Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Reference Drawings/Specification :
Rev.
Report No./
Results Verified by :
Result
SN INSPECTION / CHECK POINT Remarks
(OK/RJ/NA) DATE OE SE OE QCI K&A
Prior to Placing
4 Cleanliness
Each course check for alignment, verticality, wall ties and expanded metal lath
9
installed (Every 2 layers)
14 HSE Clearance
Legend: Accepted (OK) Rejected with Remarks (RJ) Not Applicable (NA)
Name
Signature
Date