Sei sulla pagina 1di 21

www.daehosystem.co.

kr

Venture Business

FACTORY AUTOMATION DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr

DAEHO SYSTEM !

 The FA professional enterprise which


14 has an experience
Trust  The project observes the development
tutorial which is standardized
Responsibility  Safety it develops the solution with
first priority
Sincerity  The project accepts a customer needs
with the best
 The manpower which has a varied
experience and the skill
Daeho System competitive powers

Control of Control of Control of Control of


Control of Robot
Car-body Line semiconductor equip’t Industrial Machinery vessel electricity

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr

Business Strategy

VISION TARGET

FA development enterprises The solution of the top


of top which is stable

POLICY
Trust Speciality
Responsibility 1. Quality realization of customer satisfaction Variety
Sincerity 2. Technical development and solution establishment Excellence
3. Realization of organizational culture

Quality Production Cost Delivery Service


Control Control Control Control Support

Solution of DAEHO SYSTEM

Provides a customer satisfaction and a responsible quality

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr

Contents

Company Profile
1 Company Introduction Company History
Organization & Capability
Major Facilities

2 Success Story
DAEHO Success Story

3 Major Production Control of Car-body Line


Control of Robot
Control of Semiconductor Equip’t
Control of Industrial Machinery
4 Daeho System Control of Vessel Electricity

Main Technology
Business Process
5 Outline Map Quality & After Service

F.A DAEHO SYSTEM CO.,LTD.


Company Introduction Success Story Major Production Daeho System Outline Map

1-1. Company Profile


1-2. Company History
1-3. Organization & Capability
1-4. Major Facilities

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

1. Company Introduction
1-1. Company Profile
Company Name : Daeho System Co.,Ltd.
CEO : Wan-Gyu, Choi
Establishment : 1997.8
Address : #4036, Ansan Digital Park, 1123,
Over Singil-dong, Danwon-gu, Ansan-city,
view Gyeonggi-do, Korea Ansan Digital-Park Building

Web : www.daehosystem.co.kr
Capital : U$ 1 hundred thousand Venture Business

Employees : 12 Persons
Annual Sales : U$ 1.7 million(2010)

Daeho System Factory


Control of Car-body Line(Car-body & Engine, Press, Etc)

Control of Robot (Off Line Programming & Teaching, Calibration)


Business
Control of Semiconductor Equipment(Feeder, Assy, Inspection)
Area
Control of Industrial Machinery (Factory Automation)

Control of Vessel Electricity (Engine, Exchanger, Controller, ETC)

Business

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

1. Company Introduction
1-2. Company History
Company History Project History

 Renault Motors Project(Russia)


 2012. 02 Certification(Venture Business)  X02A Project(Nissan India)
 Slovakia KMS EL Project(Kia Motors)
DAEHO SYSTEM HISTORY

 2011. 09 Change of Marketing Strategy  Resistance-Fungus Filter Line(Korea Eag Bio)


 600ton Blanking Press (Posco<Kwanyang>)
 2011. 04 Business Diversification  Waste-water Clean Project(Jaecheon)
 CaCl Mixing Equipment(MLTL)
 2004. 04 Incorporate a Firm  Vietnam Fire extinguisher Line(Shinmyung)
 China Distribution FA System(Kumho Tire)
 2002. 08 Business Start with ABB Korea  SVR LCD Line(LIG ADP)
 Semiconductor Loader(Wonik IPS)
 1998. 08  Soundproof measurement room
Business Start with Daewoo Motors
 GV Project Hyundai Motors<Jeonjoo>)
 Mexico GM Magna Motors Project
 1997. 09 Business Start with Wooshin systems
 Engine Line(Ssangyong Motors)
 Nama Project(China Nama Motors)
 1997. 08 Found Daeho System  P-450 Project(Iran Khodro)
 T-Car Project(Kia Motors<Whasung>)
 V-200 Project(Daewoo Motors)
 Canada Project(Japan Honda Motors)

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

1. Company Introduction
1-3. Organization & Capability

• Skilled Manpower
• Expert skill Insurance CEO
• Stabilized Employment
• Cooperation of Capital and Labor
• Intimate Collaboration Advisor

Production Development Dep’t


Sales Dep’t Robot Dep’t
Dep’t S/W Team H/W Team Ctrl Team

• Marketing • Task of • Industry Robot • Software Development


• Customer Mng electrical system Teaching • Control Design & Management
• Management • Task of • Industry Robot • PLC Program Development
installation & Trial Control • Database & Standard Management

 Management : 3persons(Career : 3∼30Years )


 Development : 5persons(Career : 5∼15Years)
Daeho Cooperation
System Company  Production : 20persons(Career : 1 ∼15years)
<Including Cooperation Company>

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

1. Company Introduction
1-4. Major Facilities
NO Name Spec Set Maker Remark

1 Lab View Tools Network Windows 2 Developer

2 Industrial Computer Systems IEC Series 3 Touch LCD

3 Oscilloscope 6810C 2 Real time

Level Measurement GTN-105N 1 Laser Type

4 Ground Resistance Tester 4,200 2

Power meter Pro-3000 1 AC

5 Tesla Meter TM-702 1 0-1,500mt

Digital Tester Fluke-289 2 Fluke

6 Insulation Resistance Instrument 3007A 1

Clamp Tester CL-360 1 D60

7 Tube Numbering M-1Pro3K 2 Brother

Electric Tools Japan/China 12

8 OrCad System 10.5 2


AutoCad System 2008 2

9 Networking System 100Mbps 1

Output Equipment HP-A4/A3 2

F.A DAEHO SYSTEM CO.,LTD.


Company Introduction Success Story Major Production Daeho System Outline Map

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

2. Success Story (1/2)

Section of Car-body Line

Project Name Customer Remark


L38 / B32 Body Side Project R-Motors (Russia)
Panorama Sun-roof Line IA-Korea
Cylinder Head Block Assembly Line S-Motors(Engine Dep’t)
X02A Body Side Ass’y Line Nissan (India)
KMS Plant EL Project K-Motors (Slovakia)
WT Under Body & Main Line Project T-Daewoo
JB Laser Brazing LIne K-Motors
L38 Moving Line Nissan (Turkey)
HDC Car-Body Line H-Motors (Czech)
KJ & Fj Door/Hood Line S-Motors
DYK2 B/C Line DF Motors (China)
HM BB Line K-Motors
GV Project(Roof, Floor, Back-Comp, Main) H-Motors (Jeonjoo)
RIO CTR & FRT Floor Line Iran Saipa
Floor & Door Line NH-Motors (Canada)

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

2. Success Story (2/2)

Section of Robot / Semiconductor / Industry Machinery / Vessel Electricity

Project Name Customer Remark


Resistance-Fungus File Line(Installation) Korea-EB
TF Driven & Drive Gear Processing Line Hyundai-PT
Press & Laser Cutting M/C(Installation & T/O) TPI
Robot Welding Line Teaching & T/O TPI(china)
600ton Blanking Press T/O P(Kwangyang Iron Mill)
HF-7 ABB Robot(Manufacture & Installation) H-Motors(China)
Waste-water Clean Project JC
CaCl Mixing Equipment Project MLTL
Fire Extinguisher Line S-DP (Vietnam)
Black Carbon Equipment(CCS Rework) D-Chemical(Pohang Plant)
Distribution & Conveyor FA System K-Tire(China Plant)
SVR LCD Line(Joining System Design) L-ADP
Semiconductor Loader(Installation & T/O) W-IPS
Soundproof Measuring Room

F.A DAEHO SYSTEM CO.,LTD.


Company Introduction Success Story Major Production Daeho System Outline Map

3-1. Control of Car-body Line


3-2. Control of Robot
3-3. Control of Semiconductor Equip’t
3-4. Control of Industry Machinery
3-5. Control of Vessel Electricity

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

3. 주요 사업 (1/2)

3-1. Control of Car-body Line

Car Manufacturing Automation System


Main Body Line | Side Body Line | Moving Line
Sub Line | Equipments | Car-Parts Assembly Line
Under & Upper Body Complete / Roof, Cowl & Dash / Package Tray
Side Frame L/R / Door Assembly & Sealing, Welding, Finishing
Main Buck(Shift & Swing Type, 2-4Face) / Shuttle(Truck, Shuttle, Lifter)
A.F.M / E.M.S(Link, Cylinder Type)
Hemming System(Table Top, Die Change)
Engine & Cylinder Assembly Line
3-2. Control of Robot
Panorama Sun-roof Line / Paint Line & ETC
Robot & Control Systems
- Handling Control
- Welding Control
- Sealing Control
- Setting Control

OLP / OLT

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

3. 주요 사업 (2/2)

3-3. Control of Semiconductor Equip’t 3-4. Control of Industry Machinery

Semiconductor & FPD Equipment Factory


Automation
- FPD Evaporation System
Systems
- FPD Sputter Positioner
- ETC - Conveyor System
- Distribution Warehouse
• Loading Equipment - Welding Equipment
• Transfer System - Assembly M/C
• Unite Equipment - ETC(F.A Facilities)
• Vacuum Joining M/C • Feeding & Loading
• Thermal Process • Welding & Cutting
• Inspection Facilities • Assembly
• Inspection

3-5. Control of Vessel Electricity

Ship Building Equipment


- Vertical Conveyor System
- Main Switch Console
- Engine Control Console
- Bridge Control Console
- ETC

F.A DAEHO SYSTEM CO.,LTD.


Company Introduction Success Story Major Production Daeho System Outline Map

4-1. Main Technology


4-2. Business Process
4-3. Quality & After Service

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

4. Daeho System
4-1. Main Technology [Technical Competitiveness]
PLC Control

Multi-Programming Siemens | AB
Technology Skills Mitsubishi | Fuji
- Composite Language Know-How
- Distributed Development Great Experience Design & Manufacturing
- PLC Control
Best Engineers • Control Box & Switchboard
- Industrial PC Control
• Wiring & Piping, Etc

DAEHO SYSTEM TECHNOLOGY


- Measuring Control
- CAD/CAM Design
BOM & Sheets - Configuration and Sequence
of Intuitional Screen
- Draw up a Bill of Material - Design Which Considers
- Manages the Supply and a Mass Production
Demand of the Parts
- Check Sheets Simulation & Revision
- Before Producing, Operation Test
- Adjustment and complement
of design(Prevention of Error)
Robot System Control
Robot Control
- Reflection of 3D data simulations
ABB | Kawasaki
- Robot System Control
Fanac | Nachi
- Off-Line Programming
Yaskawa | ETC…
OLP / OLT / Calibration

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

4. Daeho System
4-2. Business Process
Daeho Total Management

- Trouble and Shooting 1 - Check of Customer Spec


(Daeho System AS System) - Collecting the Customer‘s
Spec
- Management of AS Needs
Contents 8 Check 2 - Decision of Production
- Feedback(Next Project) Planning Concept
After
Service Approval
- Units Acting Test - Making of Production Aim
- Linkage Total Test - Drawing up the Schedule
- Adjustment & complement - Decision of Order and
- Final Test 7 3 Outsourcing
- Customer Approval T/O DAEHO Program - Customer Approval
(Finish) Process Design
- Control Box, Switchboard - Programming
- Duct & Pipe, Etc - Design(Control Box, …. )
- Wiring & Piping - Simulation & Adjustment
- Joining & Assembly
4 - B.O.M & Check Sheets
6 Design
- Check of Installation - Distributed Development
Installation Approval
5
- Order and Receipt of Parts Production
(standard, Manufactured) - Program Approval
- Input of Program - Design Approval
- Manufacturing(Hardware) - Simulation Check
- Outsourcing Managing
 Schedule Control
 Quality Control

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

4. Daeho System
4-3. Quality & After Service
Quality Improvement

Problem Defectiveness priority Countermeasure Improvement Effect Standard


Check Analysis Action consideration Action Analysis (registration)
Problem Recording Cause Recording Priority Action Removes a Cause Improvement Execution Result Analysis Confirmation Technique
-Name, Quan’y, Process -Worker, Material -Heavy: Stop Task -Plan Consideration -Real Improvement -Defective Fact -Effective Confirmation
-Date, Worker -Mechanism, Method -Light: Partial Task -Schedule & personnel -Data, Person in Charge -Inspection -Apply Feedback

After Service

Customer Daeho System Customer

AS AS AS AS AS
Request Receipt Planning (Action) Finishing

AS Cycling T/S
Recording Flow Management

AS Result
AS Database Improvement
Registration
T/S : Trouble Shooting

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr
Company Introduction Success Story Major Production Daeho System Outline Map

5. Outline Map

Shiwha Jeongwang Walgot/Incheon


Industrial Complex Station

Doil
Incheon/Ilsan

Osram Seo-Ansan
Dongsea Food TollGate Yeongdog
Highway
Daesung Banwal
Electric Industrial Complex Doil
Crossroad

Boryeng

Ansan
Shiheung
Digital Park Substation
City hall
Ilsung
Ansan Station
Ink-Tech Seo-Ansan
Interchage

Sunbu-dong
Ansan
Distributer 신갈/용인/강릉
Sunbu-dong
Shingal/Yongin/Kangreung
Suwon
Gongdan Station

Daeho system Co.,Ltd.


Address : #4036, Ansan Digital Park, 1123, Singil-dong, Danwon-gu, Ansan-city, Gyeonggi-do, Korea
Tel : +82-31-310-1834/1835 | Fax : +82-31-310-1836 | Web : www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.


www.daehosystem.co.kr

Venture Business

Thank You

FACTORY AUTOMATION DAEHO SYSTEM CO.,LTD.

Potrebbero piacerti anche