Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Material Preparation:
1 Panel Enclosure Minor Visual, IS 2859- GA Drawing GA Drawing Incoming Test report P R
dimension AQL =1 Inspection
al report
2 Sinusoidal filter Major Visual, IS 2859- Technical Technical data Incoming Test report p R
Dimension AQL =1 data Sheet Sheet, Drawing Inspection
al report
Major Electrical 100% WI for Technical data Incoming Test report p R
Incoming Sheet, Drawing Inspection
Inspection report
3 Inverter ,ACB, Major Visual, IS 2859- Technical Technical data Incoming Test report p R
MCCB ,MCB, SFU, Dimension AQL =1 data Sheet Sheet, Drawing Inspection
contactors, power al report
supply, indication
lamps and others
S. Item Category Type / Extent Reference Acceptance Format of Records to be Agency Remarks
SUPPLIER Manufacturer
Date
Name
Signature
In process inspection:
1 wire cutting, Major Visual, 100% WI for Wire Schematic In process In process p R
stripping and Dimensional cutting , Drawing Inspection Inspection report
crimping , Electrical stripping and report
process crimping
process
2 Cable channel Minor Visual, 100% WI for cable GA Drawing In process In process p R
cutting process Dimensional channel Inspection Inspection report
& Din rail , cutting & Din report
cutting process rail cutting
3 Electrical Major Visual, 100% WI for cable GA Drawing In process In process p R
component Dimensional channel Inspection Inspection report
mounting in , cutting & Din report
Din rail process rail cutting
4 Mounting plate Major Visual, 100% WI for GA Drawing, In process In process P R
assembly Dimensional mounting Schematic Inspection Inspection report
, Continuity plate Drawing report
SUPPLIER Manufacturer
Date
Name
Signature
Final inspection:
1 Final Major Electrical 100% Testing Software Final test Final test P W
testing(Fun instructions simulation – report report
ctional, output for
Grounding, functional
Burn-In) check.
2 Efficiency Major Electrical 100% IEC61683 IEC61683 Efficiency Efficiency P W
Test test report test report
SUPPLIER Manufacturer
Date
Name
Signature
GENDS:-
P – Performer who will satisfy himself prior to offering any inspection and any documents for review as per extent of check mention
W – Witness
RM – Random Witness
R –Review
A – Approval
SUPPLIER Manufacturer
Date
Name
Signature