Sei sulla pagina 1di 2

GNPOWER DINGININ LTD. CO.

CONSTRUCTION
GNPD 03 00 1 MCP 50XXX 0
MANAGEMENT

Mechanical Completion (Final Inspection) Punchlist

System Title: DC & UPS System System Number: 00-D-1002


Sub-system Title: 500kV GIS DC System Sub-system Number: 00-D-1002-001
Drawing Number: Unit:
FI&TR Number: Date:

P&ID Number:

(Strikethrough if not
applicable)
System Walk Down Inspection System WTP Inspection

Defect Category
Item Initiated
Discip Equipment Description P/L
No. By Comm
Initiator

Defect Category Description: Discipline :


A - Must be corrected before system commissioning
B - Must be corrected before automated operation B = Boiler; T = Turbine; C = Civil; ECI = Electrical / Control &
C - Must be corrected before performance/reliability test Instrumentation; BoP = Balance of Plant
D - Must be corrected before commercial operation date
Mechanical Completion (Final Inspection) Punchlist Acceptance
GNPD Engineering GNPD Construction GNPD Quality GNPD Commissioning
Name:
Position:

Signature:

GNPD 03 00 1 TEM 50130 0 - Effective Date 2019.02.15 Page 1 of 2


GNPOWER DINGININ LTD. CO.CONSTRUCTION
GNPD 03 00 1 MCP 50XXX 0
MANAGEMENT

Mechanical Completion (Final Inspection) Punchlist

Date:

GNPD 03 00 1 TEM 50130 0 - Effective Date 2019.02.15 Page 2 of 2

Potrebbero piacerti anche