OPTION 1

CADANGAN MEMBINA DAN MENYIAPKAN


ASRAMA AKADEMIK BOMBA DAN PENYELAMAT TRONOH, PERAK DARUL RIDZUAN

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

Notes :
1. The amount of excavation is given as a provisional
quantity. The actual amount shall be measured by
Meridian Survey and paid by Contractor. The amount
measured shall be final

2. All filled areas to be compacted with 10 ton


vibrating roller in layers not exceeding 230mm thick

3. The filling materials should be approved by the


Engineer. If necessary the suitable material should be
imported or disposed within 10KM radius

B.2 ROAD CONSTRUCTION


Road and Carpark
2.1 Supply, lay, spread and compact (minimum 10 ton
vibratory roller) for the following layer according to
specification including cambered, rolled to fall and
levelled up to the road formation all as per drawings
all in accordance with the specification or as directed
by the S.O.(Rate to include traffic management and
temporary traffic signage during construction):-.

Internal road and Carpark


a) 60mm thick binder course and 40mm thick m2 3,185 34.30 109,245.50
wearing course including a layer of tack coat

b) 300mm thick crusher run as road base material m2 3,185 24.60 78,351.00

c) 50mm thick sand blanket m2 3,185 12.50 39,812.50

Gravel Carpark
Supply, lay, spread 50mm thick sand blanket and
300mm thick compacted approved gravel for gravel
carpark. m2 3,485 12.50 43,562.50

External road
a) 75mm thick binder course and 50mm thick wearing 34.30 138,297.60
course including a layer of tack coat m2 4,032

b) 450mm thick crusher run as road base material m2 4,032 12.30 49,593.60

c) 100mm thick sand blanket m2 4,032 5.20 20,966.40

B - 1/28
OPTION 1

479,829.10
TO COLLECTION RM

CADANGAN MEMBINA DAN MENYIAPKAN


ASRAMA AKADEMIK BOMBA DAN PENYELAMAT TRONOH, PERAK DARUL RIDZUAN

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)
Road Kerbs
2.2 Precast concrete kerb grade 20 c/w discharge opening
together with 230mm concrete pipe at every 5m
interval as per drawing. Prepare and apply one coat
alkali resisting and 2 coats of emulsion paint of black
and white colors alternately at 600mm length to sides m 300 19.10 5,730.00
and on top of kerb

Road Line Marking


2.3 Supply and lay 2 coats of approved thermoplastic
reflective road line paint including clearing surfaces
from dirt, grease, oil or others to edges and centre of m 4,032 17.20 69,350.40
road and parking area

B - 2/28
OPTION 1

75,080.40
TO COLLECTION RM

CADANGAN MEMBINA DAN MENYIAPKAN


ASRAMA AKADEMIK BOMBA DAN PENYELAMAT TRONOH, PERAK DARUL RIDZUAN

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

Road Traffic Signs


2.4 Furnishing and erecting, permanent traffic sign in
accordance with specifications and as shown in the
drawings or as instructed by the Engineer

b) Stop at intersection no 3 250.00 750.00

c) T-Junction no 4 265.00 1,060.00

e) Give way no 1 265.00 265.00

e) Others no 2 270.00 540.00

B - 3/28
OPTION 1

2,615.00
TO COLLECTION RM

CADANGAN MEMBINA DAN MENYIAPKAN


ASRAMA AKADEMIK BOMBA DAN PENYELAMAT TRONOH, PERAK DARUL RIDZUAN

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

Precast Concrete Drain


5.1 In 450mm wide Precast Concrete U-shaped drain not m 115 221.90 25,518.50
exceeding 1.2m deep.

Reinforced Concrete Drain

In 450mm wide reinforced concrete drain not


5.4 exceeding 1.2m deep as per drawing.Rate to include m 15 221.90 3,328.50
Heavy Duty M.S Grating cover.

In 600mm wide reinforced concrete drain not


5.6 exceeding 1.2m deep as per drawing.Rate to include m 70 251.30 17,591.00
Heavy Duty M.S Grating cover.

In 900mm wide reinforced concrete drain not


5.6 exceeding 1.2m deep as per drawing.Rate to include m 30 352.00 10,560.00
Heavy Duty M.S Grating cover.

B - 4/28
OPTION 1

56,998.00
TO COLLECTION RM

CADANGAN MEMBINA DAN MENYIAPKAN


ASRAMA AKADEMIK BOMBA DAN PENYELAMAT TRONOH, PERAK DARUL RIDZUAN

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

Rubbish Trap
5.15 To supply and install rubbish trap at the drainage brick no 20 120.20 2,404.00
sump outlet discharge, compised of 20mm dia. M.S.
bars welded
Precast BoxatCulvert
50mm c/c, 10mm thk x 50mm wide
m.S. plate at 450mm c/c max c/w 13mm dia. Holes,
5.16 Supply,
10mm thk layxand
t5mmfix wide
precast
M.S.reinforced
flat plateconcrete box
to be suit on
culverts
a) 600mm c/w dry
(b) x weather
600mm flow
(h)
site and as per specification. and
not lids.
exceedingRate to
3.5m include
deep m 13 634.20 8,244.60
excavation, get out, part return, fill in and ram, remove
surplus excavated materials from site, 150mm thk
concrete base with one layer of BRC A6 throughout,
200mm thk well compacted hardcore on 50mm thk
sand bedding, concrete copping, 10-20mm gap to be
jointed with cement mortar and etc. as per
specification

10,648.60
TO COLLECTION RM

CADANGAN MEMBINA DAN MENYIAPKAN


ASRAMA AKADEMIK BOMBA DAN PENYELAMAT TRONOH, PERAK DARUL RIDZUAN

BILL B : INFRASTRUCTURE WORKS


AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.6 COVERED WALKWAY


6.1 Construct and complete 3.0M wide (approximately) m 1500 251.21 376,811.10
covered walkway with r.c. footing, RC slabs, RC
apron slab, RC column, RC beam, timber roof
B.7 GUARD RAILS m 0 281.3 -
structures, concrete roof tiles as per drawings. Rate to
include excavation, backfilling, RC concrete,
reinforcement, 150mm thk compacted hardcore on
50mm thk lean concrete, and all necessary strut and
formwork as per detail drawing and accordance to
specification architecture drawings.

B - 5/28
OPTION 1

376,811.10
TO COLLECTION RM

CADANGAN MEMBINA DAN MENYIAPKAN


ASRAMA AKADEMIK BOMBA DAN PENYELAMAT TRONOH, PERAK DARUL RIDZUAN

BILL B : INFRASTRUCTURE WORKS

COLLECTION FOR BILL 'B'

PAGE………………..B - 1/14 RM 479,829.10

PAGE………………..B - 2/14 RM 75,080.40

PAGE………………..B - 3/14 RM 2,615.00

PAGE………………..B - 4/14 RM 56,998.00

PAGE………………..B - 5/14 RM 10,648.60

PAGE………………..B - 6/14 RM 376,811.10

PAGE………………..B - 7/14 RM

PAGE………………..B - 8/14 RM

PAGE………………..B - 9/14 RM

PAGE………………..B - 10/14 RM

PAGE………………..B - 1114 RM

PAGE………………..B - 12/14 RM

PAGE………………..B - 13/14 RM

TOTAL FOR BILL 'B' CARRIED TO GENERAL


RM 1,001,982.20
SUMMARY OF TENDER

B - 6/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

COLLECTION FOR BILL 'B'

PAGE………………..B - 1/14 RM

PAGE………………..B - 2/14 RM

PAGE………………..B - 3/14 RM

PAGE………………..B - 4/14 RM

PAGE………………..B - 5/14 RM

PAGE………………..B - 6/14 RM

PAGE………………..B - 7/14 RM

PAGE………………..B - 8/14 RM

PAGE………………..B - 9/14 RM

PAGE………………..B - 10/14 RM

PAGE………………..B - 1114 RM

PAGE………………..B - 12/14 RM

PAGE………………..B - 13/14 RM

TOTAL FOR BILL 'B' CARRIED TO GENERAL


RM
SUMMARY OF TENDER

B - 7/28
B - 8/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

TO COLLECTION RM
B - 9/28
TO COLLECTION RM

B - 10/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.2 ROAD CONSTRUCTION


Road and Carpark
A Supply, lay, spread and compact (minimum 10 ton
vibratory roller) for the following layer according to
specification including cambered, rolled to fall and
levelled up to the road formation all as per drawings
all in accordance with the specification or a

a) 50mm thick sand blanket M2 34,000


b) 100mm thick sand blanket M2
c) 300mm thick crusher run as road base material M2 27,000
d) 450mm thick crusher run as road base material M2 7,000
e) 60mm thick binder course and 40mm thick M2 27,000
wearing course including a layer of tack coat
f) 75mm thick binder course and 50mm thick wearing M2 7,000
course including a layer of tack coat

Road Kerbs
B Supply and fix complete precast concrete G20 road as M 5,000
per drawings and/or approved design by the local
authorities. Rate to include round opening at every
6m, concrete bedding, setting, jointing, painting, etc
and including discharge pipe to nearest drain/

Road Line Marking


C Supply and lay 2 coats of approved thermoplastic M 1,834
reflective road line paint including clearing surfaces
from dirt, grease, oil or others to edges and centre of
road and parking area

a) Continuity Line M 1,500


b) Give-way Line M 1,000
c) Centre Line M 2,500
d) Edge Line M 5,000
e) Stop Line M 100
f) Pedestrian Crossing (Zebra) M 50
g) Double Line M 1,500
h) Perpendicular / Parallel Parking Line Lot 300
i) Motorcycle Line Lot 50
j) Bus Bay Line Lot 6
k) Arrow No 60
l) Chevron / Ghost Island M 50

TO COLLECTION RM
B - 11/28
TO COLLECTION RM

B - 12/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.2 ROAD CONSTRUCTION (Cont'd)


Road Traffic Signs
D Furnishing and erecting, permanent traffic sign in
accordance with specifications and as shown in the
drawings or as instructed by the Engineer
a) Speed Limit No 5
b) Stop No 5
c) T-Junction No 5
d) No-Entry No 5
e) Others No 20

Road Sign Board


E No 10
To supply and install double sided road sign with
overall height of 1500mm. Rate to include excavation,
backfilling, concrete foundation, formwork and etc,
including M.S. hollow 62.5mm x 62.5mm Galvanised
Hot Dipped (grey finishes).

Concrete Paver Block


F Supply and lay approved pattern by Engineer M2 5,000
interlocking concrete paver block complete with edge
restraint. Rate to include preparation of formation, all
necessary concrete and sand fill.

B.3 WATER RETICULATION


All plumbing works shall be done by registered
plumbing contractor with Authorities and should be
done accordance to Authorities requirement inclusive
submission for approval of forms and fees.

External Water Supply


Service Pipe
A Supply, install and complete the followirng water 860
reticulation pipe from water tank distribute to all
buildings including all pipe cutting, fittings and
necessary accessories (bends, end caps, tees, reducer,
etc). Rate to include trench excavation, backfi

a) 180mm O.D. H.D.P.E. Pipe PN12.5 M 400


b) 315mm O.D. H.D.P.E. Pipe PN12.5 M 600

sluice valve,air release valve, scour valves, valve


chamber c/w cover

TO COLLECTION RM

B - 13/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.3 WATER RETICULATION (Cont'd)


Hydrant Pipe
B Supply, install and complete hydrant pipeof 100mm M 1,200
diameter from water tank distribute to all buildings
including all fittings and necassary accessories (bends,
end caps, tees), excavation and backfilling, r.c. thrust
block and bedding, sluice valve,air re

Pillar Hydrant
C Supply and install pillar hydrant including, flanged No 10
extension pipe, r.c. duct foot bend and all necessary
accessories, excavation and disposal

Pipe Crossing
D Supply and lay M.S Pipe sleeves for crossing the
track/metalled road .
a) 200mm dia. MS Pipe M 50
b) 350mm dia. MS Pipe M 50

Water Meter
E Supply and install water meter including all necessary No 8
jointing and connection and paying all fees and
charges on connection as required by the local
Authorities for the installation

Connection To Existing Pipe


F Supply, install and complete the water reticulation M 600
pipe of 180mm OD H.D.P.E Pipe PN12.5 from
approved SAJH tapping point of watermains to
elevated water tank including all pipe cutting, fittings
and necessary accessories (bends, end caps, tees,
reducer).

Pipe Marker
G Concrete pipe marker at every 50m interval complete No 35
including all excavation and backfilling as detail
shown in the drawing

TO COLLECTION RM

B - 14/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.3 WATER RETICULATION (Cont'd)


Sampling Point
H Supply and install sampling point including all No 2
necessary jointing and connection as required by local
Authority for the installation

Testing & Commissioning


I Supply labour, equipment, hand pump, screw jack, L.Sum
pressure gauge, end cap timber anchor, and all
necessary accessories to conducting testing on all
pipelines as per B.S. 100, including to sterilise and
flushing of pipelines, make good any defect and leave

B.4 SEWERAGE PLUMBING


A Supply, install and lay underground 225mm diameter M 600
VC pipe complete with flexible joint. Rate to include
all necessary accessories (bend, tee), excavation,
embedded in carefully campacted 20mm aggregate
and top compacted carefully with selected backfillin

Manhole
B Supply and construct the following sewer manhole c/w
cover. Ratedepth
a) Manhole to include all necessary
not exceeding 2M depth excavation, No 7
backfilling, precast R.C. chamber,
b) Ditto, exceeding 2M but not exceeding concrete base,
3M depth No 3
heavy duty ductile iron frame and cover, stainless
c) Ditto,
steel stepsexceeding 3M but
and all details not drawing
as per exceeding 4Masdepth
and p No Rate Only
d) Ditto, exceeding 4M but not exceeding 5M depth No Rate Only
e) Ditto, exceeding 5M but not exceeding 6M depth No Rate Only
f) Ditto, exceeding 6M but not exceeding 7M depth No Rate Only

Testing & Commissioning


C Testing of sewer line as per specification (Rate to
include CCTV inspection)

B - 15/28
TO COLLECTION RM

B - 16/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.5 SURFACE WATER DRAINAGE


A Supply and lay the following Approved UPVC
Uniform Perforated Pipes pre-wrap with a layer of
filter membrance c/w a number of non-perforated
joiner laid to gradient in trench, . Rate to including
excavation and backfilling with coarse clean sand,
100mm sa

a) 300mm UPVC Perforated pipe M 3500


b) 450mm UPVC Perforated pipe M 60
c) 600mm UPVC Perforated pipe M 20
d) 750mm UPVC Perforated pipe M 200

Brick sump
B Construct and complete varies type and size of No 70
bricksump c/w mild steel grating cover. Rate to
including excavation and backfilling, concrete base
with reinforcement and plastering to expose surfaces
as per detail drawing.

Rubbish Trap
C To supply and install rubbish trap at the drainage brick No 5
sump outlet discharge, compised of 20mm dia. M.S.
bars welded at 50mm c/c, 10mm thk x 50mm wide
m.S. plate at 450mm c/c max c/w 13mm dia. Holes,
10mm thk x t5mm wide M.S. flat plate to be suit on si

Precast Box Culvert


D Supply, lay and fix precast reinforced concrete box
culverts c/w dry weather flow and lids. Rate to include
excavation, get out, part return, fill in and ram, remove
surplus excavated materials from site, 150mm thk
concrete base with one layer of BRC A6 t

a) 600mm (W) x 450mm (H) M 20


b) 1200mm (W) x 750mm (H) M 20
c) 1200mm (W) x 1200mm (H) M 60
d) 1500mm (W) x 1200mm (H) M 60
e) 1500mm (W) x 1500mm (H) M 110
f) 3000mm (W) x 1500mm (H) M 20
g) 3000mm (W) x 1800mm (H) M 15
h) 3300mm (W) x 1800mm (H) M 10

TO COLLECTION RM
B - 17/28
TO COLLECTION RM

B - 18/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.5 SURFACE WATER DRAINAGE (Cont'd)


Precast Concrete U-Shape Drain
E Supply, layl and complete the following sizes of
precast concrete U-shape drain as per block drain
schedule drawing .
Rate to include the excavation, backfilling, 100mm
thk concrete base (Grade 15), Heavy duty M.S grating
cover, and all others necessasar

a) 700mm(W) x 450mm(D) U-shape Drain M 150


a) 800mm(W) x 500mm(D) U-shape Drain M 50
a) 900mm(W) x 600mm(D) U-shape Drain M 150

Culvert
F Supply and lay r.c. culvert including concrete base and
surrounding, excavation and backfilling works
a) 900mm diameter M 20
b) 1200mm diameter M 20

B.6 TURFING
A Supply and lay turfing with approved turf of not less
than 200mm square and laid at 380mm centers both
ways from approved source. Rate to including all
necessary surface preparation, vegetable soil,
watering, tending, caring, protection and maintenance
a

a) Spot turfing M2 37,300


a) Closed turfing M2 650

B - 19/28
TO COLLECTION RM

B - 20/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.7 FENCING AND GATE


Chainlink Fencing
A Supply and install 2.10M height PVC coated chainlink M 350
fencing in c/w 3 strands of straining wire, mild steel
angle post, r.c. kerbs with 75mm fence embedded in
concrete and all necassary works as per detail drawing

Brick Fence
B Construct one brick thick 2.10M height brick fence M 2,000
complete with plaster and paint on both sides
including all necessary r.c. footing, excavation and
backfilling all as per detail drawing.

Second Entrance Gate


C Supply and install second entrance gate overall size No 2
1500mm x 2100mm high with G.I. Post, r.c. footing,
barrel bolt and all necessary accessories including
painting works

Main Gate
D Supply and install G.I. main entrance gate overall size No 1
6000mm x 2100mm high with G.I. Post, r.c. footing,
barrel bolt and all necessary accessories including
painting works

B.8 RETENTION POND


A Construct and complete retention pond as per L.Sum
MASMA requirement and JPS approval

B.9 RETAINING WALL.


A Supply, construct and complete R.C Retaining Walls M Rate Only
of variable height along the project borders as being
indicated in the layout plan or as instructed by the
Engineer. Rate to include excavation, lean concrete,
formwork, reinforcement bars, concrete G-25,

B.10 RUBBLE WALL


A Supply, construct and complete Rubble Wall of 2,000 M Rate Only
mm height as instructed by Engineer. Rate to include
excavation, lean concrete,concrete strip foundation
c/w formwork, BRC no. 64, concrete G-20,100mm
diameter PVC weepholes at 1000mmcentres both verti

B - 21/28
TO COLLECTION RM

B - 22/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

AMOUNT
BIL DESCRIPTION UNIT QTY RATE
(RM)

B.11 COVERED WALKWAY


A Construct and complete 3.0M wide (approximately) M 300
covered walkway with r.c. footing, RC slabs, RC
apron slab, RC column, RC beam, timber roof
structures, concrete roof tiles. Rate to include
excavation, backfilling, RC concrete, reinforcement,
150mm thk c

B.12 OTHERS
A Other item not mentioned above but necessary to
complete the works

a. ……………………………………
b. ……………………………………
c. ……………………………………
d. ……………………………………
e. ……………………………………

TO COLLECTION RM
B - 23/28
TO COLLECTION RM

B - 24/28
PEMBANGUNAN KOMPLEKS LATIHAN FELDA TANJUNG LEMAN
MUKIM TENGGAROH, MERSING, JOHOR DARUL TAKZIM

BILL B : INFRASTRUCTURE WORKS

COLLECTION FOR BILL 'B'

PAGE………………..B - 1/10 RM

PAGE………………..B - 2/10 RM

PAGE………………..B - 3/10 RM

PAGE………………..B - 4/10 RM

PAGE………………..B - 5/10 RM

PAGE………………..B - 6/10 RM

PAGE………………..B - 7/10 RM

PAGE………………..B - 8/10 RM

PAGE………………..B - 9/10 RM

TOTAL FOR BILL 'B' CARRIED TO GENERAL


RM
SUMMARY OF TENDER

B - 25/28
B - 26/28
Bill Unit Length Width Depth Qtty Note
B1 M2 270 300 81000
M3 270 300 0
M2 270 300 81000
R/O
B2 M2 120 12 1440 entrance
300 8 2400 main road
110 8 880 stp
160 8 1280 tnb
100 8 800 surau
140 50 7000 parking (blok utama)
90 25 2250
60 50 3000 parking (dewan makan)
40 40 1600
60 8 480
21130
M 200 200 entrance
170 170 round about
280 280 parking (blok utama)
80 80
730
M 48 48 entrance
480 480 parking (blok utama)
224 224
352 352
145 145
585 585 parking (dewan makan)
1834
B3 NO 9 9
B6 M2 300 100 30000
300 10 3000
40 40 1600
90 30 2700
90 30 2700
37300
M2 25 5 125
15 10 150
15 15 225
30 5 150
650
53 5 265
26 5 130
23 5 115
15 5 75