Which of following statement is apt for noise factor in a designed experiment, it is a factor that?
Is Not Controlled
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 1/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
What is the RPN number in FMEA with ratings for low-heat temperature failure mode being severity = 9, occurrence = 2
and detection = 1?
18
12
Develop strategies to accelerate and improve current maintenance and reliability performance
All of these
Scheduled
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 2/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
None of these
PdM
Breakdown
Provide necessary input to unit and system-level life cycle cost analyses
Assess the effect of product reliability on the maintenance activity and on the quantity of spare units required for acceptable Ueld
performance of any particular system
All of these
Visual reminders
ZQC
None of these
What can be deduced for FTA an AND gate has four inputs and one output with all four of the input events occurs?
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 3/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
None of these
None of these
Generic
Industry speciUc
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 4/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
Appraisal
Prevention
External failure
Internal failure
Summarization
Sorting
None of these
Validation
What term refers to standards which are part of legally binding contracts, laws or regulations
de jure
de facto
Voluntary
None of these
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 5/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
What is the resulting data called when a test is terminated before all units fail?
Interval Data
None of these
Right Censored
Left Censored
What is the reliability of a device at 12 hours with hazard rate function for a device is given by 0.001 if t <= 10 hours and
0.010 if t > 10 hours ?
0.988
0.97
0.98
0.99
Which maintenance strategy consists of assets being taken o�ine, inspected at periodic, predetermined intervals and
repaired if necessary
None of these
PdM
Breakdown
Scheduled
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 6/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
What can be deduced for FTA an AND gate has four inputs and one output with three of the input events occurs?
None of these
Which of the following is the Urst step in active corrective maintenance as per MIL-HDBK-472
Disassembly
Reassembly
Localization
Interchange
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 7/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
All of these
All of these
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 8/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
How many factors are used to analyze the interference of load and strength distributions
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 9/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
Method
Task
Tools
All of these
Which organization had provided code of ethics, which provides useful guidelines for reliability professional
UN
CERT
ASQ
ISO
None of these
Delay time
Slop Time
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 10/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
Either maximum test time or maximum number of failures are Uxed prior to testing
The maximum accumulated test time is shorter than for a truncated sequential test based on the same parameters
the number of failures and the accumulated test time will exceed those of a similar truncated sequential test
Interference
Experimental Error
Interaction
Correlation
What is derating?
None of these
A Procedure Used In Lathe Operations In Which Feeds And/Or Speeds Are Reduced
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 11/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
use items which are declared and accepted to be representative of production items
provide su唆cient test observations to produce results which are statistically signiUcant or can be assessed in some other way
All of these
Which term refers to whether an estimator tends to either over or underestimate the parameter
Mean
Point estimate
Sampling variability
Bias
None of these
fault avoidance
fault-tolerant
Both of these
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 12/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
All of these
Dedicated sta唆ng
What refers to an understanding of the things that can affect the dependability of a system
None of these
Threat
Reliability
Means
Which of the following refers to a set of values containing, for example, 95% of posterior belief
credible interval
point estimate
None of these
interval estimate
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 13/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
What is P(X & Y) for independent events X and Y with P(X) = 0.25 and P(Y) = 0.35?
0.605
0.5125
0.25
0.0875
All of these
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 14/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
The Set Of Activities For Which Any Increase In Time Required Results In An Increase In Total Project Time
What will be the reliability of the system for a 100-hour mission, the system has three subsystems are reliability-wise in
series, Subsystem 1 has a reliability of 99.5%, subsystem 2 has a reliability of 98.7% and subsystem 3 has a reliability of
97.3%
0.9555
0.9455
0.94
0.95
None of these
Arrhenius
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 15/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
Which data source is used for most reliability predictions of electronic equipment?
Mil-Hdbk-217
Mil-Std-105
Mil-Hdbk-785
Mil-Std-781
How many parts does hazard function comprise of, in a bathtub curve
Which type of data place things in one of two mutually exclusive categories
Nominal
Binomial
Discrete
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 16/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
Which of the following detects the inherent degradation in the reliability of items over the course of production and
involves ongoing sample testing of produced items using tests that may be similar to those used during development to
measure reliability
reliability prediction
None of these
PRAT
How many values are usually assigned for every failure mode identiUed under FMEA?
FMECA
STA
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 17/18
4/17/2020 Maintenance and Reliability Mock Test Vskills Practice Tests
FMEA
What factor affect the accuracy of the actual predicted value by reliability prediction
All of these
SUBMIT TEST
Prev
Next
Questions Index
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
Report This Question
Report error here SUBMIT TEST
Government
Close Submit CertiUcation
CertiUcation valid for life
-Lifelong
©2008 2018 bye-learning access
Vskills.in All Rights Reserved.
Terms
and
Lifelong
Conditions
Practice
| Privacy
Tests access
PolicySiteMap
ProUle
tagging
on Job Portals
Know More
https://www.vskills.in/practice/maintenanceandreliabilitymocktest 18/18