Sei sulla pagina 1di 4

c 

   
  

1st Oct 2010 1.Ê Orientation by HR person and was introduced to NPD team
members.
Friday 2.Ê Yee Shiang, my colleague was introduced me to charge plate
produce department and guided me to select data of the charge
plate.
3.Ê Study on why cleanroom through powerpoint slides.

4th Oct 2010 1.Ê Meeting with supervisor and job assigned is study on corona
charged/discharged.
Monday 2.Ê Microphone studies through powerpoint slides.
3.Ê Searching about corona charge through internet.
5th Oct 2010 1.Ê Learned to use the microscope camera with David guidance.
2.Ê Take the dimension of the laser making on microphone.
Tuesday 3.Ê Li Wei assigned me to investigate on the new designed
diaphragm tray.
6th Oct 2010 1.Ê Continue with the investigation of diaphragm tray.
2.Ê Received the login ID and read through the rules of using the
Wednesday computer and internet while waiting the result of investigation.
3.Ê Write the full report of the investigation.

7th Oct 2010 1.Ê New testing on the flipping tools assigned by Li Wei.
2.Ê Help May Thing to update Reliability Test logsheet and create
Thursday ORT logsheet
3.Ê Run the second time Mechanical Shock test (MS) for EM and
BTO microphones
8th Oct 2010 1.Ê Continue with MS test for EM, XTM, TMS, EK, EM and TM
model
Friday 2.Ê RFI testing for EM, BEM and TM model
3.Ê Data compilation for RFI
4.Ê FCAMT test after the MS test


c  
   
  

11th Oct 2010 1.Ê Noise testing for those I have done the Mechanical Shock test
microphones
Monday 2.Ê Data compilation
3.Ê Run Mechanical Shock test for TO model
4.Ê Noise testing for TM and BTM model with operator guidance
because of fixture problem.

12th Oct 2010 1.Ê Data compilation for the noise testing data
2.Ê RFI for FG, FG38 and TO model
Tuesday 3.Ê Data compilation
4.Ê Check the simen inside the microphone whether is broken or
any problem

13th Oct 2010 1.Ê Mechanical Shock test on EM and BTO microphones for the
3rd time and proceed with FCAMT test
Wednesday 2.Ê Data compilation
3.Ê Shaker test for Control and Eval microphones

14th Oct 2010 1.Ê Continue with Shaker Test


2.Ê Data compilation
Thursday 3.Ê RFI for TO38 model

15th Oct 2010 1.Ê Continue RFI on FG38 microphone model


2.Ê Noise testing for previous model microphones that I have done
Friday for Mechanical Shock Test
c  
   
  

18th Oct 2010 1.Ê Data compilation for the third time Mechanical Shock test data
2.Ê Prepare template on Mechanical Shock test, Vibration
Monday Sensitivity and IEC
3.Ê Zap test and FCAMT on EM and FG microphones

19th Oct 2010 1.Ê Continue with Zap test and FCAMT

Tuesday

20th Oct 2010 1.Ê Continue with Zap test and FCAMT
2.Ê Data compilation
Wednesday 3.Ê RFI for TO38 model

21th Oct 2010 1.Ê Data compilation for 3rd Mechanical Shock test data
2.Ê Zap test and FCAMT for EM model
Thursday
22th Oct 2010 *Annual leave*

Friday
c 
   
  

18th Oct 2010 1.Ê Continue Zap test and FCAMT


2.Ê Data compilation
Monday 3.Ê PY from FA department teach about microphone structure and
microphone hybrid
4.Ê Run Humidity Noise Test on EM hybrid
19th Oct 2010 *Medical Leave*

Tuesday
20th Oct 2010 1.Ê Rerun Humidity Noise Test on EM hybrid using old fixture
and new fixture
Wednesday

21th Oct 2010 1.Ê Continue HNT on EM hybrid after soaking for 16 hours
2.Ê Run GR&R test
Thursday
22th Oct 2010

Friday

Potrebbero piacerti anche