Customer comments Resolution sheet For Drawing 060_JS_402 Not for Client Submiss

Project Ref: IOCLP MEG MIX


Customer: L&T Hydrocarbon
Date: 9/4/2020
Tag No 060_JS_401
Clarification of comments

Comment
Sr.No DOCUMENT TITLE Sulzer Drawing no
Source

1 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

2 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

3 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

4 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

# 000000SULZER CONFIDENTIAL
5 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

6 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

7 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

8 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

9 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

10 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

11 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

12 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

13 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

# 000000SULZER CONFIDENTIAL
14 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

15 L&T IPEG-6389-SIPL(2)-8430-19-060-0002 9053222-002-001

# 000000SULZER CONFIDENTIAL
Closed
Open

# 000000SULZER CONFIDENTIAL
stomer comments Resolution sheet For Drawing 060_JS_402 Not for Client Submission

PM t+F27

Comments by Customer Post Order Engineering reply

Process/technology should give inputs.


We will update input received fron process on drawing.

We need inputs from FEA for this point.


As there is corrosion allowance value for hydrotest in cold and
new condition (MAP) and hot and corroded condition should be
different in FEA Report.
After receiving inputs from FEA we can update those value
according to FEA report on drawing.

Need input from PM, as we have taken this value from submitted
heat treatment and test requirement report sent by PM.
Our suggestion is, 200 degree is safe. Please update in other
report if acceptable.

We will provide CRS on this point to client as below,


As there is crayogenic service, temperature is low and due to that
ice formation on actual nameplate is takes place so we have
provided a additional nameplate over actual. In between those two
nameplate we have provided a wooden block having less thermal
conductivity so reduces chances of ice formation and increases
visibility of nameplate.

# 000000SULZER CONFIDENTIAL
Need inputs from PM/WPS owner.
We have considered penetration+fillet weld there, as thickness of
blind flange is very high and pipe is thickness is comparatively low
it is difficult to provide throughout penetration weld over there.
Please check and provide correct inputs.

We have already provided orientation in plan view, but for more


understanding we will add number to earthing lug in plan.

We will update this dimension on drawing.

We will update this comment.

Need inputs from PM/QA

We can Update after receiving report from FEA as mentioned in


point no 2.

We will update this point.

Already given material number but we will add this note for more
clarification.

We will update wording as mentioned.

# 000000SULZER CONFIDENTIAL
Already provided impact test details in heat treatment details table
however we will add impact test-Yes in parameter tabel as per
comment.

PM to varify ITP no.


PM/manufacturing to arrange submission of painting procedure.

# 000000SULZER CONFIDENTIAL
Status

OPEN

OPEN

OPEN

OPEN

# 000000SULZER CONFIDENTIAL
OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

# 000000SULZER CONFIDENTIAL
OPEN

OPEN

# 000000SULZER CONFIDENTIAL