0 valutazioniIl 0% ha trovato utile questo documento (0 voti)
10 visualizzazioni2 pagine
The document is a bill for construction work on site BVM Mangla, Block-E LG (Sitting area Slab and caps). It provides details of quantities and rates for slab area, beams, columns, remaining reinforced concrete walls and caps. The total quantity is 6,271 square feet at a rate of 49 rupees per square foot, for a total amount of 307,255 rupees.
The second section provides material calculations for conducting concrete experiments with 440 concrete cubes. It lists the number of samples needed at various ages for different tests and the resulting cement, water, and admixtures required.
The document is a bill for construction work on site BVM Mangla, Block-E LG (Sitting area Slab and caps). It provides details of quantities and rates for slab area, beams, columns, remaining reinforced concrete walls and caps. The total quantity is 6,271 square feet at a rate of 49 rupees per square foot, for a total amount of 307,255 rupees.
The second section provides material calculations for conducting concrete experiments with 440 concrete cubes. It lists the number of samples needed at various ages for different tests and the resulting cement, water, and admixtures required.
The document is a bill for construction work on site BVM Mangla, Block-E LG (Sitting area Slab and caps). It provides details of quantities and rates for slab area, beams, columns, remaining reinforced concrete walls and caps. The total quantity is 6,271 square feet at a rate of 49 rupees per square foot, for a total amount of 307,255 rupees.
The second section provides material calculations for conducting concrete experiments with 440 concrete cubes. It lists the number of samples needed at various ages for different tests and the resulting cement, water, and admixtures required.
Sr# Description L, W/ft H, T/ft Sides No.s Qty/sft Remarks A. Slab (Gr 47-54) 1 Slab Area irregular shape 3981 Slab 2 Sides Rok 252 0.5 1 2 126 All Sides B. Beams. 1 BSB-31 gr 47 & 54 62.5 1 2 2 250 2 bsb-29 gr 49 55.5 1.5 2 1 166.5 3 BSB 29 2 3 297 33 1.5 4 BSB-26 2 1 187.5 62.5 1.5 5 BSB 29 GR X & Y 2 2 270 45 1.5 6 BSB 30 GR Z 2 1 93 31 1.5 7 Stair beam 2 1 26 13 1 C. Columns & Remaining RC Wall LG 1.5 2.5 2 6 45 1 C-1 Cap B-Wall 0.75 2.5 2 6 22.5 1.5 2.5 2 4 30 2 C2A Cap 1.5 2.5 2 4 30 Center 3 sw cap 4 4 2 1 32 3 RC Wall Cap Front 30 3 2 1 180 F-Wall 4 RC Wall Cap Back 89 3 2 1 534
Total Qty/sft = 6,271
Rate/sft = 49
Total Amount = 307,255
material calcuations for (1:3 ) MATERIAL REQUIRED FOR CONDUCTING EXPERIMENTS No of Cube samples Name of test Number of design Total samples Remarks Sr. No 7 days 28 days 56 days combinations 1 Compressive strength 2 3 3 8 64 2 Flexural strength 2 3 3 8 64 3 Splitting Tensile 2 3 3 8 64 4 Sorptivity 2 3 3 8 64 5 Electrical resistivity 0 8 0 use cubes for flexural strength 6 Freeze and thaw 2 3 3 8 64 7 Acid attack 2 3 3 8 64 use cubes for compressive 8 Water absorption 2 3 2 8 56 strength 9 Microstructural study 440 volume (2"X2"X2" Cubes) 2.16172 Cft dry vol 3.026408 Cft cement (cft) 0.756602 Cft cement 0.6052816 Bags CEMENT Weight 30.26408 KG WTA (.75% of cement) 0.2269806 KG RTA (.75% of cement) 0.2269806 KG Note: Sir I need 0.3 kg WTA & 0.3kg WTA