Sei sulla pagina 1di 1

Diisi oleh Superintenden K3LL dan RSES (Filled by HSE Superintendent & RSES) Foto / Sketsa jika ada

Foto / Sketsa jika ada (Photo or sketch, if any)


CeRMAT [ ] For Statistic Purpose [ ] Register in Synergi No: ___________________
Diisi oleh pelapor (Filled by reporter) [ ] Anomaly [ ] Incident
Uraian (Details) : Potensi Risiko Awal (Initial Potential Risk)

Found the walkway behind HLB Manifold -02 was obstructed by 6 inci Tingkat Keparahan/ Severity Real Severity Potential Likelihood
pipe that crossing the walkway. In case of lack concentration, the Level (1-6) Severity (1-6) (1-6)

worker's head may exposed to risk of being hit by the 6 inchi pipe Cedera Manusia / Human Injury
while moving or threspassing. Extra vigilant needed, Kerusakan Lingkungan/Environment Damage
Kerusakan Finansial/ Financial Loss:
[ ] Production Loss [ ] Material Loss
Media

Tindakan Perbaikan Jangka Pendek (Short Term Mitigation):


Lokasi (Site): CPA - Field Daerah (Area): HLB cluster, M3
Tanggal (Date): 30 September 2017 Jam (Time): 16.00 Close-out Acknowledgement / Pengakuan Penutupan
Tindakan langsung yang dilakukan (Immediate action taken): Description of Action Implemented /
- Issued CERMAT Deskripsi Tindakan yang Dilaksanakan
- Report to hierarcy •
- Take picture for documentation

Risiko Sisa (Residual Risk) •


Tingkat Keparahan/ Severity Severity Likelihood
Level (1-6) (1-6)
STOP Card Issued? [ ] Ya/Yes [ ] Tidak/No Cedera Manusia / Human Injury
Penyebab langsung (Immediate causes): Kerusakan Lingkungan/Environment Damage

Kerusakan Finansial/ Financial Loss:


- Lack of safety awareness [ ] Production Loss [ ] Material Loss
Date / Tanggal :

Media Name of Performing / Nama Pelaksana :


Service / Dinas :
Date: Signature&Name: Signature / Td. Tangan :
RSES recommendations/actions:
*Action Description - Responsible for Action (By) - Target Date :
Saran pencegahan&perbaikan (Suggestion for prevention&improvement): Close-out Acceptance / Penerima Penutupan
l Line supervisor / Penyelia Lini
Date / Tanggal :

- Apply coating or painting at 6 inci pipe by colourful paint, make it


eye catching and visible from the distance Name / Nama :

l Signature / Td. Tangan :

l
Pelapor - Diisi jika diperlukan (Filled if required) RSES - CSR
Nama (Name): Gede Andi Dipayadnya l Date / Tanggal :
Bagian (Entity): CST/OPB Perusahaan (Co.): INCONIS Name / Nama :
Signature / Td. Tangan :
Atasan Pelapor (Line Supervisor) ; M. Sigalingging *Internal Deadline (Estimated date for the case to be closed) :
Bagian (Entity): CST/OPB Td. Tangan (Signature): Date: Signature&Name:

CeRMATi sekeliling anda untuk meningkatkan keselamatan. Do CeRMAT in your surrounding to improve safety. Use CR EP HSE 102 as reference to define severity level of the case

Potrebbero piacerti anche