SITI NOR SHAHIRAH BINTI SHAHROL ANUAR

2019802314
AP 247 5A
SEMESTER MARCH – JULY 2020
THE RESOURCES THE OBJECTIVES

• Construction • To ensure adequate and


equiptments timely supply of resources
• Finance THE DEFINITION • Maximizes the utilisation
• Facilities of resources between
• Humans • The process of planning the projects.
• Materials & Supplies resources necessary to meet the
• Time objectives of the project & the
client’s requirements.
to consider

• Time Management
• What is needed In terms of
• Human resources
• What is available
management
• Where it is located
• Budget Management
• Process of organising and implementing a strategy
DEFINITION related to the time required for work activities on a
project.

• To ensure works are • To determine necessary


completed in a way that  Resources
optimises  Durations
 Cost OBJECTIVES  Procedures
 Timeframe
 Quality

THE METHODS OF TIME MANAGING


WBS
WORK BREAKDOWN SCHEDULES • Illustrates tasks
STRUCTURE
• Records significant
Timeline events in the projects
• A hierarchical tree structure • Used in designating a task to be chart • States how often/how
that outlines project and executed in line with project
breaks it down into smaller, objectives can it be done
more manageable portions. • Consists of a lists of outputs • Can be negotiated
• To make a large project more with predetermined time and agreed. Example of WBS (Work Breakdown Structure)
manageable limit. Gantt
• Calendars can be used
• Contains each important tasks chart
that is to be carried out. for recorning and
plannig functions.
THE STEPS OF CREATING SCHEDULES

• Finish to Start
(1) • Finish to Finish
ESTABLISH
DEPENDENCIES • Start to Start

• Start to Finish

(2)
• Discover resources required to carry out the task
ASSIGN RESOURCES
• Based on the availability of the resources, the
schedule may be adjusted according to time. TO OBLIGATIONS

• Input the work effort/duration for


(3) every project
CREATE THE • Arranging tasks and calculate the
SCHEDULE very last date for the undertaking.
• Verifications and adjustment of the
scheduling.
THE TECHNIQUE IN TIME MANAGING

ACCELERATIONS FAST TRACK RESOURCE LEVELLING

- To accelerate the progress of - Reduce overall duration of projects - Limited resources is accommodated
works. by overlapping tasks. by adjusting the project programme.
- To meet new requirement - Whilst the same number of tasks - To analyse the variations in
need to be performed, they are resource usage that can occur over
• Accomodating aditional works
condensed into a shorter period. time.
• Bring forward completion date
• Reduction in scope of work
• Changes in design
DEFINITION • Process of managing people within an organisation.

OBJECTIVES

• To ensure that a project has


sufficient human resources,
with correct skill-sets and
experience.

Human Resource Responsibility


Plan Assign Matrix
Organizational
Chart
Roles &
Responsibilities

Safety
Competence

Recognitions
& Awards

Human Authorities

Training
Resource Organizational
Needs
Plan Chart

Compliance Staff
Management
Plan
Staff
Acquisition Human
Resource
• A document that highlights the role and • A document that shows the relations
& Release
Plan Calendar responsibilities of the team and each between work packages or project
person comprising it. activities and the project team.
• Features work breakdown structure • Tasks & activities concerning a specific
• Creates a system on how the human that has a definite owner and clear person/team are established as a guide.
resources will be staffed, managed, understanding of their respectives roles • Uses RACI method – Responsible,
and released. and responsibilities. Accountable, Consult, and Inform.

1) HUMAN RESOURCE PLAN 2) ORGANIZATIONAL CHART 3) RESPONSIBILITY ASSIGN


MATRIX (RAM)
CIOB CODE OF PRACTICE FOR PROJECT
MANAGEMENT
DEFINITION • Quantification of resources needed to achieve a task by a
set of time, within which the task owners are required to
work.
• Consist of
 Financial/quantitative statement
 Prepared and approved prior to a defined period

RIBA PLAN OF WORK,2013


• Client’s budget for the project.
Construction cost
Land/property acquisition
Approvals fees • To allocate the budget to the main elements of
COST CONTROL

Planning costs the project to provide a basis for cost control.


Financing costs • To manage the delivery of the project within
the approved budget.
Site investigations
• Includes as following:
Fixtures, fittings, equiptments  Estimation of cash flows for the project
Decanting/Relocate/Staff moving  Set targets for future running costs
Insurance  Cover all stages of the project
Consultance fees  As referrence against which project costs
Inflations
are managed.
contigency
1) BUDGET MANAGEMENT SHOULD INCLUDE THE FOLLOWING TASKS.

Oversee contractor Determine true cost


Analyze project
Develop a total in performance of and time parameters
requirements and
project budget as detailed line item for obtaining all
drawings to verify
early as possible construction project jurisdictional
scope
cost estimate approvals

Prepare soft cost Analyze utility, Allocate sufficient


Establish FF&E
budget including all permitting, testing contingency and cost
design and budget
consultants and inspection costs escalation

Oversee value- Implement ongoing


Determine and
engineering and controls for real-
analyze cash flow
improvements in time trackig of cost
requirements
cost and schedule impacts
2) BUDGET PLANNING.

Determination Of Vendor Bid Reseve Analysis Cost Of Quality


Resource Cost Rates Analysis • Putting some money aside • Tracking the amount of
• Firgure out what the rate for labour • Evaluating the in case of overruns. money of activities that
and materials will be. contractor’s bids and needs.
choosing the one that will
be accepted.

3) ESTIMATING COSTS.

Analogous Parametric Bottom-Up Activity-Based


Estimate Estimate Estimating Estimates
• An estimates that based on • Using factors like size and • The most accurate & time- • Detailed estimates from all
other project estimates. locations (Average cost per consuming method. sources can be organized.
• Less-experience managers sqft of a building & • Identify the cost of each • The detailed cost estimation
can use DCPI to identify adjustments for local labour item in each activity of the can be sorted and
projetcs that have similar costs) schedule, including labour subtotaled by activity to
profiles to the project under • Calculated by multiplying and materials. determine the cost for each
consideration. measured parameters by activity.
cost-per-unit values.
4) MANAGING BUDGET
Managing Cash Flow Contingency Reserves Management Reserves Evaluating Budget during
•Making sure that there is enough •Money is used for dealing with •The money that is needed for Project
amount of funding for the project. unexpected bit statistically improvements of the project,, that •Comparing the amount of money
predictable cost increases. will change the scope of the project. spent with the budgeted amount and
report the information.

Earned Value Analysis Schedule Variance Estimated Cost to Estimate Final Project
•Periodically comparing the budgeted •The difference between planned and Complete the Project Cost
costs with the actual costs during the actual progress of the projects. •Evaluates the accuracy of the cost •The estimation that is done whenever
project. estimates for the activities that have the costs of activities up to the
taken place and uses that experience present vary from the original
to predict how much money it will estimations.
take to complete the unfinished
activities.

5) ESTABLISH BUDGET

• A schedule of money transfers is created to match the need


Budget of pay for the actitivies done in the project.
Timeline • The process of matching the schedule of transfers with the
schedule of activity payments.
https://www.designingbuildings.co.uk/wiki/Resource_management_in_construction

https://www.designingbuildings.co.uk/wiki/Scheduling_construction_activities

https://www.consysa.com/forum/pages/project-management-schedule

https://constructionprojectmanagementpro.com/human-resource-management-for-construction-project/

https://www.designingbuildings.co.uk/wiki/Budget_for_building_design_and_construction_projects

https://www.designingbuildings.co.uk/wiki/Budget_for_building_design_and_construction_projects

THANK YOU.