Sei sulla pagina 1di 5

BANDAR ABBAS

SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR PIPELINE CASING CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. Rev.
Code
.
INSULATORS AND END SEALS

1117 ED 00 PL SP 013 A1 PAGE 1 of 5

SPECIFICATION
FOR
PIPELINE CASING INSULATORS AND END SEALS

A1 05-MAY-2015 FINAL ISSUED M.SHAHSAVAN M.PALVAN F.ATAEI


A0 11-APR-2015 ISSUED FOR APPROVAL M.SHAHSAVAN M.PALVAN F.ATAEI

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract No.
111703/GC-GN/CON-EPC1-00 06/Dec/14
BANDAR ABBAS
SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR PIPELINE CASING CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. Rev.
Code
.
INSULATORS AND END SEALS

1117 ED 00 PL SP 013 A1 PAGE 2 of 5

REVISION INDEX

REVISION REVISION
SHEET NO. SHEET NO.
A0 A1 A2 A3 A4 A5 A0 A1 A2 A3 A4 A5
1 x
2 x
3 x
4 x
5 x

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14
BANDAR ABBAS
SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR PIPELINE CASING CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. Rev.
Code
.
INSULATORS AND END SEALS

1117 ED 00 PL SP 013 A1 PAGE 3 of 5

Table of Content

1. INTRODUCTION .................................................................................................................................................... 4
2. SCOPE ...................................................................................................................................................................... 4
3. DEFINITIONS .......................................................................................................................................................... 4
4. REFERENCES ......................................................................................................................................................... 4
5. MODIFICATIONS, CHANGES AND/OR ADDITIONS /DELETIONS ............................................................... 5

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14
BANDAR ABBAS
SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR PIPELINE CASING CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. Rev.
Code
.
INSULATORS AND END SEALS

1117 ED 00 PL SP 013 A1 PAGE 4 of 5

1. INTRODUCTION

National Iranian Oil Engineering and Construction Company intend to construct a 26” product pipeline to
transport outlet products (Gas oil, Kerosene & Gasoline) from new Bandar Abbas refinery (Setareh Khalij Fars
under construction) to the center of country (Rafsanjan-Terminal) including 8” branch pipeline to Sirjan. This
pipeline is going to transport 300,000 BPD Gasoil, 330,000 BPD kerosene, 360,000 BPD Gasoline products
through Bandar Abbas,Ghotb-Abad and Mehraran Pump Stations with considering all passive defenses & HSE
design criteria.

2. SCOPE

This specification covers the minimum requirements for the purchase casing insulator and end seals to be used
for Bandar abbas sirjan-rafsanjan 26” New Product Pipeline.
This document refers to existing IGS standard No. IGS-M-TP-015(0).

3. DEFINITIONS

Within the context of this document, the following definitions will be applicable:

PROJECT: Bandar Abbas Sirjan-Rafsanjan 26˝ New Product Pipeline


CLIENT: National Iranian Oil Engineering and Construction Company (NIOEC)
END USER: Iranian Oil Pipeline and Telecommunication Company
MANAGEMENT CONSULTANT: Pars Consulting Engineers
CONTRACTOR: Consortium of ODCC/Payandan/Tehran Jonob

4. REFERENCES

Throughout this Specification, the following dated and undated standards/ codes are referred to. These referenced
documents shall, to the extent specified herein, form a part of this Specification.
For undated references, the latest edition of the referenced document (including any supplements and
amendments) applies. For dated references, the edition cited applies.
The applicability of changes in dated references that occur after the cited date shall mutually be agreed upon by
NIOEC and the Vendor/Contractor.

IGS (IRANIAN GAS STANDARDS)

IGS-M-TP-015(0) “IRANIAN GAS STANDARD FOR PIPELINE CASING INSULATOR AND END
SEALS (JAN.,2010) ”
This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14
BANDAR ABBAS
SIRJAN-RAFSANJAN
26˝ NEW PRODUCT PIPELINE

DOCUMENT NO.
SPECIFICATION FOR PIPELINE CASING CONTRACT NO. :
Proj. Phase Area Disc. Type Ser. No. Rev.
Code
.
INSULATORS AND END SEALS

1117 ED 00 PL SP 013 A1 PAGE 5 of 5

5. MODIFICATIONS, CHANGES AND/OR ADDITIONS /DELETIONS

This document is based on IGS standard No. IGS-M-TP-015(0).


The following modifications, changes, and/or additions/deletions to IGS standard No. IGS-M-TP-015(0).
considered covering the requirements of “Bandar Abbas Sirjan_Rafsanjan 26” new product pipeline”.

NO CHANGE TO
(IRANIAN GAS STANDARD FOR PIPELENE CASING INSULATOR AND END SEALS -JAN.,2010) (IGS-
M-TP-015(0))

This document belongs to NIOEC and is confidential and shall be used according to the provisions of contract for Iranian Oil Pipeline and Telecommunication Company, Contract
No. 111703/GC-GN/CON-EPC1-00 06/Dec/14

Potrebbero piacerti anche