STRUCTURAL STEEL / PLATE WORK INSPECTION REPORT


RECORD NUMBER: SS.01 DATE: 25 FEB2015 TIME: 15:33
PROJECT NUMBER: ESCC.01 PROJECT NAME: Coal Mill Feeding Project
UNIT/AREA: 461 SYSTEM: Filter WORK PACKAGE NUMBER: N.A
BUILDING: 461.BF300 DESCRIPTION: Filter Supporting Steel Structure Building Inspection
REFERENCE DOCUMENT NO. REV. NO. REMARKS
1.DWG 7 , 10 0,0 ALEX Steel GA Drawing
2.DWG 13 , 14 0,0 ALEX Steel GA Drawing

ITEM ACCEPT REJECT N/A N.A N.F REMARKS


1. Base plates at correct elevation ( Level Check )
2. Base plates at correct NS & EW location ( Verticality &
Alignment )
3. Column hold down nuts and washers in place and torqued
4. Columns plumb in all directions
5. Horizontal steel framing at correct elevation
6. Bolted connections properly torqued using correct bolting material
7. Plate washers provided to cover long slotted holes as required
8. Weld filler material and completed weldment acceptable
9. Post weld heat treatment complete and acceptable
10. Welding nondestructive examination complete and acceptable
11. Vertical and horizontal bracing complete and properly bolted
12. Exterior siding supports installed correctly
13. Temporary supports and brackets removed from structure
14. Miscellaneous steel (ladders, platforms, etc.) properly installed
15. Grouting completed Need APR
16. Coatings touched up as required
17. Fire proofing repaired as required

CHECKED MEASURMENTS ( HAND WRITING ) DESIGNED ACTUAL TOLERANCE ACCEPT REJECT N/A
1. A
2. B
3. C
4. D
5. E
6. F
7. G
8. H
COMMENTS: The Steel Building columns is ready for release the grout casting ( RIGA ).
The Erected parts only will be marked in the attached DWG.s

PERFORMED BY: AHMAD.Eldagen ROLE : RIGA DATE:

REVIEWED BY: Amr.Mamdouh ROLE : ESCC DATE:

RECIVED BY: PRASAD ROLE : FLS DATE:


PAGE 2 OF 2