Sei sulla pagina 1di 76

Submission folder

Hilti CP606 Flexible Firestop


Sealant 6XEPLVVLRQ)ROGHU

Product Info. & Method Statement 2-6

Test Report
- Warres No. 69754/C 7 - 31 
- Warres No. C125356 32 -40

Government Letters
Buildings Department  41
Fire Services Department  42
Architectural Services Dept. 43
Country of Origin  44
LEED Letter  45
BEAM Plus information 46
92&&RQWHQW 7
Material Safety Data Sheet 48 - 55 
Job Reference 6 - 76
Make your submission simple!
To download the most updated submission folders and
technical manuals, visit http://www.hilti.com.hk/download

P Recycling one ton of paper saves 17 trees and 7000 gallons of

water. Please consider your environmental responsibility before using the hard
copy version!

Customer Hotline
Hong Kong 8228 8118
Macau (Toll free) 00800- 8228 8118
1 Jul 2019
Flexible firestop sealant CP 606

APPLICATIONS Technical data


● Sealing rigid or low-movement ceiling/wall joints, widths from 6 Chemical basis Water-based acrylic dispersion
to 30 mm Base materials Concrete, Masonry, Drywall, Steel
● Sealing metal pipe penetrations Movement1) ±12.5% (ISO 11600)
● For use in various base materials such as masonry, concrete, Approx. tack-free time (ventilated 20 min
drywall and metal at 77°F, 80% rel. humidity)
Approx. curing time2) 3 mm/3 days
Average volume shrinkage 22.2%
ADVANTAGES Application temperature range 5 - 40 °C
● Paintable Temperature resistance range -30 - 80 °C
● Easy to clean up with water Storage and transportation 5 - 25 °C
temperature range
● Smoke, fume and water resistant
Shelf life3) 24 Months
1)
according to HTC 1250
2)
at 75°F/24°C, 50% relative humidity
3)
at 77°F/25°C and 50% relative humidity; from date of manufacture
Water 
Smoke Acoustic Siesmic
Tight

Mould &
Mildew

Consumption Guide Application Procedure
Joint installation
Consumption Guide
Cartridge volume = 310 ml (CP 606) Application Procedure
a = Joint width in mm Joint installation
Cartridge volume = 310 ml (CP 606)
b = Sealant depth in mm
a = Joint width in mm
Linear metre per cartridge = Cartridge volume in ml
b = Sealant depth in mm a  x  b
Linear metre per cartridge = Cartridge volume in ml
1. Clean opening 2. Insert backing  3. Apply CP 606 4. Smooth CP 606
a  x  b
Therefore linear metres per cartridge = 310/(20 x 10) = 1.55 metre per cartridge material
Pipe installation (non-combustible pipes only)
1. Clean opening 2. Insert backing  3. Apply CP 606 4. Smooth CP 606
Therefore linear metres per cartridge = 310/(20 x 10) = 1.55 metre per cartridge material
a
b Pipe installation (non-combustible pipes only)
a b
a
b
b
a
1. Clean opening 2. Insert  backing  3. Apply CP 606 4. Smooth CP 606
material
Wall Floor
1. Clean opening 2. Insert  backing  3. Apply CP 606 4. Smooth CP 606
Joint width (mm)
Wall 0-15 16-20
Floor 21-30 material
Sealant depth (mm) 6 10 15
Joint width (mm) 0-15 16-20 21-30 Info | Shop
Sealant depth (mm) 6 10 15
Order Now
Info | Shop

Ordering designation Colour Volume per unit Packaging Sales pack  Item number


quantity
CP 606 310ml INT grey
Ordering designation Grey
Colour 310 ml
Volume per unit Cartridge
Packaging 1 pc
Sales pack  209630
Item number
CP 606 580ml INT grey Grey 580 ml Foil pack quantity
1 pc 209633
CP 606 310ml INT grey
CP 606 310ml white Grey
White 310 ml
310 ml Cartridge
Cartridge 1 pc
1 pc 209630
209625
CP 606 580ml INT grey
CP 606 580ml white Grey
White 580 ml
580 ml Foil pack
Foil pack 1 pc
1 pc 209633
209632
CP 606 310ml white White 310 ml Cartridge 1 pc 209625
CP 606 580ml white White 580 ml
Please visit Hilti website for the latest item numbers and related products Foil pack 1 pc 209632

Please visit Hilti website for the latest item numbers and related products

Hilti online: www.hilti.com.hk


2 Jul 2019
334
Subject: Method Statement of CP 606 for Penetration Seal.
Material: CP 606 firestop sealant
Accessory: Hilti Dispenser CFS-DISP or Hilti Dispenser CS 270-P1 or equivalent.

Setting Operation
1 Clean the opening. Joint sides and surfaces to
which CP 606 will be applied must be sound,
dry and free from dust, oil and grease.

2 Insert the required fill of mineral wool and


backer.

3 Apply firestop CP 606 over backer.

Joint width (mm) 0-15 16-20 21-30


Sealant thickness (mm) 6 10 15

Hilti (Hong Kong) Ltd.


701-704 | Tower A | Manulife Financial Centre
223 Wai Yip Street | Kwun Tong
Kowloon | Hong Kong
P +852-8228 8118 I F +852-2954 1751
www.hilti.com.hk

3 Jul 2019
4 Smooth the firestop sealant with a trowel
before the skin forms. Once cured, CP 606
can only be removed mechanically.

5 For maintenance reasons, a penetration seal


could be permanently marked with an
identification plate. In such a case, mark the
identification plate and fasten it in a visible
position next to the seal.

Safety precautions:

 Never use in areas immersed in water


 Keep out of reach of children
 Read the Material Safety Data Sheet
 Eyes sand hands must be suitably protected
 Avoid contact with eyes or skin
 Only use in well ventilated areas

4 Jul 2019
Subject: Method Statement of CP 606 for Linear Joint Seal
Material: CP 606 firestop sealant
Accessory: Hilti Dispenser CFS-DISP or Hilti Dispenser CS 270-P1 or equivalent.

Setting Operation
1 Clean the opening. Joint sides and surfaces to which CP
606 will be applied must be sound, dry and free from
dust, oil and grease.

2 Insert fill of mineral wool or backing material (if required)

3 Apply CP 606 over the backing material .

Joint width (mm) 0-15 16-20 21-30


Sealant thickness (mm) 6 10 15

Hilti (Hong Kong) Ltd.


701-704 | Tower A | Manulife Financial Centre
223 Wai Yip Street | Kwun Tong
Kowloon | Hong Kong
P +852-8228 8118 I F +852-2954 1751
www.hilti.com.hk

5 Jul 2019
4 Smooth CP 606 using a trowel before the skin forms. It
can only be removed mechanically once it is cured.

5 For maintenance reasons, a penetration seal would be


permanently marked with an identification plate. In such
a case, mark the identification plate and fasten it in a
visible position next to the seal

Safety precautions:
• Never use in areas immersed in water
• Keep out of reach of children
• Read the Material Safety Data Sheet
• Eyes and hands must be suitably protected
• Avoid contact with eyes or skin
• Only use in well ventilated areas

6 Jul 2019
7 Jul 2019
8 Jul 2019
9 Jul 2019
10 Jul 2019
11 Jul 2019
12 Jul 2019
13 Jul 2019
14 Jul 2019
15 Jul 2019
16 Jul 2019
17 Jul 2019
18 Jul 2019
19 Jul 2019
20 Jul 2019
21 Jul 2019
22 Jul 2019
23 Jul 2019
24 Jul 2019
25 Jul 2019
26 Jul 2019
27 Jul 2019
28 Jul 2019
29 Jul 2019
Exova Warringtonfire T: +44(0) 1925655116
Holmesfield Road F: +44 (0) 1925 655 419
Warrington E: warrington@exova.com
WA120S W: www.exova.com

II
United Kingdom

Testing. Advising. Assuring.

WF Report No. 401231b


Page 1 of 2
2nd July 2018
Mr Uwe Bohn

Hilti Entwicklungsgellschaft mbH


86916 Kaufering
Hiltistr. 6
Germany

Review of Fire Test Report Referenced WARRES No. 69754C

1 Introduction

The report referenced WARRES No. 69754C relates to a fire resistance test conducted to assess
the ability of four different specimens of a proprietary linear gap sealing system to
reinstate the fire resistance, with respect to the integrity and insulation (maximum
temperature rise) performance criteria as defined in BS 476: Part 20: 1987, of a simulated
floor construction at positions where various structures abut. Since there was no
standardised British test procedures for this purpose the test utilised the general principles of
BS 476: Part 20: 1987, in conjunction with additional guidelines from the draft document
CENT/TC127 N579.

The test was performed on four different specimens of gap sealing systems referenced 1
to 4 for the purposes of the test. Three specimens were incorporated between aerated
concrete gap faces, the fourth between steel gap faces. The gaps referenced 1 and 2
were of nominal width 20 mm, those referenced 3 and 4 were of nominal width 30 mm, all
were of nominal length 950 mm. Each gap was sealed using Hilti CP606 in conjunction with a
proprietary backing material.

The results obtained where as follows:

Gap
Specimen Gap CP606 Backing Integrity Insulation
Width
Ref: Faces Depth Material (mins) (mins)
(mm)
I 20 AAC/AAC 10 PE 240 130
2 20 AAC/AAC 15 CF 125-50 240 208
3 30 Steel/Steel 15 Rockfibre 240 36
4 30 AAC/AAC 15 Rockfibre 240 216

2 Confirmation of Specification

It has been confirmed by Hilti Entwicklungsgellschaft mbH that there have been no changes to
the specification or the construction given in the original report referenced WARRES No. 69754C.

Registered Office: Exova (UK) lid, lochend Industrial Estate, Newbridge. Midlothian EH28 8PL United Kingdom. Reg No.SC 70429

30 Jul 2019
WF Report No. 401231b

Page 2 of 2

3 Considerations

While there is now a published European Standard (EN 1366-4: 2006) relating to the fire
resistance testing of linear joint sealing systems, this standard was not available when the test
was conducted and therefore, as the fire resistance of the floor or wall construction into which
the seal would be installed, is determined by test procedures detailed within BS 476: Part 20:
1987, 'Method for determination of the fire resistance of elements of construction (general
principles)'.

The current test methodology with respect to the fire resistance testing of penetration sealing
systems, i.e. utilising the heating conditions and performance criteria for integrity and insulation
given in BS 476: Part 20: 1987 or EN 1363-1, has not been amended and would, therefore, still
be utilised for this purpose.

At present there are no existing Resolutions adopted by the Fire Test Study Group since the
original test was performed, which would affect the manner in which the test would be
conducted, or the interpretation of the test results.

4 Conclusions

At present there are no additional resolutions adopted by the Fire Test Study Group since the
original test was performed which would affect the manner in which the test would be conducted
or the interpretation of the test results.

The procedures adopted for the original test have been re-examined and are similar to those
currently in use.

Therefore, with respect to the fire resistance test report referenced WARRES No. 69754C its
contents should remain valid until 1st July 2020.

5 Validity

This review is based on information used to formulate the original test report. No other
information or data has been submitted by Hilti Entwicklungsgellschaft mbH, which could affect
this review.

Performed by: Reviewed By:

C Abbott D. Hankinson
Principal Certification Engineer Principal Certification Engineer
Exova Warringtonfire Exova Warringtonfire

This copy has been produced from a .pdf format electronic file that has been provided by
Exova Warringtonfire to the sponsor of the report and must only be reproduced in full.
Extracts or abridgements of reports must not be published without permission of Exova
Warringtonfire. The pdf copy supplied is the sole authentic version of this document. All pdf
versions of this report bear authentic signatures of the responsible Exova Warringtonfire staff.

31 Jul 2019
32 Jul 2019
33 Jul 2019
34 Jul 2019
35 Jul 2019
36 Jul 2019
37 Jul 2019
38 Jul 2019
39 Jul 2019
40 Jul 2019
41 Jul 2019
42 Jul 2019
43 Jul 2019
44 Jul 2019
45 Jul 2019
To whom it may concern

Date: 22nd April 2016

Dear Sir / Madam,

Subject: Hilti Firestop Products non-CFC and Ozone Confirmation

Referring to your enquiry about the captioned subject, please be advised that:

Hilti firestop products, &3)OH[LEOH)LUHVWRS6HDODQWLV free of CFC, HCFC nor other


ozone depletion elements.

CFC, HCFC and ozone depletion elements were not used during the product process neither.

Should you have further questions, please do not hesitate to contact our
Technical Representatives or Customer Service Hotline at 8228-8118.

Yours sincerely,

Andrew Lau
Product Manger

Hilti (Hong Kong) Ltd.


701-704 & 708A&B | Tower A | Manulife Financial Centre
223 Wai Yip Street | Kwun Tong
Kowloon | Hong Kong
P +852-8228 8118 I F +852-2954 1751
www.hilti.com.hk

46 Jul 2019
88 Empire Drive • St. Paul, Minnesota • 55103
(651) 642-1150 • fax (651) 642-1239


VOC Content Test Certificate

October 26, 2009

Supplier: Hilti Entwicklungsgesellschaft mbH


BU Chemicals
Hiltistrasse 6
86916 Kaufering
GERMANY

Sample Description: Hilti CP 606

Date tested: July 20, 2009

Test Method: SCAQMD method 304-91 Determination of Volatile Organic Compounds


(VOC) in various materials as referenced by South Coast Air Quality
Management District (SCAQMD) rule 1168. The values also comply with the
requirements of EPA test method #24.

Test Data: Legend Project Number 0903311

Specification Product
LEED 2009 (LEED 3.0)
LEED 2.2
IEQ-4.1: Low-Emitting Materials –
Architechtural Sealant Hilti
Green Building Council of Australia
Green Star Office Design 3.0, IEQ-13
CP 606
Green Star Office Design 2.0, IEQ-13
Green Star Office Interiors 1.1, IEQ-11

Architectural Sealant;
Product contains: 75 g/L of VOC
VOC Limit: 250 g/L

William Welbes Allen Noreen, Ph.D.


Vice President of Laboratory Operations Technical Director


47 Jul 2019
CFS-S ACR; CP 606
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH) with its amendment Regulation (EU) 2015/830
Date of issue: 05/07/2017 Revision date: 05/07/2017 Supersedes: 28/06/2017 Version: 4.4

SECTION 1: Identification of the substance/mixture and of the company/undertaking


1.1. Product identifier
Product form Mixture
Name CFS-S ACR; CP 606
Product code BU Fire Protection
Type of product Sealants

1.2. Relevant identified uses of the substance or mixture and uses advised against
1.2.1. Relevant identified uses
Industrial/Professional use spec For professional use only

1.2.2. Uses advised against


No additional information available

1.3. Details of the supplier of the safety data sheet


Hilti (Gt. Britain) Ltd.
1 Trafford Wharf Road
M17 1BY Manchester - Great Britain
T +44 161 886 1000
0800 886 100 Toll-free - F +44 161 872 1240
gbsales@hilti.com

Supplier Department issuing data specification sheet


Hilti (Gt. Britain) Ltd. Hilti AG
1 Trafford Wharf Road Feldkircherstraße 100
M17 1BY Manchester - Great Britain 9494 Schaan - Liechtenstein
T +44 161 886 1000 T +423 234 2111
0800 886 100 Toll-free - F +44 161 872 1240 chemicals.hse@hilti.com
gbsales@hilti.com

1.4. Emergency telephone number


Emergency number Schweizerisches Toxikologisches Informationszentrum – 24h Service
+41 44 251 51 51 (international)
+44 161 886 1000
0800 886 100 Toll-free
Country Organisation/Company Address Emergency number
United Kingdom National Poisons Information Service (NPIS) Dudley Road 111
City Hospital B18 7QH Birmingham

SECTION 2: Hazards identification

2.1. Classification of the substance or mixture


Classification according to Regulation (EC) No. 1272/2008 [CLP]Mixture/Substance: SDS EU 2015: According to Regulation (EU) 2015/830
(REACH Annex II)
Not classified

05/07/2017 GB - en 1/8

48 Jul 2019
CFS-S ACR; CP 606
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH) with its amendment Regulation (EU) 2015/830

2.2. Label elements


Labelling according to Regulation (EC) No. 1272/2008 [CLP] Extra labelling to displayExtra classification(s) to display

EUH-statements EUH208 - Contains 2-octyl-2H-isothiazol-3-one. May produce an allergic reaction


EUH210 - Safety data sheet available on request

2.3. Other hazards


No additional information available

SECTION 3: Composition/information on ingredients


3.1. Substance
Not applicable

3.2. Mixture

Name Product identifier % Classification according to


Regulation (EC) No. 1272/2008
[CLP]
Calcium carbonate (CAS No) 1317-65-3 40 - 60 Not classified
substance with national workplace exposure limit(s) (GB) (EC No) 215-279-6
Propane-1,2-diol (CAS No) 57-55-6 1 - 2.5 Not classified
substance with national workplace exposure limit(s) (GB) (EC No) 200-338-0
(REACH-no) 01-2119456809-23
diiron trioxide (CAS No) 1309-37-1 1 - 2.5 Not classified
substance with national workplace exposure limit(s) (GB) (EC No) 215-168-2
(REACH-no) 01-2119457614-35

Full text of H-statements: see section 16

SECTION 4: First aid measures


4.1. Description of first aid measures
First-aid measures after inhalation Get medical advice/attention if you feel unwell.
First-aid measures after skin contact Wash skin with plenty of water. If skin irritation occurs: Get medical advice/attention.
First-aid measures after eye contact Rinse cautiously with water for several minutes. Remove contact lenses, if present and easy to
do. Continue rinsing. If eye irritation persists: Get medical advice/attention.
First-aid measures after ingestion Get medical advice/attention if you feel unwell.

4.2. Most important symptoms and effects, both acute and delayed
No additional information available

4.3. Indication of any immediate medical attention and special treatment needed
No additional information available

SECTION 5: Firefighting measures


5.1. Extinguishing media
Suitable extinguishing media Water spray. Dry powder. Foam. Carbon dioxide.

05/07/2017 GB - en 2/8

49 Jul 2019
CFS-S ACR; CP 606
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH) with its amendment Regulation (EU) 2015/830

5.2. Special hazards arising from the substance or mixture


Hazardous decomposition products in case of Carbon dioxide. Carbon monoxide.
fire

5.3. Advice for firefighters


Protection during firefighting Self-contained breathing apparatus. Complete protective clothing.

SECTION 6: Accidental release measures


6.1. Personal precautions, protective equipment and emergency procedures
6.1.1. For non-emergency personnel
No additional information available
6.1.2. For emergency responders
Protective equipment For further information refer to section 8: "Exposure controls/personal protection".

6.2. Environmental precautions


No additional information available

6.3. Methods and material for containment and cleaning up


Methods for cleaning up Mechanically recover the product.

6.4. Reference to other sections


For further information refer to section 13.

SECTION 7: Handling and storage


7.1. Precautions for safe handling
Precautions for safe handling Wear personal protective equipment.
Hygiene measures Wash contaminated clothing before reuse. Do not eat, drink or smoke when using this product.
Always wash hands after handling the product.

7.2. Conditions for safe storage, including any incompatibilities


Storage conditions Keep cool. Store in a dry place.
Storage temperature 5 - 25 °C

7.3. Specific end use(s)


No additional information available

SECTION 8: Exposure controls/personal protection


8.1. Control parameters
Calcium carbonate (1317-65-3)
United Kingdom WEL TWA (mg/m³) 10 mg/m³
Propane-1,2-diol (57-55-6)
United Kingdom WEL TWA (mg/m³) 474 mg/m³
United Kingdom WEL TWA (ppm) 150 ppm
diiron trioxide (1309-37-1)
United Kingdom WEL TWA (mg/m³) 5 mg/m³
United Kingdom WEL STEL (mg/m³) 10 mg/m³

Additional information The product has a pasty consistency. Exposure limit values for respirable dusts are not relevant
for this product.

05/07/2017 GB - en 3/8

50 Jul 2019
CFS-S ACR; CP 606
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH) with its amendment Regulation (EU) 2015/830

8.2. Exposure controls


Personal protective equipment Protective clothing. Safety glasses. Gloves.
Hand protection Protective gloves. EN 374
Type Material Permeation Thickness (mm) Standard
Disposable gloves Nitrile rubber (NBR) 3 (> 60 minutes) >0.4 EN 374
Eye protection
Type Use Characteristics Standard
Safety glasses EN 166, EN 170
Skin and body protection Wear suitable protective clothing

SECTION 9: Physical and chemical properties


9.1. Information on basic physical and chemical properties
Physical state Liquid
Appearance Pasty.
Molecular mass Not determined
Colour red. white. Grey.
Odour characteristic.
Odour threshold Not determined
pH ≈ 9 Not applicable
Relative evaporation rate (butylacetate=1) No data available
Melting point Not applicable
Freezing point No data available
Boiling point No data available
Flash point Not applicable
Auto-ignition temperature No data available
Decomposition temperature No data available
Flammability (solid, gas) Not applicable
Vapour pressure No data available
Relative vapour density at 20 °C No data available
Relative density No data available
Density 1.6 g/cm³
Solubility No data available
Log Pow No data available
Viscosity, kinematic No data available
Viscosity, dynamic No data available
Explosive properties No data available
Oxidising properties No data available
Explosive limits No data available

9.2. Other information


No additional information available

05/07/2017 GB - en 4/8

51 Jul 2019
CFS-S ACR; CP 606
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH) with its amendment Regulation (EU) 2015/830

SECTION 10: Stability and reactivity


10.1. Reactivity
The product is non-reactive under normal conditions of use, storage and transport.

10.2. Chemical stability


Stable under normal conditions.

10.3. Possibility of hazardous reactions


No dangerous reactions known under normal conditions of use.

10.4. Conditions to avoid


None under recommended storage and handling conditions (see section 7).

10.5. Incompatible materials


No additional information available

10.6. Hazardous decomposition products


Under normal conditions of storage and use, hazardous decomposition products should not be produced.

SECTION 11: Toxicological information


11.1. Information on toxicological effects
Acute toxicity Not classified
Calcium carbonate (1317-65-3)
LD50 oral rat 6450 mg/kg (Rat; Literature study)
Propane-1,2-diol (57-55-6)
LD50 oral rat 20000 mg/kg (Rat; Experimental value)
LD50 dermal rat 22500 mg/kg (Rat; Experimental value)
LD50 dermal rabbit 20800 mg/kg (Rabbit; Experimental value)
diiron trioxide (1309-37-1)
LD50 oral rat > 5000 mg/kg (Rat; Literature study)
Skin corrosion/irritation Not classified
pH: ≈ 9 Not applicable
Serious eye damage/irritation Not classified
pH: ≈ 9 Not applicable
Respiratory or skin sensitisation Not classified
Germ cell mutagenicity Not classified
Reproductive toxicity Not classified
Specific target organ toxicity (single exposure) Not classified
Specific target organ toxicity (repeated Not classified
exposure)
Aspiration hazard Not classified

SECTION 12: Ecological information


12.1. Toxicity
Ecology - general The product is not considered harmful to aquatic organisms nor to cause long-term adverse
effects in the environment.
Propane-1,2-diol (57-55-6)
LC50 fish 1 51400 mg/l (96 h; Pimephales promelas)
LC50 other aquatic organisms 1 > 1000 mg/l (96 h)
EC50 Daphnia 1 34400 mg/l (48 h; Daphnia magna)

05/07/2017 GB - en 5/8

52 Jul 2019
CFS-S ACR; CP 606
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH) with its amendment Regulation (EU) 2015/830

LC50 fish 2 51600 mg/l (96 h; Oncorhynchus mykiss)


TLM fish 1 > 1000 ppm (96 h; Pisces)
TLM other aquatic organisms 1 > 1000 ppm (96 h)
Threshold limit other aquatic organisms 1 > 1000 mg/l (96 h)
Threshold limit algae 1 15000 mg/l (336 h; Selenastrum capricornutum)
Threshold limit algae 2 < 5300 mg/l (336 h; Skeletonema costatum)
diiron trioxide (1309-37-1)
LC50 fish 1 > 1000 mg/l (48 h; Leuciscus idus; Nominal concentration)

12.2. Persistence and degradability


Calcium carbonate (1317-65-3)
Persistence and degradability Biodegradability: not applicable.
Biochemical oxygen demand (BOD) Not applicable
Chemical oxygen demand (COD) Not applicable
ThOD Not applicable
BOD (% of ThOD) Not applicable
Propane-1,2-diol (57-55-6)
Persistence and degradability Readily biodegradable in water. Biodegradable in the soil.
Biochemical oxygen demand (BOD) 0.96 - 1.08 g O₂ /g substance
Chemical oxygen demand (COD) 1.63 g O₂ /g substance
ThOD 1.69 g O₂ /g substance
BOD (% of ThOD) 0.57 % ThOD
diiron trioxide (1309-37-1)
Persistence and degradability Biodegradability: not applicable. Adsorbs into the soil.
Biochemical oxygen demand (BOD) Not applicable
Chemical oxygen demand (COD) Not applicable
ThOD Not applicable
BOD (% of ThOD) Not applicable

12.3. Bioaccumulative potential


Calcium carbonate (1317-65-3)
Bioaccumulative potential No bioaccumulation data available.
Propane-1,2-diol (57-55-6)
Log Pow -1.41 - -0.30
Bioaccumulative potential Not bioaccumulative.
diiron trioxide (1309-37-1)
Bioaccumulative potential No bioaccumulation data available.

12.4. Mobility in soil


Propane-1,2-diol (57-55-6)
Surface tension 0.036 N/m (25 °C)

12.5. Results of PBT and vPvB assessment


No additional information available

12.6. Other adverse effects


No additional information available

SECTION 13: Disposal considerations


13.1. Waste treatment methods
Waste treatment methods Dispose of contents/container in accordance with licensed collector’s sorting instructions.
Waste disposal recommendations Dispose in a safe manner in accordance with local/national regulations.
European List of Waste (LoW) code 08 04 10 - waste adhesives and sealants other than those mentioned in 08 04 09

05/07/2017 GB - en 6/8

53 Jul 2019
CFS-S ACR; CP 606
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH) with its amendment Regulation (EU) 2015/830

SECTION 14: Transport information


In accordance with ADR / RID / IMDG / IATA / ADN

Other information No supplementary information available

ADR IMDG IATA RID


14.1. UN number
Not regulated for transport

14.2. UN proper shipping name


Not applicable Not applicable Not applicable Not applicable

14.3. Transport hazard class(es)


Not applicable Not applicable Not applicable Not applicable
Not applicable Not applicable Not applicable Not applicable

14.4. Packing group


Not applicable Not applicable Not applicable Not applicable

14.5. Environmental hazards


Dangerous for the environment : Dangerous for the environment : Dangerous for the environment : Dangerous for the environment :
No No No No
Marine pollutant : No
No supplementary information available

14.6. Special precautions for user

- Overland transport

- Transport by sea
No data available

- Air transport
No data available

- Rail transport
Carriage prohibited (RID) No

14.7. Transport in bulk according to Annex II of MARPOL 73/78 and the IBC Code
Not applicable

SECTION 15: Regulatory information


15.1. Safety, health and environmental regulations/legislation specific for the substance or mixture
15.1.1. EU-Regulations

Contains no REACH substances with Annex XVII restrictions


Contains no substance on the REACH candidate list
Contains no REACH Annex XIV substances

15.1.2. National regulations

Switzerland
Swiss CPID No 517055-60

05/07/2017 GB - en 7/8

54 Jul 2019
CFS-S ACR; CP 606
Safety Data Sheet
according to Regulation (EC) No. 1907/2006 (REACH) with its amendment Regulation (EU) 2015/830

15.2. Chemical safety assessment


No chemical safety assessment has been carried out

SECTION 16: Other information

Full text of H- and EUH-statements:


EUH208 Contains . May produce an allergic reaction
EUH210 Safety data sheet available on request

SDS_EU_Hilti

This information is based on our current knowledge and is intended to describe the product for the purposes of health, safety and
environmental requirements only. It should not therefore be construed as guaranteeing any specific property of the product

05/07/2017 GB - en 8/8

55 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Application


Project Type:ASD
2011 Kai Tak Development Electrical penetration through fire rated board
2011 Kai Tak Development Metal pipe penetration sealing
2011 Tamar Development Electrical services fixing
2011 Tamar Development Fire rated board sealing
2011 Tamar Development Gap sealing
2011 Tamar Development MVAC services fixing
2011 Tamar Development Top of wall joint sealing
2011 Tamar Development Wall tie hole sealing
2012 Caritas Hospital Air duct penetration through fire rated board
2012 Kai Tak Development Curtain wall / façade gap sealing
2012 Kai Tak Development Fire rated board sealing
2012 Kai Tak Development Fire sealing of openings
2012 Kai Tak Development Metal pipe penetration sealing
2012 Kai Tak Development Movement / construction joint sealing
2012 Kai Tak Development Top of wall joint sealing
2012 North Lantau Hospital Cable penetration sealing
2012 North Lantau Hospital Curtain wall / façade gap sealing
2012 North Lantau Hospital Electrical penetration through fire rated board
2012 North Lantau Hospital Metal pipe penetration sealing
2013 Caritas Hospital Cable penetration sealing
2013 Caritas Hospital Top of wall joint sealing
2013 Kai Tak Development Curtain wall / façade gap sealing
2013 Kai Tak Development Door frame sealing
2013 Kai Tak Development Electrical penetration through fire rated board
2013 Kai Tak Development Fire rated board sealing
2013 Kai Tak Development Metal pipe penetration sealing
2013 Kai Tak Development Movement / construction joint sealing
Project Type:Buildings
2011 Hennessy Center Redevelopment Fire rated board sealing
2011 Hennessy Center Redevelopment Metal pipe penetration sealing
2011 Hennessy Center Redevelopment Movement / construction joint sealing
2011 Hennessy Center Redevelopment Top of wall joint sealing
2011 Lohas Park Development Air duct penetration through fire rated board
2011 Lohas Park Development Metal pipe penetration sealing
2011 Pak Shek Kok Development Metal pipe penetration sealing
2011 Tseung Kwan O Station Development (Area 56) Air duct penetration through fire rated board
2011 Tseung Kwan O Station Development (Area 56) Cable penetration sealing
2011 Tseung Kwan O Station Development (Area 56) Cable tray penetration sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 1
56 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Application


2011 Tseung Kwan O Station Development (Area 56) Electrical penetration through fire rated board
2011 Tseung Kwan O Station Development (Area 56) Fire rated board sealing
2011 Tseung Kwan O Station Development (Area 56) Fire sealing of openings
2011 Tseung Kwan O Station Development (Area 56) Metal pipe penetration sealing
2011 Tseung Kwan O Station Development (Area 56) Safety system fixing
2011 Tseung Kwan O Station Development (Area 56) Top of wall joint sealing
2011 Union Square 7, Kwoloon Station Air duct penetration through fire rated board
2011 Union Square 7, Kwoloon Station Fire sealing of openings
2011 Union Square 7, Kwoloon Station Interior finishings fixing
2011 Union Square 7, Kwoloon Station MVAC services fixing
2012 Ha Ko Po Village Air duct penetration through fire rated board
2012 Hennessy Center Redevelopment Blockwork gap sealing
2012 Hennessy Center Redevelopment Metal gate fixing
2012 Hennessy Center Redevelopment Metal pipe penetration sealing
2012 Hennessy Center Redevelopment Top of wall joint sealing
2012 HSBC Data Centre Air duct penetration through fire rated board
2012 HSBC Data Centre Metal pipe penetration sealing
2012 Lohas Park Development Air duct penetration through fire rated board
2012 Lohas Park Development Curtain wall / façade gap sealing
Lok Wo Sha Complex Development
2012 落禾沙綜合發展 Air duct penetration through fire rated board
Lok Wo Sha Complex Development
2012 落禾沙綜合發展 Door frame sealing
Lok Wo Sha Complex Development
2012 落禾沙綜合發展 Electrical penetration through fire rated board
Lok Wo Sha Complex Development
2012 落禾沙綜合發展 Fire rated board sealing
Lok Wo Sha Complex Development
2012 落禾沙綜合發展 Metal pipe penetration sealing
2012 NTT Data Centre Cable penetration sealing
2012 NTT Data Centre Fire rated board sealing
2012 NTT Data Centre Metal pipe penetration sealing
2012 Pak Shek Kok Development Blockwork gap sealing
2012 Pak Shek Kok Development Electrical penetration through fire rated board
2012 Pak Shek Kok Development Eletrical fixing
2012 Pak Shek Kok Development Fire rated board sealing
2012 Pak Shek Kok Development Metal pipe penetration sealing
2012 Pak Shek Kok Development Top of wall joint sealing
2012 Seymour Road Residential Curtain wall / façade gap sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 2
57 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Application


2012 Seymour Road Residential Door frame sealing
2012 Seymour Road Residential Metal pipe penetration sealing
2012 Tseung Kwan O Area 85 Residential Cable penetration sealing
2012 Tseung Kwan O Area 85 Residential Fire rated board sealing
2012 Tseung Kwan O Area 85 Residential Metal pipe penetration sealing
2012 Tseung Kwan O Station Development (Area 56) Blockwork gap sealing
2012 Tseung Kwan O Station Development (Area 56) Fire rated board sealing
2012 Tseung Kwan O Station Development (Area 56) Fire sealing of openings
2012 Tsuen Wan Area 7 Metal pipe penetration sealing
2012 Union Square 7, Kwoloon Station Blockwork gap sealing
2013 Ha Ko Po Village Fire rated board sealing
2013 Ha Ko Po Village Metal pipe penetration sealing
2013 HK EX Data Centre Fire rated board sealing
2013 HK EX Data Centre Insulated pipe penetration sealing
2013 HK EX Data Centre Metal pipe penetration sealing
2013 HSBC Data Centre Top of wall joint sealing
2013 Lohas Park Development Metal pipe penetration sealing
Lok Wo Sha Complex Development
2013 落禾沙綜合發展 Fire rated board sealing
2013 NTT Data Centre Air duct penetration through fire rated board
2013 NTT Data Centre Fire rated board sealing
2013 Pak Shek Kok Development Fire rated board sealing
2013 Science Park Phase 3 Top of wall joint sealing
2013 Seymour Road Residential Curtain wall / façade gap sealing
2013 Seymour Road Residential Fire rated board sealing
2013 Tsuen Wan Area 7 Air duct penetration through fire rated board
2013 Tsuen Wan Area 7 Door frame fixing
2013 Tsuen Wan Area 7 Insulated pipe penetration sealing
Project Type:HKAA
Airport Development
2011 機場主要發展 Air duct penetration through fire rated board
Airport Development
2011 機場主要發展 Blockwork gap sealing
Airport Development
2011 機場主要發展 Cable tray penetration sealing
Airport Development
2011 機場主要發展 Electrical penetration through fire rated board
Airport Development
2011 機場主要發展 Electrical services fixing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 3
58 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Application


Airport Development
2011 機場主要發展 Fire rated board sealing
Airport Development
2011 機場主要發展 Metal pipe penetration sealing
Airport Development
2011 機場主要發展 Top of wall joint sealing
Airport Development
2012 機場主要發展 Blockwork gap sealing
Airport Development
2012 機場主要發展 Cable penetration sealing
Airport Development
2012 機場主要發展 Door frame sealing
Airport Development
2012 機場主要發展 Electrical penetration through fire rated board
Airport Development
2012 機場主要發展 Fire rated board sealing
Airport Development
2012 機場主要發展 Fire sealing of openings
Airport Development
2012 機場主要發展 Metal pipe penetration sealing
Airport Development
2012 機場主要發展 Movement / construction joint sealing
Airport Development
2012 機場主要發展 Top of wall joint sealing
Airport Development
2013 機場主要發展 Drywall track fixing
Airport Development
2013 機場主要發展 Top of wall joint sealing
Project Type:Macau - Casino & Hotel
2012 Galaxy Maga Resort銀河渡假村 Door frame sealing
2012 Galaxy Maga Resort銀河渡假村 Metal pipe penetration sealing
2012 The Venetian Casino Resort Blockwork gap sealing
2012 The Venetian Casino Resort Door frame fixing
2012 The Venetian Casino Resort Door frame sealing
2012 The Venetian Casino Resort Fire rated board sealing
2012 The Venetian Casino Resort Metal pipe penetration sealing
2012 The Venetian Casino Resort Top of wall joint sealing
Windsor Arch
2012 名門世家 Air duct penetration through fire rated board

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 4
59 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Application


2013 Galaxy Maga Resort銀河渡假村 Blockwork gap sealing
2013 Galaxy Maga Resort銀河渡假村 Door frame sealing
2013 Galaxy Maga Resort銀河渡假村 Fire sealing of openings
2013 Galaxy Maga Resort銀河渡假村 Top of wall joint sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2013 威尼斯人(五六期) Blockwork gap sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2013 威尼斯人(五六期) Curtain wall / façade gap sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2013 威尼斯人(五六期) Movement / construction joint sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2013 威尼斯人(五六期) Rebar fixing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2013 威尼斯人(五六期) Top of wall joint sealing
2013 The Venetian Casino Resort Cable tray penetration sealing
2013 The Venetian Casino Resort Rebar fixing
2013 The Venetian Casino Resort Top of wall joint sealing
Project Type:Others
2011 DISNEYLAND Air duct penetration through fire rated board
2011 DISNEYLAND Interior finishings fixing
2011 DISNEYLAND Top of wall joint sealing
2011 Hong Kong University Redevelopment Air duct penetration through fire rated board
2011 Hong Kong University Redevelopment Blockwork gap sealing
2011 Hong Kong University Redevelopment Electrical services fixing
2011 Hong Kong University Redevelopment Fire rated board sealing
2011 Hong Kong University Redevelopment Metal gate fixing
2011 Hong Kong University Redevelopment Metal pipe penetration sealing
2011 Hong Kong University Redevelopment Top of wall joint sealing
2012 Chinese University Redevelopment Air duct penetration through fire rated board
2012 Chinese University Redevelopment Door frame sealing
2012 Chinese University Redevelopment Metal pipe penetration sealing
2012 Chinese University Redevelopment Top of wall joint sealing
2012 DISNEYLAND Door frame sealing
2012 DISNEYLAND Fire sealing of openings

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 5
60 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Application


2012 DISNEYLAND Metal gate fixing
2012 DISNEYLAND Metal pipe penetration sealing
2012 DISNEYLAND Movement / construction joint sealing
2012 Harrow International School, Tuen Mun Metal pipe penetration sealing
2012 Harrow International School, Tuen Mun Top of wall joint sealing
2012 HKUST Redevelopment Air duct penetration through fire rated board
2012 HKUST Redevelopment Electrical penetration through fire rated board
2012 HKUST Redevelopment Fire rated board sealing
2012 HKUST Redevelopment Metal pipe penetration sealing
2012 Hong Kong University Redevelopment Air duct penetration through fire rated board
2012 Hong Kong University Redevelopment Blockwork gap sealing
2012 Hong Kong University Redevelopment Electrical penetration through fire rated board
2012 Hong Kong University Redevelopment Fire rated board sealing
2012 Hong Kong University Redevelopment Metal pipe penetration sealing
2012 Hong Kong University Redevelopment Movement / construction joint sealing
2012 Ocean Park Development Cable tray penetration sealing
2012 Poly-U Redevelopment Curtain wall / façade gap sealing
2012 Poly-U Redevelopment Electrical penetration through fire rated board
2012 Poly-U Redevelopment Fire rated board sealing
2012 Poly-U Redevelopment Metal pipe penetration sealing
2013 Chinese University Redevelopment Fire rated board sealing
2013 HKUST Redevelopment Top of wall joint sealing
2013 Hong Kong University Redevelopment Top of wall joint sealing
2013 Poly-U Redevelopment Air duct penetration through fire rated board
2013 Poly-U Redevelopment Curtain wall / façade gap sealing
2013 Poly-U Redevelopment Door frame sealing
2013 Poly-U Redevelopment Fire rated board sealing
2013 Poly-U Redevelopment Fixing on steel structural
2013 Tai Po Fung Yuen Chuen Air duct penetration through fire rated board
2013 Tai Po Fung Yuen Chuen Metal pipe penetration sealing
2013 Yuen Long Tai Tong Air duct penetration through fire rated board
2013 Yuen Long Tai Tong Fire rated board sealing
Project Type:Railway
2011 KCR Tai Wai Depot Metal pipe penetration sealing
MTR - West Island Line
2011 地鐵西港島線 Blockwork gap sealing
2012 Che Kung Temple Depot Air duct penetration through fire rated board
2012 Che Kung Temple Depot Fire rated board sealing
2012 Che Kung Temple Depot Lift door frame sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 6
61 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Application


2012 Che Kung Temple Depot Metal pipe penetration sealing
MTR - Express Rail Link
2012 港深廣高速鐵路 Fire rated board sealing
MTR - Express Rail Link
2012 港深廣高速鐵路 Top of wall joint sealing
MTR - Kwun Tong Line Extension
2012 地鐵觀塘延長線 Blockwork gap sealing
MTR - West Island Line
2012 地鐵西港島線 Top of wall joint sealing
2012 Tuen Mun Station Development (TMTL 447) Air duct penetration through fire rated board
2012 Tuen Mun Station Development (TMTL 447) Door frame sealing
2012 Tuen Mun Station Development (TMTL 447) Fire rated board sealing
2012 Tuen Mun Station Development (TMTL 447) Metal pipe penetration sealing
MTR - Express Rail Link
2013 港深廣高速鐵路 Air duct penetration through fire rated board
MTR - Express Rail Link
2013 港深廣高速鐵路 Blockwork gap sealing
MTR - Express Rail Link
2013 港深廣高速鐵路 Top of wall joint sealing
MTR - South Island Line
2013 地鐵南港島線 Electrical penetration through fire rated board
MTR - South Island Line
2013 地鐵南港島線 Rebar fixing
MTR - South Island Line
2013 地鐵南港島線 Top of wall joint sealing
2013 Tuen Mun Station Development (TMTL 447) Electrical penetration through fire rated board

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 7
62 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


Project Type:ASD
Kai Tak Trade & Industry Tower
2014 工業及貿易發展局大樓 Dragages Blockwork gap sealing
Kai Tak Trade & Industry Tower
2014 工業及貿易發展局大樓 Dragages Gap sealing
Kai Tak Trade & Industry Tower
2014 工業及貿易發展局大樓 Dragages Wall tie hole sealing
2014 St Paul Hosiptal China State Top of wall joint sealing
ASD West Kowloon Law Courts Building
2015 西九法院 Shui On Door frame sealing
ASD West Kowloon Law Courts Building
2015 西九法院 Shui On Gap sealing
Kai Tak Trade & Industry Tower
2015 工業及貿易發展局大樓 Dragages Blockwork gap sealing
Tin Shui Wai Hospital
2015 天水圍醫院 Leighten Electric trunking internal sealing
Tin Shui Wai Hospital
2015 天水圍醫院 Leighten Gap sealing
Tin Shui Wai Hospital
2015 天水圍醫院 Leighten Metal pipe penetration sealing
Tin Shui Wai Hospital
2015 天水圍醫院 Leighten Others
Project Type:Buildings
2014 HSBC Data Centre Top of wall joint sealing
Kau To Shan Residential Development
2014 九肚山住宅發展 Hsin Chong Insulated pipe penetration sealing
Kau To Shan Residential Development
2014 九肚山住宅發展 Hsin Chong Metal pipe penetration sealing
Lok Wo Sha Complex Development
2014 落禾沙綜合發展 HIP HING / EMAN Door frame sealing
Lok Wo Sha Complex Development
2014 落禾沙綜合發展 HIP HING / EMAN Fire rated board sealing
Lok Wo Sha Complex Development
2014 落禾沙綜合發展 HIP HING / EMAN Insulated pipe penetration sealing
Lok Wo Sha Complex Development
2014 落禾沙綜合發展 HIP HING / EMAN Metal pipe penetration sealing
Lok Wo Sha Complex Development
2014 落禾沙綜合發展 HIP HING / EMAN Top of wall joint sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 8
63 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


SHK Tung Chung Area 55A Residential Development
2014 新鴻基東浦55A住宅發展 sanfield Insulated pipe penetration sealing
2014 Tsuen Wan Area 7 EXCEL Air duct penetration through fire rated board
2014 Tsuen Wan Area 7 EXCEL Door frame fixing
103 Mount Nicholson Road Residential Development
2015 聶歌信山道103號住宅發展 GAMMON Top of wall joint sealing
GOLDIN FINANCIAL GLOBAL CENTRE
2015 高銀金融環球中心 HIP HING Chilled water pipe penetration sealing
GOLDIN FINANCIAL GLOBAL CENTRE
2015 高銀金融環球中心 HIP HING Metal pipe penetration sealing
Kau To Shan Residential Development
2015 九肚山住宅發展 Hsin Chong Chilled water pipe penetration sealing
Kau To Shan Residential Development
2015 九肚山住宅發展 Hsin Chong Door frame sealing
Kau To Shan Residential Development
2015 九肚山住宅發展 Hsin Chong Metal pipe penetration sealing
Lok Wo Sha Complex Development
2015 落禾沙綜合發展 HIP HING / EMAN Door frame sealing
Lok Wo Sha Complex Development
2015 落禾沙綜合發展 HIP HING / EMAN Electric trunking internal sealing
Lok Wo Sha Complex Development
2015 落禾沙綜合發展 HIP HING / EMAN Fire rated board sealing
Lok Wo Sha Complex Development
2015 落禾沙綜合發展 HIP HING / EMAN Metal pipe penetration sealing
New World Centre Redevelopment
2015 新世界中心重建 NEW WORLD Fire rated board sealing
New World Centre Redevelopment
2015 新世界中心重建 NEW WORLD Gap sealing
New World Centre Redevelopment
2015 新世界中心重建 NEW WORLD Metal pipe penetration sealing
SHK Ho Man Tin Fat Kwong St
2015 何文田佛光街住宅發展 sanfield Gap sealing
SHK Sha Po Tsuen Residentil Development
2015 新鴻基沙埔村住宅發展 sanfield Chilled water pipe penetration sealing
SHK Sha Po Tsuen Residentil Development
2015 新鴻基沙埔村住宅發展 sanfield Fire rated board sealing
SHK TKO 66A Residential development
2015 將軍澳66A 住宅發展 sanfield Chilled water pipe penetration sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 9
64 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


SHK TKO 66A Residential development
2015 將軍澳66A 住宅發展 sanfield Fire rated board sealing
SHK Tung Chung Area 55A Residential Development
2015 新鴻基東浦55A住宅發展 sanfield Insulated pipe penetration sealing
SHK Tung Chung Area 55A Residential Development
2015 新鴻基東浦55A住宅發展 sanfield Lift door frame sealing
SHK Tung Chung Area 55A Residential Development
2015 新鴻基東浦55A住宅發展 sanfield Metal pipe penetration sealing
SHK Yuen Long Yoho Town Phase 3
2015 元朗Yoho Town 3期住宅發展 sanfield Gap sealing
TKO 66D1 Residential development
2015 將軍澳66D1 住宅發展 Grantech Insulated pipe penetration sealing
Project Type:HKAA
Airport Development
2014 機場主要發展 AA Drywall track fixing
Airport Development
2014 機場主要發展 GAMMON Blockwork gap sealing
Airport Development
2014 機場主要發展 GAMMON Chilled water pipe penetration sealing
Airport Development
2014 機場主要發展 GAMMON Fire sealing of openings
Airport Development
2014 機場主要發展 GAMMON Gap sealing
Airport Development
2014 機場主要發展 GAMMON Top of wall joint sealing
Airport Development
2015 機場主要發展 GAMMON Blockwork gap sealing
Airport Development
2015 機場主要發展 GAMMON Fire rated board sealing
Airport Development
2015 機場主要發展 GAMMON Fire sealing of openings
Airport Development
2015 機場主要發展 GAMMON Multi service penetration sealing
Airport Development
2015 機場主要發展 GAMMON Top of wall joint sealing
Project Type:Macau - Casino & Hotel
2014 Galaxy Maga Resort銀河渡假村 Hsin Cheong Fire sealing of openings
2014 Galaxy Maga Resort銀河渡假村 Hsin Chong Blockwork gap sealing
2014 Galaxy Maga Resort銀河渡假村 Hsin Chong Top of wall joint sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 10
65 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


Galaxy Mega Resort (Phase 2)
2014 銀河渡假村二期 Hsin Chong Chilled water pipe penetration sealing
Galaxy Mega Resort (Phase 2)
2014 銀河渡假村二期 Hsin Chong Gap sealing
Galaxy Mega Resort (Phase 2)
2014 銀河渡假村二期 Hsin Chong Metal pipe penetration sealing
Galaxy Mega Resort (Phase 2)
2014 銀河渡假村二期 Hsin Chong Top of wall joint sealing
2014 Galaxy Mega Resort (Phase 2)銀河渡假村二期 Hsin Chong Air duct penetration through fire rated board
2014 Galaxy Mega Resort (Phase 2)銀河渡假村二期 Hsin Chong Blockwork gap sealing
2014 Galaxy Mega Resort (Phase 2)銀河渡假村二期 Hsin Chong Top of wall joint sealing
2014 Galaxy Mega Resort (Phase 2)銀河渡假村二期 Sundart Top of wall joint sealing
2014 Galaxy Mega Resort (Phase 2)銀河渡假村二期 永成 Top of wall joint sealing
2014 Galaxy Mega Resort (Phase 2)銀河渡假村二期 深裝 Top of wall joint sealing
Macao Studio City
2014 星麗門 Paul Y & Yau Lee JV Chilled water pipe penetration sealing
Macao Studio City
2014 星麗門 Paul Y & Yau Lee JV Curtain wall / façade gap sealing
Macao Studio City
2014 星麗門 Paul Y & Yau Lee JV Electrical penetration through fire rated board
Macao Studio City
2014 星麗門 Paul Y & Yau Lee JV Gap sealing
Macao Studio City
2014 星麗門 Paul Y & Yau Lee JV Insulated pipe penetration sealing
Macao Studio City
2014 星麗門 Paul Y & Yau Lee JV Metal pipe penetration sealing
Macao Studio City
2014 星麗門 Paul Y & Yau Lee JV Others
Macao Studio City
2014 星麗門 Paul Y & Yau Lee JV Top of wall joint sealing
Macau Fisherman's Wharf (Phase 1&2)
2014 漁人碼頭 Lik Cheong Metal pipe penetration sealing
2014 Macau Studio City Paul Y Top of wall joint sealing
2014 Macau Studio City Paul Y Yau Lee JV Blockwork gap sealing
2014 Macau Studio City YAU LEE - PAUL Y Top of wall joint sealing
MGM Cotai
2014 美高梅(路氹發展) nil Metal pipe penetration sealing
One Oasis
2014 金豐南岸 成龍 Air duct penetration through fire rated board

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 11
66 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Movement / construction joint sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Hsin Chong Air duct penetration through fire rated board
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Hsin Chong Curtain wall / façade gap sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Hsin Chong Door frame sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Hsin Chong Gap sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Hsin Chong Metal pipe penetration sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Hsin Chong Others
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Hsin Chong Pre-cast façade joint
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Hsin Chong Top of wall joint sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Sundart Top of wall joint sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) Unknown Electrical penetration through fire rated board
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) VOL Blockwork gap sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) VOL Door frame sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 12
67 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2014 威尼斯人(五六期) VOL Top of wall joint sealing
Venetian (Parcel 3) - Parisian
2014 威尼斯人(三期) - 巴黎人 Hsin Chong Chilled water pipe penetration sealing
Venetian (Parcel 3) - Parisian
2014 威尼斯人(三期) - 巴黎人 Hsin Chong Curtain wall / façade gap sealing
Venetian (Parcel 3) - Parisian
2014 威尼斯人(三期) - 巴黎人 Hsin Chong Metal pipe penetration sealing
Venetian (Parcel 3) - Parisian
2014 威尼斯人(三期) - 巴黎人 Hsin Chong Pre-cast façade joint
Venetian (Parcel 3) - Parisian
2014 威尼斯人(三期) - 巴黎人 Hsin Chong Top of wall joint sealing
Windsor Arch
2014 名門世家 Great Harvest Metal pipe penetration sealing
Windsor Arch
2014 名門世家 Great Harvest Pre-cast façade joint
Wynn Palace
2014 永利皇宮 Leighton Cable tray penetration sealing
Wynn Palace
2014 永利皇宮 Leighton Metal pipe penetration sealing
Wynn Palace
2014 永利皇宮 Leighton Top of wall joint sealing
City of Dreams Hotel Tower D
2015 新濠天地酒店大樓D Dragages Curtain wall / façade gap sealing
Galaxy Mega Resort (Phase 2)
2015 銀河渡假村二期 Hsin Chong Chilled water pipe penetration sealing
Galaxy Mega Resort (Phase 2)
2015 銀河渡假村二期 Hsin Chong Gap sealing
Galaxy Mega Resort (Phase 2)
2015 銀河渡假村二期 Hsin Chong Metal pipe penetration sealing
Galaxy Mega Resort (Phase 2)
2015 銀河渡假村二期 Hsin Chong Others
Galaxy Mega Resort (Phase 2)
2015 銀河渡假村二期 Hsin Chong Top of wall joint sealing
Louis XIII Hotel Development
2015 路易十三酒店發展 Paul Y Metal pipe penetration sealing
Louis XIII Hotel Development
2015 路易十三酒店發展 Paul Y Top of wall joint sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 13
68 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


Macao Studio City
2015 星麗門 Paul Y & Yau Lee JV Blockwork gap sealing
Macao Studio City
2015 星麗門 Paul Y & Yau Lee JV Chilled water pipe penetration sealing
Macao Studio City
2015 星麗門 Paul Y & Yau Lee JV Curtain wall / façade gap sealing
Macao Studio City
2015 星麗門 Paul Y & Yau Lee JV Electrical penetration through fire rated board
Macao Studio City
2015 星麗門 Paul Y & Yau Lee JV Gap sealing
Macao Studio City
2015 星麗門 Paul Y & Yau Lee JV Metal pipe penetration sealing
Macao Studio City
2015 星麗門 Paul Y & Yau Lee JV Top of wall joint sealing
MGM Cotai
2015 美高梅(路氹發展) China State Blockwork gap sealing
MGM Cotai
2015 美高梅(路氹發展) China State Metal pipe penetration sealing
MGM Cotai
2015 美高梅(路氹發展) China State Others
One Oasis
2015 金豐南岸 Omas Door frame sealing
One Oasis
2015 金豐南岸 Omas Top of wall joint sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2015 威尼斯人(五六期) Hsin Chong Blockwork gap sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2015 威尼斯人(五六期) Hsin Chong Curtain wall / façade gap sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2015 威尼斯人(五六期) Hsin Chong Gap sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2015 威尼斯人(五六期) Hsin Chong Metal pipe penetration sealing
Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2015 威尼斯人(五六期) Hsin Chong Others

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 14
69 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


Shangri-la and Traders Hotels
Sheraton and St. Regis Hotels (Parcel 5&6)
2015 威尼斯人(五六期) Hsin Chong Top of wall joint sealing
SJM Lisboa Palace
2015 澳博路氹城“上葡京” Multiple contractors Others
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Blockwork gap sealing
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Chilled water pipe penetration sealing
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Curtain wall / façade gap sealing
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Electrical penetration through fire rated board
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Fire rated board sealing
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Gap sealing
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Metal pipe penetration sealing
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Others
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Pre-cast façade joint
Venetian (Parcel 3) - Parisian
2015 威尼斯人(三期) - 巴黎人 Hsin Chong Top of wall joint sealing
Windsor Arch
2015 名門世家 Great Harvest Metal pipe penetration sealing
Wynn Palace
2015 永利皇宮 Leighton Blockwork gap sealing
Wynn Palace
2015 永利皇宮 Leighton Cable tray penetration sealing
Wynn Palace
2015 永利皇宮 Leighton Chilled water pipe penetration sealing
Wynn Palace
2015 永利皇宮 Leighton Electric trunking internal sealing
Wynn Palace
2015 永利皇宮 Leighton Gap sealing
Wynn Palace
2015 永利皇宮 Leighton Metal pipe penetration sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 15
70 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


Wynn Palace
2015 永利皇宮 Leighton Others
Wynn Palace
2015 永利皇宮 Leighton Top of wall joint sealing
Project Type:Macau - Housing
Gov. Housing project
2014 政府公屋 Government Air duct penetration through fire rated board
Gov. Housing project
2014 政府公屋 Multiple contractors Metal pipe penetration sealing
Gov. Housing project
2015 政府公屋 Multiple contractors Metal pipe penetration sealing
Project Type:Others
2014 Yuen Long Tai Tong Air duct penetration through fire rated board
2015 66 A, SHK SITE, TONG YIN STR SUN YU CHAU ENG CO. LTD.
Fire sealing of openings
2015 SHK SITE, FAT KWONG ST&CHUNG HAU ST GOOD CHANCE ENG LTDFire sealing of openings
2015 SHK SITE, YING HEI ROAD SHUN TUNG ENG. CO. LTD.
Fire sealing of openings
2015 YOHO TOWN PHASE 3 TINMA ENGINEERING COMPANY
Fire sealing of openings
2015 YOHO TOWN PHASE 3 MAN TUNG AIR-CONDITIONING
Fire sealing
WORKS of openings
LTD
2015 YUEN LONG, YOHO TOWN WINGO ENG CO LTD Fire sealing of openings
Project Type:Railway
MTR - Express Rail Link
2014 港深廣高速鐵路 MTRC Insulated pipe penetration sealing
MTR - Express Rail Link
2014 港深廣高速鐵路 MTRC Top of wall joint sealing
MTR - South Island Line
2014 地鐵南港島線 MTRC Blockwork gap sealing
MTR - South Island Line
2014 地鐵南港島線 MTRC Fire rated board sealing
MTR - South Island Line
2014 地鐵南港島線 MTRC Top of wall joint sealing
MTR - South Island Line
2014 地鐵南港島線 MTRCL Top of wall joint sealing
MTR - West Island Line
2014 地鐵西港島線 MTRC Blockwork gap sealing
MTR - West Island Line
2014 地鐵西港島線 MTRC Chilled water pipe penetration sealing
MTR - West Island Line
2014 地鐵西港島線 MTRC Metal pipe penetration sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 16
71 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP 606

Date Project Name Contractor Application


MTR - West Island Line
2014 地鐵西港島線 MTRC Top of wall joint sealing
MTR - Express Rail Link
2015 港深廣高速鐵路 MTRC Blockwork gap sealing
MTR - Express Rail Link
2015 港深廣高速鐵路 MTRC Fire rated board sealing
MTR - Express Rail Link
2015 港深廣高速鐵路 MTRC Gap sealing
MTR - Express Rail Link
2015 港深廣高速鐵路 MTRC Top of wall joint sealing
MTR - Kwun Tong Line Extension
2015 地鐵觀塘延長線 MTRC Blockwork gap sealing
MTR - Kwun Tong Line Extension
2015 地鐵觀塘延長線 MTRC Fire sealing of openings
MTR - Shatin to Central Link
2015 沙中線 MTRC Blockwork gap sealing
MTR - Shatin to Central Link
2015 沙中線 MTRC Chilled water pipe penetration sealing
MTR - Shatin to Central Link
2015 沙中線 MTRC Door frame sealing
MTR - Shatin to Central Link
2015 沙中線 MTRC Electrical penetration through fire rated board
MTR - Shatin to Central Link
2015 沙中線 MTRC Fire rated board sealing
MTR - Shatin to Central Link
2015 沙中線 MTRC Insulated pipe penetration sealing
MTR - Shatin to Central Link
2015 沙中線 MTRC Metal pipe penetration sealing
MTR - South Island Line
2015 地鐵南港島線 MTRC Blockwork gap sealing
MTR - South Island Line
2015 地鐵南港島線 MTRC Top of wall joint sealing
MTR - West Island Line
2015 地鐵西港島線 MTRC Blockwork gap sealing
MTR - West Island Line
2015 地鐵西港島線 MTRC Fire rated board sealing
MTR - West Island Line
2015 地鐵西港島線 MTRC Metal pipe penetration sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
Hotline: 8228 8118 17
72 Jul 2019
Job / Application Reference
Product Name: FS joint filler CP606

Date Project Name Contractor Application

2016 FAT KWONG ST, GATE 2 NISHIMATSU CONSTRUCTION CO LTD Top of wall joint sealing

2016 TSEUNG KWAN O,CHUN WANG STREET CR CONSTRUCTION COMPANY LIMITED Top of wall joint sealing

2016 KWAI CHUNG, SHEK ON HOUSE GOLDFIELD N & W CONSTRUCTION Top of wall joint sealing

2016 LOK FU, THE HK BUDDHIST HOSPITAL DOUBLE GAIN ENGINEERING LIMITED Top of wall joint sealing

2016 WING CHEONG ESTATE PAUL Y. GENERAL CONTRACTORS LIMITED Top of wall joint sealing

2016 SCIENCE PARK PHASE 3C (CJ) GAMMON CONSTRUCTION LIMITED Top of wall joint sealing

2016 109-135 KADOORIE ROAD GAMMON CONSTRUCTION LIMITED Top of wall joint sealing

2016 WO CHE ESATE, SHATIN YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

2016 SHEK YAM EST EAST YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

2016 TAI PO, SCIENCE PARK PHASE 3 (CJ) GAMMON CONSTRUCTION LIMITED Top of wall joint sealing

2016 WAN CHAI, 531 JAFFE ROAD CHUN WO BUILDING CONSTRUCTION LTD Top of wall joint sealing

2016 SHATIN, AREA 52, PHASE 3 & 4 CHINA STATE CONSTRUCTION Top of wall joint sealing

2016 41 HEUNG YIP ROAD GREAT HARVEST CONSTRUCTION Top of wall joint sealing

2016 ON LOK RD (NEAR LONG PING MTRC) GREAT HARVEST CONSTRUCTION Top of wall joint sealing

2016 160 PO KONG VILLAGE ROAD VINCI CONSTRUCTION GRANDS PROJETS Top of wall joint sealing

2016 601-603 TAI NAN WEST STREET CHUN WO BUILDING CONSTRUCTION LTD Top of wall joint sealing

2016 SHATIN AREA 52, PHASE 2 CHINA STATE CONSTRUCTION Top of wall joint sealing

2016 HK-ZHU HAI-MACAU BRIDGE MILESTONE BUILDER ENGINEERING Top of wall joint sealing

2017 TUEN MUN,18 TIN HAU ROAD OCEAN SHARE LTD Top of wall joint sealing

2017 18-24 SALISBURY ROAD NEW WORLD CONSTRUCTION CO LTD Top of wall joint sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
1
73
Hotline: 8228 8118
Jul 2019
Job / Application Reference
Product Name: FS joint filler CP606

Date Project Name Contractor Application

2017 22 COTTON TREE DRIVE GAMMON ENGINEERING & CONSTRUCTION Top of wall joint sealing

2017 HARCOURT ROAD INTEGRAL E&M ENGINEERING LIMITED Top of wall joint sealing

2017 KING FUK ST SHUI ON BUILDING Top of wall joint sealing

2017 84-92 CHAI WAN KOK STREET FORTUNE (HK) ENG & MATERIALS LTD Top of wall joint sealing

2017 NO. 9 SHEUNG YUET ROAD YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

2017 KAI TAK 3A INTEGRAL E&M ENGINEERING LIMITED Top of wall joint sealing

2017 ON NING ROAD GREAT HARVEST CONSTRUCTION Top of wall joint sealing

2017 SHATIN, SHA KOK ESTATE YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

2017 MUK ON STREET YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

2017 12105 CLEAR WATER BAY ROAD NEW WORLD CONSTRUCTION CO LTD Top of wall joint sealing

2017 15 CORNWALL STREET BUILD KING CONSTRUCTION LIMITED Top of wall joint sealing

2017 98 TAI HO ROAD MAN KIT CONSTRUCTION CO LTD Top of wall joint sealing

2017 8 CONNAUGHT PLACE ALPHA BUILDING CONSTRUCTION Top of wall joint sealing

2017 NAM CHEONG STATION (CJ) SANFIELD (MANAGEMENT) LIMITED Top of wall joint sealing

2017 7-9 TSAT PO ST LINKING D & D CO. LTD. Top of wall joint sealing

2017 11 HOI SHING ROAD HONOR CREATION ENGINEERING LTD Top of wall joint sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
2
74
Hotline: 8228 8118
Jul 2019
Job / Application Reference
Product Name: FS joint filler CP606

Date Project Name Contractor Application

2018
9 HILLWOOD RD, WILLIAM INTERNATIONAL CONSTRUCTION Top of wall joint sealing

2018
SHEUNG TAK ESTATE CONWAY ENGINEERING (HONG KONG) Top of wall joint sealing

2018
HK INTERNATIONAL AIRPORT T1 PALGO COMPANY LIMITED Top of wall joint sealing

2018
KAM TIN WAREHOUSE RINGTONE LIMITED Top of wall joint sealing

2018
22/F CATIC PLAZA OCEAN SHARE LTD Top of wall joint sealing

2018
TSENG CHOI STREET BLOOM TEAM BUILDING CONSTRUCTION Top of wall joint sealing

2018
1-11 TUNG ON STREET MANIFUL MATERIAL SUPPLIER LIMITED Top of wall joint sealing

2018
SAI LAU KOK ROAD P & T CONSTRUCTION AND Top of wall joint sealing

2018
12 NG FONG STREET LEE KEI MACHINERY Top of wall joint sealing

2018
20 SALISBURY RD KIN LUEN CONSTRUCTION Top of wall joint sealing

2018
22/F CATIC PLAZA OCEAN SHARE LTD Top of wall joint sealing

2018
2 CHUN YAT STREET GAMMON ENGINEERING & CONSTRUCTION Top of wall joint sealing

2018
NEAR KWUN TONG POLICE STATION YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

2018
45 CLEAR WATER BAY RD RINGTONE LIMITED Top of wall joint sealing

2019
CHUK YUEN SOUTH ESTATE RINGTONE LIMITED Top of wall joint sealing

2019
TW5,TSUEN WAN WEST RAILWAY CHUNG HING (INTERNATIONAL) E&C LTD Top of wall joint sealing

2019
NEAR KWUN TONG POLICE STATION YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

2019
LEI TUNG ESTATE RINGTONE LIMITED Top of wall joint sealing

2019
FAN KAM ROAD W. M. CONSTRUCTION LIMITED Top of wall joint sealing

2019
NEAR KWUN TONG POLICE STATION YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
3
75
Hotline: 8228 8118
Jul 2019
Job / Application Reference
Product Name: FS joint filler CP606

Date Project Name Contractor Application

2019
9-11 AND 15 SAI WAN HO STREET PAUL Y. BUILDERS LIMITED Top of wall joint sealing

2019
3-27 CANTON RD RAY ON CONSTRUCTION CO LTD Top of wall joint sealing

2019
NEAR KWUN TONG POLICE STATION YAU LEE CONSTRUCTION CO LTD Top of wall joint sealing

2019
PRINCE OF WALES HOSPITAL ADRIAN CONSTRUCTION LTD Top of wall joint sealing

2019
1-11 TUNG ON STREET MANIFUL MATERIAL SUPPLIER LIMITED Top of wall joint sealing

2019
AUSTIN ROAD WEST CHAMPION TIME ENGINEERING LIMITED Top of wall joint sealing

2019
KWAI YUE ST CHUN WO CONSTRUCTION AND Top of wall joint sealing

2019
AUSTIN ROAD WEST GAMMON CONSTRUCTION LIMITED Top of wall joint sealing

2019
61 VICTORIA ROAD, MOUNT DAVIS PAUL Y. BUILDERS LIMITED Top of wall joint sealing

2019
TAI WAI MTR STATION WAH SING CONSTRUCTION ENG. LIMITED Top of wall joint sealing

2019
277-291 KING'S RD , WOO HING CO Top of wall joint sealing

2019
2 DISCOVERY BAY ROAD WAH FAI CONSTRUCTION AND Top of wall joint sealing

701-704 Tower A, Manulife Fiancial Centre, 223 Wai Yip Street, Kwun Tong, Kwoloon , Hong Kong
4
76
Hotline: 8228 8118
Jul 2019

Potrebbero piacerti anche