Safe access coverage for drinking water is 72,04%. However, pipeline system
coverage by Indonesia water enterprises (PDAM) is only around 17%.
(Source: Dit.SPAM, 2018)
Total investment needed to achieve 100% access to drinking water supply is IDR 253,8 trillion. It is
planned to be funded by State budget plan as much as IDR 67,5 trillion (27%), APBD of IDR 199,23
trillion (47%) and private funds are expected as much as IDR 49,05 trillion (27%).
(Source: Dit. Pengembangan SPAM CK, 2017)
100%
Drinking
Water
0%
Slump
100%
Sanitation
REALIZATION
MINISTRY
MINISTRY OF
OF PUBLIC
PUBLIC WORKS
WORKS AND
AND HOUSING
HOUSING 8
National
National Agency
Agency For
For Water
Water Supply
Supply System
System Improvement
Improvement
9
PDAM Funds
Action Plan Unhealthy and Less
(Recommendation) healthy PDAM
Central/Local
Government Funds
Investment Alternative
Healthy PDAM Financing (CSR,
Model
commercial bank
loan, etc)
Bilateral /
Balancing interests of Customer
Multilateral Donor
and water supply provider
Agency
PPP/B to B
Keterangan:
TACB = Technical Assistance and Capacity Building
6. Water meter Replacement (Fund allocation, Trade credit, water meter verification)
7. Investment fund model to improve coverage (State Budget, Local State Budget, PPP, B to B,
Trade Credit)
8. Improvement of human resource competency (Inline with SKKNI SPAM, training and
recruitment)
Regulation of Head of National Public Procurement Agency (LKPP) Number 29 Year 2018 on
Perka LKPP No. 29 Year 2018
5 PROCEDURES FOR PROCUREMENT OF PROVISIONS FOR IMPLEMENTING BUSINESS AGENCIES
INFRASTRUCTURE THROUGH GOVERNMENT COOPERATION WITH THE AGENCY
BUSINESS FOR INITIATING MINISTER / HEAD OF INSTITUTION / REGIONAL HEAD
Regulation of Minister of Public Works and Housing Number 19 of 2016 on the Provision of
Permen PUPR
Support by the Central Government and / or Regional Government in the Cooperation of
6 No. 19 Year 2016 Implementation of Drinking Water Supply System
Market Prequalification
Preliminary Study Sounding Signing of PPP Operation and
and Public Agreement Transfer
Consultation
Preparation of Land
Request for
Procurement Proposal & Bid Financial Close
Documents Including Submission The PPP
Submission of Location
Value for Money Determination (if Agreement comes
Assessment needed) to an end
Evaluation &
Application for
Deciding the
Government Support winning bidder
Decision on PPP
/ Guarantee Plan (if
Continue / No any)
Final Business
Case
Implemented by
Contracting Based on Regulation of Minister of National Planning and Development Number 4 of 2015
Agency on Procedures for Cooperation Between Government and Businnes Entities in Infrastructure
GOVERNMENT
SCHEMES CONTRACTING AGENCY
PROCUREMENT
Intake/Broncaptering House
Water Treatment
Connection
Plant (WTP)
House
Reservoar Connection
Secondary &
Raw Water Transmition Tertier Pipeline
Pipeline
Bulk Water Main Distribution
Tranmition Pipeline Pipeline (JDU)
SCOPE
ACTIVITIES
Raw Water Unit Production Unit Distribution Unit
Build • Directorate General of Private Sector • Directorate General of Human Settlement
Water Resource (SDA) (CK) and/or
and/or • Private Sector and/or
• Private Sector • Local Government and/or
• Regional-Owned Enterprise/ ROE (PDAM).
Operation &
Maintenance Private Sector Private Sector Water Enterprise (PDAM)
17
17
18
PROGRAMS REQUIRED
TO IMPROVE WATER SUPPLY SYSTEM DEVELOPMENT
PDAM Performance
1. Assists PDAMs in reducing NRW and improving efficiency in production process
2. Assists unhealthy PDAM in preparing Feasibility Study for expansion of water supply
systems
3. Assists PDAM in preparing Business Plan and recommend action plans to improve
water supply performance.
4. Assists PDAMs in implementing Good Coorporate Gorvenance (GCG).
5. Capacity Building on water supply system development.
Investment Improvement
1. Preparing Business Plan
2. Financial Experts
Review Financial Projection KPBU and BtoB Unsolicited
MINISTRYOF
MINISTRY OFPUBLIC
PUBLICWORKS
WORKSAND
ANDHOUSING
HOUSING
18 NationalAgency
National AgencyFor
ForWater
WaterSupply
SupplySystem
SystemImprovement
Improvement
19
Gap Investment
6,429
PPP Investment Realization
26.3 % IDR 6,429 Trillion
17,971
Invessment Need
73, % IDR 17,97 Trillion
NUWSP
67 PDAM
Now Gap
MINISTRYOF
MINISTRY OFPUBLIC
PUBLICWORKS
WORKSAND
ANDHOUSING
HOUSING
NationalAgency
National AgencyFor
ForWater
WaterSupply
SupplySystem
SystemImprovement
Improvement
20
PARTNERSHIP OPPORTUNITY
IN PDAM PERFORMANCE’S IMPROVEMENT
Assisting PDAM in preparing business plan and recommend action plans to improve water
3
service performance
Rp, 0.33
TRILIUN USD 47 Million
KARIAN
SERPONG
4600 Ltr/sec
Rp,
2
TRILIUN
USD 135 Million
Jatigede Kamijoro
Jatiluhur I 1500 Ltr/sec 300 Lt/sec West
5000 Ltr/sec Semarang Umbulan
1000 Lt/sec 4000 Lt/sec Sarbagikun
Preparation Stage
Transaction Stage and
Consruction Stage
Makassar City
600 Ltr/sec
Rp,
0.3
TRILLION
USD 20 Million
Raw Water Source Suka Birus River Cisadane river Sungai Tallo Kali Angke Gerak Sembayat Dam Cikeas river
Capacity 150 liter/second 1000 liter/second 600 liter/detik 200 liter/second 1000 liter/second 200 liter per second
Estimated Investment IDR 0.15 Trillion IDR 0,583 Trillion Rp. 400 milyar IDR 0.3 Trillion IDR 0.79 Trillion IDR 0,06 Trillion
Director of Bogor Director of PDAM Director of PDAM Director of PDAM Director of PDAM
Contracting Agency Director of PT. PITS
Regency PDAM Tangerang City Makasar City Gresik Regency Bekasi City
Northern Gresik
domestic area
3 sub-districts (Ciputat, 3 sub-districts (Jatiasih,
2 sub-districts (Ciawi East domestic area (Bungah, Manyar,
Service Area 3 zone in service area Ciputat Timur, and Jatisampurna, Pondok
and Mega Mendung) Makasar City Kebomas, Gresik) and
Pamulang) Melati)
non-domestic area (JPII
industrial area)
Signing of cooperation
Evaluation of Pre- Finalisation of Director Finalisation of Director
Preliminary agreement with PT.
Feasibility Study (from Decree and Pre- Decree and Pre- Announce Commercial
Status requirements from PT. Pembangunan
PT. Sauh Sejahtera as Feasibility Study by Feasibility Study by Date
Tirta Tangsel Mandiri Perumahan Kraratau
initiator candidate) PDAM PDAM
Tirta at April, 11 2019