Change firefighting LOA/STW Holder and safety officer LOA/STW Holder must ensure the fire suppression system is changed from
system from are not available before start of the automatic to manual.
automatic position activity that leads to failure to Safety Officer also should re-check the fire suppression system changed from
4 to manual position change the firefighting system. automatic to manual while entering.
before starting the Incompetent person assigned for Safety personnel should not allow anybody to enter the energized substation
activity. this activity that leads to personal without the LOA/STW Holder.
(OPTIONAL) injury and or property damage. If auto manual switch not working properly immediately report to the
Page 2 of 13 Rev.2 [08-April-2019] Projects Business Unit
PROJECT NAME: CONNECTION OF AL JUBA / 132KV NETWORK IN WADI AL DAWASIR
FROM 8780 TO 9701
ELEMENT 5.19.3
JOB SAFETY PRACTICES
7 Mobilization of Entry not registered into the Boom truck/Crane entry should be registered on the logbook and must be
materials & logbook. ensured by Security staff, LOA/STW Holder & safety officer.
equipment using Boom truck/Crane operator has no The operator should have valid SEC ID.
used.
Not applicable tools for the job.
Uninspected tools being used at
Never use defective or damaged tools. It must be removed from site for proper
work
repairs or replacement.
Manual handling (back injuries,
(hammers, cutters, Never use altered tools or homemade tools.
muscular strains due to poor
screwdriver, pliers,
working postures). Choose the right tool for the job.
rollers etc.). All tools should be in good quality & good working condition.
Falls on same level due to slips &
trips Ensure that all exit/entry points are free from any obstruction of hand tools.
Tools lying around near exit/entry Never use uninsulated hand tools at site. Provision of insulated tools must be
points provided.
Use of uninsulated hand tools
Using worn out tools.
Selected Boom truck/Crane is not
good for intended use regarding it
The load bearing capacity and other factors must be considered while choosing
load lifting capacity.
the Boom truck/Crane.
The person who inspected the
It should be inspected by competent personnel.
Boom truck/Crane has no sufficient
Boom truck/Crane should have valid third-party certification from the
knowledge about this specific task.
approved agency.
Valid third-party certification is not
Pulling machine must have valid calibration certificates
available for lifting equipment,
Sticker and certificate should be available with vehicle.
operator and for the pulling
Arrangement and Effective daily equipment inspection should be carried out by operator by using
machine.
inspection of lifting pre-defined checklist.
Third party certification is not from
equipment and Ensure vehicle maintenance record is available with vehicle and check the
approved agency.
9 other equipment Daily vehicle inspection not
equipment maintenance history.
(Boom Ensure the Boom truck/Crane have valid government registration and
performed by driver and genuinely
truck/Crane, cable insurance.
filled checklist not available.
pulling machine) The Boom truck/Crane driver should have valid SAG heavy vehicle driving
Boom truck/Crane driver has no
license.
valid SAG heavy vehicle driving
Visual inspection must be done before entering to the site about Hydraulic
license.
system, tire condition, breaking effectiveness, boom & lifting hook condition,
Vehicle maintenance record is not
etc.
available
Vehicle Government registration
Pre-task inspection of extended outriggers, jib, and 380® rotation of boom
must be done prior to starting any activity.
documents, valid insurance
documents not available.
Selected lifting gears are not good Choose right lifting gears for the intended use.
for intended use regarding its load Certified rigger should inspect the lifting accessories.
lifting capacity. All the lifting accessories should be inspected by approved third party agency
Arrangement and The person who inspected the and should have valid certification.
inspection of all lifting ancillaries has not sufficient All the lifting gears must have tags and color coding.
the lifting knowledge about this specific task. All lifting gears rated capacity / SWL must be available or clearly visible on the
10 accessories. Valid third-party certifications are accessories.
(Lifting hook, not available for lifting gears. All lifting gears must be properly stored, handled and labelled in the storage
shackles, web Third party certification is not from area.
slings, etc.) approved agency.
Use of uninspected lifting tools
Suitable storage facility not
provided.
11 Cable pulling from Incompetent personnel performing Permit to work should be obtained prior to the activity
terminal compound the task, lack of supervision, no A pre-start survey will be carried out to check on route, manpower and
area to GIS isolation control established equipment requirements, and the foreseeable hazards. The work will be
Basement The pulling machines not properly planned to ensure a safe means of access is provided.
maintained, inspected or missing Any equipment required should be properly inspected and color coded.
color coding. Personal protective equipment will be provided I-e Hard Hat with chin strap,
Contact with live electrical Glasses, dust mask, hand gloves, safety vest, Safety Shoes.
conductors and equipment Good communications must be maintained between levels when cable is being
Contact with moving cables pulled in multi-story buildings and over long distances.
Entanglement Work activity must be monitored to ensure that additional precautions and
Poor Cable management equipment is taken into use if edge protection if opportunity arrives.
Unavailability EEP, ERP, First Aid kit, Close supervision is required to ensure that over-stressing of the cable does not
First Aider, Emergency Vehicle, occur. Cable pulls will be smooth and maintained at a reasonable rate to
Firefighter, Firefighting equipment. ensure control and tension requirements are met.
Unable to maintain the safe Workforce must be trained in manual handling techniques and instructed in
distance from energized the used and precautions required for the safe use of necessary tools and
equipment, lines etc. equipment (lifting and tensioning devices).
Inadequate or substandard PPEs. All the equipment should be inspected and maintained prior to work to avoid
Improper supervision any accident.
Workforce not aware of hazards Cables should be properly arranged to avoid slip, trip and fall.
involving cable pulling activity. Area should be properly lit and ventilated.
No induction or toolbox by Proper signage and barricading should be provided to avoid unauthorized
competent person. entry.
Falling from height, trips and slips EEP, ERP, first aid kit, first aider, emergency vehicle, firefighting equipment and
provided.
Insufficient cable rollers
Improper handling of materials.
Use of damaged cable pulling
sockets.
Unauthorized entry in the cable
pulling area.
No proper signage and barricading
provided.
No proper access in the working
area.
No proper lighting in the working
area.
No proper ventilation in the
working area.
Lifting gears without SWL.
12 Housekeeping and Obstructed materials generated by Conduct TBT and ensure that all the workers get educated about the activity.
removal of activity may lead to slips, trips and Adopt correct manual handling techniques before lifting (never twist or turn
undesired falls when handling heavy objects).
materials, tools, & Dust accumulated inside the Remove or cover sharp edges, burrs, etc.
equipment buildings may cause skin and All flammable materials should be removed and disposed properly.
generated by the breathing issues. Only skilled person shall carry out the job.
activity.
Lack of coordination in group Ensure adequate PPEs are available before commencing the work and are in
effort/adopting poor manual safe condition to use.
handling techniques/ awkward All hand tools must be in good working condition.
positioning, leading to cuts, crush, Provide isolated area for dumping of scrap materials.
musculoskeletal disorders etc. Proper schedule of scrap disposal.
Poor housekeeping initiated – Conduct TBT to all workers regarding ERGONOMICS.
rubbish materials everywhere Full supervision shall be implemented.
Proper disposal bins not provided Ensure that waste management plan is established.
at the working area. Assign permanent cleaners on a daily basis.
Working personnel not following Provision of adequate dust bins.
waste management system. Proper ventilation and lighting must be provided during housekeeping
Poor supervision and/or no activities.
instructions provided. Ensure removal of all undesired materials and garbage generated by the
Inadequate cleaning materials activity inside substation.
available and used. Ensure proper communication and clear instructions are provided.
Change firefighting LOA/STW Holder must ensure that FACP is turned from manual to automatic
Incompetent person doing the
system from after the activity is executed.
changing of firefighting system.
manual position to Safety Personnel must recheck that FACP is turned from manual to auto after
15 automatic position Auto-Manual switch not working the activity is executed.
properly resulting to gas release,
after completing SEC engineer should also recheck the fire suppression system is changed from
the activity. injury or even fatality.
manual to automatic
Improper
LOA/STW Holder is responsible for coordinating with SEC control center.
communication/Language barriers
Informing to CRCC Proper communication must be established with CRCC before and after
16 after completion of LOA/STW Holder not available on completion of job.
site may lead to penalties and legal
the work. Communication with CRCC to be done in the language understood by CRCC
actions.
officially.
Unauthorized entry of personnel or
equipment and unauthorized
activity may lead to legal issues and
LOA/STW Holder must ensure that the gates are closed.
penalties.
Engineer/manager should recheck that the gates are properly closed and
LOA/STW Holder and safety officer
Close the gate and properly communicated
failed to inform SEC safety team
handover the key LOA/STW Holder or safety officer must inform SEC-safety team once the work
17 after the work is completed.
to SEC is completed.
Workers left behind inside the sub-
LOA/STW Holder and Safety Personnel must ensure that all the workers are out
station
of sub-station before locking it.
Lock misplaced by LOA/STW Holder
Ensure that lock of the gate is properly secured
LOA/STW Holder failed to inform
the SEC on completion of activity
JSP Approved By (SEC- PD): Engr. BADER SHBAB AL OTAIBI Signature: Date: