PROJECT NO.

10P145
PROJECT TITLE
Rehabilitation of Doha South Sewage Treatment Works (DSSTW)
LOCATION Doha
PR No MBG-PR-47742
Date 31.07.2019
FRP Tanks

SR.NO. DESCRIPTION PR/Proposal Details Sunrise EPP Goodwin Qatar WLL Goodwin Qatar WLL Amiantit Oman co l.l.c Amiantit Oman co l.l.c Almuftah Fiber Glass Almuftah Fiber Glass PREVIOUS REF NO.

Country of Origin INDIA INDIA INDIA Doha Doha Oman Oman Doha Doha
Price basis CPT Site Ex-work CPT JNPT port CPT Doha Site CPT Doha Site Ex-work Ex-work CPT Site CPT Site
IWG Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate Total Cost Unit Rate
Cost Cost Cost
Cost Cost Cost Cost
Final Qty Cost Cost Cost Cost Cost Cost Cost Cost (INR) (INR) Cost Cost Cost (INR)
Sr Nlo Description Tag No Size (RO) (QAR) (QAR) (QAR)
(Nos) (INR) (INR) (INR) (INR) (INR) (INR) (QR) (QR) 1QR-19.11 1QR-19.11 (RO) (RO) (RO) 1QR-19.11
IRO-180.66

EQUIPMENT NAME: FERRIC CHLORIDE BULK STORAE TANK 420940


1 301-T-001 2.5m Dia X 3.25m Ht 1 123,000 123,000 712,300 712,300 382,000 382,000 57,980 57,980 1,107,998 1,107,998 2,950 2,950 532,947 532,947 64,500 64,500 1,232,595 1,232,595
(10P136 -2.6 m X 3.5)

EQUIPMENT NAME: SODIUM HYPO-CHLORITE BULK STORAE


420940
2 TANK 307-T-001 2.5m Dia X 3.25m Ht 1 297,899 297,899 712,300 712,300 382,000 382,000 57,980 57,980 1,107,998 1,107,998 2,950 2,950 532,947 532,947 64,500 64,500 1,232,595 1,232,595
(10P136 -2.6 m X 3.5)

496400
3 Caustic Soda Dosing Tank for Aerobic Digester 205-T-001 2.5m Dia x 2.8m H 1 297,899 297,899 679,800 679,800 378,000 378,000 55,595 55,595 1,062,420 1,062,420 2,750 2,750 496,815 496,815 62,500 62,500 1,194,375 1,194,375 (10P149 -2.5M X 2.9M)
with Disso.Basket

2328000
4 Caustic Soda Bulk Storage Tank for Digester 308-T-001 4.5m dia x 8.6 m H 1 326,870 326,870 3,547,800 3,547,800 3,509,000 3,509,000 160,530 160,530 3,067,728 3,067,728 13,800 13,800 2,493,108 2,493,108 344,500 344,500 6,583,395 6,583,395
(10P125 -5 X 8.8)

420940
5 Caustic Soda Bulk Storage Tank for UF 305-T-001 2.5m Dia x 3.2m H 1 442,000 442,000 708,400 708,400 382,000 382,000 57,070 57,070 1,090,608 1,090,608 3,500 3,500 632,310 632,310 64,500 64,500 1,232,595 1,232,595
(10P136 -2.6 m X 3.5)

6 Ladder & platform Included Included 316,500 Included Included Included Included Included Included

8 Inspection & hydrotest Included Included Included Included Included Included

Total Basic Cost 5 1,487,668 6,360,600 5,349,500 389,155 7,436,752 25,950 4,688,127 600,500 11,475,555
3 Packing (Seaworthy packing) Included Extra Included Included Included Included Included Included Included
Fright upto JNPT port/Site Included Extra 1,587,600 8,000 152,880 6,250 119,438
15,675 2,831,846
Fright upto JNPT port to Doha Included 950,000 950,000 NA NA

4 SubTotal, FOR JNPT PORT 1,487,668 7,310,600 7,887,100 397,155 7,589,632 41,625 7,519,973 600,500 11,594,993
5 GST As applicable As applicable As applicable As applicable As applicable As applicable As applicable As applicable As applicable
7 Sub total incl. Taxes and duties 1,487,668 7,310,600 5,349,500 389,155 7,436,752 25,950 4,688,127 600,500 11,475,555
9 Customs duty NA NA NA NA NA NA NA NA NA
10 Supervision E & C NA NA NA NA NA NA NA NA NA
11 Total landed cost in INR 1,487,668 7,310,600 5,349,500 397,155 7,589,632 41,625 7,519,973 600,500 11,594,993
12 CONTROL COST (in INR) 1,487,668 1,487,668 1,487,668 1,487,668 1,487,668 1,487,668 1,487,668 1,487,668 1,487,668
13 VARIANCE 0 (5,822,932) (3,861,832) 1,090,513 (6,101,964) 1,446,043 (6,032,305) 887,168 (10,107,325)
14 Commissioning Assistance
15 COMMERCIAL
14 to 16 weeks after receipt of
Purchase Order subject to drawing 12 weeks after receipt of MFC 12 weeks after receipt of MFC
a Delivery period 6-8 weeks after receipt ofMFC Drwaing 12 weeks after receipt of MFC Drwaing 12 weeks after receipt of MFC Drwaing 12 weeks after receipt of MFC Drwaing 12 weeks after receipt of MFC Drwaing
approval within 2 weeks after Drwaing Drwaing
submission

24 Months from the date of 24 Months from the date of 24 Months from the date of
24 Months from the date of 24 Months from the date of commissioning or 24 Months from the date of commissioning 24 Months from the date of commissioning 24 Months from the date of
commissioning or 32 months from commissioning or 32 months from commissioning or 32 months
b Guarantee/Warranty commissioning or 32 months from the 32 months from the date of dIspatch or 32 months from the date of dIspatch or 32 months from the date of dIspatch commissioning or 32 months from the
the date of dIspatch whichever is the date of dIspatch whichever is from the date of dIspatch
date of dIspatch whichever is earlier. whichever is earlier. whichever is earlier. whichever is earlier. date of dIspatch whichever is earlier.
earlier. earlier. whichever is earlier.

16 PAYMENT TERMS
a Advance NIL

b Mile Stone -1 100% Agst LC 35% adv +60% agst PI 50% Adv +50% Before delivery 50% Adv +50% Before delivery 50% Adv +50% Before delivery 50% Adv +50% Before delivery Against irrevocable LC at Sight Against irrevocable LC at Sight

17 TECHNICAL CLEARANCE STATUS TECHNICALLY CLEARED TECHNICALLY CLEARED


Concern Person Mr. Joy Mr. T M Jadhav Mr. Shanu S Mr. Shanu S Mr. MOHMED AVESH Mr. MOHMED AVESH Mr. M.T. Hameed Mr. M.T. Hameed
9426081103 7226902299 974 55166626 974 55166626 968 24446600, 24446622 ,Ext - 968 24446600, 24446622 ,Ext - 55542445 55542445
Contact details Contact No.
178 178
hameedmt@almuftah.com hameedmt@almuftah.com
Email Id marketing@sunrisepolymers.com tmjadhav@epp.co.in sales@goodwinqatar.com sales@goodwinqatar.com avesh_amiantit@omzest.com avesh_amiantit@omzest.com
18
EPP/CE/04/19-20/8808 Dt. GW-QU08135-GRP-VTW-May19 Dt 19.05.2019 GW-QU08135-GRP-VTW-May19 Dt Mail 24.05.2019 Mail 24.05.2019 AMFG/Q-AND1/TCM1/2019/095 AMFG/Q-AND1/TCM1/2019/095
19 Vendor reference No. Qtn ref no. SIIL/CED/Q/19-20/75 27.04.2019 29.04.2019 19.05.2019

20 Wabag reference No. Enquiry no.

Conclusion - Order to be placed with M/s


M?s Goodwing shall be provide POD likeGAD,Resing Specification from Manufacturar,ITP,Installation procedure, Test Certificate. Design Calculation charges extra Of QR 25000 If requirde.

Buyer Sr Manager- Procurement Head Procurement Head- Procurement