ANKARA-SIVAS HIGH SPEED RAIL PROJECT

Ankara-Sivas High Speed Railway, which is one of the few private railway lines designed in accordance
with the speed of 300 km per hour in the world, will reduce the travel time from 12 hours to 2 hours,
between the capital Ankara and Sivas province, which is one of the key points of our history.

Ankara-Sivas High Speed Railway, whose construction continues non-stop, will be in service in 2020.
The speed of the high-speed trains designed specifically for this project has been determined as an
average of 300 km / h.

High Speed Train services will be organized by Turkish State Railways, which will be a total of 405 km
long, double track, with electricity and signals. The project will be extended to Kars and connected to
Baku-Tbilisi-Kars Railway.

Ulusoy Railway Systems Inc.’s overhead line equipments are used in Ankara-Sivas High Speed Railway
which is Turkey’s one of the largest transportation project.

MARMARAY PROJECT, ISTANBUL,


PROJECT OF THE CENTURY

With the Marmaray Project, which reduces the trave time between Asia and Europe to 4 minutes,
approximately 1 million 200 thousand commuters will be transported per day. The railway lines on
both sides of the Bosphorus are connected by immersed tunnel under the Bosphorus.

Ulusoy Rail Systems’ products were used in all electrification stages of the project, which is the
backbone of the Istanbul transportation system, with a total length of 76 km and also our own
production of 1: 5 Automatic Tensioning Devices were used for the first time in this Project in Turkey.

The Marmaray Project, the world's first transcontinental railway, has the world's deepest immersion
tunnel which is used by rail systems at 60 m beneath sea level. It provides the opportunity to travel
between two continents at a speed of 200 km per hour with the latest technology products it contains.

BAŞKENTRAY PROJECT, ANKARA

Baskentray Project, one of the most special railway projects in the History of the Republic of Turkey,
linked Ankara from end to end with railway network comprised 36 km route length (150 km track
length).

Designed with the necessary traffic capacity and sufficient infrastructure for high speed train, semi
speed train and conventional train, Başkentray serves 520 thousand commuters daily. Responding to
all needs in railway transportation, Başkentray Project has been designed in accordance with an
average speed of 250 km/h. Ulusoy Railway Systems products were preferred in this special project in
the Capital Ankara.
Ulusoy Railway Systems products were preferred in this special project in the Capital Ankara.

SELCUK-TEPEKOY RAILWAY PROJECT, IZMIR

The Selcuk-Tepekoy railway project, which was completed in a record time of 2 months, was designed
according to the speed of 160km / h.

Ulusoy Railway Systems produced all overhead line equipments and catenary systems of this Project
and delivered on time as well as completed the project successfully with Turkish State Railways.

LEKI-QEBELE RAILWAY PROJECT, AZERBAIJAN

Azerbaijan State Railways preferred Ulusoy Rail Systems' Over Head Line Equipments and Catenary
Systems in the construction stage of electrification works of Leki-Qebele railway project.

The railway, which will start operating in June 2020, is suitable at a speed of 160 km / h per hour with
sufficient infrastructure for high speed trains.

ATEF GROUPS COMPANY, AZERBAIJAN

Cantilever set fittings used in Azerbaijan Railways and causing problems have been replaced with
Ulusoy Rail Systems products with the initiative of ATEF GROUP company based in Azerbaijan and the
problems experienced in the lines have finally been completed with the successful working
performance of our products.

MERSIN – ADANA and NIGDE – BOGAZKOY RAILWAY PROJECT

The two major cities of Mersin and Adana in the Southern of the Republic of Turkey is a very special
project linking. With this project, these big cities, where millions of people live, have become closer to
each other.

Within the scope of the project, the region between Niğde and Boğazköy has also reached the railroad
and the spine of transportation has been equipped with the latest technology Ulusoy Rail Systems
products. This railway project, which offers modern transportation to cities in the Mediterranean
region, is designed to be suitable for a speed of 160 km / h.

OSMANELİ-KARAGÖZLER 2. Ve 3. Stages Railway Electrification RenewalProject


KÖSEKÖY-SAPANCA, PAMUKOVA-OSMANELİ, ARİFİYE-MİTHATPAŞA and TORBALI-FİDANLIK
RAILWAY PROJECTS
SAKARYA
Marmara Region of Turkey has reached the modern railway line with the completion of comprising a
plurality of line renewal and construction of extensive railway projects. People have been served to
travel faster and more comfortable in this geography with the railway network which is projected
according to an average speed of 160 km / h per hour and speed trains.

Ulusoy Rail Systems products are preferred in this pretty exclusive project which equips Marmara
region with a new generation of electric railways.

HALKALI – CERKEZKOY RAILWAY PROJECT, ISTANBUL

With approximately 20 million inhabitants, the most populous province of Turkey in Istanbul,
transportation problems with the newly built railway network is decreasing. Turkey and the region's
economic center of Istanbul, is among the most important cities in the world with fascinating historical
past.

In Istanbul, which has an important place in the history of humanity, the transportation load of our city
has been reduced by the railway lines between Halkalı-Çerkezköy regions, where Ulusoy Rail Systems
is involved.

This modern railway line, where our products are used at all stages, is built for an average speed of
160 km / h per hour.