MINISTRY OF Electricity
1. The Government of Iraq has received financing from the World Bank toward the cost of
the Emergency Operation for Development Project (EODP) -Additional Finance,
and intends to apply part of the proceeds toward payments under the contract for
Supplying 36 and 11 KV Switchgear and Equipment for (132 KV) Substations
Rehabilitation for Ninawa. For this contract, the Borrower shall process the payments
using the Direct Payment disbursement method, as defined in the World Bank’s
Disbursement Guidelines for Investment Project Financing.
2. The Ministry of Electricity (MOE) now invites sealed Bids from eligible Bidders for
the supply of the following goods for Ninawa Governorate :
Switchgear (full set of 3 sections), Wave Traps, Earthing / Auxiliary Transformers ,
Busbar Voltage Transformer, 36kV Feeders, Circuit Breakers, Relays, Coils,
Meters, Charging motor for C.B. , Accessories
The Goods are required to be delivered within 120 to 180 days from date of signing the
contract, and a margin of domestic preference shall not apply
4. Interested eligible Bidders may obtain further information from the Ministry of
Electricity/ Investment and Contracts Office / Al-Mansour /AL - Naqabat Street,
Attention: Ahmed Mahmood Sami – Procurement Officer, Electronic mail address:
eodp@moelc.gov.iq and inspect the bidding document during office hours 0900 to 1430
hours at the address given below.
5. The bidding document in ENGLISH may be purchased by interested Bidders upon the
submission of a written application to the address below and upon payment of a
nonrefundable fee of USD 60. The method of payment will be in cash. The document
will be hand delivered.
6. Bids must be delivered to the address below on or before Jul 30, 2019 Time: 11:00 A.M
Baghdad Local Time. Electronic Bidding will not be permitted. Late Bids will be
rejected. Bids will be publicly opened in the presence of the Bidders’ designated
representatives and anyone who chooses to attend at the address below on Jul 30, 2019
Time: 11:30 A.M Baghdad Local Time.
7. All Bids must be accompanied by a Bid Security of USD 60,000. The validity of the bid
security shall be valid for twenty eight (28) days beyond the original validity period of
the Bid.
9. A pre-bid meeting for interested eligible Bidders will be held on Tuesday, Jul 16, 2019
10 AM Baghdad local time at the address in item 8.
REPUBLIC OF IRAQ
MINISTRY OF Electricity
Table of Contents
PART 1 – Bidding Procedures ............................................................................................... 3
Section I - Instructions to Bidders .............................................................................................5
Section II - Bid Data Sheet (BDS) ...........................................................................................37
Section III - Evaluation and Qualification Criteria ..................................................................43
Section IV - Bidding Forms .....................................................................................................47
Section V - Eligible Countries .................................................................................................61
Section VI - Fraud and Corruption ..........................................................................................63
Contents
A. General ............................................................................................................................... 7
1. Scope of Bid ...................................................................................................................7
2. Source of Funds .............................................................................................................7
3. Fraud and Corruption .....................................................................................................8
4. Eligible Bidders .............................................................................................................8
5. Eligible Goods and Related Services ...........................................................................11
A. General
1. Scope of Bid 1.1 In connection with the Specific Procurement Notice,
Request for Bids (RFB), specified in the Bid Data Sheet
(BDS), the Purchaser, as specified in the BDS, issues this
bidding document for the supply of Goods and, if
applicable, any Related Services incidental thereto, as
specified in Section VII, Schedule of Requirements. The
name, identification and number of lots (contracts) of this
RFB are specified in the BDS.
1.2 Throughout this bidding document:
(a) the term “in writing” means communicated in
written form (e.g. by mail, e-mail, fax, including if
specified in the BDS, distributed or received
through the electronic-procurement system used by
the Purchaser) with proof of receipt;
(b) if the context so requires, “singular” means
“plural” and vice versa; and
(c) “Day” means calendar day, unless otherwise
specified as “Business Day”. A Business Day is
any day that is an official working day of the
Borrower. It excludes the Borrower’s official
public holidays.
2. Source of Funds 2.1 The Borrower or Recipient (hereinafter called
“Borrower”) specified in the BDS has applied for or
received financing (hereinafter called “funds”) from the
International Bank for Reconstruction and Development
or the International Development Association
(hereinafter called “the Bank”) in an amount specified
in the BDS, toward the project named in the BDS. The
Borrower intends to apply a portion of the funds to
eligible payments under the contract for which this
bidding document is issued.
2.2 Payment by the Bank will be made only at the request of
the Borrower and upon approval by the Bank in
accordance with the terms and conditions of the Loan
(or other financing) Agreement. The Loan (or other
financing) Agreement prohibits a withdrawal from the
Section I – Instructions to Bidders (ITB) 8
4. Eligible Bidders 4.1 A Bidder may be a firm that is a private entity, a state-
owned enterprise or institution subject to ITB 4.6, or any
combination of such entities in the form of a joint venture
(JV) under an existing agreement or with the intent to enter
into such an agreement supported by a letter of intent. In
the case of a joint venture, all members shall be jointly and
severally liable for the execution of the entire Contract in
accordance with the Contract terms. The JV shall nominate
a Representative who shall have the authority to conduct
all business for and on behalf of any and all the members
of the JV during the Bidding process and, in the event the
JV is awarded the Contract, during contract execution.
Unless specified in the BDS, there is no limit on the
number of members in a JV.
5. Eligible Goods and 5.1 All the Goods and Related Services to be supplied under
Related Services the Contract and financed by the Bank may have their
origin in any country in accordance with Section V,
Eligible Countries.
5.2 For purposes of this ITB, the term “goods” includes
commodities, raw material, machinery, equipment, and
industrial plants; and “related services” includes services
such as insurance, installation, training, and initial
maintenance.
5.3 The term “origin” means the country where the goods
have been mined, grown, cultivated, produced,
manufactured or processed; or, through manufacture,
processing, or assembly, another commercially
recognized article results that differs substantially in its
basic characteristics from its components.
Criteria
Section IV - Bidding Forms
Section V - Eligible Countries
Section VI - Fraud and Corruption
PART 2 Supply Requirements
PART 3 Contract
C. Preparation of Bids
9. Cost of Bidding 9.1 The Bidder shall bear all costs associated with the
preparation and submission of its Bid, and the Purchaser
shall not be responsible or liable for those costs,
regardless of the conduct or outcome of the Bidding
process.
10. Language of Bid 10.1 The Bid, as well as all correspondence and documents
relating to the Bid exchanged by the Bidder and the
Purchaser, shall be written in the language specified in
the BDS. Supporting documents and printed literature
that are part of the Bid may be in another language
provided they are accompanied by an accurate
translation of the relevant passages into the language
specified in the BDS, in which case, for purposes of
interpretation of the Bid, such translation shall govern.
11. Documents 11.1 The Bid shall comprise the following:
Comprising the Bid
(a) Letter of Bid prepared in accordance with ITB 12;
(b) Price Schedules: completed in accordance with ITB
12 and ITB 14;
(c) Bid Security or Bid-Securing Declaration, in
accordance with ITB 19.1;
Section I – Instructions to Bidders (ITB) 14
Requirements.
16.3 The documentary evidence may be in the form of
literature, drawings or data, and shall consist of a
detailed item by item description of the essential
technical and performance characteristics of the Goods
and Related Services, demonstrating substantial
responsiveness of the Goods and Related Services to the
technical specification, and if applicable, a statement of
deviations and exceptions to the provisions of the
Section VII, Schedule of Requirements.
16.4 The Bidder shall also furnish a list giving full
particulars, including available sources and current
prices of spare parts, special tools, etc., necessary for the
proper and continuing functioning of the Goods during
the period specified in the BDS following
commencement of the use of the goods by the Purchaser.
16.5 Standards for workmanship, process, material, and
equipment, as well as references to brand names or
catalogue numbers specified by the Purchaser in the
Schedule of Requirements, are intended to be descriptive
only and not restrictive. The Bidder may offer other
standards of quality, brand names, and/or catalogue
numbers, provided that it demonstrates, to the
Purchaser’s satisfaction, that the substitutions ensure
substantial equivalence or are superior to those specified
in the Section VII, Schedule of Requirements.
17. Documents 17.1 To establish Bidder’s eligibility in accordance with ITB 4,
Establishing the Bidders shall complete the Letter of Bid, included in
Eligibility and Section IV, Bidding Forms.
Qualifications of the
Bidder 17.2 The documentary evidence of the Bidder’s qualifications
to perform the Contract if its Bid is accepted shall
establish to the Purchaser’s satisfaction:
(a) that, if required in the BDS, a Bidder that does not
manufacture or produce the Goods it offers to supply
shall submit the Manufacturer’s Authorization using
the form included in Section IV, Bidding Forms to
demonstrate that it has been duly authorized by the
manufacturer or producer of the Goods to supply
these Goods in the Purchaser’s Country;
(b) that, if required in the BDS, in case of a Bidder not
doing business within the Purchaser’s Country, the
Bidder is or will be (if awarded the Contract)
Section I – Instructions to Bidders (ITB) 19
19. Bid Security 19.1. The Bidder shall furnish as part of its Bid, either a Bid-
Securing Declaration or a Bid Security, as specified in
the BDS, in original form and, in the case of a Bid
Security, in the amount and currency specified in the
BDS.
Section I – Instructions to Bidders (ITB) 20
20. Format and Signing 20.1 The Bidder shall prepare one original of the documents
of Bid comprising the Bid as described in ITB 11 and clearly
mark it “ORIGINAL.” Alternative Bids, if permitted in
accordance with ITB 13, shall be clearly marked
“ALTERNATIVE.” In addition, the Bidder shall submit
copies of the Bid, in the number specified in the BDS and
clearly mark them “COPY.” In the event of any
discrepancy between the original and the copies, the
Section I – Instructions to Bidders (ITB) 22
23. Late Bids 23.1. The Purchaser shall not consider any Bid that arrives
after the deadline for submission of Bids, in accordance
with ITB 22. Any Bid received by the Purchaser after
the deadline for submission of Bids shall be declared
late, rejected, and returned unopened to the Bidder.
24. Withdrawal, 24.1. A Bidder may withdraw, substitute, or modify its Bid
Substitution, and after it has been submitted by sending a written notice,
Modification of Bids duly signed by an authorized representative, and shall
include a copy of the authorization (the power of
attorney) in accordance with ITB 20.3, (except that
withdrawal notices do not require copies). The
corresponding substitution or modification of the Bid
must accompany the respective written notice. All
notices must be:
(a) prepared and submitted in accordance with ITB 20
and 21 (except that withdrawal notices do not
require copies), and in addition, the respective
envelopes shall be clearly marked
“WITHDRAWAL,” “SUBSTITUTION,” or
“MODIFICATION;” and
(b) received by the Purchaser prior to the deadline
prescribed for submission of Bids, in accordance
with ITB 22.
24.2. Bids requested to be withdrawn in accordance with ITB
24.1 shall be returned unopened to the Bidders.
24.3. No Bid may be withdrawn, substituted, or modified in
the interval between the deadline for submission of Bids
and the expiration of the period of Bid validity specified
by the Bidder on the Letter of Bid or any extension
thereof.
25. Bid Opening 25.1. Except as in the cases specified in ITB 23 and ITB 24.2,
the Purchaser shall, at the Bid opening, publicly open
and read out all Bids received by the deadline at the
date, time and place specified in the BDS in the presence
of Bidders’ designated representatives and anyone who
chooses to attend Any specific electronic Bid opening
procedures required if electronic bidding is permitted in
accordance with ITB 22.1, shall be as specified in the
BDS.
25.2. First, envelopes marked “WITHDRAWAL” shall be
Section I – Instructions to Bidders (ITB) 25
31. Correction of 31.1 Provided that the Bid is substantially responsive, the
Arithmetical Errors Purchaser shall correct arithmetical errors on the following
basis:
(a) if there is a discrepancy between the unit price and
the line item total that is obtained by multiplying
the unit price by the quantity, the unit price shall
prevail and the line item total shall be corrected,
unless in the opinion of the Purchaser there is an
obvious misplacement of the decimal point in the
unit price, in which case the line item total as
quoted shall govern and the unit price shall be
corrected;
(b) if there is an error in a total corresponding to the
addition or subtraction of subtotals, the subtotals
shall prevail and the total shall be corrected; and
(c) if there is a discrepancy between words and
figures, the amount in words shall prevail, unless
the amount expressed in words is related to an
arithmetic error, in which case the amount in
figures shall prevail subject to (a) and (b) above.
31.2 Bidders shall be requested to accept correction of
arithmetical errors. Failure to accept the correction in
Section I – Instructions to Bidders (ITB) 29
34. Evaluation of Bids 34.1 The Purchaser shall use the criteria and methodologies
listed in this ITB and Section III, Evaluation and
Qualification criteria. No other evaluation criteria or
methodologies shall be permitted. By applying the
criteria and methodologies, the Purchaser shall
determine the Most Advantageous Bid. This is the Bid
of the Bidder that meets the qualification criteria and
whose Bid has been determined to be:
(a) substantially responsive to the bidding document;
and
(b) the lowest evaluated cost.
34.2 To evaluate a Bid, the Purchaser shall consider the
following:
(a) evaluation will be done for Items or Lots
(contracts), as specified in the BDS; and the Bid
Price as quoted in accordance with ITB 14;
(b) price adjustment for correction of arithmetic errors
in accordance with ITB 31.1;
(c) price adjustment due to discounts offered in
accordance with ITB 14.4;
(d) converting the amount resulting from applying (a)
to (c) above, if relevant, to a single currency in
accordance with ITB 32;
(e) price adjustment due to quantifiable nonmaterial
nonconformities in accordance with ITB 30.3; and
(f) the additional evaluation factors are specified in
Section III, Evaluation and Qualification Criteria.
34.3 The estimated effect of the price adjustment provisions of
the Conditions of Contract, applied over the period of
execution of the Contract, shall not be taken into account
Section I – Instructions to Bidders (ITB) 30
in Bid evaluation.
34.4 If this bidding document allows Bidders to quote separate
prices for different lots (contracts), the methodology to
determine the lowest evaluated cost of the lot (contract)
combinations, including any discounts offered in the Letter
of Bid, is specified in Section III, Evaluation and
Qualification Criteria.
34.5 The Purchaser’s evaluation of a Bid will exclude and not
take into account:
(a) in the case of Goods manufactured in the
Purchaser’s Country, sales and other similar taxes,
which will be payable on the goods if a contract is
awarded to the Bidder;
(b) in the case of Goods manufactured outside the
Purchaser’s Country, already imported or to be
imported, customs duties and other import taxes
levied on the imported Good, sales and other
similar taxes, which will be payable on the Goods
if the contract is awarded to the Bidder;
(c) any allowance for price adjustment during the
period of execution of the contract, if provided in
the Bid.
34.6 The Purchaser’s evaluation of a Bid may require the
consideration of other factors, in addition to the Bid
Price quoted in accordance with ITB 14. These factors
may be related to the characteristics, performance, and
terms and conditions of purchase of the Goods and
Related Services. The effect of the factors selected, if
any, shall be expressed in monetary terms to facilitate
comparison of Bids, unless otherwise specified in the
BDS from amongst those set out in Section III,
Evaluation and Qualification Criteria. The criteria and
methodologies to be used shall be as specified in ITB
34.2(f).
35. Comparison of Bids 35.1 The Purchaser shall compare the evaluated costs of all
substantially responsive Bids established in accordance
with ITB 34.2 to determine the Bid that has the lowest
evaluated cost. The comparison shall be on the basis of
CIP (place of final destination) prices for imported
goods and EXW prices, plus cost of inland
transportation and insurance to place of destination, for
goods manufactured within the Borrower’s country,
Section I – Instructions to Bidders (ITB) 31
39. Standstill Period 39.1 The Contract shall not be awarded earlier than the expiry
of the Standstill Period. The Standstill Period shall be ten
(10) Business Days unless extended in accordance with
ITB 44. The Standstill Period commences the day after the
date the Purchaser has transmitted to each Bidder the
Notification of Intention to Award the Contract. Where
only one Bid is submitted, or if this contract is in response
to an emergency situation recognized by the Bank, the
Standstill Period shall not apply.
40. Notification of 40.1 The Purchaser shall send to each Bidder the Notification
Intention to Award of Intention to Award the Contract to the successful
Bidder. The Notification of Intention to Award shall
contain, at a minimum, the following information:
(a) the name and address of the Bidder submitting the
successful Bid;
(b) the Contract price of the successful Bid;
(c) the names of all Bidders who submitted Bids, and
their Bid prices as readout, and as evaluated;
(d) a statement of the reason(s) the Bid (of the
unsuccessful Bidder to whom the notification is
addressed) was unsuccessful, unless the price
information in c) above already reveals the reason;
(e) the expiry date of the Standstill Period;
(f) instructions on how to request a debriefing and/or
submit a complaint during the standstill period.
F. Award of Contract
41. Award Criteria 41.1 Subject to ITB 38, the Purchaser shall award the
Contract to the Bidder offering the Most Advantageous
Bid. The Most Advantageous Bid is the Bid of the Bidder
that meets the qualification criteria and whose Bid has
been determined to be:
Section I – Instructions to Bidders (ITB) 33
45. Signing of Contract 45.1 The Purchaser shall send to the successful Bidder the
Letter of Acceptance including the Contract Agreement,
and, if specified in the BDS, a request to submit the
Section I – Instructions to Bidders (ITB) 35
45.2 The successful Bidder shall sign, date and return to the
Purchaser, the Contract Agreement within twenty-eight
(28) days of its receipt.
46. Performance 46.1 Within twenty-eight (28) days of the receipt of Letter of
Security Acceptance from the Purchaser, the successful Bidder, if
required, shall furnish the Performance Security in
accordance with the GCC 18, using for that purpose the
Performance Security Form included in Section X,
Contract Forms, or another Form acceptable to the
Purchaser. If the Performance Security furnished by the
successful Bidder is in the form of a bond, it shall be
issued by a bonding or insurance company that has been
determined by the successful Bidder to be acceptable to
the Purchaser. A foreign institution providing a bond
shall have a correspondent financial institution located in
the Purchaser’s Country, unless the Purchaser has
agreed in writing that a correspondent financial
institution is not required.
46.2 Failure of the successful Bidder to submit the above-
mentioned Performance Security or sign the Contract
shall constitute sufficient grounds for the annulment of
the award and forfeiture of the Bid Security. In that
Section I – Instructions to Bidders (ITB) 36
ITB A. General
Reference
ITB 1.1 The reference number of the Request for Bids (RFB) is : EODP-AF-
MOE/T.E/G16
The Purchaser is: Ministry of Electricity (MOE)
The name of the RFB is: Supplying 36 and 11 KV Switchgear and
Equipment for (132 KV) Substations Rehabilitation for Ninawa
The number and identification of lots (contracts) comprising this RFB is: 1
Lot
ITB 4.1 Maximum number of members in the Joint Venture (JV) shall be: 3 (three)
ITB 4.5 A list of debarred firms and individuals is available on the Bank’s external
website: http://www.worldbank.org/debarr.
C. Preparation of Bids
ITB 10.1 The language of the Bid is: English
All correspondence exchange shall be in English language.
Language for translation of supporting documents and printed literature is
________NA_______________.
ITB 11.1 (j) The Bidder shall submit the following additional documents in its bid:
1. Two copies of original catalogues for Equipment for 132kV
Substation rehabilitation with its code no. in his bid;
1.1 All symbols, marks and abbreviations etc. using on any
documents shall be clearly explained by a legend on the same
document or on separate sheets.
1.2 The abbreviation and marks used for an individual device shall be
identical throughout the complete documentation so as to avoid
confusion.
1.3 Design calculations, specifications, instruction manuals and other
documents as required shall preferably be prepared and submitted
in A4 size.
2. A copy of certified Manufacturer's Authorization letter from the
manufacturer , and must be certified by the Iraqi Embassy /
Commercial Consulate at the Manufacturer's Country (or any
neighbor country in the absence of an embassy in that country) and
Chamber of commerce at the Manufacturer's Country;
3. The bidder shall submit type test report for main transformer for an
evaluation of conformity to the specification in the tender process
(The test report should be less than six years prior to the date of
tender submission).
4. ISO 9001 Certification; Equivalent quality assurance certificate
issued by an internationally recognized certification agency
5. The Bidder shall submit at least two certificates confirming
satisfactory performance, for similar equipment and specifications
as this bid, issued from at least two recognized entities which have
used similar equipment from the same manufacturer within the last
Section III – Evaluation and Qualification Criteria 39
5 years.
ITB 14.5 The prices quoted by the Bidder shall not be subject to adjustment during
the performance of the Contract.
ITB 14.6 Prices quoted for each lot (contract) shall correspond at least to 100% of
the items specified for each lot (contract).
Prices quoted for each item of a lot shall correspond at least to 100% of the
quantities specified for this item of a lot.
ITB 15.1 The bidder is not required to quote in the currency of the Purchaser's
Country the portion of the bid price that corresponds to expenditures
incurred in the currency.
ITB 16.4 Period of time the Goods are expected to be functioning (for the purpose of
spare parts): 5 years
ITB 18.1 The bid validity period shall be: Ninety (90) days.
ITB 18.3 (a) The bid price shall be adjusted by the following factor(s): The local
currency portion of the Contract price shall be adjusted by a factor
reflecting local inflation during the period of extension, and the foreign
currency portion of the Contract price shall be adjusted by a factor
reflecting the international inflation (in the country of the foreign currency)
during the period of extension
Section III – Evaluation and Qualification Criteria 40
ITB 20.1 In addition to the original of the bid, the number of copies is: (3) Three
Copies
ITB 20.3 The written confirmation of authorization to sign on behalf of the Bidder
shall consist of Certified power of Attorney
ITB 25.6 The Letter of Bid and Price Schedules shall be initialed by three
representatives of the Purchaser conducting Bid opening.
Each bid shall be initialed by all representatives and shall be numbered,
any modification to the unit or total price shall be initialed by the
Representative of the Employer.
ITB 30.3 The adjustment shall be based on the average price of the item or
component as quoted in other substantially responsive Bids. If the price of
the item or component cannot be derived from the price of other
substantially responsive Bids, the Purchaser shall use its best estimate.
ITB 32.1 The currency that shall be used for bid evaluation and comparison
purposes to convert all bid prices expressed in various currencies into a
single currency is: USD
The source of exchange rate shall be: Central Bank of Iraq
The date for the exchange rate shall be: Bid Submission Date.
period, an adjustment factor of 1% of the bid price will be added for every
6 days late delivery for a maximum of 10% for 60 days difference between
120 & 180 days. The adjustment will be applied proportionally to fractions
of 6 days. The adjustment factor will be added, for evaluation purposes
only
F. Award of Contract
ITB 42 The maximum percentage by which quantities may be increased is:25%
The maximum percentage by which quantities may be decreased is: 25 %
ITB 45. 1 The successful Bidder shall not submit the Beneficial Ownership
Disclosure Form.
ITB 47.1 The procedures for making a Procurement-related Complaint are detailed
in the “Procurement Regulations for IPF Borrowers (Annex III).” If a
Bidder wishes to make a Procurement-related Complaint, the Bidder
should submit its complaint following these procedures, in writing (by the
quickest means available, that is either by email or fax), to:
For the attention: Ahmed Mahmood Sami
Title/position: Procurement
Purchaser: Ministry of Electricity
Email address: eodp@moelc.gov.iq
In summary, a Procurement-related Complaint may challenge any of the
following:
1. the terms of the Bidding Documents; and
2. the Purchaser’s decision to award the contract.
Section III – Evaluation and Qualification Criteria 43
Contents
1. Margin of Preference (ITB 33) ........................................................................................ 44
The Bidder shall furnish documentary evidence that it meets the following
financial requirement(s):
The Bidder shall furnish documentary evidence to demonstrate that the Goods it
offers meet the following usage requirement:
Overall experience of the firm in the supply of goods and related services,
an official letter from each client certifying that the goods similar to the
goods object of this bidding process are still in good operating conditions.
(i) Eligibility and Conformity of Facilities: Copies of Type Test Reports and
technical documents (catalogue, brochures, drawings.) of each major item
offered shall form part of the bid. Copies of Type Test Reports shall meet the
following requirements:
Price Schedule: Goods Manufactured Outside the Purchaser’s Country, to be Imported ......... 54
Price Schedule: Goods Manufactured Outside the Purchaser’s Country, already imported ..... 55
Letter of Bid
The Bidder must prepare this Letter of Bid on stationery with its letterhead clearly
showing the Bidder’s complete name and business address.
Date of this Bid submission: [insert date (as day, month and year) of Bid submission]
RFB No.: [insert number of RFB process]
Request for Bid No.: [insert identification]
Alternative No.: [insert identification No if this is a Bid for an alternative]
(a) No reservations: We have examined and have no reservations to the bidding document,
including Addenda issued in accordance with Instructions to Bidders (ITB 8);
(b) Eligibility: We meet the eligibility requirements and have no conflict of interest in
accordance with ITB 4;
(c) Bid/Proposal-Securing Declaration: We have not been suspended nor declared
ineligible by the Purchaser based on execution of a Bid-Securing Declaration or
Proposal-Securing Declaration in the Purchaser’s Country in accordance with ITB 4.7;
(d) Conformity: We offer to supply in conformity with the bidding document and in
accordance with the Delivery Schedules specified in the Schedule of Requirements the
following Goods: [insert a brief description of the Goods and Related Services];
(e) Bid Price: The total price of our Bid, excluding any discounts offered in item (f) below
is:
Option 1, in case of one lot: Total price is: [insert the total price of the Bid in
words and figures, indicating the various amounts and the respective currencies];
Or
Option 2, in case of multiple lots: (a) Total price of each lot [insert the total price
of each lot in words and figures, indicating the various amounts and the
respective currencies]; and (b) Total price of all lots (sum of all lots) [insert the
total price of all lots in words and figures, indicating the various amounts and the
respective currencies];
(f) Discounts: The discounts offered and the methodology for their application are:
Section IV – Bidding Forms 49
(i) The discounts offered are: [Specify in detail each discount offered.]
(ii) The exact method of calculations to determine the net price after application of
discounts is shown below: [Specify in detail the method that shall be used to apply
the discounts];
(g) Bid Validity Period: Our Bid shall be valid for the period specified in BDS 18.1 (as
amended, if applicable) from the date fixed for the Bid submission deadline specified in
BDS 22.1 (as amended, if applicable), and it shall remain binding upon us and may be
accepted at any time before the expiration of that period;
(h) Performance Security: If our Bid is accepted, we commit to obtain a performance
security in accordance with the bidding document;
(i) One Bid per Bidder: We are not submitting any other Bid(s) as an individual Bidder,
and we are not participating in any other Bid(s) as a Joint Venture member, or as a
subcontractor, and meet the requirements of ITB 4.3, other than alternative Bids
submitted in accordance with ITB 13;
(j) Suspension and Debarment: We, along with any of our subcontractors, suppliers,
consultants, manufacturers, or service providers for any part of the contract, are not
subject to, and not controlled by any entity or individual that is subject to, a temporary
suspension or a debarment imposed by the World Bank Group or a debarment imposed
by the World Bank Group in accordance with the Agreement for Mutual Enforcement of
Debarment Decisions between the World Bank and other development banks. Further,
we are not ineligible under the Purchaser’s Country laws or official regulations or
pursuant to a decision of the United Nations Security Council;
(k) State-owned enterprise or institution: [select the appropriate option and delete the
other] [We are not a state-owned enterprise or institution] / [We are a state-owned
enterprise or institution but meet the requirements of ITB 4.6];
(l) Commissions, gratuities, fees: We have paid, or will pay the following commissions,
gratuities, or fees with respect to the Bidding process or execution of the Contract:
[insert complete name of each Recipient, its full address, the reason for which each
commission or gratuity was paid and the amount and currency of each such commission
or gratuity]
(m) Binding Contract: We understand that this Bid, together with your written acceptance
thereof included in your Letter of Acceptance, shall constitute a binding contract
between us, until a formal contract is prepared and executed;
Section IV – Bidding Forms 50
(n) Purchaser Not Bound to Accept: We understand that you are not bound to accept the
lowest evaluated cost Bid, the Most Advantageous Bid or any other Bid that you may
receive; and
(o) Fraud and Corruption: We hereby certify that we have taken steps to ensure that no
person acting for us or on our behalf engages in any type of Fraud and Corruption.
Name of the person duly authorized to sign the Bid on behalf of the Bidder: **[insert
complete name of person duly authorized to sign the Bid]
Title of the person signing the Bid: [insert complete title of the person signing the Bid]
Signature of the person named above: [insert signature of person whose name and
capacity are shown above]
Date signed [insert date of signing] day of [insert month], [insert year]
*: In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder.
**: Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be attached
with the Bid Schedules.
Section IV – Bidding Forms 51
Date: [insert date (as day, month and year) of Bid submission]
RFB No.: [insert number of RFB process]
Alternative No.: [insert identification No if this is a Bid for an alternative]
2. In case of JV, legal name of each member: [insert legal name of each member in JV]
7. Attached are copies of original documents of [check the box(es) of the attached
original documents]
Articles of Incorporation (or equivalent documents of constitution or association), and/or
documents of registration of the legal entity named above, in accordance with ITB 4.4.
In case of JV, letter of intent to form JV or JV agreement, in accordance with ITB 4.1.
In case of state-owned enterprise or institution, in accordance with ITB 4.6 documents
establishing:
Legal and financial autonomy
Operation under commercial law
Establishing that the Bidder is not under the supervision of the Purchaser
8. Included are the organizational chart, a list of Board of Directors, and the beneficial
ownership. [If required under BDS ITB 45.1, the successful Bidder shall provide additional
information on beneficial ownership, using the Beneficial Ownership Disclosure Form.]
Section IV – Bidding Forms 52
[The Bidder shall fill in this Form in accordance with the instructions indicated below. The
following table shall be filled in for the Bidder and for each member of a Joint Venture].
Date: [insert date (as day, month and year) of Bid submission]
RFB No.: [insert number of Bidding process]
Alternative No.: [insert identification No if this is a Bid for an alternative]
7. Attached are copies of original documents of [check the box(es) of the attached original
documents]
Articles of Incorporation (or equivalent documents of constitution or association), and/or
registration documents of the legal entity named above, in accordance with ITB 4.4.
In case of a state-owned enterprise or institution, documents establishing legal and financial
autonomy, operation in accordance with commercial law, and that they are not under the
supervision of the Purchaser, in accordance with ITB 4.6.
8. Included are the organizational chart, a list of Board of Directors, and the beneficial ownership.
[If required under BDS ITB 45.1, the successful Bidder shall provide additional information on
beneficial ownership for each JV member using the Beneficial Ownership Disclosure Form.]
Section IV – Bidding Forms 53
[insert [insert name of good] [insert [insert [insert number [insert unit price CIP [insert total CIP [insert the corresponding [insert total price of the line item]
number country of quoted of units to be per unit] price per line item] price per line item]
of the origin of the Delivery supplied and
item] Good] Date] name of the
physical unit]
Total Price
Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person signing the Bid] Date [Insert Date]
Section IV – Bidding Forms 55
Price Schedule: Goods Manufactured Outside the Purchaser’s Country, already imported*
Date: _________________________
(Group C Bids, Goods already imported) RFB No: _____________________
Alternative No: ________________
Currencies in accordance with ITB 15 Page N ______ of ______
1 2 3 4 5 6 7 8 9 10 11 12
Line Item Description of Goods Country of Delivery Quantity Unit price Custom Duties Unit Price net Price per line Price per line item Sales and other Total Price per line
N Origin Date as and including and Import Taxes of custom item net of for inland taxes paid or item
defined by physical Custom Duties paid per unit in duties and Custom Duties transportation and payable per item (Col. 9+10)
Incoterms unit and Import accordance with import taxes, in and Import other services if Contract is
Taxes paid, in ITB 14.8(c)(ii) , accordance Taxes paid, in required in the awarded (in
accordance [to be supported with ITB 14.8 accordance with Purchaser’s accordance with
with ITB by documents] (c) (iii) ITB 14.8(c)(i) Country to convey ITB 14.8(c)(iv)
14.8(c)(i) (Col. 6 minus (Col. 58) the goods to their
Col.7) final destination, as
specified in BDS in
accordance with
ITB 14.8 (c)(v)
[insert [insert name of [insert [insert [insert [insert unit [insert custom [insert unit [ insert price per [insert price per [insert sales and [insert total price per
number of Goods] country of quoted number of price per unit] duties and taxes price net of line item net of line item for inland other taxes line item]
the item] origin of Delivery units to be paid per unit] custom duties custom duties transportation and payable per item
the Good] Date] supplied and import and import other services if Contract is
and name taxes] taxes] required in the awarded]
of the Purchaser’s
physical Country]
unit]
Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person signing the Bid] Date [insert date]
* [For previously imported Goods, the quoted price shall be distinguishable from the original import value of these Goods declared to customs and shall include
any rebate or mark-up of the local agent or representative and all local costs except import duties and taxes, which have been and/or have to be paid by the
Purchaser. For clarity the Bidders are asked to quote the price including import duties, and additionally to provide the import duties and the price net of import
duties which is the difference of those values.]
Section IV – Bidding Forms 56
1 2 3 4 5 6 7 8 9 10
Line Description of Goods Delivery Date Quantity Unit price Total EXW Price per line item for Cost of local labor, Sales and other taxes payable Total Price per
Item as defined by and EXW price per line inland transportation and raw materials and per line item if Contract is line item
N Incoterms physical item other services required in components from awarded (in accordance with (Col. 6+7)
unit (Col. 45) the Purchaser’s Country to with origin in the ITB 14.8(a)(ii)
convey the Goods to their Purchaser’s Country
final destination % of Col. 5
[insert [insert name of Good] [insert quoted [insert [insert EXW [insert total [insert the corresponding [Insert cost of local [insert sales and other taxes [insert total
number Delivery number of unit price] EXW price per price per line item] labor, raw material payable per line item if price per item]
of the Date] units to line item] and components Contract is awarded]
item] be from within the
supplied Purchase’s country
and name as a % of the EXW
of the price per line item]
physical
unit]
Total Price
Name of Bidder [insert complete name of Bidder] Signature of Bidder [signature of person signing the Bid] Date [insert date]
Section IV – Bidding Forms 57
[insert [insert name of Services] [insert country [insert delivery date at [insert number of units to be supplied and [insert unit price per [insert total price per
number of of origin of the place of final name of the physical unit] item] item]
the Services] destination per Service]
Service ]
[The bank shall fill in this Bank Guarantee Form in accordance with the instructions
indicated.]
RFB No.: [Purchaser to insert reference number for the Request for Bids]
Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]
We have been informed that ______ [insert name of the Bidder, which in the case of a joint
venture shall be the name of the joint venture (whether legally constituted or prospective) or
the names of all members thereof] (hereinafter called "the Applicant") has submitted or will
submit to the Beneficiary its Bid (hereinafter called "the Bid") for the execution of
________________ under Request for Bids No. __________ _ (“the RFB”).
At the request of the Applicant, we, as Guarantor, hereby irrevocably undertake to pay the
Beneficiary any sum or sums not exceeding in total an amount of ___________
(____________) upon receipt by us of the Beneficiary’s complying demand, supported by
the Beneficiary’s statement, whether in the demand itself or a separate signed document
accompanying or identifying the demand, stating that either the Applicant:
(a) has withdrawn its Bid during the period of Bid validity set forth in the Applicant’s
Letter of Bid (“the Bid Validity Period”), or any extension thereto provided by the
Applicant; or
(b) having been notified of the acceptance of its Bid by the Beneficiary during the Bid
Validity Period or any extension thereto provided by the Applicant, (i) has failed to sign
the contract agreement, or (ii) has failed to furnish the performance security, in
Section IV – Bidding Forms 59
This guarantee will expire: (a) if the Applicant is the successful Bidder, upon our receipt of
copies of the Contract agreement signed by the Applicant and the performance security
issued to the Beneficiary in relation to such Contract agreement; or (b) if the Applicant is not
the successful Bidder, upon the earlier of (i) our receipt of a copy of the Beneficiary’s
notification to the Applicant of the results of the Bidding process; or (ii) twenty-eight days
after the end of the Bid Validity Period.
Consequently, any demand for payment under this guarantee must be received by us at the
office indicated above on or before that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010
Revision, ICC Publication No. 758.
_____________________________
[Signature(s)]
Note: All italicized text is for use in preparing this form and shall be deleted from the final
product.
Section IV – Bidding Forms 60
Manufacturer’s Authorization
[The Bidder shall require the Manufacturer to fill in this Form in accordance with the
instructions indicated. This letter of authorization should be on the letterhead of the
Manufacturer and should be signed by a person with the proper authority to sign documents
that are binding on the Manufacturer. The Bidder shall include it in its Bid, if so indicated in
the BDS.]
Date: [insert date (as day, month and year) of Bid submission]
RFB No.: [insert number of RFB process]
Alternative No.: [insert identification No if this is a Bid for an alternative]
WHEREAS
We [insert complete name of Manufacturer], who are official manufacturers of [insert type
of goods manufactured], having factories at [insert full address of Manufacturer’s factories],
do hereby authorize [insert complete name of Bidder] to submit a Bid the purpose of which is
to provide the following Goods, manufactured by us [insert name and or brief description of
the Goods], and to subsequently negotiate and sign the Contract.
We hereby extend our full guarantee and warranty in accordance with Clause 28 of the
General Conditions of Contract, with respect to the Goods offered by the above firm.
In reference to ITB 4.8 and ITB 5.1, for the information of the Bidders, at the present time
firms, goods and services from the following countries are excluded from this Bidding
process:
1
For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation,
(i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated
sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of
such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing
contract.
2
A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider
(different names are used depending on the particular bidding document) is one which has been: (i) included by the
bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that
allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.
3
Inspections in this context usually are investigative (i.e., forensic) in nature. They involve fact-finding activities
undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits,
such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms.
Section VI – Fraud and Corruption 65
Such activity includes but is not limited to: accessing and examining a firm's or individual's financial records and
information, and making copies thereof as relevant; accessing and examining any other documents, data and
information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies
thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits;
and obtaining third party verification of information.
Part 2 – Supply Requirements 67
Contents
Schedule of Requirements
As a summery the Purchaser requests from the Bidder according to this Bidding Document to
undertake for the following supplies and services:
Line Item Description of Goods Quantity Physical Final (Project Delivery (as per Incoterms) Date
N unit Site)
Earliest Delivery Latest Delivery Bidder’s offered
Destination as
Date Date Delivery date [to be
specified in
BDS provided by the
bidder]
Qaraqush
120 days from the 180 days from the
132kV
1 132kV Line Wave Traps 1 Unit. Substation
date of signing the date of signing
Contract the Contract
Warehouse
EARTHING / Qaraqush
120 days from the 180 days from the
AUXILIARY 132kV
2 5 Unit. Substation
date of signing the date of signing
TRANSFORMER Contract the Contract
250kVA 11/0.4 Warehouse
3 Qaraqush
33KV Busbar voltage 120 days from the 180 days from the
132kV
transformer with fuse 5 Unit. Substation
date of signing the date of signing
33/√3/0.11/√3/0.11/√3 Warehouse
Contract the Contract
4 Qaraqush
120 days from the 180 days from the
33kV neutral point 132kV
12 Unit. date of signing the date of signing
Earthing reactor Substation
Contract the Contract
Warehouse
Qaraqush
Indoor section 36kV 120 days from the 180 days from the
132kV
5 switchgear (full set of 3 1 set Substation
date of signing the date of signing
sections)1 Warehouse
Contract the Contract
Qaraqush
120 days from the 180 days from the
132kV
5.1 Transformer Feeder 3 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Section VII – Schedule of Requirements 72
Qaraqush
120 days from the 180 days from the
132kV
5.2 Bus bar Section 2 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.3 Bus Riser Feeder 2 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.4 Line Feeder 12 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.5 Capacitor Feeder 3 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.6 Busbar Metering Feeder 1 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Auxiliary transformer 132kV
5.7 3 Unit Substation
date of signing the date of signing
feeder Contract the Contract
Warehouse
5.8 Accessories ,
Lifter including draw-out Qaraqush
120 days from the 180 days from the
handle, charging handle, 132kV
5.8.1 4 set Substation
date of signing the date of signing
operating handle etc. for Contract the Contract
VCB & ES Warehouse
Protection relay with Qaraqush
120 days from the 180 days from the
original software and 132kV
5.8.2 1 Unit Substation
date of signing the date of signing
configuration with USB to Contract the Contract
Serial port converter cable Warehouse
5.9 Spares
Section VII – Schedule of Requirements 73
Qaraqush
120 days from the 180 days from the
132kV
5.9.1 Outgoing Feeder 1 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Incoming Circuit 132kV
5.9.2 2 Unit Substation
date of signing the date of signing
Breaker Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Outgoing feeder circuit 132kV
5.9.3 4 Unit Substation
date of signing the date of signing
breaker Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.4 Incoming Feeder CT 1 Set Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.5 Outgoing feeder CT (set) 1 Set Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.6 Voltage Transformer 1 Set Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.7 Closing Coil 6 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.8 Tripping Coil 6 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Protection device for 132kV
5.9.9 3 Unit Substation
date of signing the date of signing
outgoing feeder Contract the Contract
Warehouse
Section VII – Schedule of Requirements 74
Qaraqush
120 days from the 180 days from the
132kV
5.9.10 Charging motor for C.B. 3 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.11 A.C.M.C.B. 10 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.12 D.C.M.C.B. 10 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Multi-meter for outgoing 132kV
5.9.13 4 Unit Substation
date of signing the date of signing
feeder Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.14 Auxiliary relay 6 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.15 Frequency relay 1 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
5.9.16 Voltage relay 1 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
Indoor section 12kV 120 days from the 180 days from the
132kV
6 switchgear (full set of 3 1 set Substation
date of signing the date of signing
sections)2 Warehouse
Contract the Contract
Qaraqush
120 days from the 180 days from the
132kV
6.1 Transformer Feeder 3 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Section VII – Schedule of Requirements 75
Qaraqush
120 days from the 180 days from the
132kV
6.2 Busbar Section 2 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.3 Bus Riser 2 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.4 Line Feeder 18 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Auxiliary Grounding 132kV
6.5 3 Unit Substation
date of signing the date of signing
Transformer Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.6 Busbar Metering Feeder 1 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
6.7 Accessories
Lifter including draw-out Qaraqush
120 days from the 180 days from the
handle, charging handle, 132kV
6.7.1 4 set Substation
date of signing the date of signing
operating handle etc. for Contract the Contract
VCB & ES Warehouse
Protection relay with Qaraqush
120 days from the 180 days from the
original software and 132kV
6.7.2 1 Unit Substation
date of signing the date of signing
configuration with USB to Contract the Contract
Serial port converter cable Warehouse
6.8 Spare parts
Qaraqush
120 days from the 180 days from the
132kV
6.8.1 Outgoing Feeder 1 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Section VII – Schedule of Requirements 76
Qaraqush
Circuit breaker for 120 days from the 180 days from the
132kV
6.8.2 incoming transformer 2 Unit Substation
date of signing the date of signing
feeder 2500A Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Circuit breaker for 132kV
6.8.3 4 Unit Substation
date of signing the date of signing
outgoing feeder Contract the Contract
Warehouse
Qaraqush
Current transformer for 120 days from the 180 days from the
132kV
6.8.4 incoming transformer 1 Set Substation
date of signing the date of signing
feeder Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Current transformer for 132kV
6.8.5 3 Set Substation
date of signing the date of signing
outgoing feeder Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.8.6 Voltage transformer 1 Set Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.8.7 Closing coil 10 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.8.8 Tripping coil 10 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
Protection device for 120 days from the 180 days from the
132kV
6.8.9 incoming transformer 1 Unit Substation
date of signing the date of signing
feeder Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Protection device for 132kV
6.8.10 2 Unit Substation
date of signing the date of signing
outgoing feeder Contract the Contract
Warehouse
Section VII – Schedule of Requirements 77
Qaraqush
120 days from the 180 days from the
132kV
6.8.11 Charging motor for C.B. 4 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.8.12 A.C. M.C.B. 10 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.8.13 D.C.M.C.B. 10 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
Multi-meter for incoming 132kV
6.8.14 3 Unit Substation
date of signing the date of signing
transformer feeder Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.8.15 Auxiliary relay 6 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.8.16 Frequency relay 1 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
120 days from the 180 days from the
132kV
6.8.17 Voltage relay 1 Unit Substation
date of signing the date of signing
Contract the Contract
Warehouse
Qaraqush
Protection & Control 120 days from the 180 days from the
132kV
7 Relay for 33, 11kV as 4 Unit Substation
date of signing the date of signing
specified in item 12 Contract the Contract
Warehouse
1) Every section consists of one incoming feeder, four feeders with bus-section, and capacitor feeder.
2) Every section consists of one incoming feeder, six outgoing feeders and one auxiliary feeder with bus-section with bus-riser.
*Note:
- “Partial shipments are allowed ”.
Section VII – Schedule of Requirements 78
1. If applicable
Section VII – Schedule of Requirements 79
3. Technical Specifications
1: General Specification
1.1: Scope of Works
The Works shall include the design, manufacturing, testing, inspection for export packing by
an internationally reputable inspection company, packing, insurance, shipping, landing,
customs clearance, deliver to the Delivery Point, unloading, material receiving inspection and
attending final receiving inspection with MoE at warehouse.
This section covers the manufacture and supply of indoor metal enclosed, metal clad type 11kV and
33kV switchboards constructed and tested in accordance with IEC 62271 as well as circuit breakers,
associated equipment and spares. All bays shall be clearly labelled in English language with feeder or
transformer name.
Tests shall be made in accordance with IEC 62271. Arc tests, as specified in IEC 62271-200 are
required. The arc type test shall be performed by an internationally recognized test institution
for the full short circuit current in at least 1 sec.
The Supplier should quote for delivery of the boards complete with cable boxes, current transformers,
relays, instruments and other ancillary equipment, fully wired, but dismantled to individual panels for
delivery purposes.
Full assembly instructions, wiring diagrams and schematics together with all equipment operation and
maintenance instructions and manuals which shall be in the English language shall be provided by the
Supplier prior to delivery of the equipment.
The switchgear shall be provided from manufacturers, who have at least 300 units in operation and
manufactured such equipment for at least five years.
The Bid shall be fully supported with manufacturers' brochures and technical literature, illustrations,
outline dimensional drawings and copies of performance certificates.
Particulars of Environment
The Plant shall be capable of operation under the atmospheric conditions as specified.Particular
attention should be paid in the design of all equipment to ensure that there is no damage to working
parts or insulation through the ingress of dust, insects, vermin which are prevalent for long periods in
the year. All orifices and air vents should be covered by easily replaceable weather resisting, fine
mesh wire where practicable.
Standards, Units and Language
All equipment shall be designed, constructed and tested in accordance with requirements of the latest
version of the standards specified herein except to the extent explicitly modified in the specification:
The panel switchboards shall be manufactured to high quality standard. Companies manufacturing the
panel switchboards shall have ISO Certification.
Unless otherwise stated all circuit breakers and cubicles shall comply with IEC.60056 and IEC 62271
or equivalent.
The Supplier shall advise to which standard the circuit breakers are manufactured and tested, and
shall provide with the bid offer relevant test certificates in accordance with IEC 60267.
SI Units of measurements and the English language shall be used throughout.
Section VII – Schedule of Requirements 82
Detailed Specification
General
The boards shall be complete with busbars, withdrawable circuit breakers, cable connection points,
earthing switches, measuring transformers, cable relays, instruments and other ancillary equipment,
fully wired, but dismantled to individual panels/sections for delivery purposes.
The boards shall be suitable for indoor use and shall be of single busbar three-phase configuration at a
rated frequency of 50 Hz. Each board shall be of the totally enclosed metal-clad type and shall have a
separated high voltage and low voltage compartment. The low voltage compartment shall house the
control and protection devices, position indicators, meters, instruments, signalling devices and all
required wiring and terminal blocks.
The configuration shall consist of one withdrawable circuit breaker per feeder/incomer connected via
isolating switches to the busbars. The busbar shall be split by a withdrawable sectionalizing circuit
breaker. In any case it shall be possible to add new boards including such bus coupler at a later stage.
The complete configuration is shown on the single line diagram attached to the Schedule of
Requirements showing the number of transformer incomers, feeder cubicles and bus coupler and the
distribution thereof.The boards shall be metal-enclosed with separate compartments for busbars,
circuit breakers, cable termination and instruments, and shall be so designed that future extension can
easily be made.The switchgear and main equipment items shall include at least the following:
(i) steel-clad, bulkheaded design, the various functional compartments (circuit breaker,
busbar connection and relays) being separated from each other by multiple bulkheading,
(ii) busbar system,
(iii) withdrawable circuit breakers (vacuum or SF6) with motor-driven stored energy
mechanism; provisions are to be made that when the switch is withdrawn, the insertion
contacts are automatically covered by sheet metal shutters so as to prevent any accidental
contact,
(iv) cable connection compartment with current and voltage transformers, earthing switch,
including the necessary fixing for high voltage cables,
(v) fuses and voltage transformers for busbar measuring and earth fault protection,
(vi) relay recess for the protection and monitoring relays; coupling relays, measuring
transducers, mini circuit breakers, complete terminal boards, meters, etc., including
illumination
(vii) mimic diagram on the front of each cubicle consisting of graphical symbol and position
indication,
(viii) heating units within the switchgear panels,
(ix) integrated busbar earthing,
(x) fire-proof closure to the floor of the switchgear panels to seal the outgoing power cables
The cubicles shall be short circuit and arc type tested by an internationally recognised test institution to
IEC 62271 and shall be air insulated. Insulation medium of the busbar system shall be either air. All
primary connections shall be solidly insulated for the maximum service voltage in air. Tape insulated
primary connections will not be accepted. Details are to be provided with the Tender.
Lack of complete documentation may result in bidder being declared non responsiveness.
The cubicles shall be designed with protection class IP3X for external surfaces and IP2X for internal
Section VII – Schedule of Requirements 83
compartmentalization.
The instrumentation compartment shall house all secondary equipment. The compartment shall be
accessible from outside without opening any of the doors to the H.V. equipment. In cubicles housing
voltage transformers, circuit breakers and switch disconnectors, the instrument compartment shall in
addition, contain fuses for secondary circuits and direct-on-line starters for the operating devices.
Internal H.V. connection shall be made of copper or aluminium alloy. The cubicles shall be painted in
a colour that will be stated at a later date. Each cubicle shall be labelled and the equipment marked.
The Supplier shall confirm that the panels satisfy IEC 62271 in terms of necessary free spaces behind
and above the switchgear for pressure relief purposes. The service side of the switchgear shall be
completely screened from shock waves and fume gases. Documentary proof shall be provided.
Pressure relief arrangements are to be provided wherever short circuits are to be in an upwards
direction. Details are to be provided with the Tender.
Busbar conductors shall be manufactured using processes that ensure smooth surfaces, with all metal
free from burrs, sharp edges, lumps and dross, to minimize dielectric stress concentrations and shall be
made of either copper or aluminium alloy
The circuit breakers shall be mounted on trucks so that they can be moved into counter contacts of the
switchgear (draw-out type). When a circuit-breaker is drawn out, the counter contacts shall be protected
by means of automatically operated safety shutters. A separate measuring truck shall be provided for
measuring on incomers and feeders.
Each cubicle shall be provided with facilities for local control and position indications and for this
purpose a key-locked selector switch for local and remote control is to be provided. All trucks for
circuit breakers and switch disconnectors shall be incorporated in the interlocking system.
All manual operations of circuit-breakers, disconnectors and earth switches shall be performed from
outside with closed door.
The instrumentation compartment shall house all secondary equipment. The compartment shall be
accessible from outside without opening any of the doors to the H.V. equipment.
In cubicles housing voltage transformers, circuit breakers and switch disconnectors, the compartment
shall in addition, contain fuses for secondary circuits and direct-on-line starters for the operating
devices.
The Supplier shall state necessary free spaces behind and above the switchgear for pressure relief
purposes. The service side of the switchgear shall be completely screened from pressure relief spaces.
Any formation of condensation water must be prevented by an appropriate heating in the switchgear.
It shall be controlled by one surface humidity control device per switchboard. One heating power
supply of 230/415Vac shall be provided for each switchgear installation.
Provisions shall be made for remote control of the cubicle from the control room and for its
connection to a SCADA system.
Surface Treatment and Painting
Control boards, panel boards, cubicles, cabinets, etc., if applicable, shall have interior surfaces
painted with at least one primary, one finishing coat of white anti-corrosion paint. Exterior surfaces
shall be substantially corrosion-resistant with one primary coat and one finishing coat.
The equipment shall have at least one primary, and two layers of paint on zinc powder basis applied
after perfect cleaning. Parts that cannot be readily painted shall be hot-dip galvanized.
Section VII – Schedule of Requirements 84
Voltage rating
The switchgear will be used on networks with nominal voltages 33kV or 11kV and maximum
voltages of 36kV or 12kV.
Section VII – Schedule of Requirements 85
Current rating
The rated normal current of the circuit breakers and busbars and connections shall not be less than the
following:
Equipment 33 kV 11 kV
Three phase busbar 2500 A 2500 A
Transformer incomers 2500 A 2500A
Bus section 2500 A 2500 A
Feeders 1250 A 1250 A
All other HV connections 2500 A 2500 A
Circuit Breakers
The three-phase circuit breaker shall be of the vacuum type and shall comply with IEC 62771 or other
approved standards, withdrawable truck mounted type.
The supplier shall prove the origin of the vacuum interrupter unit with appropriate certificate.
The drive mechanism for the circuit breaker shall be electrically operated spring energy storing type, and
provision shall be given to allow for emergency manual operation. Single-phase switching operations
shall not be accepted. All breakers must be electrically trip-free and have anti-pumping circuits.
Indication devices directly connected to the driving mechanism shall be provided to indicate the ON and
OFF position of circuit breakers.
The circuit breaker provided for outgoing feeder shall be suitable for three-phase three-time short auto-
reclosure. After loss of control power, the mechanism shall be capable of performing an “OFF-ON-OFF”
operation sequence. An auxiliary switch shall give remote indication, if the spring is discharged. Re-
charging of the spring shall not exceed 25 sec and it shall not be possible to close the CB during charging
the spring.
Vacuum circuit breakers shall operate, without inspection, at least 20,000 times at rated current, 100
times at full short circuit capacity or 10 years, whatever comes first. Vacuum circuit breakers shall form a
completely independent interchangeable module between switchboards with the same current rating. It
shall be possible to install or remove the circuit breaker without de-energising the main busbars or
needing access to adjacent compartments.
The breakers shall be capable of handling the following operation cycle, according to the IEC
Standards:
0-t-CO-t1-CO t = 0.3 sec t1 = 3 min or CO-t2-CO t2=15 sec
The total breaking time (opening time plus duration of the arc) of the breakers shall be as short as
possible, but in no case is it to be longer than 60 msec.
The circuit breakers shall be designed for switching of capacitor banks and shall be such that
restriking during breaking operation cannot occur.
A spring operated mechanism shall be provided and the mechanism shall be equipped for electrical
local (from switch room) and remote control (from Control Centre). If not differently specified in the
Section VII – Schedule of Requirements 86
Schedule of Requirements, the control voltage for closing and opening commands shall be:
110Vdc + 10% - 20%, unearthed, from battery
All operating mechanism motors shall be for 1-phase, 240 V, 50 Hz.
The opening device shall be provided with two independent trip coils, connected to separate terminal
blocks, allowing for the connection of two independent trip commands.
The circuit breakers shall be mounted on manual operated trucks so that they can be moved into
counter contacts of the switchgear (draw-out/jack up down type). All breakers of the same rating shall
be fully interchangeable.
Each cubicle shall be provided with facilities for local control and position indications. All trucks for
circuit breakers and disconnectors shall be incorporated in the interlocking system.
A crank, lever or other similar suitable device shall be provided to permit charging the operating
mechanism by hand in the event of a failure of the auxiliary supplies or in the event of a failure of the
energy storing device.
The stored energy shall for all types of operating mechanisms be sufficient to allow a complete
O-C-O cycle.
A sufficient number of readily wired auxiliary contacts for 110 V DC shall be provided for control
and interlock purposes, the minimum number being 5.
Motors shall be designed in accordance with valid IEC standards and shall be effectively protected by
miniature circuit breakers (MCBs), with alarm contacts.
All wirings shall lead to terminals. 10% of the terminals shall be left as spare.
Installation
All switchgear cubicles must be mounted on special frames. These frames shall also be delivered by
the Supplier. Furthermore, the panels are to be arranged in such a way that they can be installed
freestanding in the room. It is envisaged that in general the switchgear will be set up in a single room.
Bulkheads
All switchgear cubicles must be separated from each other by double sheet metal bulkheads or an
approved equivalent system. The individual panels in the busbar compartments must have arc barrier
bulkheads. Inside the cubicles, the compartments for circuit breakers, busbars, instrument
transformers and cable connections as well as the relay recesses shall have bulkheads between each.
Sufficient pressure relief must be provided in the case of fault arcs. A separate pressure relief must be
provided for each bulkhead compartment. Care must be taken that in the event of arcing no hot gases
can escape to the front side of the cubicle (operational side). Type test certificates shall be provided
proving that the supplied switchgear can withstand fault arcs in accordance with IEC 60298.
Switchgear Components
The switchgear and main equipment items shall include at least the following:
steel-clad, bulkheaded design, the various functional compartments (circuit breaker, busbar
connection and relays) being separated from each other by multiple bulkheading,
double busbar system,
Section VII – Schedule of Requirements 87
withdrawable circuit breakers (vacuum or SF6) with motor-driven stored energy mechanism;
provisions are to be made that when the switch is withdrawn, the insertion contacts are
automatically covered by sheet metal shutters so as to prevent any accidental contact,
cable connection compartment with current and voltage transformers, earthing switch,
including the necessary fixing for high voltage cables,
fuses and voltage transformers for busbar measuring and earth fault protection,
relay recess for the protection and monitoring relays; coupling relays, measuring transducers,
mini circuit breakers, complete terminal boards, meters, etc., including illumination
mimic diagramme on the front of each cubicle consisting of graphical symbol and position
indication,
heating units within the switchgear panels,
integrated busbar earthing,
fire-proof closure to the floor of the switchgear panels to seal the outgoing power cables.
Three Position Isolator Switch
The boards shall be equipped with a three position isolator switch operating as a combined busbar
isolator and feeder earthing switch in conjunction with the circuit breaker. The following switching
positions shall be possible:
With these earthing facilities given by the combination of the three position switch and the circuit
breaker, it shall be possible for manual operation, to operate the switchgear mechanically in the same
way as conventional type switchgear.
The bus coupler cubicle shall have one switch on each side of the breaker for earthing of the busbar
sections.
The contact surfaces shall be heavily silver plated. The contact pressure shall be ensured by means of
springs. All earthing switches shall have full fault making capability at the specified fault level.
The isolating switches and the earthing switches shall be manually operated but shall be provided
with the necessary equipment for electrical or mechanical interlocking. Switches in the LV
connection of power transformers and busbar sectionalizing switches shall be provided with facilities
for remote position indication.
Circuit Isolation and Interlocks
The arrangement of the secondary isolating contacts must be such that when the breaker is in the test
position, the secondary isolating contacts are still made so that the secondary circuit may be tested
without the need for jumper connections. It must be possible to leave the breaker trolley in
disconnector open position with closed cabinet door
Clearly labelled mechanical interlocks shall be provided to prevent:
a closed breaker from being withdrawn from or inserted into the isolating contacts.
Section VII – Schedule of Requirements 88
the breaker from being withdrawn or replaced except when its mechanism is in the "off"
position.
the breaker being closed in the “service” position when the secondary circuits are not
properly connected
Switch-Disconnectors and Fuses
Cabinets for station transformers for local LV supply to be equipped with switch-disconnectors, fuse
holders and earthing switches. Such breakers do not need to be erected on trolley but the arch test
requirements prevail and the cubicle must be extensible with standard cubicles on both sides. The
disconnector must be so arranged that it is possible to insert an isolating plate between the live and
dead contacts when working in the cubicle. Such plate should be part of the supply.
Transformer Cubicles shall be provided with fuse tripping devices via striker pin. The HRC fuses
must conform to DIN regulation for 12 kV or 36 kV.
Cable Compartment
Cable compartment shall be on the outside of the switchgear with cable outlet downwards to the
bottom. The compartment and the termination as well as the gland plate shall be designed for
connection of single as well as three core power cables. It shall also be possible to connect two or
three single core cable per phase. Furthermore, it shall be possible to connect plug-in surge arresters
in sockets for power cables.
The cable compartment shall be designed to connect power cables in cable terminations via plug-in
cable sealing ends. Connection of different sizes and numbers of cables per system as already
mentioned above must be possible. Suitable cable plug-in sealing ends have to be provided. Details
regarding size and number of necessary sealing ends shall be co-ordinated with design and size of
power cables and the necessary surge arresters.
For cable test purposes, it must be possible to loosen the connection between cables and the
measurement transformers from the front of the switchboard, with energized busbars without
removing any apparatus.
An enclosed low voltage compartment of adequate size at the top of the cubicle shall be provided for
the mounting of the protection relays, control and other auxiliary devices.
A door shall be provided with a hinged rack and a glass window allowing for direct visual
observation of the protection relays. Alternatively, all door mounted protection and control devices
may be flush mounted.
All devices which are to be permanently visible or be occasionally reset shall be mounted on the front
of the hinged rack. Contactors, relays and the terminals shall be located at the rear of the rack.
A neon-indicating lamp shall be provided for each phase to monitor the voltage presence of the
feeder.
Potential indicators for each phase shall be solidly mounted in the LV compartment for indication
whether the phases on the outgoing side of the switchgear are alive or dead.
Control cables shall enter the switchboard from the bottom. Exposed runs of control cables through
the switchgear shall be protected by suitable covers.
Anti-condensation heater shall be installed in the low voltage compartment including the related
control unit
Section VII – Schedule of Requirements 89
Current Transformers
General
All current transformers shall have bar primaries, be resin encapsulated and comply with IEC 60044-
6 First edition 1992-03 and B.S. 3938: 1973.
All currenttransformers shall have a maximum short-time current rating, at rated output of not less
than 1400 MVA or 500MVA for three seconds. The ratio and rated burden of current transformers
shall be as shown on table 1.
Feeder Circuits
Each feeder circuit shall be equipped with a three core current transformer on each phase. The current
transformer ratios shall be as specified in the Schedule of Requirements.
The cores shall have the following main data:
The first core shall have an accuracy of class 0.2S and will be used for Energy metering.
Instrument security factor equal to or less than 5.The rated burden for this core shall be 10VA.
The second core shall have an accuracy of class 10P10 and will be used for overcurrent and
earth fault protection. The rated burden for this core shall be 20VA.
The third core shall have an accuracy of class 5P20 . The rated burden for this core shall be
20VA.
Transformer Incomers
The transformer incomers shall be equipped with a current transformer on each phase. The current
transformer ratios are specified in the Schedule of Requirements
The cores shall have the following main data:
The first core shall have an accuracy of class 0.2S and will be used for Energy metering.
Instrument security factor equal to or less than 5.The rated burden for this core shall be 10VA.
The second core shall have an accuracy of class X and shall be used for Restricted earth
fault protection. The Knee Point shall be Vk >250Volts and Im < 8mA and rated burden shall
be 20VA
The third core shall have an accuracy of class 5P20 and shall be used for directional
overcurrent protection. The rated burden shall be 20VA.
The fourth core shall have an accuracy of class 5P20 and shall be used for overcurrent and
earth fault protection. The rated burden shall be 20VA.
Voltage Transformers
Each transformer incomer shall be equipped with three phase voltage transformers that shall have the
following characteristics
ratio 1100
√3 11
√3 11
√3 for 11 kV switchgears.
√3 √3 √3
√3 √3 √3
Section VII – Schedule of Requirements 90
The VT windings shall have an accuracy class 0.2S for the measuring winding and class 3 P of
capacity between 100 to 200 VA for the protection winding in accordance with IEC 60186.
Each voltage transformers shall be withdrawable and equipped with both primary HV and secondary LV
fuses, and shall be so arranged that the HV fuses are not accessible unless the voltage transformer is
withdrawn. The insulation shall be of the solid synthetic resin type.
Each incomer shall be equipped with three phase voltage transformer and at least each busbar section
shall be equipped with a three-phase voltage transformer.
The voltage transformers shall be equipped with both primary H.V. and secondary L.V. fuses, and
shall be so arranged that the H.V. fuses are not accessible unless the voltage transformer is
withdrawn.
The transformer shall be resin encapsulated of the electromagnetic type.
Control, Protection Relays and Instrumentation
General
The protection and control voltage shall be 110Vdc, +10%, -20% supplied from the station battery
unless otherwise specified in the Schedule of Requirements.
Each individual feeder shall contain the auxiliary elements required for proper control, measuring and
interlocking as well as the necessary MCBs for protection of DC supply circuits and the VT.
Anti-pumping devices shall be supplied for all breakers. All MCB’s shall be interchangeable and shall
be to the approval of the Employer.
MCB’s associated with trip circuits shall be mounted on the external face of their respective switch
control/relay panel, with the purpose of each MCB clearly labelled.
Lockable type control handles shall be fitted on all circuit breakers.
The ammeter and thermal maximum demand ammeter shall be to the approval of the
Employer/Engineer.
General
Control and operation of each switchboard shall be realised via a bay control unit (BCU) that the CPU
is installed in the low voltage compartment of each cubicle and the display must be installed on the
control board. It must be possible to see whether a relay has operated without opening the door.
Necessary current and voltage intermediate transformers shall also be provided by the Supplier.
The power circuits for the protection relays shall be provided via internal power supply units, fed by
the 110 V DC control voltage. The Supplier must ensure that the electrical plant in its entirety is
sufficiently protected. All protection relays have to be selective. The Supplier may offer additional
protection devices as an option, if necessary.
The same degree of accuracy of the protection relays shall be guaranteed for ambient temperatures of
up to 40°C.
Arch Detection
The complete board shall be fitted with arc detection or pressure detection devices in the cubicles
Section VII – Schedule of Requirements 91
which instantaneously trips the incomer circuit breakers or those in a combination with the bus-
section breaker, to isolate the faulty part in case of a short circuit on the busbar or in a circuit breaker
cubicle. The arch detection shall be insensitive to sunlight and flashlight. Rapid tripping scheme shall
not influence the test requirements given above. The scheme is to be approved by the
Employer/Engineer.
Transformer incomers
Each panel shall be equipped with the following:
Single pole earth relay (1 Amp) standard curve inverse definite minimum time (IDMT) relay
generally in accordance with B.S. 142:1966. It shall also include directional Overcurrent and
earth fault features.
A single element high speed, high impedance relay for transformer restricted earth fault
protection. (To work in conjunction with transformer star point neutral current transformer).
LV master trip relay
Bay control units
Other accessories for complete functionality.
Feeders
Feeder panels shall be equipped with (1 Amp) triple pole standard curve IDMT relays, generally in
accordance with B.S.142:1966, having two over current elements and an earth leakage element.
One sensitive earth fault relay shall be provided.
An auto-reclosing scheme with a minimum of three recloses before lockout shall be provided on those
feeders specified in the Schedule of Requirements. Such an arrangement shall be provided by means
of a single composite auto-reclose relay initiated by the over current protection. The number of fast
or slow recloses shall be adjustable up to minimum 20 seconds. A lockout trip relay with electrical
hand reset facilities shall be provided.
All relays shall be to the approval of the purchaser and shall be provided with an extra normally open
contact for remote indication purposes.
As a minimum, the following protection shall be installed in the outgoing feeders:
In-feed Three-phase, independent over current protection against phase and
cubicle: earth faults, with intertripping on both sides (132 and 33(11) kV)
including directional overcurrent and earth fault feature
Two-stage over current, time-delayed, multiple-trip characteristic
(50/51)
Bay control units
Outgoing Time-delayed earth fault over current, connected to phase CTs (51N)
cubicles: Distance relay with fault record, location and auto-reclosing, single
cycle (79), only for OHL feeders
Bay control units
Broken conductor protection (unbalance protection), if applicable
Fault location
Instruments
Voltmeters
Section VII – Schedule of Requirements 92
Voltmeters suitable for flush mounting and operating from the above respective voltage transformers
shall be provided, and mounted on each transformer incomer panel. The voltmeter shall be calibrated
to the requirements of the Employer and full technical and over-all dimensions to be supplied.
Ammeters
Ammeters suitable for flush mounting and operating from the above respective current transformers
shall be provided, and mounted on each transformer incomer panel. The ammeter shall be calibrated
to the requirements of the Employer and full technical and over-all dimensions to be supplied.
Measuring Transformers
The thermal withstand capability of the instrument transformers shall be based on a disconnection
time of 0.9 seconds in the outgoing circuits of the consumers, and of 1.5 seconds in the in-feeds. All
current transformers must be mounted in the fixed part of the switchgear cubicle.
Cast resin-insulated, corona-free transformers shall be used. The current transformers must be capable
of withstanding the dynamic and thermal short circuit stresses. Intermediate transformers shall be
avoided. Separate cores shall be provided for protection and measuring issues. In the in-feed cubicles,
3 single-phase insulated voltage transformers shall be used.
The secondary sides of measuring transformers shall generally be safeguarded by mini circuit
breakers. In case the same transformer voltage is used for several purposes (e.g. measuring,
protection, metering), separate voltage transformer mini circuit breakers with auxiliary contact shall
be provided. The voltage transformers of the measuring feeder shall be connected via fuse,
disconnector and surge arrester.
Current Transformers
All current transformers shall have bar primaries and shall be resin encapsulated and generally
comply with IEC 60044. All current transformers shall have a maximum short-time current rating for
one second.
Feeder circuits shall be equipped with a current transformer on three phases with two cores:
For measuring and instruments, not less than 15 VA, Class 0.5:
33 kV: Ratio 200-400-800/1 amp
11 kV: Ratio 200-400-600/1 amp
For over current and earth fault protection, not less than 15 VA, Class 5P10:
33 kV: Ratio 200-400-800/1 amp
11 kV: Ratio 200-400-600/1 amp
All current-transformers shall be arranged such that they can be replaced easily, and without any
extensive dismantling of the power transformer or parts of it.
Ratio, rating, Accuracy Limit Factors and Instrument Security Factors shall be selected by the
Contractor, and shall be matched to the requirements of the control and protection systems.
Current-transformers used for differential protection and restricted earth-fault protection shall be from
the same production batch, and shall have identical excitation characteristics.
The transformer manufacturer shall be very careful to ensure that the different cores are connected to
the correct terminals, and shall include tests to verify that this has been achieved.
Mimic Diagram and Local Indications
Section VII – Schedule of Requirements 93
A coloured mimic diagram with the necessary graphical symbols and indicator lamps/LED’s shall be
provided on the front of each switchgear cubicle. It shall contain at least the following items:
busbars,
circuit breaker position indicator,
circuit breaker operating buttons,
earthing switch with position indicator,
transformer symbol.
In addition, the following indications must be provided on the front door of each cubicle:
switchgear truck in test position,
switchgear truck in operating position,
circuit breaker tripped,
no control voltage,
no motor voltage,
mini circuit breaker tripped,
earth fault indication.
The tripping of mini circuit breakers for voltage transformer protection shall have a separate
indication.
Local Auxiliary Relays and Measurement Instruments
Fix mounted or plug-in type relays shall be used for auxiliary relays. Measuring instruments, relays
and shock-sensitive meters must be protected against vibration.
All ammeters shall be rated for 1A, but the indication scale shall be calibrated to indicate the primary
current flowing through the current transformer. The faceplates for the other ratios of the
current transformers must also be included.
The instantaneous, average and maximum current values must be displayed on the amp meter. The
maximum current value must be hand reset. An ammeter must be provided for each phase and
current leads shall not be switched.
The voltage meter must be rated for 110 V but the indication scale will be calibrated for 132 kV or 33
kV. One voltage meter with a selector switch can be provided for each voltage.
All energy meters provided by the contractor shall be provided with summation CT's where
necessary. In all cases, the meter and CT accuracies shall be such as to guarantee a final reading
within 1% accuracy. Where more than one incomer is to be summated, a single meter with the
required summation CT's shall be provided. In all cases, the meters shall be correctly calibrated in
accordance with the VT and CT ratios and shall be mounted in an accessible position on the front of
the panel, so as to allow the reading of the meter without opening the front panels.
The meters shall be provided with adequate sealing facilities to prevent tampering.
The nameplate and meter details shall be clearly marked using materials and colours that are durable
and indelible.
The meter base cover shall be of non-metallic, non-hygroscopic, flame retardant, polished material
having high impact-resilience and low dirt absorption properties.
The front cover may be of translucent material with a clear transparent front.
The meter shall have a minimum of three sealing - provisions for the meter body, terminal cover and
front cover (where applicable).
The meter terminal cover shall be the normal short length with provisions of easy bottom breakage
for cable entry. The terminals shall be of bottom entry.
The accuracy shall be Class 0.5’
The meter errors shall comply with the requirement IEC 60687 and shall be adjusted at the
manufacturer’s works to be within ± 5% between low and high load and shall exhibit good stability.
The meter shall have a warranty against any defects, which may develop due to faulty material,
calibration, transportation or workmanship for a period of not less than eighteen months from the date
of delivery. All defective meters shall be replaced at the supplier’s cost.
The following drawings and information shall be required with the tender:
a) Meter drawing giving all the relevant dimensions.
b) Wiring diagrams.
c) Description leaflet including details of programming of the meters
d) User’s and service manuals.
Remote Indications
The Supplier shall provide the following remote indications:
switchgear truck not available for operation (in test position or not run-in as a group signal)
earthing switch "on"
earthing switch "off"
circuit breaker "on"
circuit breaker "off"
circuit breaker tripped through fault
mini circuit breaker tripped (as group signal)
no control voltage (as group signal)
earth fault,
protection activated (as group signal)
no busbar voltage,
voltage transformer mini circuit breaker tripped (as group signal).
Remote Measuring
Section VII – Schedule of Requirements 96
The Supplier shall supply, install and internally wire the 33 kV switchgear current and voltage
measuring transducers with an output signal of 4-20 mA.
For the case of energy flow direction reversal, the concerned panels shall have transducers with an
output signal e.g. of -20… +4… +20 mA for current. If power supply to the transducers is necessary,
the Supplier shall use the available 110 V DC control voltage. The supply voltage for the transducers
is to be protected individually.
The measuring transducers are to be integrated into the modular sub-racks in the relay recesses of the
switchgear panels. The following quantities of measuring transducers shall to be delivered for the
control room:
one current measuring transducer per cubicle,
one voltage measuring transducer for the busbar.
Cabling and Wiring Inside the Switchgear Cubicles
Plug in-type connections are to be used for all auxiliary contacts between switchgear truck and the
fixed part of the switchgear cubicle. The plug contacts shall be arranged in such a way that the switch
trucks are universally interchangeable without alterations of the wiring.
As regards the cabling from the active part of the cubicle to the relay recess, no cable openings shall
remain open after commissioning. The Supplier therefore must fit pressure-tight screw plugs to all
openings without cables. A sufficient number of round-end studs must be available on the collector
bars for earthing purposes, on the busbars, and in the cubicles.
All secondary equipment in the switchgear cubicle shall principally be wired to terminal strips.
The instrument transformers secondary circuits must be individually wired to the switchgear cubicle
terminal strip. Terminals for current transformer cable connections shall be equipped with short
circuit links.
Optional Equipment and Accessories
Bidders should advise and quote, in detail for accessories and maintenance tools and equipment which
they would recommend to be provided with such a switchboard installation.
It is emphasized that full information must be provided as to the costs of replaceable materials, such
as gaskets, seals; 'O' rings spare contacts and mechanisms etc.
Spare Parts
The spare parts required for the above equipment shall be delivered together with the switchgear
equipment. Their prices shall be indicated in the price schedule.
All spare parts must be new, unused and strictly interchangeable with the parts they should replace.
Spare parts are divided into two categories: The first category contains those spare parts that are
necessary to replace equipment/parts worn out under normal service conditions. The second category
contains spare parts that may be required due to accidents, malfunctioning equipment or other emer-
gencies. The latter would be stocked to avoid long shutdown periods of the switchgear equipment.
For each spare part category, a separate list should be prepared and included in the bid.
For the guidance of the Supplier, lists of the principal spare parts are given below. The Supplier shall
prepare his recommendations generally in line with these lists. However, if the Supplier considers the
provisions made hereunder to be too big or inadequate, he shall add to these lists all other parts he
Section VII – Schedule of Requirements 97
Testing
All routine tests shall be carried out in accordance with relevant IS. All routine/acceptance tests shall
be witnessed by the Employer/his authorised representative. The tests shall include the following:
a) Routine/Acceptance Tests (all units)
Mechanical Operation tests
Power frequency voltage withstand test (dry)
Tests on auxiliary & control circuits
Measurement of resistance of the main circuit.
b) Type Tests:
The Supplier shall furnish type test certificates and results for the following tests along with
the bid for breaker of identical design.
Breaking and making capacity test
Short-time current test
Temperature rise tests
Lightning Impulse voltage test
c) Test Certificates
Copies of routine/acceptance test certificates shall be produced with the endorsement of the
inspecting authority to the Employer before effecting despatch. The test report shall contain
the following information.
Complete identification data, including serial No. of the breaker.
Method of application, where applied, duration and interpretation of results in each
test.
Compliance with Specification
If the technical requirements are not met or the performance of the circuit breaker during test do not
Section VII – Schedule of Requirements 98
meet the guarantees stated in the technical particulars subject to tolerances specified in relevant IEC
Standards, the Employer shall have the right to reject the faulty component or the entire breaker.
The Supplier shall replace the same in full compliance with the specification.
Section VII – Schedule of Requirements 99
Hanging or
1.2 Type
Pedestal
Phase to phase or
1.3 Connection interface for each
line
EARTHING / AUXILIARY
2 TRANSFORMER 11/0.4,
WITH AUXILIARY Pcs
WINDING
Three phase,
2.3 Type oil immersed,
core type
IEC 60076-1, -
Standards 2, -3, -5, -10,
2.4
60296
NEMA TR1
Outdoor ,
2.6 Mounting
wheel
Data
No. Description Unit
required offered
Type (graded/non-graded) of
2.12
windings
HV winding
2.13.1
11kV kV 11
HV winding
2.14.1
11kV KV 12
HV terminal
2.16.1
11kV KV 28
Section VII – Schedule of Requirements 102
Data
No. Description Unit
required offered
LV terminal
2.16.2 kV 3
HV neutral terminal
2.17 11kV KV
28
2.19.1 Windings K 55
Data
No. Description Unit
required offered
HV terminal
2.24.1
11kV KA 40
Data
No. Description Unit
required offered
2.35.1 >4%
Air-filled cable
2.39.1 HV terminal
box
Air-filled cable
2.39.2 LV terminal
box
Air-filled cable
2.39.3 HV neutral terminal
box
Air-filled cable
2.39.4 LV neutral terminal
box
Section VII – Schedule of Requirements 105
Data
No. Description Unit
required offered
2.40.2 LV terminal No
2.41 Oil:
Viscosity
At 20C° mm2/s
2.41.5 To be filled
At 50C° mm2/s
At 80C° mm2/s
Data
No. Description Unit
required offered
33/√3 / 0.11/√3
3.3 - Ratio
/ 0.11/√3
3.6 - Core 2 CI . 3p
Section VII – Schedule of Requirements 107
Type To be filled
Rated voltage kV 36
Rated frequency Hz 50
Degree of protection
- LV compartments IP3XD
Manufacturer To be filled
Type To be filled
Standards IEC/VDE
Number of phases 3
Rated frequency Hz 50
Type To be filled
Auxiliary contacts:
- current rating A 10
Type To be filled
Standards IEC/VDE
Section VII – Schedule of Requirements 111
Rated voltage kV 33 / √3
Rated frequency Hz 50
Arrangement indoor
- Protection core A 5
1
- Protection, if required A 5
core 2
- Instruments / measuring A 5
core 3
Measuring cores:
- Burden VA 30
Protection core1:
Section VII – Schedule of Requirements 112
- Burden VA 30
Protection core2:
- Burden VA 30
Insulation material
Type To be filled
Rated frequency Hz 50
Arrangement indoor
Number of phases # 1
Rated output:
- secondary VA 200
- tertiary VA 200
- with t s <3
Closing time ms
Dead time ms
Break time ms
Make time ms
Arcing time ms
Auxiliary contacts:
- number of NO #
- number of NC #
- current rating A 10
Operating mechanism
Motor
- voltage V DC 110
- power W
Type
Rated frequency Hz
Number of phases # 3
Arrangement indoor
Auxiliary contacts:
- number of NO #
- number of NC #
- current rating A 10
Motor
- voltage V DC 110
- power W
Item 8: Protection
Backup protection (O/C+E/F + stand by E/F+ Voltage+ frequency)
A. General Specification
ES operating point
10 Space heater with thermostat AC 220V, with 2-Pole MCB 1 set
11 2 Pole MCCB for Control & Motor circuit for VCB 1 set
12 Fluorescent lamp AC 220V, with door switch 1 set
13 Outdoor type enclosure IP44 1 set
14 Connection materials Terminals, cable glands and cleats
1 set
for 3-phase cable,
each
3 x 1c x 500mm2 Cu
A. General Specification
4. Drawings
General
All drawings submitted shall be to scale and give details of construction, types of materials
used, overall and specific dimensions, where requested, and any other pertinent information
relating to special features put forward by the Supplier.
A general outline drawing showing overall dimensions shall be provided.
List of Drawings
1) Testing requirements:
Before any item of equipment is packed or delivered from the manufacturer's factory,
all tests itemized in the relevant Clause of this specification shall be carried out by the
Supplier as far as practicable to prove compliance with the requirement of the
specifications.
All tests will be witnessed by International Reputable Inspection Company (IRI) to be
hired by Supplier, subject to approval of MoE (for the 33&11kVSwichgear only and
the supplier should supply all test results and reports for the other equipment).
All results of tests shall be approved by MoE. In the event an additional test requested
by MoE or its representative indicates noncompliance with the terms of the Contract,
the Supplier shall, at his own expense, make all necessary repairs and perform
additional test(s) required to ensure compliance with the terms of the Contract.
Acceptance of shipment of the equipment after the satisfactory factory
test/inspections shall be given from MoE or its representative. The Supplier shall
provide Form of Release Note to MoE or its representative for signature.
The approval of the tests, acceptance of the test certificates or waiving of witnessing
tests shall not relieve the Supplier from his contractual obligations.
The Supplier shall give access and necessary facilities for MoE and/or his assigned
representative (2 expert) who may attend and witness the tests of specified
transformers at manufacturer's factory. All the costs, such as travel, accommodation
and associated upkeep costs, associated with the MoE and/or his designated
representative witnessing the tests shall be borne by the MoE.
3) Test Report:
The supplier shall compile all test results, test certificates, type test records etc. into a
test report for each switchgear. The test report shall appear sufficient information for
the subject of the test, project name, contract number, document number and the test
date.
The test report shall be countersigned by the witnessed MOE engineer or his assigned
Representative.
Section VII – Schedule of Requirements 131
One (1) copy of the test report or its draft shall be handed over to each person
witnessed the test. The test report shall be submitted officially two (2) copies to MOE
the soonest after execution of each test.
After completion of all factory tests, the Supplier shall bind all test reports properly
into books of A4 format and submit two (2) sets of the bound test reports to MOE.
4) Witnessing tests:
The tests shall be carried out in the presence of authorized representatives from the
purchaser (MoE) and the inspecting firm (Third Party).
The number of MoE representative to witness the test is (4) and the cost of travelling
& accommodation of the authorized representatives to witness the test at the place of
manufacture for the required days, will be borne by MoE.
The supplier shall inform MoE with the time and place of conducting the tests before
at least one month from the appointed date to enable MoE to nominate its
representatives.
In the event that MoE representatives could not be present on time, the tests shall be
carried out at the appointed date in the presence of the Third Party. The third party
shall be responsible for following up the tests as required and including, but not
limited to matching all the values contracted in this contract.
The Inspections and tests company (Third party inspection) should be a member of IFIA.
The Inspections and tests shall be carried out at manufacturer’s factory or relevant assembly
yard before shipment in accordance with latest IEC standard.
The Contractor shall submit the test reports prior to each shipment of equipment.
2) Special Tests:
3) Equipment Site Tests:
3-1 Material Receiving Inspection (MRI):
Upon delivery of the transformers to the Delivery Point, the Supplier or his assigned
representative shall carry out the Material Receiving Inspection at the presence of
MoE or his assigned representative at the Delivery Point.
3-2 Material Receiving Inspection shall include the following items:
a) Visual inspection.
b) Contents of goods and quantity.
B: Local Inspections:
The following inspections and tests shall be performed (Locally) by receiving committee
conducted at the:
1. Ninawa during the installation procedure.
PART 3 - Contract
Section VIII – General Conditions of Contract 134
Table of Clauses
5. Language........................................................................................................................ 138
7. Eligibility........................................................................................................................ 139
4. Interpretation 4.1 If the context so requires it, singular means plural and vice versa.
4.2 Incoterms
(a) Unless inconsistent with any provision of the Contract,
the meaning of any trade term and the rights and
obligations of parties thereunder shall be as prescribed by
Incoterms specified in the SCC.
(b) The terms EXW, CIP, FCA, CFR and other similar terms,
when used, shall be governed by the rules prescribed in
the current edition of Incoterms specified in the SCC and
published by the International Chamber of Commerce in
Paris, France.
4.3 Entire Agreement
Section VIII – General Conditions of Contract 138
6. Joint Venture, 6.1 If the Supplier is a joint venture, consortium, or association, all of
Consortium or the parties shall be jointly and severally liable to the Purchaser for
Association the fulfillment of the provisions of the Contract and shall
designate one party to act as a leader with authority to bind the
joint venture, consortium, or association. The composition or the
constitution of the joint venture, consortium, or association shall
not be altered without the prior consent of the Purchaser.
7. Eligibility 7.1 The Supplier and its Subcontractors shall have the nationality of
an eligible country. A Supplier or Subcontractor shall be
deemed to have the nationality of a country if it is a citizen or
constituted, incorporated, or registered, and operates in
conformity with the provisions of the laws of that country.
7.2 All Goods and Related Services to be supplied under the
Contract and financed by the Bank shall have their origin in
Eligible Countries. For the purpose of this Clause, origin means
the country where the goods have been grown, mined,
cultivated, produced, manufactured, or processed; or through
manufacture, processing, or assembly, another commercially
recognized article results that differs substantially in its basic
characteristics from its components.
8. Notices 8.1 Any notice given by one party to the other pursuant to the
Contract shall be in writing to the address specified in the
SCC. The term “in writing” means communicated in written
form with proof of receipt.
8.2 A notice shall be effective when delivered or on the notice’s
effective date, whichever is later.
9. Governing 9.1 The Contract shall be governed by and interpreted in
Law accordance with the laws of the Purchaser’s Country, unless
otherwise specified in the SCC.
9.2 Throughout the execution of the Contract, the Supplier shall
comply with the import of goods and services prohibitions in the
Purchaser’s Country when
(a) as a matter of law or official regulations, the Borrower’s
country prohibits commercial relations with that country; or
9.2 (b) by an act of compliance with a decision of the United Nations
Security Council taken under Chapter VII of the Charter of the
United Nations, the Borrower’s Country prohibits any import of
goods from that country or any payments to any country, person,
or entity in that country.
10. Settlement of 10.1 The Purchaser and the Supplier shall make every effort to
Section VIII – General Conditions of Contract 140
14. Supplier’s 14.1 The Supplier shall supply all the Goods and Related Services
Responsibilities included in the Scope of Supply in accordance with GCC
Clause 12, and the Delivery and Completion Schedule, as per
GCC Clause 13.
15. Contract Price 15.1 Prices charged by the Supplier for the Goods supplied and the
Related Services performed under the Contract shall not vary
from the prices quoted by the Supplier in its Bid, with the
exception of any price adjustments authorized in the SCC.
16. Terms of 16.1 The Contract Price, including any Advance Payments, if
Payment applicable, shall be paid as specified in the SCC.
16.2 The Supplier’s request for payment shall be made to the
Purchaser in writing, accompanied by invoices describing, as
appropriate, the Goods delivered and Related Services
performed, and by the documents submitted pursuant to GCC
Clause 13 and upon fulfillment of all other obligations
stipulated in the Contract.
16.3 Payments shall be made promptly by the Purchaser, but in no
case later than sixty (60) days after submission of an invoice or
request for payment by the Supplier, and after the Purchaser has
accepted it.
16.4 The currencies in which payments shall be made to the Supplier
under this Contract shall be those in which the Bid price is
expressed.
16.5 In the event that the Purchaser fails to pay the Supplier any
payment by its due date or within the period set forth in the
SCC, the Purchaser shall pay to the Supplier interest on the
amount of such delayed payment at the rate shown in the SCC,
for the period of delay until payment has been made in full,
whether before or after judgment or arbitrage award.
17. Taxes and 17.1 For goods manufactured outside the Purchaser’s Country, the
Duties Supplier shall be entirely responsible for all taxes, stamp duties,
license fees, and other such levies imposed outside the
Purchaser’s Country.
Section VIII – General Conditions of Contract 142
18. Performance 18.1 If required as specified in the SCC, the Supplier shall, within
Security twenty-eight (28) days of the notification of contract award,
provide a performance security for the performance of the
Contract in the amount specified in the SCC.
18.2 The proceeds of the Performance Security shall be payable to
the Purchaser as compensation for any loss resulting from the
Supplier’s failure to complete its obligations under the Contract.
18.3 As specified in the SCC, the Performance Security, if required,
shall be denominated in the currency(ies) of the Contract, or in a
freely convertible currency acceptable to the Purchaser; and
shall be in one of the format stipulated by the Purchaser in the
SCC, or in another format acceptable to the Purchaser.
18.4 The Performance Security shall be discharged by the Purchaser
and returned to the Supplier not later than twenty-eight (28)
days following the date of Completion of the Supplier’s
performance obligations under the Contract, including any
warranty obligations, unless specified otherwise in the SCC.
19. Copyright 19.1 The copyright in all drawings, documents, and other materials
containing data and information furnished to the Purchaser by
the Supplier herein shall remain vested in the Supplier, or, if
they are furnished to the Purchaser directly or through the
Supplier by any third party, including suppliers of materials, the
copyright in such materials shall remain vested in such third
party
20. Confidential 20.1 The Purchaser and the Supplier shall keep confidential and shall
Information not, without the written consent of the other party hereto,
divulge to any third party any documents, data, or other
information furnished directly or indirectly by the other party
hereto in connection with the Contract, whether such
information has been furnished prior to, during or following
completion or termination of the Contract. Notwithstanding the
above, the Supplier may furnish to its Subcontractor such
documents, data, and other information it receives from the
Section VIII – General Conditions of Contract 143
21. Subcontracting 21.1 The Supplier shall notify the Purchaser in writing of all
subcontracts awarded under the Contract if not already specified
in the Bid. Such notification, in the original Bid or later shall
not relieve the Supplier from any of its obligations, duties,
responsibilities, or liability under the Contract.
21.2 Subcontracts shall comply with the provisions of GCC Clauses
3 and 7.
22. Specifications 22.1 Technical Specifications and Drawings
and Standards
(a) The Goods and Related Services supplied under this
Section VIII – General Conditions of Contract 144
23. Packing and 23.1 The Supplier shall provide such packing of the Goods as is
Documents required to prevent their damage or deterioration during transit
to their final destination, as indicated in the Contract. During
transit, the packing shall be sufficient to withstand, without
limitation, rough handling and exposure to extreme
temperatures, salt and precipitation, and open storage. Packing
case size and weights shall take into consideration, where
appropriate, the remoteness of the goods’ final destination and
the absence of heavy handling facilities at all points in transit.
23.2 The packing, marking, and documentation within and outside
the packages shall comply strictly with such special
requirements as shall be expressly provided for in the Contract,
including additional requirements, if any, specified in the SCC,
and in any other instructions ordered by the Purchaser.
24. Insurance 24.1 Unless otherwise specified in the SCC, the Goods supplied
under the Contract shall be fully insured—in a freely
convertible currency from an eligible country—against loss or
damage incidental to manufacture or acquisition, transportation,
storage, and delivery, in accordance with the applicable
Incoterms or in the manner specified in the SCC.
25. Transportation 25.1 Unless otherwise specified in the SCC, responsibility for
and Incidental arranging transportation of the Goods shall be in accordance
Section VIII – General Conditions of Contract 145
expenses.
26.4 Whenever the Supplier is ready to carry out any such test and
inspection, it shall give a reasonable advance notice, including
the place and time, to the Purchaser. The Supplier shall obtain
from any relevant third party or manufacturer any necessary
permission or consent to enable the Purchaser or its designated
representative to attend the test and/or inspection.
26.5 The Purchaser may require the Supplier to carry out any test
and/or inspection not required by the Contract but deemed
necessary to verify that the characteristics and performance of
the Goods comply with the technical specifications codes and
standards under the Contract, provided that the Supplier’s
reasonable costs and expenses incurred in the carrying out of
such test and/or inspection shall be added to the Contract Price.
Further, if such test and/or inspection impedes the progress of
manufacturing and/or the Supplier’s performance of its other
obligations under the Contract, due allowance will be made in
respect of the Delivery Dates and Completion Dates and the
other obligations so affected.
26.6 The Supplier shall provide the Purchaser with a report of the
results of any such test and/or inspection.
26.7 The Purchaser may reject any Goods or any part thereof that fail
to pass any test and/or inspection or do not conform to the
specifications. The Supplier shall either rectify or replace such
rejected Goods or parts thereof or make alterations necessary to
meet the specifications at no cost to the Purchaser, and shall
repeat the test and/or inspection, at no cost to the Purchaser,
upon giving a notice pursuant to GCC Sub-Clause 26.4.
26.8 The Supplier agrees that neither the execution of a test and/or
inspection of the Goods or any part thereof, nor the attendance
by the Purchaser or its representative, nor the issue of any report
pursuant to GCC Sub-Clause 26.6, shall release the Supplier
from any warranties or other obligations under the Contract.
27. Liquidated 27.1 Except as provided under GCC Clause 32, if the Supplier fails
Damages to deliver any or all of the Goods by the Date(s) of delivery or
perform the Related Services within the period specified in the
Contract, the Purchaser may without prejudice to all its other
remedies under the Contract, deduct from the Contract Price, as
liquidated damages, a sum equivalent to the percentage
specified in the SCC of the delivered price of the delayed
Goods or unperformed Services for each week or part thereof of
delay until actual delivery or performance, up to a maximum
Section VIII – General Conditions of Contract 147
28. Warranty 28.1 The Supplier warrants that all the Goods are new, unused, and
of the most recent or current models, and that they incorporate
all recent improvements in design and materials, unless
provided otherwise in the Contract.
28.2 Subject to GCC Sub-Clause 22.1(b), the Supplier further
warrants that the Goods shall be free from defects arising from
any act or omission of the Supplier or arising from design,
materials, and workmanship, under normal use in the conditions
prevailing in the country of final destination.
28.3 Unless otherwise specified in the SCC, the warranty shall
remain valid for twelve (12) months after the Goods, or any
portion thereof as the case may be, have been delivered to and
accepted at the final destination indicated in the SCC, or for
eighteen (18) months after the date of shipment from the port or
place of loading in the country of origin, whichever period
concludes earlier.
28.4 The Purchaser shall give notice to the Supplier stating the nature
of any such defects together with all available evidence thereof,
promptly following the discovery thereof. The Purchaser shall
afford all reasonable opportunity for the Supplier to inspect such
defects.
28.5 Upon receipt of such notice, the Supplier shall, within the
period specified in the SCC, expeditiously repair or replace the
defective Goods or parts thereof, at no cost to the Purchaser.
28.6 If having been notified, the Supplier fails to remedy the defect
within the period specified in the SCC, the Purchaser may
proceed to take within a reasonable period such remedial action
as may be necessary, at the Supplier’s risk and expense and
without prejudice to any other rights which the Purchaser may
have against the Supplier under the Contract.
29. Patent 29.1 The Supplier shall, subject to the Purchaser’s compliance with
Indemnity GCC Sub-Clause 29.2, indemnify and hold harmless the
Purchaser and its employees and officers from and against any
and all suits, actions or administrative proceedings, claims,
demands, losses, damages, costs, and expenses of any nature,
including attorney’s fees and expenses, which the Purchaser
may suffer as a result of any infringement or alleged
infringement of any patent, utility model, registered design,
Section VIII – General Conditions of Contract 148
32. Force Majeure 32.1 The Supplier shall not be liable for forfeiture of its Performance
Security, liquidated damages, or termination for default if and to
the extent that its delay in performance or other failure to
perform its obligations under the Contract is the result of an
event of Force Majeure.
32.2 For purposes of this Clause, “Force Majeure” means an event or
situation beyond the control of the Supplier that is not
foreseeable, is unavoidable, and its origin is not due to
negligence or lack of care on the part of the Supplier. Such
events may include, but not be limited to, acts of the Purchaser
in its sovereign capacity, wars or revolutions, fires, floods,
epidemics, quarantine restrictions, and freight embargoes.
32.3 If a Force Majeure situation arises, the Supplier shall promptly
Section VIII – General Conditions of Contract 150
34. Extensions of 34.1 If at any time during performance of the Contract, the Supplier
Time or its subcontractors should encounter conditions impeding
timely delivery of the Goods or completion of Related Services
pursuant to GCC Clause 13, the Supplier shall promptly notify
the Purchaser in writing of the delay, its likely duration, and its
cause. As soon as practicable after receipt of the Supplier’s
notice, the Purchaser shall evaluate the situation and may at its
discretion extend the Supplier’s time for performance, in which
case the extension shall be ratified by the parties by amendment
of the Contract.
34.2 Except in case of Force Majeure, as provided under GCC
Clause 32, a delay by the Supplier in the performance of its
Section VIII – General Conditions of Contract 152
36. Assignment 36.1 Neither the Purchaser nor the Supplier shall assign, in whole or
in part, their obligations under this Contract, except with prior
written consent of the other party.
37. Export 37.1 Notwithstanding any obligation under the Contract to complete
Restriction all export formalities, any export restrictions attributable to the
Purchaser, to the country of the Purchaser, or to the use of the
products/goods, systems or services to be supplied, which arise
from trade regulations from a country supplying those
products/goods, systems or services, and which substantially
impede the Supplier from meeting its obligations under the
Contract, shall release the Supplier from the obligation to
provide deliveries or services, always provided, however, that
the Supplier can demonstrate to the satisfaction of the Purchaser
and of the Bank that it has completed all formalities in a timely
manner, including applying for permits, authorizations and
licenses necessary for the export of the products/goods, systems
or services under the terms of the Contract. Termination of the
Contract on this basis shall be for the Purchaser’s convenience
pursuant to Sub-Clause 35.3.
Section VIII – General Conditions of Contract 154
b. Rejects a proposal for award if the Bank determines that the firm or individual
recommended for award, any of its personnel, or its agents, or its sub-consultants,
sub-contractors, service providers, suppliers and/ or their employees, has, directly
or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive
practices in competing for the contract in question;
c. In addition to the legal remedies set out in the relevant Legal Agreement, may
take other appropriate actions, including declaring misprocurement, if the Bank
determines at any time that representatives of the Borrower or of a recipient of
any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive,
coercive, or obstructive practices during the procurement process, selection and/or
execution of the contract in question, without the Borrower having taken timely
and appropriate action satisfactory to the Bank to address such practices when
they occur, including by failing to inform the Bank in a timely manner at the time
they knew of the practices;
d. Pursuant to the Bank’s Anti- Corruption Guidelines and in accordance with the
Bank’s prevailing sanctions policies and procedures, may sanction a firm or
individual, either indefinitely or for a stated period of time, including by publicly
declaring such firm or individual ineligible (i) to be awarded or otherwise benefit
from a Bank-financed contract, financially or in any other manner;1 (ii) to be a
nominated2 sub-contractor, consultant, manufacturer or supplier, or service
provider of an otherwise eligible firm being awarded a Bank-financed contract;
and (iii) to receive the proceeds of any loan made by the Bank or otherwise to
participate further in the preparation or implementation of any Bank-financed
project;
e. Requires that a clause be included in bidding/request for proposals documents and
in contracts financed by a Bank loan, requiring (i) bidders (applicants/proposers),
consultants, contractors, and suppliers, and their sub-contractors, sub-consultants,
service providers, suppliers, agents personnel, permit the Bank to inspect 3 all
accounts, records and other documents relating to the procurement process,
selection and/or contract execution, and to have them audited by auditors
appointed by the Bank.
1
For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i)
applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-
contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such
contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract.
2
A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider
(different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in
its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder
to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower.
3
Inspections in this context usually are investigative (i.e., forensic) in nature. They involve fact-finding activities undertaken
by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating
the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes
but is not limited to: accessing and examining a firm's or individual's financial records and information, and making copies
thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic
format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other
relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information.
Section IX – Special Conditions of Contract 157
GCC 4.2 (b) The version edition of Incoterms shall be : Incoterms 2010
GCC 10.2 The rules of procedure for arbitration proceedings pursuant to GCC
Clause 10.2 shall be as follows:
GCC 15.1 The prices charged for the Goods supplied and the related Services
performed shall not be adjustable
GCC 16.1 GCC 16.1—The method and conditions of payment to be made to the
Supplier under this Contract shall be as follows:
Payment for Goods supplied from abroad:
Payment of foreign currency portion shall be made in ( )
(i) Advance Payment: Ten (10) percent of the Contract Price shall be
paid within thirty (30) days of signing of the Contract, and upon
submission of claim and a bank guarantee for equivalent amount
valid until the Goods are delivered and in the form provided in the
bidding documents or another form acceptable to the Purchaser.
(ii) On Shipment: (80) percent of the Contract Price of the Goods
shipped shall be paid to the account of the supplier within thirty (30)
days of submission of documents specified in GCC Clause 13.
(Partial shipments are allowed)
(iii) On Acceptance: seven (7) percent for the local Bidder& foreign
Bidder that have a representative in Iraq and ten (10) percent for
the foreign Bidder which has not representative in Iraq of the
Contract Price of Goods received shall be paid within thirty (30)
days of receipt of the Goods upon submission of claim supported by
Section IX – Special Conditions of Contract 160
(iv) Taxes Payment: (only for the local bidder and foreign bidder that
have a representative office in Iraq)Three (3) percent of the Contract
Price of Goods after submitting tax clearance letter issued from
General Commission for Taxes.
Payment for Goods and Services supplied from within the Purchaser’s
country shall be made in _____ [currency], as follows:
(iii) Taxes Payment: (only for the local bidder and foreign bidder
that have a representative office in Iraq).The remaining three
(3) percent of the Contract Price of Goods after submitting tax
clearance letter issued from General Commission for Taxes.
GCC 16.5 The payment-delay period after which the Purchaser shall pay interest to
the supplier shall be Forty five (45) days.
The interest rate that shall be applied is: 2 % annually.
contract price
GCC 18.4 Discharge of the Performance Security shall take place: not later than
twenty-eight (28) days following the date of Completion of the Supplier’s
performance obligations.
Section IX – Special Conditions of Contract 162
GCC 23.2 The packing, marking and documentation within and outside the packages shall
be:
Each equipment and materials shall be packed or bundled or protected for shipment
so that no damage should be sustained during shipping and transportation from the
place of manufacture to the site.
All outdoor porcelain bushings of equipment mounted on the trailer shall be
equipped with suitable reinforcement fitted with detachable bracings for protection
against otherwise possible damage by vibration and impact during shipping and
transportation.
Any equipment and device which are vulnerable to vibration and /or impact and
therefore be necessary to be taken by a special care for transportation shall be, if
necessary, rested into the transport-position and securely fastened with fixing plates
or attachments by bolts.
All “materials for protection during transportation” shall be kept separately, after
each installation, for future use by MOE and therefore shall be painted yellow or red
for an easy identification distinguishable from the other materials for picking up
when required.
Any end terminal of wire or connector-end block or strap-end etc. shall not be left
free and shall be securely fastened to the nearby fixed-plate or frame of equipment
by temporary fixing straps, bands or tapes during shipping and transportation.
Each crate of package shall contain a packing list and a copy in triplicate shall be
forwarded to MOE prior to delivery. All items of material shall clearly mark for easy
identification against the packing list.
All cases, packages, etc., shall be clearly marked on the outside to indicate the total
weight, to show where the weight is bearing and the correct position of the slings
and shall bear an identification mark relating them to the appropriate shipping
documents.
Cases or packages which cannot be marked as above shall have tags made of metal
or other durable materials with the necessary marking on them.
The shipping mark shall bear typically the following information in sequence and in
a frame commensurate with size of package:
a) Consignee : Ministry of Electricity, Iraq
b) Project Name :
c) Contract No.
d) Port of destination :
e) Case Number, if applicable :
f) Case Number in sequence :
g) Description of contents :
h) Net and Gross Weight
i) Dimension :
j) Name of site :
The packing inspection shall be carried out by MOE-nominated Inspection Agency
before shipping of any goods to verify the packing condition of equipment and
materials as well as to check the contents with the packing list of the packages which
are to be delivered to warehouse. The Supplier shall be entirely responsible for
ensuring that the packing is suitable for shipping and transportation.
The Supplier shall keep the inspection records of all equipment and materials prior
to the shipment.
Section IX - Special Conditions of Contract 163
GCC 25.1 Responsibility for transportation of the Goods shall be as specified in the
Incoterms.
GCC 26.1 The inspections and tests shall be: See the details in Section VII.
Schedule of Requirements/ 5. Inspection and test
GCC 26.2 The Inspections and tests shall be conducted at : See the details in Section
VII. Schedule of Requirements/ 5. Inspection and test
The required inspection and test to be part of the contract.
GCC 27.1 The liquidated damage shall be: 1% per week
GCC 27.1 The maximum amount of liquidated damages shall be: 10%
GCC 28.3 The period of validity of the Warranty shall be: 18 months after the
equipment have been delivered to and accepted at the final destination
(issuance acceptance certificate)
For purposes of the Warranty, the place(s) of final destination(s) shall be:
Qraqush 132kV Substation Warehouse/ Ninawa Governorate
GCC 28.5, The period for repair or replacement shall be: less than three (3) months.
GCC 28.6
GCC 33.4 If the value engineering proposal is approved by the Purchaser the amount
to be paid to the Supplier shall be ( )% of the reduction in the Contract
Price. N/A
Section IX – Special Conditions of Contract 164
15.1 Prices payable to the Supplier, as stated in the Contract, shall be subject to adjustment
during performance of the Contract to reflect changes in the cost of labor and material
components in accordance with the formula:
P1 = P0 [a + bL1 + cM1] - P0
L0 M0
a+b+c = 1
in which:
The Bidder shall indicate the source of the indices, and the source of exchange rate (if
applicable) and the base date indices in its Bid.
Base date = thirty (30) days prior to the deadline for submission of the Bids.
The above price adjustment formula shall be invoked by either party subject to the
following further conditions:
(a) No price adjustment shall be allowed beyond the original delivery dates. As a
rule, no price adjustment shall be allowed for periods of delay for which the
Section IX - Special Conditions of Contract 165
(b) If the currency in which the Contract Price P0 is expressed is different from the
currency of origin of the labor and material indices, a correction factor will be
applied to avoid incorrect adjustments of the Contract Price. The correction
factor shall be: Z0 / Z1, where,
Z0 = the number of units of currency of the origin of the indices which equal
to one unit of the currency of the Contract Price P0 on the Base
date, and
Z1 = the number of units of currency of the origin of the indices which equal to
one unit of the currency of the Contract Price P0 on the Date of
Adjustment.
(c) No price adjustment shall be payable on the portion of the Contract Price paid to
the Supplier as advance payment.
Section X – Contract Forms 167
Table of Forms
[This Notification of Intention to Award shall be sent to each Bidder that submitted a Bid.]
[Send this Notification to the Bidder’s Authorized Representative named in the Bidder
Information Form]
For the attention of Bidder’s Authorized Representative
Name: [insert Authorized Representative’s name]
Address: [insert Authorized Representative’s Address]
Telephone/Fax numbers: [insert Authorized Representative’s telephone/fax numbers]
Email Address: [insert Authorized Representative’s email address]
[IMPORTANT: insert the date that this Notification is transmitted to Bidders. The
Notification must be sent to all Bidders simultaneously. This means on the same date and
as close to the same time as possible.]
DATE OF TRANSMISSION: This Notification is sent by: [email/fax] on [date] (local time)
2. Other Bidders [INSTRUCTIONS: insert names of all Bidders that submitted a Bid.
If the Bid’s price was evaluated include the evaluated price as well as the Bid price
as read out.]
Evaluated Bid price
Name of Bidder Bid price
(if applicable)
[insert name] [insert Bid price] [insert evaluated price]
[INSTRUCTIONS: State the reason/s why this Bidder’s Bid was unsuccessful. Do
NOT include: (a) a point by point comparison with another Bidder’s Bid or (b)
information that is marked confidential by the Bidder in its Bid.]
promptly advise you in writing how the debriefing will take place and confirm the date
and time.
If the deadline to request a debriefing has expired, you may still request a debriefing. In
this case, we will provide the debriefing as soon as practicable, and normally no later than
fifteen (15) Business Days from the date of publication of the Contract Award Notice.
6. Standstill Period
DEADLINE: The Standstill Period is due to end at midnight on [insert date] (local
time).
The Standstill Period lasts ten (10) Business Days after the date of transmission of this
Notification of Intention to Award.
The Standstill Period may be extended as stated in Section 4 above.
If you have any questions regarding this Notification please do not hesitate to contact us.
Signature: ______________________________________________
Name: ______________________________________________
Title/position: ______________________________________________
Telephone: ______________________________________________
Email: ______________________________________________
Section X – Contract Forms 172
For the purposes of this Form, a Beneficial Owner of a Bidder is any natural person who
ultimately owns or controls the Bidder by meeting one or more of the following conditions:
In response to your request in the Letter of Acceptance dated [insert date of letter of
Acceptance] to furnish additional information on beneficial ownership: [select one option as
applicable and delete the options that are not applicable]
(i) we hereby provide the following beneficial ownership information.
OR
(ii) We declare that there is no Beneficial Owner meeting one or more of the following
conditions:
OR
(iii) We declare that we are unable to identify any Beneficial Owner meeting one or more of
the following conditions. [If this option is selected, the Bidder shall provide explanation on
why it is unable to identify any Beneficial Owner]
directly or indirectly holding 25% or more of the shares
directly or indirectly holding 25% or more of the voting rights
directly or indirectly having the right to appoint a majority of the board of directors or
equivalent governing body of the Bidder]”
Name of the person duly authorized to sign the Bid on behalf of the Bidder: **[insert
complete name of person duly authorized to sign the Bid]___________
Title of the person signing the Bid: [insert complete title of the person signing the
Bid]______
Signature of the person named above: [insert signature of person whose name and
capacity are shown above]_____
Date signed [insert date of signing] day of [insert month], [insert year]_____
*
In the case of the Bid submitted by a Joint Venture specify the name of the Joint Venture as Bidder. In the
event that the Bidder is a joint venture, each reference to “Bidder” in the Beneficial Ownership Disclosure Form
(including this Introduction thereto) shall be read to refer to the joint venture member.
**
Person signing the Bid shall have the power of attorney given by the Bidder. The power of attorney shall be
attached with the Bid Schedules.
Section X – Contract Forms 174
Letter of Acceptance
[use letterhead paper of the Purchaser]
[date]
To: [name and address of the Supplier]
This is to notify you that your Bid dated [insert date] for execution of the [insert name of the
contract and identification number, as given in the SCC] for the Accepted Contract Amount
of [insert amount in numbers and words and name of currency], as corrected and modified
in accordance with the Instructions to Bidders is hereby accepted by our Agency.
You are requested to furnish (i) the Performance Security within 28 days in accordance with
the Conditions of Contract, using for that purpose one of the Performance Security Forms
and (ii) the additional information on beneficial ownership in accordance with BDS ITB 45.1
within eight (8) Business days using the Beneficial Ownership Disclosure Form, included in
Section X, - Contract Forms, of the Bidding Document.
Authorized Signature:
Name and Title of Signatory:
Name of Agency:
Contract Agreement
[The successful Bidder shall fill in this form in accordance with the instructions indicated]
BETWEEN
(1) [insert complete name of Purchaser], a [insert description of type of legal
entity, for example, an agency of the Ministry of .... of the Government of
{insert name of Country of Purchaser}, or corporation incorporated under the
laws of {insert name of Country of Purchaser}] and having its principal place
of business at [insert address of Purchaser] (hereinafter called “the
Purchaser”), of the one part, and
(2) [insert name of Supplier], a corporation incorporated under the laws of
[insert: country of Supplier] and having its principal place of business at
[insert: address of Supplier] (hereinafter called “the Supplier”), of the other
part:
WHEREAS the Purchaser invited Bids for certain Goods and ancillary services, viz., [insert
brief description of Goods and Services] and has accepted a Bid by the Supplier for the
supply of those Goods and Services
1. In this Agreement words and expressions shall have the same meanings as are
respectively assigned to them in the Contract documents referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement. This Agreement shall prevail over all other contract documents.
4. The Purchaser hereby covenants to pay the Supplier in consideration of the provision of
the Goods and Services and the remedying of defects therein, the Contract Price or such
other sum as may become payable under the provisions of the Contract at the times and
in the manner prescribed by the Contract.
IN WITNESS whereof the parties hereto have caused this Agreement to be executed in
accordance with the laws of [insert the name of the Contract governing law country] on the
day, month and year indicated above.
Performance Security
Option 1: (Bank Guarantee)
[The bank, as requested by the successful Bidder, shall fill in this form in accordance with
the instructions indicated]
Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]
We have been informed that _ [insert name of Supplier, which in the case of a joint venture shall be the
name of the joint venture] (hereinafter called "the Applicant") has entered into Contract No. [insert
reference number of the contract] dated [insert date] with the Beneficiary, for the supply of _
[insert name of contract and brief description of Goods and related Services] (hereinafter called "the
Contract").
At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the
Beneficiary any sum or sums not exceeding in total an amount of [insert amount in figures]
( ) [insert amount in words] ,1 such sum being payable in the types and proportions of
currencies in which the Contract Price is payable, upon receipt by us of the Beneficiary’s
complying demand supported by the Beneficiary’s statement, whether in the demand itself or
in a separate signed document accompanying or identifying the demand, stating that the
Applicant is in breach of its obligation(s) under the Contract, without the Beneficiary needing
to prove or to show grounds for your demand or the sum specified therein.
This guarantee shall expire, no later than the …. Day of ……, 2…2, and any demand for
payment under it must be received by us at this office indicated above on or before that date.
1
The Guarantor shall insert an amount representing the percentage of the Accepted Contract Amount
specified in the Letter of Acceptance, and denominated either in the currency (ies) of the Contract or a
freely convertible currency acceptable to the Beneficiary.
2
Insert the date twenty-eight days after the expected completion date as described in GC Clause 18.4. The
Purchaser should note that in the event of an extension of this date for completion of the Contract, the
Purchaser would need to request an extension of this guarantee from the Guarantor. Such request must be
Section X – Contract Forms 178
This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010
Revision, ICC Publication No. 758, except that the supporting statement under Article 15(a)
is hereby excluded.
_____________________
[signature(s)]
Note: All italicized text (including footnotes) is for use in preparing this form and shall be
deleted from the final product.
in writing and must be made prior to the expiration date established in the guarantee. In preparing this
guarantee, the Purchaser might consider adding the following text to the form, at the end of the penultimate
paragraph: “The Guarantor agrees to a one-time extension of this guarantee for a period not to exceed
[six months] [one year], in response to the Beneficiary’s written request for such extension, such request to
be presented to the Guarantor before the expiry of the guarantee.”
Section X - Contract Forms 179
By this Bond [insert name of Principal] as Principal (hereinafter called “the Supplier”) and
[insert name of Surety] as Surety (hereinafter called “the Surety”), are held and firmly bound
unto [insert name of Purchaser] as Obligee (hereinafter called “the Supplier”) in the amount
of [insert amount in words and figures], for the payment of which sum well and truly to be
made in the types and proportions of currencies in which the Contract Price is payable, the
Supplier and the Surety bind themselves, their heirs, executors, administrators, successors
and assigns, jointly and severally, firmly by these presents.
WHEREAS the Supplier has entered into a written Agreement with the Purchaser dated the
day of , 20 , for [name of contract and brief
description of Goods and related Services] in accordance with the documents, plans,
specifications, and amendments thereto, which to the extent herein provided for, are by
reference made part hereof and are hereinafter referred to as the Contract.
NOW, THEREFORE, the Condition of this Obligation is such that, if the Supplier shall
promptly and faithfully perform the said Contract (including any amendments thereto), then
this obligation shall be null and void; otherwise, it shall remain in full force and effect.
Whenever the Supplier shall be, and declared by the Purchaser to be, in default under the
Contract, the Purchaser having performed the Purchaser’s obligations thereunder, the Surety
may promptly remedy the default, or shall promptly:
(1) complete the Contract in accordance with its terms and conditions; or
(2) obtain a Bid or Bids from qualified Bidders for submission to the Purchaser for
completing the Contract in accordance with its terms and conditions, and upon
determination by the Purchaser and the Surety of the lowest responsive Bidder,
arrange for a Contract between such Bidder and Purchaser and make available as
work progresses (even though there should be a default or a succession of defaults
under the Contract or Contracts of completion arranged under this paragraph)
sufficient funds to pay the cost of completion less the Balance of the Contract
Price; but not exceeding, including other costs and damages for which the Surety
may be liable hereunder, the amount set forth in the first paragraph hereof. The
term “Balance of the Contract Price,” as used in this paragraph, shall mean the
total amount payable by Purchaser to Supplier under the Contract, less the amount
properly paid by Purchaser to the Supplier; or
(3) pay the Purchaser the amount required by Purchaser to complete the Contract in
accordance with its terms and conditions up to a total not exceeding the amount of
this Bond.
The Surety shall not be liable for a greater sum than the specified penalty of this Bond.
Section X – Contract Forms 180
Any suit under this Bond must be instituted before the expiration of one year from the date of
the issuing of the Taking-Over Certificate.
No right of action shall accrue on this Bond to or for the use of any person or corporation
other than the Purchaser named herein or the heirs, executors, administrators, successors, and
assigns of the Purchaser.
In testimony whereof, the Supplier has hereunto set his hand and affixed his seal, and the
Surety has caused these presents to be sealed with his corporate seal duly attested by the
signature of his legal representative, this day of 20 .
SIGNED ON on behalf of
By in the capacity of
In the presence of
SIGNED ON on behalf of
By in the capacity of
In the presence of
Section X - Contract Forms 181
Guarantor: [Insert name and address of place of issue, unless indicated in the letterhead]
We have been informed that [insert name of Supplier, which in the case of a joint venture
shall be the name of the joint venture] (hereinafter called “the Applicant”) has entered into
Contract No. [insert reference number of the contract] dated [insert date] with the
Beneficiary, for the execution of [insert name of contract and brief description of Goods and
related Services] (hereinafter called "the Contract").
At the request of the Applicant, we as Guarantor, hereby irrevocably undertake to pay the
Beneficiary any sum or sums not exceeding in total an amount of [insert amount in figures]
( ) [insert amount in words] 1 upon receipt by us of the Beneficiary’s complying
demand supported by the Beneficiary’s statement, whether in the demand itself or in a
separate signed document accompanying or identifying the demand, stating either that the
Applicant:
(d) has used the advance payment for purposes other than toward delivery of Goods;
or
(e) has failed to repay the advance payment in accordance with the Contract
conditions, specifying the amount which the Applicant has failed to repay.
1
The Guarantor shall insert an amount representing the amount of the advance payment and denominated
either in the currency(ies) of the advance payment as specified in the Contract, or in a freely convertible
currency acceptable to the Purchaser.
Section X – Contract Forms 182
A demand under this guarantee may be presented as from the presentation to the Guarantor
of a certificate from the Beneficiary’s bank stating that the advance payment referred to
above has been credited to the Applicant on its account number [insert number] at [insert
name and address of Applicant’s bank].
The maximum amount of this guarantee shall be progressively reduced by the amount of the
advance payment repaid by the Applicant as specified in copies of interim statements or
payment certificates which shall be presented to us. This guarantee shall expire, at the latest,
upon our receipt of a copy of the interim payment certificate indicating that ninety (90)
percent of the Accepted Contract Amount, has been certified for payment, or on the [insert
day] day of [insert month], 2 [insert year], whichever is earlier. Consequently, any demand
for payment under this guarantee must be received by us at this office on or before that date.
This guarantee is subject to the Uniform Rules for Demand Guarantees (URDG) 2010
Revision, ICC Publication No.758, except that the supporting statement under Article 15(a)
is hereby excluded.