Project   General Notes

25 North Colonnade 1. This drawing is not to scale. Do not scale from this drawing.
2. All dimensions are in millimetres unless noted otherwise.
Title 3. All drawings shall be read in conjunction with all relevant L+C, Arup and Architect's drawings and specifications for the works.
Level 00 - Extg pit infill 4. All steelwork to be grade S355 as a minimum. All bolts to be Gr 8.8 UNO.
5. For setting out refer to drawings by others.
Project. No Sketch No Prep. By Date Checked By Date 6. For fireproofing and finishes refer to details by others.
2660 SK615 IVP Mar '20 7. The contractor shall be responsible for ensuring that operations do not in any way impair the safety or condition of the existing structure. They shall provide
any additional temporary supports required for this purpose and shall carefully inspect the condition of the structure both before and during the execution of the
Drawing No 2660-DRG-XX-3615 [00]
Rev 00 Sketch
First Issue - 16.03.2020 - For comments and approval works, and immediately inform the engineer if they consider that any more stringent procedure than specified is necessary.

  L+C PROJECT NO: 21519


A252 Mesh Void former

5 4 depth to suit

30
100
SSL +9.925 m 10500
50
H10 dowel bars
Levels to be checked on @600 crs
site prior to construction

H Extg RC edge

H10 dowel bars


@600 crs
Detail 1-1
SSL +9.875 m Typical slab construction
4800

250mm lg H10 dowel bar


resin fixed into extg slab
S24 130 Nwt Conc. C35/45 200 20 20 with Hilti HIT HY-200
Span direction
of extg slab; 0502 Composite Slab on Tata 150thk RC slab
2No A252 Mesh to T&B Eq
180 thk ComFlor 60 Decking
Eq
De-bonding sleeve

Note: Extg Deck Compressible material


For level finishes, threshold levels and/or
water proofing refer to drawings by others
5700
Note: Extg RC wall
Movement joints to be 20mm thk Plan view: Level 00 - Extg RC edge
Detail 2-2
Existing pit infill Dowel bar movement joint
Construction (Design & Management) Regulations 2015 20
Residual Hazards:
We have assumed that competent contractors will be entrusted with the
structural works, and that these contractors will be aware of all common
construction hazards and how to deal with such hazards safely. Our
residual hazard list(s) below contain only those hazards which are not
likely to be obvious to a competent contractor or follow-on designer

- Load limits apply as below Compressible material


Extg RC upstand
Movement joints key: Design Loads: Design Loads: MEWPs
Denotes dowel bar joint + compressible filler Finishes = 2.3kN/m2 (SLS) SWmax= 1500kg
Denotes compressible filler joint Public access = 4.0kN/m2 (SLS) Leg loadmax=900kg

Note: Note: Note: Detail 3-3


Concrete to be Min C30/37 Structural void former to have capacity of: Analysis is based on Floormate 500-A
Mesh to be A252; 30mm cover to sides 500kPa @ 10% strain and 190kPa @1% strain structural void former
Simple movement joint