Sei sulla pagina 1di 18

MEWA DEVELOPERS PVT. LTD.

MIDDLE MEWA HYDROPOWER PROJECT(49MW)
RESOURCES UTILIZATION CHARTS 

1  FOREMAN (SURFACE)

1400 16000

1200 14000

12000
1000

10000
800

HOURS 
HOURS

8000
600
6000

400
4000

200 2000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Surface Foreman Sum of Cum. Surface Foreman
2  SKILLED MANPOWER (SURFACE)

50000 3500

45000
3000
40000

35000 2500

30000
2000
HOURS

25000
1500
20000

15000 1000
10000
500
5000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Surface Skilled Sum of Cum. Surface Skilled
3 UNSKILLED MANPOWER (SURFACE)

7000 90000

80000
6000
70000
5000
60000

4000 50000
HOURS

3000 40000

30000
2000
20000
1000
10000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Surface Unskilled Sum of Cum. Surface Unskilled
4 SURFACE MANPOWERS
7000 90000

80000
6000
70000
5000
60000

4000 50000
HOURS

3000 40000

30000
2000
20000
1000
10000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Surface Foreman Sum of Surface Skilled Sum of Surface Unskilled


Sum of Cum. Surface Foreman Sum of Cum. Surface Skilled Sum of Cum. Surface Unskilled
5 TUNNEL MANPOWERS
4500 100000

4000 90000

3500 80000

70000
3000
60000
HOURS 

2500
50000
2000
40000
1500
30000
1000 20000
500 10000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Tunnel Foreman Sum of Tunnel Skilled Sum of Tunnel Unskilled


Sum of Cum.Tunnel Foreman Sum of Cum. Tunnel Skilled Sum of Cum.Tunnel Unskilled
6 GELATINE/DETONATOR/DETONATING CORD
25000 300000

250000
20000

200000

KG/NOS/M
15000
KG/NOS/M

150000

10000
100000

5000
50000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
Axis Title

Sum of Gelatine Sum of Nonel detonator Sum of Detonating cord


Sum of Cum. Gelatine Sum of Cum. Nonel detonator Sum of Cum. Detonating Cord
7 CEMENT
2000000 35000000

1800000
30000000
1600000

1400000 25000000

1200000
20000000
KG

KG
1000000
15000000
800000

600000 10000000
400000
5000000
200000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Cement Sum of Cum.Cement
8 SAND AND AGGREGATE 
2500 45000

40000
2000 35000

30000
1500
25000
M3

M3
20000
1000
15000

500 10000

5000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Sand Sum of Coarse aggregate 5‐10mm Sum of Coarse aggregate 10‐40mm


Sum of Cum. Sand Sum of Cum. Coarse aggregate 5‐10mm Sum of Cum. Coarse aggregate 10‐40mm
9 MICRO SILICA, STEEL FIBER, PLASTICIZER,ACCELERATOR,EXPANDING AGENT & PLASTICIZER
Thousands 45 1000

Thousands
40 900

35 800
700
30
600
KG/LTR

25
500
20
400
15
300
10 200
5 100
0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Micro Silica Sum of Steel fiber Sum of Plasticizer


Sum of Set accelerator liquid Sum of Set accelerator powder Sum of Expanding agent for grouting
Sum of Cum. Expanding agent for grouting Sum of Cum. Micro Silica Sum of Cum. Steel fiber
Sum of Cum. Plasticizer Sum of Cum. Set accelerator liquid Sum of Cum. Set accelerator powder
10 STEEL REBAR & BINDING WIRE
Thousands 180 3000

Thousands
160
2500
140

120 2000

100
KG

1500
80

60 1000

40
500
20

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Steel rebar Sum of Binding wire Sum of Cum. Steel rebar Sum of Cum. Binding wire


11 PLUM BOULDERS/ UNDRESSED HARDSTONE
1800 7000

1600
6000
1400
5000
1200

1000 4000
M3

M3
800 3000

600
2000
400
1000
200

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Plum boulders Sum of Undressed hardstone Sum of Cum. Plum boulders Sum of Cum. Undressed hardstone


12 PLYBOARD/ROCK BOLT/EXPANSION SHELL/BEARING PLATES
Thousands 40 600

M2/NOS
35
500
30
400
25
M2/NOS

20 300

15
200
10
100
5

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Plyboard Sum of Expansion shell 25mm dia Sum of Rock Bolt D 25


Sum of Bearing plates and bolts Sum of Cum. Plyboard Sum of Cum. Expansion shell 25mm dia
Sum of Cum. Rock Bolt D 25 Sum of Cum. Bearing plates and bolts
13 DRILL BIT, DRILL ROD/ ROCK BOLTS
9000 180000

8000 160000

7000 140000

6000 120000
NOS

5000 100000

4000 80000

3000 60000

2000 40000

1000 20000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Drill Bit‐2 Sum of Drill Steel/ Shank Rod Sum of Rock bolt D25, L = 6 m


Sum of Cum. Drill Bit‐2 Sum of Cum. Drill Steel/ Shank Rod Sum of Cum. Rock bolt D25, L = 6 m
14 SPLICE MS PLATE/NUTS& BOLTS/TIE ROD/GI NIPPLE/ GROUT CAP
6000 120000

5000 100000

4000 80000
KG/NOS

3000 60000

2000 40000

1000 20000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Splice MS plate Sum of Nuts & bolts Sum of Tie Rods 16mm dia at 1m spacing


Sum of GI Nipple Sum of Grout Cap Sum of Cum. Splice MS plate
Sum of Cum. Nuts & bolts Sum of Cum. Tie Rods 16mm dia at 1m spacing Sum of Cum. GI Nipple
Sum of Cum. Grout Cap
15 ISMB 150 H BEAM/ ROCK BOLT D25, L=4M+15CM THREAD
50000 1000000

45000 900000

40000 800000

35000 700000

30000 600000
KG

25000 500000

20000 400000

15000 300000

10000 200000

5000 100000

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of H beam ISMB 150 (H)x 80 (B) @ 14.9kg/m Sum of Rock bolt D25, L = 4 m + 15cm thread
Sum of Cum. H beam ISMB 150 (H)x 80 (B) @ 14.9kg/m Sum of Cum. Rock bolt D25, L = 4 m + 15cm thread
16 BOOMER/COMPRESSOR/GENERATOR/VENTILATION FAN/AIR PIPE/ AIR TANK
2000 30000
1800
25000
1600
1400
20000
1200
HOURS

1000 15000
800
10000
600
400
5000
200
0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Boomer including operation cost Sum of Compressor including operation cost Sum of Generator


Sum of Ventilation Fan Sum of Air pipe, ventilation & water pipe Sum of Air tank
Sum of Cum. Boomer including operation cost Sum of Cum. Compressor including operation cost Sum of Cum. Generator
Sum of Cum. Ventilation Fan Sum of Cum.  Air pipe, ventilation & water pipe Sum of Cum. Air tank
17 HAGGLOADER/DUMP TRUCK
350 4500

4000
300
3500
250
3000

200 2500
HRS

150 2000

1500
100
1000
50
500

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
MONTHS

Sum of Dump truck Sum of Haggloader Sum of Cum. Dump truck Sum of Cum. Haggloader


18 EXCAVATOR‐2,DUMPERS,BATCHING PLANT, CONCRETE PUMP, VIBRATOR
450 1800

400 1600

350 1400

300 1200

250 1000

200 800

150 600

100 400

50 200

0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

Sum of Excavator‐2 Sum of Dumpers Sum of Batching Plant Sum of Vibrator Sum of Concrete pump


Sum of Cum. Excavator‐2 Sum of Cum. Dumpers Sum of Cum. Batching Plant Sum of Cum. Vibrator Sum of Cum. Concrete pump