BLOCK WORKS CHECKLIST

General Takaful C-ring Road Office Building 4B+G+2


General Real Estate Company (SPC)

Form No. C270-QCF-C-C-05 Sheet Temperature: Weather

Rev. 0 AM Fair Sunny


Date: Time
RFI No. PM Windy Dusty
Description of the Activity / Item

Discipline : Architectural Others:

Reference Drawings/Specification :
Rev.

Report No./
Results Verified by :
Result
SN INSPECTION / CHECK POINT Remarks
(OK/RJ/NA) DATE OE SE OE QCI K&A

Prior to Placing

1 Documents previously approved by Consultant

2 All materials are complying with the project specification

3 Recquired test are conducted to specified frequency

4 Cleanliness

5 Layout prepared considering all the joints and openings

6 Damp Proofing, Insulation, reinforcement, accessories are in place

7 Mortar mix as specified

8 Blocks wet before placing

Each course check for alignment, verticality, wall ties and expanded metal lath
9
installed (Every 2 layers)

10 MEP works completed and clearance obtained

11 All joints properly filled and pointed/flush as specified

12 Number of courses as specified (7 layers for 1 day)

13 Wall anchorage checked (If any)

14 HSE Clearance

Legend: Accepted (OK) Rejected with Remarks (RJ) Not Applicable (NA)

Comments from Consultants (K&A)

Signatories SITE ENGINEER OE QCI KHATIB & ALAMI

Name

Signature

Date