4. Nationality: B&H
6. Education:
7. Language skills:
9. Employment Record
2019 Main sewage City of Cazin, Design: ''AG'' Cazin, Project Main sewage collector in urban area of Cazin, total length
collector, part Cuprija PU ''Vodovod'' ''ASI'' Inženjering Engineer L= 1.200 m, diametar DN500 mm.
– Havin most, Cazin Cazin Sarajevo
Revision: ''Higracon'' Tasks carried out: detailed design, revision of detailed
Sarajevo design, study for water permit. On going obtainig of
construction permit and preparation of Tender
documentation and contracting.
2019 Sewage system of City of Cazin, Design: ''Dvokut Pro'' Project Sewage system of business zone ''Ratkovac'' include
business zone PU ''Vodovod'' Sarajevo Engineer design and construction of sewage network total length
''Ratkovac'', City of Cazin Revision: ''Geo Feld'' about 1.200 m with diameter DN 300 and 800 mm, and
Cazin Bihać pumping station with 20 l/s capacity.
Contractor: ''I-
Selimovic'' Cazin Tasks carried out: preliminary and detail design, revision
Supervision: of detailed design, obtaining of construction permit,
''Ing.Consulting'' Cazin preparation of Tender documentation and contracting,
obtaining of use permit.
2019 Watersupply and City of Cazin, Design: ''AG'' Cazin Project Include design and construction of watersupply and
fireprotection PU ''Vodovod'' Revision: ''Geo Feld'' Engineer fireprotection network total length about 3.000 m with
network of business Cazin Bihać diameter DN 200, 125 and 100 mm.
zone ''Ratkovac'', Contractor: ''E-
phase 1 Beganovic'' Cazin Tasks carried out: preliminary and detail design, revision
Supervision: of detailed design, obtaining of construction permit,
''Ing.Consulting'' Cazin preparation of Tender documentation and contracting,
obtaining of use permit.
2019 Secondary sewage City of Cazin, Design: ''AG'' Cazin Project Secondary sewage network of Polje, phase 1, include
network of Polje, PU ''Vodovod'' Revision: ''Geo Feld'' Engineer settlements Glavasevo brdo and Ruznici, total length L=
phase 1 Cazin Bihać 3.000 m, diameter DN200 mm and pumping station with 3
ltr/sec.
2019 Secondary sewage City of Cazin, Design: ''AG'' Cazin Project Secondary sewage network of Polje, phase 2, include
network of Polje, PU ''Vodovod'' Revision: ''Geo Feld'' Engineer settlements Dulinac, Redzici and Jasalna, total length L=
phase 2 Cazin Bihać 2.500 m, diameter DN200 mm.
2019 Commercial and Private Design: Project Main design of boiler room with heat pumps and HVAC
residential building in investor ''AD&ARHITEKT'' Engineer instalation (heating and ventilation).
Puskari, Cazin Bihać
Revision: ''Geo Tasks carried out: detail design, revision of detailed
Premjer'' Cazin design, obtaining of construction permit.
2019 Watersupply of City of Cazin Design: ''Una Project Watersupply network total length L= 1.700 m, diameter
3
Ostrozac on Una, and Swiss Consulting'' Bihac Engineer DN160, DN110 and DN90 mm, and reservoir V= 50 m .
Cazin agency SDC Revision:
''AD&ARHITEKT'' Tasks carried out: preliminary and detail design, revision
Bihać of detailed design, elaboration of expropriation , obtaining
of construction permit, preparation of Tender
documentation and contracting, obtaining of use permit.
2019 Square with City of Bihac, Design: ''IG'' Banja Project Square with underground garage with 55 park spaces.
underground garage Institute for Luka Engineer
in Bihac Spatial Revision: Tasks carried out: revision of detailed design of HVAC
Planning ''AD&ARHITEKT'' instalation (ventilation system).
Bihac Bihać
2019 Sewage system of City of Bihac, Design: ''Aqua Projekt'' Project Sewage of Veliki Lig, total length L= 2.000 m, diameter
Veliki Lug, Bihac Institute for Bihac Engineer DN300, DN400, DN500 and DN600 mm, with three
Spatial Revision: pumping station.
Planning ''AD&ARHITEKT''
Bihac Bihać Tasks carried out: revision of detailed design.
2019 Reservoir and City of Cazin, Design: ''AG'' Cazin Project Watersupply network total length L= 1.250 m, diameter
pipeline in Pecigrad, Environmental Revision: ''Geo Feld'' Engineer DN160 mm and reservoir V= 50 m3.
Cazin fund of FBiH Bihać
Contractor: ''MN- Tasks carried out: preliminary and detail design, revision
Redzic'' Cazin, of detailed design, elaboration of expropriation , obtaining
''Regeneracija'' of construction permit, preparation of Tender
Supervision: documentation and contracting, obtaining of use permit.
''Ing.Consulting'' Cazin
2018 Pumping station City of Cazin Design: ''Ing Statik Project Pumping station with 8 ltr/sec for supply of Prosici
''Prosici'' biro'' Cazin engineer settlement with 250 households. Two pumps with power
Revision: 7,5 kW.
''AD&ARHITEKT''
Bihać Tasks carried out: preliminary and detail design, revision
Contractor: ''MN- of detailed design, obtaining of construction permit,
Redzic'' Cazin, preparation of Tender documentation and contracting,
Supervision: ''Domus obtaining of use permit.
MM'' Cazin
2017- Filter station of City of Cazin, Design: ''Best Soft'' Project The filter station object is a dimension of 13,5 x 7,5 m.
2018 watersource PU ''Vodovod'' Cazin Engineer
''Ljubijankici'', Cazin, Cazin Contractor: ''E- Tasks carried out: detailed design, revision of detailed
phase 1 Beganovic'' Cazin design, obtaining of construction permit, preparation of
Supervision: ''AG'' Tender documentation and contracting, obtaining of use
Cazin permit.
2017- Decentralized City of Cazin Design: ''Una Project Phase 2 include construction od main sewage collector
2018 sewage system and and Swiss Consulting'' Bihac Engineer total length L= 1.000 m, diameter DN250 mm, pumping
waste water agency SDC Revision: ''Ibis'' station with 5 ltr/sec, and construction of waste water
treatment plant in Zavidovici, Contractor: treatment plant for 800 PE.
Polje, Cazin, phase 2 ''I-Selimovic'' Cazin
Supervision: ''AG'' Tasks carried out: preliminary and detail design, revision
Cazin of detailed design, elaboration of expropriation , obtaining
of construction permit, preparation of Tender
documentation and contracting, obtaining of use permit.
2017 Decentralized City of Cazin, Design: ''Saraj Project Sewage system with waste water treatment plant for
sewage system and PU ''Vodovod'' Inzenjering'' Sarajevo Engineer Cazin west area, settlements Pjanici, Cehici, Trzac,
waste water Cazin Revision: ''Diwanx'' Trzacka Rastela. Total length L= 30.000 m, diameter
treatment plant for Sarajevo DN300, DN250 and DN200 mm, with two SBR plant 3.000
Cazin west area and 5.000 PE.
Tasks carried out: preliminary and detail design, revision
of detailed design, elaboration of expropriation, study for
water permit, study for envirnomental permit, preparation
of Tender documentation and contracting according to
FIDIC procedure.
2016 Commercial and Private Design: ''AMG'' Velika Project Main design of boiler room and HVAC instalation (heating
residential building in investor Kladusa Engineer and ventilation).
Cuprija, Cazin Revision: ''Domus MM''
Cazin Tasks carried out: detail design, revision of detailed
Contractor: ''D- design, obtaining of construction permit, construction and
Gradnja'' Cazin supervision.
Supervision: ''Ing Statik
biro'' Cazin
2015- Cazin waste water City of Cazin, Study: ''Holinger'' Project Design Support is related to the following services: (i)
2018 project European Swiss, ''Una Engineer surveying and hydraulic calculation of existing sewer,
bank for Consulting'' Bihac preparation of preliminary and detailed design of new
reconstruction Design: ''Nama'' sewer network (length about 60 km), preparation of tender
and Greece, ''Zavod za documentation (FIDIC red book) (ii) conceptual and
development vodoprivredu'' Sarajevo preliminary design of WWTP for 36.000 PE and tender
documentation (FIDIC yellow book), (iii) non-revenue
water study, preliminary and detailed design of
reconstruction of water supply system (14 km) and tender
documentation (FIDIC red book), (iv) preliminary and
detailed design of reconstruction of water treatment plant
(improving energy efficiency, replacement of pumps,
automatic and control equipment, SCADA).
2015 Watersupply system PU ''Vodovod'' Design: ''Geo Feld'' Project This project include land surveying and as-built design of
''Tahirovici'', Cazin Cazin Bihac Engineer watersupply system ''Tahirovici'' which include: (i) water
source ''Tahirovici'' with two wells (45 ltr/sec) (ii) two
reservoirs with total capacity of 4.000 m3, (iii) pressure
and gravity pipeline total length about 16.000 m, with
diameter DN 250, 300, 350 and 400 mm.
Tasks carried out: land surveying, preparation of geodetic
report, preparation of built design of pipeline and objects
(pumping stations, reservoirs, manholes).
2014 Watersupply system PU ''Vodovod'' Design: ''Aber Design'' Project This project include land surveying and as-built design of
''Liskovac'', Cazin Cazin Sarajevo Engineer watersupply system ''Liskovac'' which include: (i) two
pumping station, (ii) three reservoirs, (iii) pressure and
gravity pipeline total length about 30.000 m, with diameter
DN 50, 90, 110 and 160 mm.
2015 Business zone PU ''Vodovod'' Design: ''AG'' Cazin Project Include design and construction of watersupply and
''Incel'', Cazin Cazin Revision: ''Geo Feld'' Engineer fireprotection network total length about 3.000 m with
Bihac diameter DN160 mm.
Contractor: ''E-
Beganovic'' Cazin Tasks carried out: preliminary and detail design, revision
Supervision: ''Zavod za of detailed design, obtaining of construction permit,
saobracaj'' Sarajevo preparation of Tender documentation and contracting,
obtaining of use permit.
2015- Sewage network of City of Cazin, Design: ''AG'' Cazin Project Construction of sewage system in Klen for 60 households,
2016 Klen, Cazin Environmental Revision: ''Geo Feld'' Engineer total length L= 1.230 m, diameter DN250 mm.
fund of FBiH Bihac
Contractor: ''I- Tasks carried out: preliminary and detail design, revision
Selimovic'' Cazin of detailed design, obtaining of construction permit,
Supervision: ''AG'' preparation of Tender documentation and contracting,
Cazin obtaining of use permit.
2014- Water supply City of Cazin, Design: ''Geo Feld'' Project Water supply pipeline total length L= 5.000 m, diameter
2015 pipeline Gornja PU ''Vodovod'' Bihac Engineer DN160 mm.
Koprivna – reservoir Cazin Revision: ''AG'' Cazin
Nisan, Cazin Contractor: ''I- Tasks carried out: preliminary and detail design, revision
Selimovic'' Cazin of detailed design, obtaining of construction permit,
Supervision: ''AG'' preparation of Tender documentation and contracting,
Cazin construction of phase 1 with length L= 1.500 m.
2014 Water and sewage City of Cazin, Design: ''AG'' Cazin Project This project include replacement of asbestos-cement
network in urban PU ''Vodovod'' Revision: ''Geo Feld'' Engineer watersupply pipline total length L= 850 m, diameter DN=
area of Cazin Cazin Bihac 150 mm, and construction of new sewer network total
Contractor: ''E- lenght L= 650 m, diameter DN= 300 mm.
Beganovic'' Cazin
Supervision: ''AG'' Tasks carried out: preliminary and detail design, revision
Cazin of detailed design, obtaining of construction permit,
preparation of Tender documentation and contracting.
2014 Watersupply system Public Water Design: ''Geo Feld'' Project This project include construction of new pressure pipeline
of local community supply Bihac Engineer (length 5.000 m, DN110 mm), gravity pipeline (length
Hrustovo, Company of 5.000 m, DN50 mm), tree reservoirs and two pumping
Municipality of Sanski Most stations.
Sanski Most
Tasks carried out: preliminary and detail design.
2014 Secondary sewage City of Cazin, Design: ''AG'' Cazin Project This project include construction of secondary sewage
network in PU ''Vodovod'' Revision: ''Geo Feld'' Engineer network and connections in waterprotect area
waterprotect area Cazin, UNDP Bihac ''Ljubijankici'', diameter from 160 mm to 200 mm. Total
Ljubijankici, Cazin Contractor: ''MN- length of secondary sewage and connections is about
Redzic'' Cazin 4.000 m.
Supervision: ''Domus
MM'' Cazin Tasks carried out: preliminary and detail design, revision
of detailed design, obtaining of construction permit,
preparation of Tender documentation and contracting,
construction of phase 1 length L= 2.000 m.
2014 Secondary sewage City of Cazin, Design: ''Zavod za Project Secondary sewage collector in water protect area
collector for water PU ''Vodovod'' vodoprivredu'' Sarajevo Engineer ''Mutnik'' is total length 9.000 m with diametar DN 300
protect area ''Mutnik'' Cazin Revision: ''AG'' Cazin mm. Water source ''Mutnik'' is one of the biggest in
Municipality of Cazin with 70 ltr/sec and supply abouth
3.300 households with potable water.
2012 WWTP for business ''MS-ALEM'', Design: Project To improve process of purification of waste water from
object ''MS-ALEM'' Bosanska ''AD&ARHITEKT'' Engineer business object ''MS-ALEM'', it was necessary to prepare
Ltd Bosanska Krupa Krupa Bihac technical solution for treatment of waste water for PE 200.
Study: ''Matrica'' Bihac,
Tasks carried out: study of option of purification,
preliminary and detail design of waste water treatment
plant.
2012 Decentralised City of Cazin Design: ''Una Project Total length of collectors is 9.700 m with diameter DN
sewage system and Consulting'' Bihac Engineer 200, 250 and 300 mm. WWTP is based on SBR
WWTP of local Revision: ''AG'' Cazin technology and capacity for final period is 1.500 PE.
community ''Stijena''
Tasks carried out: preliminary design, revision of design.
2012 Commercial building PU ''Elektro Design: ''Plan'' Velika Project Construction of commercial building in City of Cazin.
of ''ELEKTRO privreda'' Kladuša Engineer Supervision of construction HVAC instalations, water and
PRIVREDA'' in Cazin Cazin ''AG'' Cazin, sewage instalations.
Contractor:
''Elektrometal'' Cazin Tasks carried out: supervision of construction of HVAC
Supervision: ''Geo and hydro installation.
Feld'' Bihac
2011 Water supply system World Bank Design: ''New Way'' Project This project include construction of: (i) pumping station
''Bosanska Krupa – (WB) and Cazin Engineer ''ADE'' and ''TEKIJA'' (40 ltr/sec), (ii) pressure pipeline
Jezerski – Mahimca Municipality Contractor: total length 7.110,36 m with diameter DN 250 mm, (iii)
Selo'', Municipality Bosanska ''Elektrometal'' Cazin gravity pipeline total length 14.013,40 m with diameter DN
Bosanska Krupa Krupa and ''BC gradnja'' 80, 100, 125, 150, 200 and 250 mm, (iv) main reservior
Bosanska Otoka with total 1.000 m3, (v) other objects: 5 small reservoirs
3
Supervision: ''AG'' (total 800 m ) and 2 small pumping stations (total 14
Cazin ltr/sec).
Tasks carried out: preliminary and detail design, revision
of detailed design, preparation of Tender documentation
and contracting according to FIDIC procedure for
construction and supervision, construction and
supervision, obtaining use permit.
2011 Main sewage City of Cazin, Design: ''Zavod za Project Main sewage collector in Municipality of Cazin is total
collector in Cazin PU ''Vodovod'' vodoprivredu'' Sarajevo Engineer length 8.000 m with diametar DN 400, 500, 600 and 800
Cazin Revision: ''AG'' Cazin mm. Main sewage collector is divided in 4 sections.
2011 Reconstruction of City of Cazin Design: ''AG'' Cazin Project Reconstruction of complete infrastructure of main city
main city square in Revision: ''Geo Feld'' Engineer square: roads, pavements, surface and drainage system,
Cazin Bihac regulation of watercourse, watersupply network, main and
Contractor: secondary sewer network, electrical and telecomunication
''Elektrometal'' Cazin installations.
Supervision: ''AG''
Cazin Tasks carried out: preliminary and detail design, revision
of detailed design, preparation of Tender documentation
and contracting for construction and supervision,
construction and supervision, obtaining use permit.
2010- Decentralised City of Cazin Design: ''Una Project Decentralised sewage system of local comunity
2012 sewage system of and Swiss Consulting'' Bihac Engineer Ljubijankici include implementation of sewer collector total
local community agency SDC Revision: ''AG'' Cazin, length about 4.000 m with diamenter DN 200, 250 and
Ljubijankici, Cazin Contractor: ''E- 300 mm and WWTP with non-convencional technology
Beganovic'' Cazin wetland (PE 640).
Supervision: ''Zavod za
saobracaj'' Sarajevo Tasks carried out: preliminary and detail design, revision
of detailed design, preparation of study for water permit
preparation of Envirnomental Impact Assesment,
preparation of Tender documentation and contracting for
construction and supervision, construction and
supervision, obtaining use permit.
2010 Construction of water Municipality of Design: ''Plan'' Velika Project This project include construction of water supply pipeline
supply system Buzim, Odraz Kladusa Engineer for local community ''Jusufovici'' in Municipality of Buzim.
''Jusufovici'', Foundation Contractor: ''Magis'' Total length of pipeline is about 11.000 m with diameter
Municipality of Buzim Bihac DN 63, 90, 110 and 125 mm.
Supervision: ''Zavod za
vodoprivredu'' Sarajevo Tasks carried out: preliminary and detail design, revision
of detailed design, preparation of Tender documentation
and contracting for construction and supervision,
construction and supervision, obtaining use permit.
2008- Water supply system World bank Design: ''New Way'' Project Construction of water supply system ''Ljubijankici'' for
2010 ''Ljubijankici'', Cazin (WB) and City Cazin Engineer approximately 3.000 hausholds (about 20% of Cazin
of Cazin Contractor: ''BC population), including: construction of three wells with total
gradnja'' Bosanska capacity of 80 ltr/sec, construction of pumping station,
Otoka construction of main pressure pipeline lenght 1.800 m and
Supervision: ''Best DN400 mm, construction of main reservoir capacity of
3
Soft'' Cazin 1.000 m , construction of main gravity pipeline lenght 43
km and diameter DN400, 350, 300, 250, 200, 150, 100
and 80 mm, construction over 100 km of secondary water
supply network.
2009 Secondary sewage City of Cazin Design: ''New Way'' Project Construction of secondary sewage collector for about 100
collector for and Swiss Cazin Engineer households of Gnjilavac settlement, 10 legal entities and
settlement agency SDC Contractor: JKP local school, lenght about 1.000 m, pipeline diameter DN
''Gnjilavac'', Cazin ''Vodovod'' Cazin 300 mm.
Supervision: ''New
Way'' Cazin Tasks carried out: preliminary and detail design,
construction and supervision.
2008- Water supply system City of Cazin, Design: ''Best Soft'' Project Construction of water supply system ''Pajica Potok''
2009 ''Pajica Potok'', Cazin PU ''Vodovod'' Cazin Engineer including reconstruction of well and pumping station with
Cazin Contractor: JKP total capacity of 15 ltr/sec, construction of main pressure
''Vodovod'' Cazin and gravity pipeline lenght 1.600 m, construction of main
3
reservoir capacity of 200 m .