Sei sulla pagina 1di 3

TIME SHEET- March-2020

1. ENGINEER : LOKESH KUMAR

2. CUSTOMER REFERENCE : ELECTRIC LOCO SHED TUGHLAKABAD

3. JOB : SERVICING OF TRACTION CONVERTERS


LOCO
IN
Out NO.
DAY DATE TIME JOB DONE REMARKS
time
TKD Shed changed MRB-2. Air flow checked by shed staff and
09:50 07:00
MON 02.03.20 32294 loco working normally. After testing loco given fit for
AM PM
service.
10:00 06:40 TKD Crimped PEC to PEC link FOC connector as SR was
TUE 03.03.20
AM PM 30443 removed for major schedule.
09:40 07:00 TKD Loco reported for 52/5 contactor flashed. Same contactor
WED 04.03.20
AM PM 37193 is being change.
TKD 37193- Contactor 52/5 changed by shed staff. After that
37193, working checked found normal and given fit for service.
31545 31545- Main power off reported.
09:50 07:15
THU 05.03.20 Found charging failure in both SR. Block mode released
AM PM
and loco working found normal. Checked input side and dc
measurement ckt, same reconnected. Loco given fit for
service.
09:50 07:00 TKD Loco came in schedule. Loco working did not check due to
FRI 06.03.20
AM PM 31788 battery box opened for maintenance.
SAT 07.03.20 No loco – off day

MON 09.03.20 LEAVE


TUE 10.03.20 HOLI FESTIVAL HOLIDAY
WED 11.03.20 LEAVE
THU 12.03.20 LEAVE
NDLS Reported BUR2 isolated. Found VCE fault in phase-2.
11:00 07:00
FRI 13.03.20 37193 Swapped GD card of bur2 with bur1 and calibration done.
AM PM
Loco working normal and given fit for service.
NDLS Attended loco for silent failure case in LC2 V BOT IGBT GE
11:00 07:30 37293 short ckt in SR1. Changed IGBT and GD card in SR1 and
SAT 14.03.20
AM PM redundancy firmware updated in both VCU
repeater/coupler cards. Loco given fit for service.

Lokesh Kumar(Romas) Mohit Sharma (ABB India ltd)


TIME SHEET- March-2020

1. ENGINEER : LOKESH KUMAR

2. CUSTOMER REFERENCE : ELECTRIC LOCO SHED TUGHLAKABAD

3. JOB : SERVICING OF TRACTION CONVERTERS

ANVT 39037- SR2 TM2 temperature sensor fail.


39037,Found loose connection at connector panel sub-D
30229,connector. Same tightened. Checked loco working in
37299 power. MC3 pebb module got bursted in SR2. Loco
booked dead towards home shed GZB.
09:40 10:00
MON 16.03.20 30229- Main power off reported. After downloading data
AM PM
found over current recorded in bur2/bur3. Loco is under
analysis.
37299- Reported both TFP pressure not ok. Checked TFP
pressure values after swapping GD cards of bur2 and bur3,
found low (0.55 to 0.65 bar). Pressure sensor to be check.
ANVT 37299- Found both TFP pump direction was reversed,
30229, same corrected by shed staff. Loco working checked found
37299 normal and given fit for service.
30229- After checking found unloader valve of CP not
09:50 09:00
TUE 17.03.20 working that’s why CP taking more current. On checking
AM PM
found VCU2 Q slot not giving output due to this unloader
not working. Interchanged Q slot with J slot card. After
that loco working checked found normal and given fit for
service.
ANVT 39037- Checked control connection in MC3 pebb in SR2.
09:50 09:00 39037, This found no loose connection but continuity and voltage
WED 18.03.20
AM PM 30715 not available at CT. Reconnected junction connector in
MC3, after that continuity and voltage found.
NDLS Reported bogie-1 isolated. Data downloaded and checked
12:30 07:00 30402 visually found MC1 pebb module was in bursted
THU 19.03.20
PM PM condition. Loco moved towards home shed GZB for
rectification.
TKD Loco reported for MC3 IGBT VCEsat and GD link error in
10:00 06:30
FRI 20.03.20 32237 SR2. SR1 PEC TRAC swapped with SR2 PEC TRAC for MC3
AM PM
GD link error.
12:30 07:00 GZB Fitted two IGBT in MC1 pebb module in SR1 and make
SAT 21.03.20
PM PM 30402 loco healthy.

Lokesh Kumar (Romas) Mohit Sharma(ABB India Ltd)


TIME SHEET- March-2020

1. ENGINEER : LOKESH KUMAR

2. CUSTOMER REFERENCE : ELECTRIC LOCO SHED TUGHLAKABAD

3. JOB : SERVICING OF TRACTION CONVERTERS

MON 23.03.20 No shed visit due to lockdown


TKD Main power off reported due to life sign missing missing
11:00 06:30 32226 from all sub system.
TUE 24.03.20
AM PM Changed both VCU repeater and coupler cards and loco
given fit for service.
WED 25.03.20 No shed visit due to lockdown
TKD 31991- Reported bogie-1 isolated due to LC1 V TOP IGBT
31991, GE short ckt. After checking found LC1 V TOP IGBT was
32169 short. So LC1 V TOP IGBT and GD card changed and loco
10:00 06:30
THU 26.03.20 given fit for service.
AM PM
32169- After schedule checkd found one time MC1 GD link
error recorded in SR2. So checked state machine, found
ok. Loco given fit for service.
FRI 27.03.20 No shed visit due to lockdown
SAT 28.03.20 No shed visit due to lockdown
MON 30.03.20 No shed visit due to lockdown
TUE 31.03.30 No shed visit due to lockdown

Lokesh Kumar (Romas) Mohit Sharma (ABB india Ltd)

Potrebbero piacerti anche