Sei sulla pagina 1di 7

UNIT PRICE MATERIAL, REMUNERATION AND RENT OF EQUIPMENT

UNIT PRICE MATERIAL, REMUNERATION AND RENT PRICE


NO. UNIT REMARK
OF EQUIPMENT (Rp.)
I MATERIAL :
1 Portland Cemen (PC) kg 1,346.00
2 Colour Cement kg 3,267.50
3 Red brick unit 600.00
4 Crushed Stone m3 179,200.00
5 Split 1/2 m3 438,900.00
6 Split 2/3 m 3
438,900.00
7 Gravel m 3 148,400.00
8 Sirtu m3 210,000.00
9 Dust split m 3
235,000.00
10 Sand m 3
235,000.00
11 Soil m3
168,500.00
12 BBM / solar litre 9,300.00
13 Water litre 15.00
14 Plain reinforced steel U 24 - BJTP 24 kg 14,800.00
15 Galvanis steel angle HTS kg 23,000.00
16 Galvanis steel angle MS kg 21,000.00
17 Deformed Bar (reinforced steel) U 32 - BJTD 40 kg 17,500.00
18 Galvanis Bolt and Nuts kg 15,700.00
19 Profil IWF kg 23,900.00
20 Plat Bordes 6 mm kg 40,200.00
21 Band plate kg 21,000.00
22 Steel L50x50x5 kg 16,500.00
23 Strip plat 20.3 kg 21,000.00
24 Welding wire kg 21,000.00
25 Paint of steel kg 74,800.00
26 Paint of wooden kg 50,200.00
27 Paint of wall Emulsi kg 58,520
28 Paint of wall Weathershield kg 94,080
29 Thinner Liter 31,350
30 Kuas / Rol no 18,300
31 Plamur of wall kg 8,360
32 Polished of steel (Sand Paper) sheet 13,600
33 Polished of wooden (Sand Paper) sheet 13,600
34 Aluminium Leaf Door Frame 4 inch m' 90,800
35 Aluminium frame doors m' 90,800
36 Glass t =5 mm m2 125,400
37 Glass t = 6 mm m2 229,900
38 Glass t = 8 mm m 2 313,500
39 Sealant m' 16,700
40 Door closer no 239,000.00
41 Hinge for door (1 set= 3 pcs) set 53,300
42 Hinge for window (1 set= 2 pcs) set 36,600
43 Door lock no 119,100.00
44 Door lock (regular) no 136,600.00
45 Door Holder (1 set= 2 pcs) no 42,500
46 Grendel for window (1 set= 2 pcs) no 36,600
47 Grendel for door double swing no 109,800
48 Wind hook of window (1 set = 2 pcs) set 26,200
49 Palm fibre kg 16,600

Page 1 of 7
50 Concrete wire kg 20,900
51 Galvanis of wire mesh dia 4 mm
Barbed wire kg 69,000
52 barbed wire kg 135,000
53 barbed
Woodenwire m3 2,926,000
54 Wooden Class III m3 2,926,000
55 plain meranti 2/20 cm sheet 52,250
56 Meranti beam 6/12 cm pcs 78,400
57 Meranti beam 5/7 cm pcs 62,700
58 Dolken dia. 10 cm, length 4 m. stick 60,000
59 Granite wall tiles 250 x 400 mm m2 197,000
60 Glazed ceramic wall tiles 200 x 250 mm m2 66,300
61 Granite wall tiles 400 x 400 mm m2 197,000
62 Granite floor tiles 600 x 600 mm m 2 215,500
63 Granite floor tiles 300 x 300 mm m 2 200,000
64 Granite floor tiles 300 x 600 mm m 2 175,000
65 Glazed ceramic floor tiles 400 x 400 mm m 2 141,500
Glazed ceramic floor tiles 300 x 300 mm m 2 120,000
66 Glazed ceramic floor tiles 200 x 200 mm m2 90,400
67 Glazed plint tiles 100 x 400 mm no 64,300
68 Granite plint tiles 100 x 600 mm no 66,300
69 Stepnosing 100 x 400 mm no 66,300
70 Naturally paint (Meni) kg 83,600
71 Minyak bekisting litre 20,000
Fence BRC height 1,20 m lenght 2,40 m m 1,325,000
72 Fence BRC height 1,50 m lenght 2,40 m m 1,656,250
73 Fence BRC height 1,90 m lenght 2,40 m m 2,097,917
74 Nail kg 15,700
75 Nail drat no 700
76 Double Gate BRC height 1,90 m lenght 3,30 m complete unit 3,450,000
77 Double Gate BRC height 1,50 m lenght 3,00 m complete unit 2,723,684
78 Single Gate BRC height 1,90 m lenght 1,10 m complete unit 4,400,000
79 Double Gate BRC height 1,75 m lenght 2,30 m complete unit 5,447,368
80 Single Gate BRC height 1,52 m lenght 1,0 m complete unit 907,895
81 Pipe of steel Dia 2 inc lenght 6,00 m stick 447,200
82 Pipe of steel Dia 3 inc lenght 6,00 m stick 904,400
83 Pipa Concrete dia 30 cm m' 225,000
84 PVC Pipe dia 1/2 " m' 7,875
85 PVC Pipe dia 3/4 " m' 9,775
86 PVC Pipe dia 1 " m' 11,275
87 PVC Pipe dia 1 1/2 " m' 23,300
88 PVC Pipe dia 2 " m' 34,550
89 PVC Pipe dia 3 " m' 57,125
90 PVC Pipe dia 4 " m' 83,000
91 PVC Pipe dia 6 " m' 130,525
92 corrugated iron sheet 1,054,400
93 Zinc sheet 90,000
Roofing Ceramic m2 70,000
Roofing concrete m2 95,000
94 Roofing Klip-lock Hi-Ten t=0.50 mm m2 212,900
95 Roofing Spandek Colorbond m 2 173,700
96 Nok Standard Hi-Ten m' 26,000
97 Nok Spandek Colorbond m' 68,580
Nok Concrete m' 24,000
98 T/L 1 x 36 Watt (incld armateur) no 45,000
99 T/L 2 x 36 Watt (incld armateur) no 90,000
100 T/L CDL E27 (1 x 8 W) no 32,300
101 T/L CDL E27 (1 x 23 W) no 48,450

Page 2 of 7
102 Clear lamp celling 60 watt no 209,000
103 Downlight no 62,600
104 Box Panel MCB no 2,250,000.00
105 Multyplex 12 mm sheet 150,850
106 Triplex t = 4 mm sheet 55,850
Kalsiboard 3.5mm sheet 61,500
107 Gypsum board 9 mm sheet 156,000
108 Listplank Superplank (GRC board) sheet 133,000
GRC 4.5 mm sheet 65,000
109 Baja Hollow 40.40.08 m' 25,000
110 Baja Hollow 40.20.08 m' 12,333
111 List profil gypsum 30 cm m' 65,000
112 Tepung gypsum kg 4,500
113 Glasswool t=10 cm, aluminium foil (single sided) with 2 (two) layer m2 58,056
114 Roof mesh kg 31,071
115 Close-coupled with eco washer complete no 2,612,500
116 Squatting water closed complete no 1,750,000
117 Ceramic bowl urinal complete no 2,926,000
118 Lavatory basin including spectacles no 1,881,000
119 Wash basin complete no 1,500,000
120 Chromium plate toiled roll holder no 1,009,229
121 Chromium plate soap dish no 144,900
122 Chromium plated hat and coat hook no 171,000
123 Tangki Air Stainless Steel Kap : 1000 lt no 5,890,000
124 Kansteen (10 x 20 x 60) cm no 65,000
125 Kansteen (25 x 30 x 50) cm no 70,000
126 Landscaping m2 250,000
127 Sodding (gebalan rumput) m2 20,000
128 Stop contact incl installation wiring no 406,000
129 Exhaus fan wall 60 W/220 Volt (16") industrial no 1,650,000
130 Exhaus fan ceiling 40 W/220 Volt (10") very low noice no 2,200,000
131 Submersible pump 8 m²/hour ( Multi stage pump Grundfos Type SP no
16,107,000
8, 2.2 kW / 3 Hp, 3 phase 63 m head or equel)
131 Emergency lighting lamp 40 W complite no 2,030,000
Emergency lighting lamp 100 W complite no 5,075,000
132 Hot mix kg 15,000.00
133 Aspalt kg 11,800.00
134 Anchor bolt 36 mm pcs 575,000.00
135 Waterproofing kg 80,500.00
136 Serat Fiber m2 16,000.00
137 Floorhardener ex sika kg 7,800.00
138 U-ditch 400/400/1200 unit 489,258.00
139 U-ditch 600/600/1200 unit 938,322.00
140 U-ditch 1000/1000/1200 unit 2,134,440.00
141 U-ditch BC 1000/1000 LD unit 2,514,435.00
142 U-ditch 1600/1600/1200 umit 5,200,000
143 U-ditch BC 1200/1200 LD unit 3,239,321
144 Cover U 400 LD unit 138,600
145 Cover U 600 LD unit 265,258
146 Cover U 1000 LD unit 379,995
147 Cover U 1600 LD unit 912,450
148 Sheet Pile Corrugated m' 450,000
149 Raised Floor m2 81,360
150 Driven Pile with reinforced concrete 40x40 cm m' 422,222
151 Driven Pile with reinforced concrete 30x30 cm m' 333,333
152 Driven Pile with reinforced concrete 20x20 cm m' 140,000
153 Spun Piles with reinforced concrete Ø 40 cm m' 422,222
154 Spun Piles with reinforced concrete Ø 35 cm m' 333,333
155 Spun Piles with reinforced concrete Ø 30 cm m' 140,000

Page 3 of 7
153 Jendela Nako unit 267,900.00
153 GIP ø 50 mm (2") m 104,167
154 GIP ø 25 mm (1") m 50,833
155 GIP ø 20 mm (3/4") m 34,167
156 GIP ø 15 mm (1/2") m 26,667
157 Gate Valve ø 25 mm (1") no 210,000
158 Clean out ø 100 mm no 75,000
Clean out ø 75 mm no 50,000
159 Clean out ø 50 mm no 10,000
160 Floor drain ø 50 mm no 110,000
161 C-75, 0.8 (Main truss) kg 21,000
162 C-75, 0.6 (Main truss) kg 21,000
163 Screw driver (baut) no 250
164 Dyna bolt no 6,500
165 R 33 - 0.45 Reng (roof bottom) m' 3,750
166 Talang Jurai m' 28,000
167 Stainless Steel Name Plate /cm 40,000
168 Bath Basin Complete No 2,145,000
169 AC split 2PK No 9,320,000.00
170 AC split 1 PK No 8,250,000
171 Panel Box MCB complete with R.S.T lamp indicator and contactor grounding No 6,100,000
172 Price for capacity electrical (For GIS 150 KV Control Building) ls 40,000,000
173 Wall lamp IDWL 194 Milk Glass dia 300 mm Mercury 125 W No 85,000
174 Alarm bell 6'' ( 150 mm ) diameter to approval surface mounted in Lobby No 2,700,000.00
175 Smoke detector No 1,800,000.00
176 Fixed and rate of rice temperature detector No 1,300,000
177 MCFA ( Master control fire alarm ) included indication lamp, battery rectifier an No 52,200,000
178 Portable fire extinghuister type dry chemical ( 5 kg hallon ) No 2,900,000
179 Mobile unit powder fire extinghuister ( 50 kg hallon ) No 29,000,000
180 Portable type 6 kg CO2 c/w wall bracket No 5,800,000
181 Jet pump capacity 32 liter/menit H=30 m Unit 19,800,000
182 GIP ø 25 mm (1") m 50,833
183 GIP ø 20 mm (3/4") m 34,167
184 GIP ø 15 mm (1/2") m 26,667
185 Gate Valve ø 25 mm (1") No 210,000
186 Cable power for Pump, NYY HY 4x4 mm ex Supreme or equal roll 1,310,000
187 Pump sensor cable , WLC NYY HY 3x1.5 mm ex Supreme or equal roll 398,000
188 Galvanized pipe Ø 2", medium A; @ 6 m m' 104,167
Batu alam andesit m2 85,000
Alumunium foil m2 59,667
Plafon pvc m2 175,000
List profil pvc m 17,500
Fence Panel + kawat duri m 1,500,000
water tank fiberglass 2000liter pcs 3,825,000
water tank fiberglass 1000liter pcs 2,091,000
Chequered pate kg 8,500
Natural stone m2 85,000
Metal roof m2 78,900

Page 4 of 7
Paving Block m2 150,000
Boc Culvert 300x150x100 pcs 19,650,000
Fire Hydrant lot 366,081,250

II REMUNERATION
1 Worker man/day 120,000
2 Surveyor man/day 200,000
3 Supervisor man/day 150,000
4 Operator man/day 152,000
5 Brick Layer man/day 120,000
6 Steel worker man/day 120,000
7 Carpeter man/day 120,000
8 Paint worker man/day 120,000
9 Mechanic man/day 120,000
10 Asphalt worker man/day 120,000
11 Worker Chief man/day 130,000
12 Engineer man/day 300,000

III RENT OF EQUIPMENT


1 Molen of machine 0.35 m3 hour 500,000.00
2 Truck/Buldozer hour 71,900.00
3 Driven Pile of Machine complete with hammer hour 250,000.00
4 Mobilisasion Equipment ls 5,000,000.00
5 Support equipment ( key + safety belt ) hour 48,600.00
6 Stamper /Stomwalls hour 113,700.00
7 Theodolit hour 47,937.50
8 Small crane unit/day 152,100
9 Pile connection no 150,000
10 Vibrator hour 149,400
11 Jack Hammer unit/day 350,000
12 Gergaji bh 10,000
13 Hammer bh 10,000
14 Tripod unit/day 2,500,000
15 Roller Vibro hour 150,000
16 Water Tank Truck unit/day 550,000.00
17 Drilling Machine hour 270,000
18 Pipe Tremi hour 150,000
19 Casing ls 37,000
20 Excavator hour 149,300
21 Aids set 170,000
22 Buldozer hour 71,900
23 Crane 10 - 15 ton hour 437,500
24 Trailer 20 ton hour 500,000
25 Crane on track 35 ton hour 437,500
26 Chisel Concrete pcs 130,000
27 Measuring Stick unit/day 500,000
28 Tape Measure unit/day 130,000
29 Car/Vehicle unit/day 350,000
Tools unit/day 50,000

IV WORK
1 Mobilization & Demobilization (for Switchyard) ls 20,000,000.00
2 Water Supply for Construction ls 10,000,000.00

Page 5 of 7
3 Electrical Supply for Construction ls 15,000,000.00
4 a. DCPT (Sondir) Pcs 450,000.00
5 b. Core Drilling Pcs 200,000.00
6 c. Test Lab and Report Sets 15,000,000.00
7 Design for Civil Works ls 50,000,000
8 b. Test Sand Cone (per-layer of 20 cm) ttk 150,000
Light-emitting diode (LED) Street Light 1 x 125 W complete with
lighting column 9 m high, fuse box, grounding system and installation
NO 3,600,000
of cable conduit and wiring and all accessories and foundation of
9 column (each 50 m length)

Light-emitting diode (LED) Flood Light 1 x 100 W complete with


support, fuse box, grounding system and installation of cable conduit NO 3,500,000
and wiring and all accessories for Switchyard
10

Light-emitting diode (LED) 1 x 20 W complete with lighting column


2 m high, fuse box, grounding system and installation of cable conduit NO 1,000,000
and wiring and all accessories and foundation of column
11

Lighting panel outdoor complete with foto cell switch fuse, mcb,
grounding system indicator wiring and all accessories (foto cell) and Set 2,000,000
foundation of panel
12
13 Purlin complete with plat simpul and steel painting kg 21,000
14 Wind bracing and tie rod kg 21,000
15 Aluminium flashing t=0.50 mm including filler in both side m' 74,800
16 Steel angle include welding or bolting kg 21,000
18 - Type PB2 (For GIS Building 150 KV) unit 4,917,200
19 - Type PJ1 (For GIS Building 150 KV) unit 5,785,000
20 - Type PD1 (For GIS Building 150 KV) unit 4,225,000
21 - Type P1 (For GIS Building 150 KV) unit 2,225,000
22 - Type P2 (For GIS Building 150 KV) unit 1,615,550
23 - Type BV1 (For GIS Building 150 KV) unit 508,640
24 - Type BV2 (For GIS Building 150 KV) unit 750,720
25 - Type BV3 (For GIS Building 150 KV) unit 3,282,000
26 - Type J1 (For GIS Building 150 KV) unit 4,915,200
27 - Type J2 (For GIS Building 150 KV) unit 4,182,000
28 Type RD unit 2,325,000
29 Grille & louvre complette with aluminium frame and accessories unit 1,500,000
Steel sliding door (P3) complete with frame, accessories and steel
unit 7,500,000
30 painting
Water tank stainless steel 2 x1000 liter and pressure tank 100 liter and
unit 20,000,000
31 steel structures tower ( cap : 2 m3 ) and installation of pipe
32 Natural stone (terace) m2 140,000
Metal raised floor 50 mm thick, including vinil finishing (control,
m2 1,251,100
33 SAS)
34 Handrail of stainless steel pipe ø 2" m' 113,400
35 Cable Rack thickness 2 mm m' 41,667
36 Emergency spiral staircase of stainless steel include foundation set 5,500,000
37 Stainless steel of fence m' 500,000
38 Steel angle include welding or bolting kg 21,000
Arder/ground rod icluded pipa and cable BC 25 mm2 and all
accessories clamps steel plate, material support and pole, grounding Lot 14,000,000
39 system for controle building

Hydrant and accessories included installation of pipe Lot 3,000,000


40
Underground Water tank (cap : 100 m3) and jet pump included
Lot 4,350,000
41 installation of pipe

Page 6 of 7
42 Flagpole Stainless Steel ø 3" with acc + Foundation No 10,000,000
43 Name plate "GIS 150 kV KARAWANG" work complete with stainless steel No 5,000,000
44 Key box No 265,000
45 - Type P1 (For Pos Jaga) unit 1,754,800
46 - Type P2 (For Pos Jaga) unit 1,498,000
47 - Type J1 (For Pos Jaga) unit 5,396,000
48 - Type J2 (For Pos Jaga) unit 1,337,600
49 - Type J3 (For Pos Jaga) unit 663,520
50 Price for capacity electrical (For Pos Jaga) ls 1,000,000
51 Accessories for Sliding Gate SNT Standard etc ls 500,000
52 Instalasi pipe & valve dia. 1" (to water tank) m 221,275
53 Mobilisation & demobilisation for Deep Well Work ls 2,000,000
Foundation boring machine, tower, install machine, basin & mud
ls 30,000,000
54 circulation for Deep Well Work
Supervision, administration & coordination for Deep Well Work ls 5,000,000
55
56 Top Casing drilling Ø 12" - 16" kedalaman 12 m atau lebih m 50,000
57 Pilot hole drilling Ø 6 " m 85,000
58 Enlarging the borehole Ø 8" m 65,000
59 Top Casing PVC pipe Ø 12" ( AW ex Wavin or equal) m 312,500
60 Deep well casing PVC pipe Ø 6" (AW ex Wavin or equal) m 130,525
61 Screen filter pipe low carbon steel Ø 4" set 2,000,000
62 Pumping fee ls 4,927,000
63 wage cleaning wells using a compressor ls 2,000,000
64 Control basin work under ground surface (well head) ls 840,000
65 Miscellaneous equipment & material for Deep Well Work ls 1,000,000
66 Resin cable connection & insulating + cable installation fee is 160,000
67 Submersible pump & galvanized pipe installation ls 1,707,000.00
68 Double WLC panel control 3 kW/380 Volt + WLC Electroda ls 2,500,000
69 Electrical panel control instalation fee ls 250,000
70 Pumping test for Deep Well Pump Work ls 200,000
71 Water quality laboratorium test for Deep Well Pump Work ls 100,000
72 Commisioning/running production for Deep Well Pump Work ls 5,000,000
73 Final report for Commissioning deep Well Pump Work book 300,000
74 cost of obtaining a license underground water ls 3,000,000
75 Water meter for Deep Well Pump Work ls 98,000
76 Accessories / completeness for License Underground Water ls 500,000
77 Mobilisation & demobilisation for Topographical Survey ls 1,000,000
78 Submersible pump & Galvanized pipe instalallation ls 500,000

Page 7 of 7