MEP Department

Schedule of Work Description for Remote Work

Date: 5-April-2020

Work Done Completed (%)


Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

TECHNICAL
Plan 20% 20% 20% 20% 20%
1 Coordination with Site Team
Actual 20% 20%
Plan 20% 20% 20% 20% 20%
2 Review and Comment on Shop drawings Submission
Actual 20% 20%
Normal /Regular Tasks
Plan 20% 20% 20% 20% 20%
3 Coodinating with Consultant
Actual 20% 20%
Plan 20% 20% 20% 20% 20%
4 Supervision of MEP Design BIM Modellers
Actual 20% 20%

Alfallah Mosque Concept design report review. 100%


Hassan Adel TRD13281 Mechnical Engineer

Yacth Crew Club - Design Comments & Clarifciations 50%

Plan 20% 20% 20% 20% 20%


1 RA4034 Waters Edge - 'Basement Coordination SP-01 Part 05
Actual 20%

Normal /Regular Tasks

1 'RA4034 Waters Edge - Attic Slap Drainage WE-10 Actual 50% 50%

Mohammed Mohsin Ahmed TR13478 Electrical-Draughtsman


Incident Tasks

Ongoing / Progressive Tasks

Plan 20% 20% 20% 20% 20%


'RA4034 Waters Edge - 'PART 6 Basement coordination
Actual 20% 20%
Normal /Regular Tasks

Incident Tasks
Mechanical Draftsman
S.Anantha Raja NPC06410

Ongoing / Progressive Tasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

Plan 100% 0% 0% 0% 0%
1 RA4034 Waters Edge - WE-08 Roof Drainage
Actual 100%
Plan 0% 50% 50% 0% 0%
Normal /Regular Tasks 2 RA4034 Waters Edge - WE-09 Roof Drainage
Actual 0%
Plan 0% 0% 0% 50% 50%
3 RA4034 Waters Edge - WE-13 Storm Water Roof Drainage
Actual 0%

Sainulabid melethil NPC06004 Mechanical Draftsman


Incident Tasks

Ongoing / Progressive Tasks

Plan 20% 20% 20% 20% 20%


1 'RA4034 Waters Edge - Basement Coordination Part 01- SP-03
Actual 0% 20%
Normal /Regular Tasks

ARA4045 Al Adlah Quarantine Camp - Update the ICU and POD design as per the given new
1 Actual 30% 70%
inputs from Civil.

Mechanical Draftsman Incident Tasks


Rashid Abdul Rahim NPC06010

Ongoing / Progressive Tasks

Plan 100% 0% 0% 0% 0%
1 RA4045 Al Adlah Quarantine Camp - Decontamination Camp Cabin Design
Actual 100%
Normal /Regular Tasks
Plan 0% 25% 25% 25% 25%
2 RA4034 Waters Edge - RCP Drawing Corridor Building 02 & 03
Actual 0% 25%

GROUND FLOOR WATER'S EDGE SP04 SLAB BUILDER'S WORK 50%

Incident Tasks
Abu Baker Abu Saleh TR13520 Mechanical Draftsman

Ongoing / Progressive Tasks

Plan 20% 20% 20% 20% 20%


1 RA4034 Waters Edge - Basement Coordination Part 01- SP-03
Actual 20% 20%

Normal /Regular Tasks

Sajith pallath babu


Incident Tasks
NPC06533 BIM Modeler

Ongoing / Progressive Tasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Ongoing / Progressive Tasks Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr
Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

Plan 25% 25% 25% 25% 0%


1 RA4034 Waters Edge - Building H1 WE-04 Roof Coordination
Actual 25% 25%
Normal /Regular Tasks
Plan 0% 0% 0% 0% 100%
2 RA4034 Waters Edge -'Building 05 Roof Coordination
Actual 0%

Incident Tasks
Mohamed Abdallah NPC05661 Mechanical Draftsman

Ongoing / Progressive Rasks

Plan 20% 80% 0% 0% 0%


1 RA4034 Waters Edge - Water Supply Roof Drawings
Actual 20% 70%
Plan 0% 0% 25% 25% 50%
Normal /Regular Tasks 2 RA4034 Waters Edge - Rejected CHW Drawing
Actual 0%

Mechanical
Simi Sunil NPC06034
DraftsWoman Incident Tasks

Ongoing / Progressive Rasks

Plan 20% 20% 20% 20% 20%


'RA4034 Waters Edge - Basement As- Build Redline Drawings SP02
Actual 20% 20%

Normal /Regular Tasks

Aboobacker Sidheeque TRD12207 HVAC Draughtsman


Incident Tasks

Ongoing / Progressive Rasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

RA4043 Private Villa - Review and comment on Revised Shop Drawing submittals / Material Plan 20% 20% 20% 20% 20%
1 Submittals for ELV System (upon receipt from subcontractor QA/QC) - considering to be received
on April 5. Actual 0%
Plan 20% 20% 20% 20% 20%
RA4043 Private Villa - Review and comment on Revised Material for ELV System (upon receipt
2
from subcontractor QA/QC) - April 5 Actual 0%
Normal /Regular Tasks
Plan 25% 25% 25% 25%
RA4044 Trojan Labour Camp - Finalize revised quotations for PA System & Lighting Control to
3
prepare Comparison Sheet Actual 25%

Plan 20% 20% 20% 20% 20%


4 'RA4044 Trojan Labour Camp - Coordinate with site team for site works
Actual 20%
Jonas Umipig Bustalinio TRD6888 ELV Technical Engineer
1 RA4045 Al Adlah Quarantine Camp - ICU ELV Design Actual 50%

Incident Tasks

1 Yacht Crew Club - ELV System design updating. Actual 20%

Ongoing / Progressive Tasks

Plan 25% 25% 50% 0% 0%


1 RA4045 Al Adlah Quarantine Camp - update power and loads as per the Al Maha
Actual 0%
Plan 20% 20% 20% 20% 20%
2 RA4039 Golf Place - Prepare for DEWA submission
Actual 20%
Plan 20% 20% 20% 20% 20%
3 RA4039 Golf Place - Coordinate with draftsman for Precast submissions
Actual 20%
Normal /Regular Tasks
Plan 20% 20% 20% 20% 20%
4 RA4039 Golf Place - Boundary wall drawings submission
Actual 20%
Plan 20% 20% 20% 20% 20%
5 RA4044 Trojan Labour Camp Precast update
Actual 20%
Plan 0% 0% 0% 50% 50%
6 Yacht crew club update the light and power
Electrical Project Actual 0%
Jafaru Mohammed NPC06134
Engineer
1 RA4045 Al Adlah Quarantine Camp - 'ICU / Isolation design of light power Actual 50%

Incident Tasks

Ongoing / Progressive Tasks

Plan 25% 25% 50% 0% 0%


1 RA4045 Al Adlah Quarantine Camp - Power and loads as per the Al Maha
Actual
Plan 0% 0% 0% 50% 50%
Normal /Regular Tasks 2 Yacht crew club Light and power update
Actual

1 RA4045 Al Adlah Quarantine Camp - 'ICU / Isolation design of light power Actual 50%

Riyas Thayyil Abdul Asees TRD12933 Draughtsman


Incident Tasks

Ongoing / Progressive Tasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

Plan 50% 50% 0% 0% 0%


1 RA4042 Al Falah - Precast drawing update (Mirror)
Actual 0%
Plan 0% 0% 25% 25% 50%
Normal /Regular Tasks 2 RA4041 Marbella Villa - Precast drawings update
Actual 0%

1 RA4042 Al Falah - Underground coordination drawing Actual 50%

Ilaiyarajalingam Murugesan TR13439 Electrical-Draughtsman


Incident Tasks

Ongoing / Progressive Tasks

Plan 20% 20% 20% 20% 20%


1 Coordination with Site Team
Actual 20%
Plan 20% 20% 20% 20% 20%
2 Review and Comment on Shop drawings Submission
Actual 20%
Normal /Regular Tasks
Plan 20% 20% 20% 20% 20%
3 Coodinating with Consultant
Actual 20%
Plan 20% 20% 20% 20% 20%
4 Supervision of MEP Design BIM Modellers
Actual 20%

Mazen ahmed abdalrsheed algaafary NPC06549 Technical Engineer

Incident Tasks

Ongoing / Progressive Tasks

Plan 50% 0% 0% 0% 0%
1 RA4039 Golf Place - Roof foundation D3S1 & B3S2M
Actual 0%
Plan 0% 100% 0% 0% 0%
2 RA4039 Golf Place - D3S3 Underground coordination and builders work
Actual 100%
Plan 0% 0% 100% 0% 0%
Normal /Regular Tasks 3 RA4039 Golf Place - D3S1 HVAC &COORDINATION
Actual 0%
Plan 0% 0% 0% 100% 0%
4 RA4039 Golf Place - D1S2M FF PRECAST PANELS
Actual 0%
Plan 0% 0% 0% 0% 100%
5 RA4039 Golf Place - D2S2M Underground coordination and builders work
Actual 0%
G. Anup Prakash NPC06148 Mechanical Draftsman

Incident Tasks

Ongoing / Progressive Tasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

Plan 50% 0% 0% 0% 0%
1 RA4044 Trojan Labour camp - Labour Accommodation GF coordination
Actual 50%
Plan 0% 50% 50% 0% 0%
2 RA4044 Trojan Labour camp - Labour Accommodation FF coordination
Actual 0%
Normal /Regular Tasks
Plan 0% 0% 50% 50% 0%
3 RA4044 Trojan Labour camp - Labour Accommodation SF coordination
Actual 0%
Plan 0% 0% 0% 0% 50%
4 RA4043 Private Villa - Pump Room Coordination
Actual 0%

Revit Bim Modeller -


Mustafauddin Mohammed TR13431
MEP
Incident Tasks

Ongoing / Progressive Tasks

Plan 100% 0% 0% 0% 0%
1 RA4039 Golf Place - Roof foundation D2S1& D2S1M
Actual 100%
Plan 0% 100% 0% 0% 0%
2 RA4039 Golf Place - Roof foundation D3S1-M & D3S2
Actual 0%
Plan 0% 0% 100% 0% 0%
Normal /Regular Tasks 3 RA4039 Golf Place - Roof foundation D3S3 & D3S2-M
Actual 0%
Plan 0% 0% 0% 100% 0%
4 RA4039 Golf Place - Roof foundation D3S3 -M
Actual 0%
Plan 0% 0% 0% 0% 100%
5 RA4039 D3S3-M Underground coordination and builders work
Actual 0%
Kaleel Chigananth TR13472 Mechanical Draftsman

Incident Tasks

Ongoing / Progressive Tasks

Plan 70% 0% 0% 0% 0%
1 RA4044 Trojan Labour camp - Staff accommodation Under Ground Drainage
Actual 70%
Plan 0% 100% 0% 0% 0%
2 RA4044 Trojan Labour camp - Staff accommodation FF Drainage
Actual 0%
Plan 0% 0% 100% 0% 0%
Normal /Regular Tasks 3 RA4044 Trojan Labour camp - Staff accommodation SF Drainage
Actual 0%
Plan 0% 0% 0% 100% 0%
4 RA4044 Trojan Labour camp - Staff accommodation RF Drainage
Actual 0%
Plan 0% 0% 0% 0% 100%
5 RA4044 Trojan Labour camp - Staff accommodation SF WS
Actual 0%
Basheer Poovathu TR0334 Mechanical Draftsman

Incident Tasks

Ongoing / Progressive Tasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

Plan 20% 20% 20% 20% 20%


1 Coordination with Site Team
Actual 20%
Plan 20% 20% 20% 20% 20%
2 Review and Comment on Shop drawings Submission
Actual 20%
Normal /Regular Tasks
Plan 20% 20% 20% 20% 20%
3 Coordination with Site Team
Actual 20%
Plan 20% 20% 20% 20% 20%
4 Supervision of MEP Draughtsman
Actual 20%

1 RA4041 Marbella Villa-Insulation order review Actual 100%

Mechanical Project
Fayyaz Qureshi NPC05692
Engineer Incident Tasks

Ongoing / Progressive Rasks

Plan 30% 35% 30% 0% 0%


1 RA4041 Marbella Villa-External Manhole Coordination for Master Plan
Actual 30%
Normal /Regular Tasks
Plan 0% 0% 0% 50% 50%
2 RA4041 Marbella Villa - Cluster 15 U/G Builders Work Drawings
Actual 0%

1 RA4041 Marbella Villa-Cluster 2 Slab on grade drawings Actual 50%

Incident Tasks
Taufeeque Aghafoor Kazi TRD12871 Draughtsman

Ongoing / Progressive Rasks

Plan 50% 50% 0% 0% 0%


1 RA4041 Marbella Villa-First Floor revised Precast Panel
Actual 50%
Plan 0% 0% 100% 0% 0%
Normal /Regular Tasks 2 RA4037 EDA- External manhole clashing checking with car parking shade foundation
Actual 0%
Plan 0% 0% 0% 50% 50%
3 RA4041 Marbella Villa-Cluster 11 Slab on grade drawings
Actual 0%

1 RA4041 Marbella Villa-First Floor revised Hollow core slab builders work Actual 100%

Nobert Cloud Xavier TRD13072 Mechanical Draftsman


Incident Tasks

Ongoing / Progressive Rasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

Plan 20% 20% 20% 20% 20%


1 RA4039 Golf Place - Light Drawings update
Actual 20%
Normal /Regular Tasks
Plan 20% 20% 20% 20% 20%
2 'RA4039 Golf Place -Prepare for DEWA submision
Actual 10%

1 RA4039 Golf Place - Kitchen elevation drawings submission Actual 100%

2 RA4041 Marbella Villa - Updating Furniture layout as per commnets Actual 100%

Incident Tasks
Hussain Helmi TRD12851 Electrical Draughtsman

Ongoing / Progressive Rasks

Plan 50% 50% 0% 0% 0%


1 RA4039 Golf Place -'Boundary wall drawings submission V125 ,126,127,129
Actual 50%
Plan 0% 0% 50% 50% 0%
Normal /Regular Tasks 2 'RA4039 Golf Place -Boundary wall drawings submission V 119, 120, 121, 179
Actual 0%
Plan 0% 0% 0% 0% 100%
3 RA4039 Golf Place -Boundary wall drawings submission V 180,222
Actual 0%

Aboobakar Siddik Kannadka TRD12899 Electrical Draughtsman


Incident Tasks

Ongoing / Progressive Rasks

Plan 25% 25% 50% 0% 0%


1 RA4044 Trojan Labour Accommodation - Precast Drawings Panel submission
Actual
Plan 0% 0% 0% 50% 50%
Normal /Regular Tasks 2 RA4044 Trojan Labour Accommodation - Shop Drawings Prerations
Actual

RA4044 Trojan Labour Accommodation - Underground electrical coordination of Staff


1 Actual 70%
accommodation
Jamshin Mohamed TRD13430 Electrical Draughtsman
Incident Tasks

Ongoing / Progressive Rasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

Plan 100% 0% 0% 0% 0%
1 RA4044 Trojan Labour Camp - Staff accomidation HVAC , Ventilation Rectifing Comments
Actual 60%
Plan 0% 50% 50% 0% 0%
Normal /Regular Tasks 2 RA4044 Trojan Labour Camp - Staff accommodation GF Floor H/L Coordination
Actual 0%
Plan 0% 0% 0% 50% 50%
3 RA4044 Trojan Labour Camp - Staff accommodation FF Floor H/L Coordination
Actual 0%

Mechanical Draftsman
M.D.jameel TR0487
Incident Tasks

Ongoing / Progressive Rasks

Plan 100% 0% 0% 0% 0%
1 RA4044 Trojan Labour Camp - Staff accommodation GF Floor WS work
Actual 0%
Plan 0% 100% 0% 0% 0%
2 RA4044 Trojan Labour Camp - Staff accommodation FF Floor WS work
Actual 0%
Normal /Regular Tasks
Plan 0% 0% 100% 0% 0%
3 RA4043 Private Villa - Basement Floor Quantity from revit
Actual 0%
Plan 0% 0% 0% 50% 50%
4 RA4044 Trojan Labour Camp - Staff accommodation GF Floor panels builders work
Actual 0%

Javid Ali Mohammed NPC06503 BIM Modeler

Incident Tasks Note: Network sharing folder not working (Emailed already to IT Support)

Ongoing / Progressive Rasks

ESTIMATION
T-982 Family Development Foundation Headquarter - 'Review the Specifications and Preparing for Plan 100% 0% 0% 0% 0%
1
Pricing Actual 100%
T-982 Family Development Foundation Headquarter - Pricing Plumbing System (Water Supply- Plan 0% 70% 30% 0% 0%
2
Drainage- Sanitaryware) and Comparing the Specs with Received Quotation) Actual 0%
Normal /Regular Tasks Plan 0% 0% 70% 30% 0%
T-982 Family Development Foundation Headquarter - Pricing FDF HVAC System and Comparing
3
the Specs with Received Quotation) Actual 0%
Plan 0% 0% 0% 0% 100%
T-982 Family Development Foundation Headquarter -Finalizing Pricing and Supporting Team with
4
Guggenheim Musuem Take off and preparing Documents with Revising The tender Clarifications Actual 0%

Ahmed Tawfeek TRD3852 Mechanical Engineer

Incident Tasks

Ongoing / Progressive Rasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

Plan 100% 0% 0% 0% 0%
1 Car Wash Building Project - Review of the Tender and Addendum Documets
Actual 100%

Car Wash Building Project - Design and Quantity Takeoff of Water Supply Services as per Specified Plan 25% 75% 0% 0% 0%
2
Specifiactions for Actual 25%
Car Wash Building Project - Design and Quantity Takeoff of Drainage Services as per Specified Plan 0% 25% 75% 0% 0%
Normal /Regular Tasks 3
Specifiactions Actual 0%
Plan 0% 0% 100% 0% 0%
4 Car Wash Building Project - Quantity Takeoff of Sanitaryware as per Specifiactions
Actual 0%
Plan 0% 0% 0% 50% 50%
5 T-974 Guggenheim Museum - Quantity Takeoff of Water Supply Equipment
Jr.Mechanical Engr. Actual 0%
Abdul Mannan TRD13206
Estimator

Incident Tasks

Ongoing / Progressive Rasks

Plan 100% 0% 0% 0% 0%
1 Car Wash Building project - Review documents of the
Actual 100%
Car Wash Building project - Review of the Tender addendums and compare with Tender Plan 100% 0% 0% 0% 0%
2
documents Actual 100%
Plan 30% 70% 0% 0% 0%
Normal /Regular Tasks 3 Car Wash Building project - Design the HVAC system
Actual 30%
Plan 0% 50% 50% 0% 0%
4 Car Wash Building project - 'Take off quantity of HVAC System
Actual 0%
Plan 0% 0% 0% 50% 50%
5 T-974 Guggenheim Museum - Take off Fan Coil Units quanitiy of equipment
Actual 0%
Mohammed Abualila TRD12996 Jr. QS Mechanical

Incident Tasks

Ongoing / Progressive Rasks

Plan 25% 20% 20% 20% 15%


1 T-974-20 Guggenheim Museum - Power
Actual 15%
Plan 100% 0% 0% 0% 0%
Normal /Regular Tasks 2 T-982-20 Family Dev't Foundation HQ - CCTV & Access Control
Actual 100%

1 T-982-20 Family Dev't Foundation HQ - 'Sending Enquiry Actual 100%

Sreeji Sreelal TR13621 Jr. QS Electrical


Incident Tasks

Ongoing / Progressive Rasks


Work Done Completed (%)
Name ID Designation Task Category Sr. Work Description
Status 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr

QS
Plan 25% 20% 20% 20% 15%
1 Review Payment Certificates for multiple project assign to me
Actual 20%
Plan 20% 20% 20% 20% 20%
2 Follow up with Site Teams of Payment Update
Actual 10%
Plan 25% 20% 15% 20% 20%
3 Assisting variations for Engr. Aldrin
Actual 0%
Normal /Regular Tasks
Plan 20% 20% 20% 20% 20%
4 Follow up with subcontractors for Tax Invoice & required documents
Actual 5%
Plan 15% 20% 25% 20% 20%
5 Mudon & Mira projects - 'Provide resource codes to Petty Cash
Actual 0%
Plan 10% 20% 20% 25% 25%
Abdul Aziz Abdul Hameed TR13620 Jr. QS 6 RA4022 Palm Tower - Prepare Payment Certificates
Actual 0%

Incident Tasks

Ongoing / Progressive Rasks

Plan 20% 20% 20% 20% 20%


1 Review Payment Certificates for multiple project assigned to me
Actual 20%
Plan 20% 20% 20% 20% 20%
2 Review, provide CCS codes for material/s order for EDA & Private Villa
Actual 20%
Plan 20% 20% 20% 20% 20%
3 Prepare subcontract payment certificate for EDA & Private Villa
Actual 20%
Coordinate with the purchase department to finalize the comparison sheet to create LPO in Plan 20% 20% 20% 20% 20%
4
Buildsmart Actual 10%
Normal /Regular Tasks
Plan 20% 20% 20% 20% 20%
5 Providing CCS code to commercial department in creating PO in build smart
Actual 10%
Plan 20% 20% 20% 20% 20%
6 EDA & Private Villa project - Prepare budget transfer
Actual 10%
Plan 20% 20% 0% 0% 0%
Sahar Elsayed NPC06411 QS - Electrical 7 Prepare monthly provision for Month of March
Actual 20%
Plan 20% 20% 20% 20% 20%
8 RA4037 EDA - 'Prepare Variation
Actual 10%

Incident Tasks

Ongoing / Progressive Rasks