JOB TITLE / AIM: JSA for Holiday Testing


JSA DATE:05/02/2007 JSA NO./ REVISION: 04
SUPERVISOR/ JSA LEADER: MalikIrshad SCRIBE: Abdullah Khan
PARTICIPANTS : Shoaib Farman, Iqbal Zafar, Shafiq
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Approved:

Bruce Boxshall 21-June-06

Attach copies of any relevant documentation/ drawings.


Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of Equipment & workers
2. Manual excavation and exposure of pipe at each joint
3. Holiday Testing includes grounding
4. Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of the following Unauthorised equipment/tools brought out to Before mobilizing any equipment/tools make sure
equipment: site that the E &P Personnel & BHP got inspected the
- Holiday tester equipment. Checklist are in equipment
- Shovels Ensure that gas testing was conducted whenever
bringing the equipment in transition and
Operations areas

Unskilled and uninducted personnel starting Ensure that all personnel prior to start have been
the job inducted and oriented about the hazard in the job
site. All persons working in Operations areaa to
be Operaitons inducted.

Workers starting the job unfit to work All personnel must be undergone fitness for work
assessment thru DEL doctor
Workers starting the job without necessary JSA must be in place prior to work. Ensure all the
controls in place (eg JSA, Permits as required) persons take part in the toolbox meeting
discussion. Persons signed at the back of JSA at
each toolbox meeting.
All works undertaken in Operations areas to be
performed under HFHWP.
Hand Injury Ensure proper hauling of materials/get help if
required/Wear hand gloves.
2 Manual excavation and exposing Dust Ensure proper wetting of soil and workers are
section of pipe at each joint prior to wearing dust mask
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
testing Back injury Ensure workers are following the correct
procedure of positioning and lifting. Get help if
required.
Heat Stress/Exhaustion Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
Snake bite Workers to be reminded of hazard in this area No
killing of snakes
Ensure that workers accessing the right walkway
Tripping hazards and watch your steps.
Other worker not involve in the job must not
SIMOPS come closer to the area
Workers to maintain a minimum distance between
each other when working close together.
Ensure workers are accessing the right pathway
and equipment must maintain the speed limit
when entering and leaving work area.
Ensure no works shall perform when strong wind
Strong wind conditions
comes
Ensure that whenever heavy equipment on the
area no works shall commence at excavated area
3. Holiday Testing includes grounding Static electrocution Ensure that the equipment is inspected by BHP
and calibrated prior to use.
Ensure that QC conducting the testing are wearing
rubber gloves
Ensure that workers performing the testing are
trained.
Unauthorized operator should not operate the
tester
Miscommunication
Always refer to manufacturers methodology of
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
testing
Ensure that during holiday testing no other
workers touching the carbon steel pipe
Ensure that earth grounding is in place prior to
Tripping hazards testing.
Ensure that the Holiday Tester will be off
immediately after detected some defects identified
or before removal of the ring.
Ensure that workers will not step on the carbon
pipe
Spark from equipment in Operations area
Ensure equipment is inspected, calibrated and
approved by BHPB operations prior to use in
Operations areas.
Ensure that gas testing is conducted whenever
working in transition zone or operations area
Strong winds Whenever strong wind comes the work must be
stop
4. Demobilization Same as item one Same as item one