OC BALANCE ACTIVITIES INCLUDING MEP, UGT, AND STP FOR COMPLETIO


S.no.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

1
2
3
4
5
6
7

1
2
3
4
5

1
2
3
4
5
6
7
8

1
2
3
4
5
6
7
8
9
10

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

1
2
3
4
5
6
7
Godrej Tranquil
OC BALANCE ACTIVITIES INCLUDING MEP, UGT, AND STP FOR COMPLETION OF TO
Activity
CIVIL WORK
Balance block work
Lower Basement level preparation
Lower Basement balance plum
Lower/upper Basement trimix finish
Lower Basement drainage preparation
Lower Basement debris/extra concrete removal
Meter Room-Civil Work
Plumbing and Fire shaft readyness
Ugt pump room civil work
Ugt pump room staircase
Swimming pool civil work
Ugt pump room civil clearance
Stp debris cleaning
Stp civil work
Stp pump room civil clearance
External Plaster
A wing OHT civil work
Terrace external plaster
Lift pit civil work completion

WATER PROOFING WORK


Toilet internal Waterpoofing
oht waterproofing
terrace waterproofing
ug tank waterproofing
swimming pool waterproofing work
stp waterproofing
Lift pit waterproofing

FIRE DOORS / CARPENTORY / WINDOW WORK


fire door finalization
fire doors fixing
Door frame
Aluminium Window
Door Shutter Installation

TILING WORK
Kitchen Platform
Dado tiling
Flooring Acid wash
External window frame
staircase flooring
Tile Flooring
Lobby flooring
swimming pool tiling

FINISHING WORK
Gypsum
terrace landscape
terrace hardscape
staircase railing
lower/upper basement lift lobby readyness
podium entrance lobby readyness
stilt floor entrance lobby readyness
Club house readyness
swimming pool finishing work
typical floor lift lobby readyness

MEP WORK
Wall Electrical Conduting
DB installation
Wiring & Switch Socket
CP fittings
Typical Plumbing
Terrace looping
Terrace fire booster pump installation with looping
Terrace domestic booster pump installation and looping
Meter room cable trays
Ugt pump room cable tray
Ugt pump room fire main pannel
Ugt pump delivery
Ugt pump installation
Stp pump room cable tray
Stp pump panels
Stp pump installation with looping
Meter room Electrical work
Ugt pump room fire fighting work with looping
Shaft plumbing work
ugt fire fighting exaust work
lower/upper basement hvac work
lower/upper basment electrification
ugt pump room electrification
stp pump room electrification
stp pump installation with looping
Lift installtion
Automatic fire sprikler work in lift lobby at typical floor ,basement and podium
Wet raiser for sprinkler and hyderant system in shaft and drain line.
Installation of courtyard hydrent around building and instalaltion of internal floor hydrent in fire shaft at each floor.
Fire alarm system for Tower A and Tower B
PA system work for Tower A and Tower B
power supply arrangement for CFO visit.

PAINTING WORK
Putty Application
External painting
Internal Painting
staircase painting
shaft painting work
lower basement painting finishing
upper basement painting finishing
OF TOWER A & B
Remark
Tower A fire lift
Sr No Description of activity Target date Remark
1 Lift pit handover to lift vendor
2 application for permisssion of lift erection work to PWD
3 material delevery of lift scaffolding
4 erection of lift scaffolding
5 White wash in lift shaft
6 lift shaft electrical work
7 lift shaft handover to lift vendor for lift erection work
8 template fixing
9 guide rail supports fixing
10 installation of guide rail
11 machine room work(lift panel fixing)
12 lift shaft ELV cable works
13 Lift cart bottom installation
14 floor finsihed level pad by civil vendor
15 lift door frame installation
16 lift cart installation
17 landing plate installation
18 lift commisioning work
19 Lift PWD inspection
Tower B fire lift
Sr No Description of activity Target date Remark
1 Lift pit handover to lift vendor
2 application for permisssion of lift erection work to PWD
3 material delevery of lift scaffolding
4 erection of lift scaffolding
5 White wash in lift shaft
6 lift shaft electrical work
7 lift shaft handover to lift vendor for lift erection work
8 template fixing
9 guide rail supports fixing
10 installation of guide rail
11 machine room work(lift panel fixing)
12 lift shaft ELV cable works
13 Lift cart bottom installation
14 floor finsihed level pad by civil vendor
15 lift door frame installation
16 lift cart installation
17 landing plate installation
18 lift commisioning work
19 Lift PWD inspection
1 Lift pit handover to lift vendor
2 application for lift erection work
3 lift electrical work
4 lift installation and commissioning
5 lift PWD inspection and certificate
6 handover of fire shaft to fire fighting venodr
7 complition of fire shaft work
8 complition of lobby automatic sprinkler system work
9 complition of lower basement level sprinkler system
10 complition of upper basement level sprinkler system
11 compltion of stilt level sprinkler system work
12 fire alram and Public annoucement system work shall begain
13 complition of podium level sprikler system work
14 complition of pump room civil work and electrification work with temp ventilation system
15 handover of pump room to fire fighting venodr
16 courtyard hydrent work and ring installation around tower A and tower B
17 Pumps ,electrical panel ,cable material delivery to site
18 OHT inlect pipe connection and terrace booster pump conection work
19 pump room fire fighting and electrical work fire fighting system
20 complition of fire alram and Public annoucement system work.
21 arrangement of temp power supply for FF system testion and commoissioning
22 CFO visit
23 Fire NOC
70
-4
-14
-10
Godrej Tranquil
Flat Load details

Sr.No Tower Flat type connected load diversity factor demand load type of meter
1A 1BHK (type 1) 11 2.20 5 1 phase
2A 1BHK (type 2) 11 2.20 5 1 phase
3A 1BHK (type 3) 11 2.20 5 1 phase
4A 1BHK (type 4) 11 2.20 5 1 phase
5B 2 BHK (type 5) 12.56 1.25 10.05 1 phase
6B 2BHK (type 6) 11.18 1.25 8.94 1 phase
7B 2BHK (type 7) 11.02 1.25 8.82 1 phase
8B 3BHK (type 8) 13.94 1.25 11.5 3 phase
9B 1BHK (type 9) 10.39 1.25 8.31 1 phase
DB mains size (from shaft to DB) Cable size (from shaft to DB)
3 nos 6 sq.mm cu wire
3 nos 6 sq.mm cu wire
3 nos 6 sq.mm cu wire
3 nos 6 sq.mm cu wire
3 nos 10 sq.mm cu wire
3 nos 10 sq.mm cu wire
3 nos 10 sq.mm cu wire
4 nos 6 sq.mm cu wire
3 nos 10 sq.mm cu wire