MANNAR WIND POWER PROJECT

AHEAD INSPECTION REQUEST LIST - Rev -0


Inspection Request List for 3/11/2020 Submitted to : Vestas Wind Sri Lanka Submitted On: 3/10/2020
Involved Field Location Scheduled Date/Time
Contractor/ Responsible
Ref/ no Sub Field Item description 06.00-
Civil/Elec/Mech Zone Element Date officer's name (contact)
18.00 Hrs

Concrete cube Crushing (09.00)

ACC/MWPP/WTG/CON/424 to 428
(7 Days)
ACC/MWPP/ACM/CON/98
(28 Days)
ACC/MWPP/ACM/CON/114
(7 Days)
ACC/MWPP/PT/CON/42
(28 Days)
1 MWPP-ACC-CN-7500 Civil QA Laboratory ACC/MWPP/MA/ CON/76 3/11/2020 9.00 Access Eng/ Anjana
(28 Days) -ME
ACC/MWPP/ADM/CON/65
(7 Days)
ACC/MWPP/GR/CON/27
(7 Days)
ACC/MWPP/GR/CON/21 , 22
(28 Days)
ACC/MWPP/PC/Wall/CON/10
(28 Days)

LAAV testing for ABC Source approval


ACC/MWPP/ABC/Source/LAAV/06 to 10 Access Eng/ Anjana
2 MWPP-ACC-CN-7501 Civil QA Laboratory 3/11/2020 9.00
(09.00) -ME

DCP Testing for Admin building roads Access Eng/ Anjana


3 MWPP-ACC-CN-7502 Civil QA Laboratory 3/11/2020 9.00
(09.00) -ME

4 MWPP-ACC-CN-7503 Civil CN WTG 01 WTG 01 Pile build up work.(P14) 3/11/2020 8.00 Access Eng/ Marlon PE

5 MWPP-ACC-CN-7504 Civil CN WTG 02 .WTG 02 PDA test at 10.00am (P14) 3/11/2020 9.00 Access Eng/ Marlon PE

WTG 02 Sonic logging test at 9.00am


6 MWPP-ACC-CN-7505 Civil CN WTG 02 3/11/2020 21.00 Access Eng/ Marlon PE

7 MWPP-ACC-CN-7506 Civil CN WTG 02 Sonic tube grouting at WTG 02 3/11/2020 8.00 Access Eng/ Marlon PE

8 MWPP-ACC-CN-7507 Civil CN WTG 01 WTG 01-P14 CSL test 3/11/2020 8.00 Access Eng/ Freedon SE

9 MWPP-ACC-CN-7508 Civil CN WTG 01 WTG 01-P14 sonic tube grouting 3/11/2020 8.00 Access Eng/ Freedon SE

3+540 Culvert 1st step concrete


10 MWPP-ACC-CN-7509 Civil CN MACRD 13.00
3/11/2020 7:00 - 19:00 Access Eng/ Freedon SE

3+070 Culvert excavation


11 MWPP-ACC-CN-7510 Civil CN MACRD 8.00
3/11/2020 7:00 - 19:00 Access Eng/ Freedon SE

12 MWPP-ACC-CN-7511 Civil CN MACRD 8+370 Culvert backfilling 3/11/2020 14.00 Access Eng/ Freedon SE

13 MWPP-ACC-CN-7512 Civil CN MACRD 6+878 Culvert backfilling 3/11/2020 10.00 Access Eng/ Freedon SE

ACCESS Road 2 . I)Sub


14 MWPP-ACC-CN-7513 Civil CN ACRD 2 base top layer FD test (0+000 to 0+060) L.H.S. 05.00 3/11/2020 9.00 Access Eng/ Sathira SE
p.m.

ii)Sub grade FD Testing (0+000 to 0+060) L.H.S.


15 MWPP-ACC-CN-7514 Civil CN ACRD 2 10.00a.m.
3/11/2020 10.00 Access Eng/ Sathira SE
iii)Excavation (0+000 to 0+080) R.H.S. 02.00 p.m.
16 MWPP-ACC-CN-7515 Civil CN ACRD 2 3/11/2020 14.00 Access Eng/ Sathira SE

iv)Sub base test (0+400-0+600) R.H.S. 03.00p.m.


17 MWPP-ACC-CN-7516 Civil CN ACRD 2 3/11/2020 15.00 Access Eng/ Sathira SE

Access road sub grade FD 11am Access Eng/ Thanushan


18 MWPP-ACC-CN-7517 WTG 32 Access road embankment FD 5pm
3/11/2020
SE

WTG 33
Access Eng/ Thanushan
19 MWPP-ACC-CN-7518 WTG 33 Crane pad subgrade FD 2pm 3/11/2020
SE
Tower area subgrade FD 5pm

Access Eng/ Thanushan


20 MWPP-ACC-CN-7519 WTG 19 Inspection request for Levelling 3/11/2020
SE

Bachelor accommodation for middle level


Bathroom lintel concreting
14.00
Accommodation Access Eng/Niroshi
21 MWPP-ACC-CN-7520 Civil CN Buildings
3/11/2020
SE

Site accommodation
Floor
Accommodation Access Eng/Niroshi
22 MWPP-ACC-CN-7521 Civil CN Buildings
Concrete 3/11/2020 16.00
SE
16.00

Site accommodation
Accommodation Floor Access Eng/Niroshi
23 MWPP-ACC-CN-7522 Civil CN Buildings Field density
3/11/2020 17.00
SE
10.00

Site accommodation
Sill beams
Accommodation Concrete Access Eng/Niroshi
24 MWPP-ACC-CN-7523 Civil CN Buildings 16.00
3/11/2020 16.00
SE

Married accommodation for


Middle level type 3B
Column build up
Accommodation 2nd stage Access Eng/Niroshi
25 MWPP-ACC-CN-7524 Civil CN Buildings Concrete
3/11/2020 16.00
SE
Grid A4/A5
17.00

Married accommodation for middle level type 3D


Sill beam
Accommodation Access Eng/Niroshi
26 MWPP-ACC-CN-7525 Civil CN Buildings
Concrete 3/11/2020 17.00
SE
10.00

Married accommodation for middle level type 3c


Column build up
Accommodation Access Eng/Niroshi
27 MWPP-ACC-CN-7526 Civil CN Buildings
Concrete 3/11/2020 10.00
SE
Grid A4/A5
10.00

Married accommodation for Executive type 2B


Floor
Accommodation Access Eng/Niroshi
28 MWPP-ACC-CN-7527 Civil CN Buildings
Concrete 3/11/2020 10.00
SE
9.00

Married accommodation for Executive type 2B


Floor
Accommodation Access Eng/Niroshi
29 MWPP-ACC-CN-7528 Civil CN Buildings
Field density 3/11/2020 17.00
SE
16.00

Bachelor accommodation for middle level


Accommodation Floor Access Eng/Niroshi
30 MWPP-ACC-CN-7529 Civil CN Buildings
Field density 3/11/2020 17.00
SE
Grid G-K/1-6
14.00

Bachelor accommodation for middle level


Floor
Accommodation Access Eng/Niroshi
31 MWPP-ACC-CN-7530 Civil CN Buildings
Concrete 3/11/2020 14.00
SE
Grid G-K/1-6
19.00
Bachelor accommodation for workers
Bathroom
Accommodation Access Eng/Niroshi
32 MWPP-ACC-CN-7531 Civil CN Buildings
Lintel 3/11/2020 18.00
SE
Concrete
18.00