Sei sulla pagina 1di 2

GNPOWER DINGININ LTD. CO.

CONSTRUCTION
GNPD 03 00 1 MCP 50XXX 0
MANAGEMENT

Electrical Completion (Final Inspection) Punchlist

System Title: Fuel Oil Building System Number:


Sub-system Lightings
Sub-system Number:
Title:
Drawing 1
Unit:
Number:
FI&TR Number: Date: July 25, 2019

P&ID Number:

(Strikethrough if
not applicable)
System Walk Down Inspection System WTP Inspection

Defect Category
Item Disci Initiate P/L
Equipment Description
No. p d By Initiato Comm
r

1 C MJN

Roof slab got water dripping (during raining) on the third


column.

2 ECI MJN

No braided explosion proof flexible conduit

Defect Category Description: Discipline :

GNPD 03 00 1 TEM 50130 1 - Effective Date 2019.06.19 Page 1 of 2


GNPOWER DINGININ LTD. CO.CONSTRUCTION
GNPD 03 00 1 MCP 50XXX 0
MANAGEMENT

Electrical Completion (Final Inspection) Punchlist

A - Must be corrected before system commissioning


B - Must be corrected before automated operation B = Boiler; T = Turbine; C = Civil; ECI = Electrical /
C - Must be corrected before performance/reliability test Control & Instrumentation; BoP = Balance of Plant
D - Must be corrected before commercial operation date
Mechanical Completion (Final Inspection) Punchlist Acceptance
GNPD GNPD Quality GNPD Commissioning GNPD O&M
GNPD Construction
Engineering
Name:
Position:

Signature:

Date:

GNPD 03 00 1 TEM 50130 1 - Effective Date 2019.06.19 Page 2 of 2