Highly reactive, two component fire resistant urea-silicate foam for


filling cavities

Product description Technical data


® Colour Viscosity Density
MEYCO MP 367 Foam is a two component, mPa.s kg/litre
solvent-free non flammable urea-silicate foam Component A Colourless 330 1.485
specifically designed for rapid cavity fillings, coal Component B Pale brown 170 1.250
and strata consolidation and water stopping. Tested at 23ºC

Fields of application Flash point: A non applicable, B > 200°C


• Filling cavities in coal and strata Mix. ratio A:B : 1:1 by volume (100 : 85 by weight)
• Consolidation of fractured rock, sands gravels
and coal
• Stabilisation of cavities in tunnels Reaction characteristics:

Features and benefits Testing temp. 30°C


Start of foaming 20s ± 10s
• MEYCO® MP 367 Foam foams without being End of foaming 40s ± 15s
in contact with water. Water has no influence Foam ext. factor 15-25
on the foaming factor.
Foam density 70 kg/m3
• Does not absorb water
• Shows good adhesion to wet substrates
• Very fast reacting material applied where Reaction temperature graph:
foaming speed, flexibility and flame
retardance is required MEYCO MP 367 Foam
100
• Good chemical stability 90

80

70

60
T /°C

50

40
MEYCO MP 367 Foam
30

20

10

0
0

0
20

40

60

80
0

10

12

14

16

18

20

22

24

36

48

60

time /s

Application procedure
Components A and B are delivered ready-to-use.
They are injected in the proportion of 1:1 by
Packaging volume using a two component injection pump
equipped with a static in-line mixer nozzle, as
MEYCO® MP XP367 Foam is available in the shown below.
following packaging:

Component A: 36kg cans, or Special Requirements


240kg drums
Please Note: The foaming reaction time is
Component B: 30.60kg cans, or significantly dependant on the temperature of the
204kg drums resin, the rock and the ground water.
Please store both components prior to application
Special packaging for coal mining available in warm place of at least 15°C
For cleaning of fittings and couplings as well as
single machine components a PU solvent should
be used.

Storage
If stored in dry conditions, in unopened, tightly
closed original containers and within a
temperature range of +5ºC and +35ºC, the
components of MEYCO® MP 367 Foam have a
To achieve the best mixing of the components shelf life of 12 months.
during injection, the inclusion of a static in-line Caution: Component A is frost sensitive!
mixer in connection with the mixing head is
essential. The length of the static mixer should be Safety precautions
approximately 100cm for correct mixing.
Refer to the Material Safety Data Sheet for safety
measures.
Cleaning of injection equipment Avoid contact with skin and eyes by using the
For short breaks in injection, pump only required personal protective equipment, such as
Component A through the in-line static mixer overalls, gloves and eye goggles. If contact with
nozzle. After injection and prior to storage of the skin occurs, wash thoroughly using soap and
equipment, pump clean engine or hydraulic oil water. If contact with eyes occurs, rinse
through the pump and both injection lines (Comp thoroughly with an eyebath filled with clean water
A and comp B). and seek medical advice.
If you leave the equipment for less than a week,
you can leave the injection lines with the product: The cured products are harmless.

Be sure to close the end of the lines with the Uncured products should be prevented from
secure caps. entering local drainage system and water courses.
Spillage must be collected using absorbent
materials such as sawdust and sand, and dispose
of in accordance with local regulations.
The information given here is true, represents our best knowledge and is based not only on laboratory work but also on field experience.
However, because of numerous factors affecting results, we offer this information without guarantee and no patent liability is assumed.
For additional information or questions, please contact your local UGC representative.

Headquarters: Europe: North America:

UGC International BASF Construction Chemicals BASF Admixtures Inc.


Division of BASF (Europe) AG Underground Construction Group
Construction Chemicals (Switzerland) Ltd Vulkanstrasse 110 23700 Chagrin Boulevard
Vulkanstrasse 110 8048 Zurich, Switzerland Cleveland, OH 44122-5554
8048 Zurich, Switzerland Phone +41-58-958 22 11 USA
Phone +41-58-958 22 11 Fax +41-58-958 32 46 Phone +1-216-839 75 00
Fax +41-58-958 32 46 Fax +1-216-839 88 29

Machines/Equipment: Latin America: Asia Pacific:

MEYCO Equipment BASF Construction Chemicals BASF Construction Chemicals


Division of BASF Latin America Asia Pacific
Construction Chemicals (Switzerland) Ltd 23700 Chagrin Boulevard Room 2207, Shanghai Times Square
Hegmattenstrasse 24 Cleveland, OH 44122-5554 93 Huai Hai Zhong Road
8404 Winterthur, Switzerland USA Shanghai 200021, P.R. China
Phone +41-58-958 27 00 Phone +1-216-839 75 00 Phone +86-21-5133 2834
Fax +41-58-958 37 07 Fax +1-216-839 88 26 Fax +86-21-5306 9055

For more information: Visit us: www.ugc.basf.com Contact us: ugc@basf.com

Potrebbero piacerti anche