Things to Remember
*No galvanized wrought iron or Galvanized steel pipe shall be
used underground, it shall be laid 152 mm above ground
*ABS and PVC DWV piping - used in High Rise Buildings
*No Vitrified Clay pipes or fittings for building drain or sewer,
shall be used ABOVE GROUND or when pipe is Pressurized by a pump or ejector
and shall be laid at least 0.30 meter the ground level
*Drainage fittings shall be the same diamter as the pipes it serve
and compatible with it
Exceptions
a. CO may be ommitted when Horizontal drain line is less than
1.5 meters unless serving a Sink or a Urinal
b. CO may be ommitted on a short horizontal drainage pipe installed
at a slope of 72 degrees or less from the vertical line (1/5 bend)
c. An approved two way CO fitting can be installed bet.the Building sewer
or Building drain
d. Additional CO provision exceeding a 135 degree offset angle of direction
e. Each CO shall be installed that it opens on the direction of flow
or at a right angles there to
f. Each CO extension shall be considered as drainage and 90 degrees
CO extension shall be extended from a wye branch
g. CO shall be outside of the interceptor
h. CO installed with cover plate shall be above Grade
i. CO installed on 51 mm piping or less shall have a clearance of 305 mm
in front of CO
*Piping Clearance
51 mm or less 305 mm
larger than 51 mm 450 mm
underground piping 450 mm vertical
750 mm horizontal (wall)