Customer: Operator: Project address: Date:

AZURE POWER FORTY PVT ENERPARC ENERGY PVT LTD ASSAM 05/03/2020
LTD.,

Assam Region-1 project

SCADA BUILDING
Assam Region-1 project 05/03/2020

Assam Region-1 project / Content

Content
Assam Region-1 project
Azure
Assam Region -1 project
SCADA buidling
Manager room
Summary................................................................................................................................................................................................. 3
Luminaire layout plan.............................................................................................................................................................................. 4
Manager room 2
Summary................................................................................................................................................................................................. 5
Luminaire layout plan.............................................................................................................................................................................. 6
scada room
Summary................................................................................................................................................................................................. 7
Luminaire layout plan.............................................................................................................................................................................. 8
Security room
Summary................................................................................................................................................................................................. 9
Luminaire layout plan............................................................................................................................................................................ 10
Toilet
Summary............................................................................................................................................................................................... 11
Luminaire layout plan............................................................................................................................................................................ 12

Page 2
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / Manager room / Summary

Manager room

Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.80

Workplane
Surface Result Average (Target) Min Max Min/average Min/max

1 Workplane (Manager room) Perpendicular illuminance (adaptive) [lx] 436 (≥ 500) 354 509 0.81 0.70
Height: 0.750 m, Wall zone: 0.000 m

# Luminaire Φ(Luminaire) [lm] Power [W] Luminous efficacy [lm/W]

2 Philips lighting (China) Investment Co., Ltd. - 3998 36.0 111.0

Total via all luminaires 7996 72.0 111.1

Lighting power density: 18.19 W/m² = 4.17 W/m²/100 lx (Floor area of room 3.96 m²)

Consumption: 200 kWh/a of maximum 150 kWh/a

The energy consumption quantities do not take into account light scenes and their dimming levels.

Page 3
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / Manager room / Luminaire layout plan

Manager room

Philips lighting (China) Investment Co., Ltd.

No. X [m] Y [m] Mounting height [m] Maintenance factor


1 0.525 0.943 3.000 0.80
2 1.575 0.943 3.000 0.80

Page 4
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / Manager room 2 / Summary

Manager room 2

Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.80

Workplane
Surface Result Average (Target) Min Max Min/average Min/max

1 Workplane (Manager room 2) Perpendicular illuminance (adaptive) [lx] 392 (≥ 500) 297 460 0.76 0.65
Height: 0.750 m, Wall zone: 0.000 m

# Luminaire Φ(Luminaire) [lm] Power [W] Luminous efficacy [lm/W]

2 Philips lighting (China) Investment Co., Ltd. - 3998 36.0 111.0

Total via all luminaires 7996 72.0 111.1

Lighting power density: 14.41 W/m² = 3.68 W/m²/100 lx (Floor area of room 5.00 m²)

Consumption: 200 kWh/a of maximum 200 kWh/a

The energy consumption quantities do not take into account light scenes and their dimming levels.

Page 5
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / Manager room 2 / Luminaire layout plan

Manager room 2

Philips lighting (China) Investment Co., Ltd.

No. X [m] Y [m] Mounting height [m] Maintenance factor


1 1.987 0.944 3.000 0.80
2 0.662 0.944 3.000 0.80

Page 6
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / scada room / Summary

scada room

Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.80

Workplane
Surface Result Average (Target) Min Max Min/average Min/max

1 Workplane (scada room) Perpendicular illuminance (adaptive) [lx] 390 (≥ 200) 273 469 0.70 0.58
Height: 0.800 m, Wall zone: 0.000 m

# Luminaire Φ(Luminaire) [lm] Power [W] Luminous efficacy [lm/W]

3 Philips lighting (China) Investment Co., Ltd. - 3998 36.0 111.0

Total via all luminaires 11994 108.0 111.1

Lighting power density: 10.39 W/m² = 2.67 W/m²/100 lx (Floor area of room 10.39 m²)

Consumption: 18 kWh/a of maximum 400 kWh/a

The energy consumption quantities do not take into account light scenes and their dimming levels.

Page 7
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / scada room / Luminaire layout plan

scada room

Philips lighting (China) Investment Co., Ltd.

No. X [m] Y [m] Mounting height [m] Maintenance factor


1 0.825 1.050 3.000 0.80
2 2.475 1.050 3.000 0.80
3 4.125 1.050 3.000 0.80

Page 8
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / Security room / Summary

Security room

Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.80

Workplane
Surface Result Average (Target) Min Max Min/average Min/max

1 Workplane (Security room) Perpendicular illuminance (adaptive) [lx] 198 (≥ 500) 141 250 0.71 0.56
Height: 0.750 m, Wall zone: 0.000 m

# Luminaire Φ(Luminaire) [lm] Power [W] Luminous efficacy [lm/W]

1 Philips lighting (China) Investment Co., Ltd. - 3998 36.0 111.0

Total via all luminaires 3998 36.0 111.1

Lighting power density: 6.08 W/m² = 3.08 W/m²/100 lx (Floor area of room 5.92 m²)

Consumption: 99 kWh/a of maximum 250 kWh/a

The energy consumption quantities do not take into account light scenes and their dimming levels.

Page 9
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / Security room / Luminaire layout plan

Security room

Philips lighting (China) Investment Co., Ltd.

No. X [m] Y [m] Mounting height [m] Maintenance factor


1 1.138 1.300 3.000 0.80

Page 10
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / Toilet / Summary

Toilet

Clearance height: 3.000 m, Reflection factors: Ceiling 70.0%, Walls 50.0%, Floor 20.0%, Maintenance factor: 0.80

Workplane
Surface Result Average (Target) Min Max Min/average Min/max

1 Workplane (Toilet) Perpendicular illuminance (adaptive) [lx] 241 (≥ 500) 196 281 0.81 0.70
Height: 0.750 m, Wall zone: 0.000 m

# Luminaire Φ(Luminaire) [lm] Power [W] Luminous efficacy [lm/W]

1 Philips lighting (China) Investment Co., Ltd. - 3998 36.0 111.0

Total via all luminaires 3998 36.0 111.1

Lighting power density: 12.07 W/m² = 5.01 W/m²/100 lx (Floor area of room 2.98 m²)

Consumption: 99 kWh/a of maximum 150 kWh/a

The energy consumption quantities do not take into account light scenes and their dimming levels.

Page 11
Assam Region-1 project 05/03/2020

Azure / Assam Region -1 project / SCADA buidling / Toilet / Luminaire layout plan

Toilet

Philips lighting (China) Investment Co., Ltd.

No. X [m] Y [m] Mounting height [m] Maintenance factor


1 1.147 0.650 3.000 0.80

Page 12