SL.NO MATERIAL DESCRIPTION PER FLAT PER FLAT PER FLAT RA-01
QTY QTY QTY
FOR CONDUIT MATERIAL
1 20mm PVC Conduit 91 114 133 49500
2 2M Modular Box 4 4 4 1303
3 3M Modular Box 5 5 6 1317
4 8M Modular Box 2 2 3 1210
5 6W SPN DB 1.02 1.02 1.02 220
FOR WIRING
1 1.0 Sqmm Copper Flexible Wire 145 150 170 0
2 1.5 Sqmm Copper Flexible Wire 75 79 95 0
3 2.5 Sqmm Copper Flexible Wire 61 68 75 0
4 4.0 Sqmm Copper Flexible Wire 34 35 35 0
FOR SWITCH AND SOCKET
1 1M FACE PLATE 3 3 3 0
2 2M FACE PLATE 1 1 1 0
3 3M FACE PLATE 5 5 6 0
5 8M FACE PLATE 2 2 3 0
6 6A 1-WAY SWITCH 12 12 18 0
8 6A SOCKET 4 4 5 0
9 16A 1-WAY SWITCH 3 3 4 0
10 16A SOCKET 3 3 4 0
11 FAN REGULATOR 2 2 3 0
7 6A CALLING BELL PUSH 1 1 1 0
Switch Dummy 0 0 2 0
2 10A MCB 2 2 2 0
3 16A MCB 2 2 2 0
1 DP 20A MCB 1 1 1 0
FOR METERING PANEL
1 Metering Panel 3 3 3 0
FOR EARTHING
1 EARTHING 6 6 6 0
Total
RA-02 RA-03 RA-04 RA-05 RA-06 RA-07 Total Received Consider
Flats
Quantity
0 0 0 0 0 0 0.0
0 60 0 0 0 60 0.0
Flat rate Total Cumulative Climed Claimed amount
70% amount Flats
30,529,492.18 27,786,244.79